SlideShare uma empresa Scribd logo
1 de 3
Test pits.  These should show the exact locations of the various materials and the presence and locations of cobbles and boulders. Mechanical analyses and percolation tests should be made for foundation and abutment materials to determine their adequacy or the necessity for their removal.<br /> Preliminary test, consisting of mechanical analysis, percolation, and density at standard compaction, should be run on all available borrow pit materials to determine their suitability and to permit intelligent selection of the most desirable material from the various short-haul areas.<br />The investigations on important dams should include an examination by a competent geologist whose interpretations of the testing result and collaboration in deciding on the adequacy of the foundation are essential.<br />FOUNDATION<br />The adequacy of the foundation materials to provide against shearing, settlement, and excessive percolation which may cause piping at the downstream toe, is of first importance. the weak points in earth-dam construction are generally found in the foundation and at the contacts of the natural ground surface an the placed embankment many of former difficulties with the construction of the embankment proper have been removed by proper laboratory analysis of the embankment material and by improved methods of compaction and moisture control. preliminary testing give some idea of the amount of undesirable material to strip from the foundation area; but this operation should be carefully watched during construction to assure the removal of all material containing vegetable matter and of all material that will be rendered unstable by saturation. Test pits for further explorations should be put down during construction if any doubt exists about the presence of unstable or otherwise unsuitable material.<br />the  character of materials in the foundation will dictate the design for the foundation cut-offs. A concrete diaphragm extending from to the crest of the dam is not recommended. Where bedrock is present, concrete walls, bonded 2 to 3 feet into rock and projecting 5 to 10 feet into the fill, will suffice. The number of walls thus constructed, will vary from one to three, depending on geologic conditions and the maximum depth of the water. Where bedrock is not within economical reach, open cut-off trenches should be used. These will vary in bottom width and depth, depending on the reservoir water depth and porosity of the material. Ordinarily, trenches about onethird of the water depth are adequate in most of the western river bed alluviums. Where earth dams are founded on bedrock with comparatively thin layers of the gravel overlying, at least three-fourths of the area should be stripped to bedrock to prevent a concentrated flow of the seepage water at high velocity through the gravel. Such dams should have.<br />a considerable length of impervious material bonded carefully to clean bedrock.<br />Dams founded on rather porous and deep alluvium should have a central clay core brought the dam from the cut-off trench ; also a long percolation distance through the base with an adequate rock-fill blanket extending downstream from the toe of the earth-fill section. Where cut-off trenches are in sand and gravel, with voids filled with fine sand and silt, it is generally preferable not to unwater the trench but to puddle a good grave of watertight clay back into the trench. Unwatering tends to wash out all the fines and render the foundation more porous.<br />Presence of river silt, sandy clay, or fine sand demands careful consideration in foundation design. Such materials should ordinarily stripped to gravel. This is generally expensive and may greatly affect the economic feasibility of the dam.This item very often is grossly underestimated in preparing the preliminary estimates. a decision to leave such material in place can only be made after careful settlement, consolidation, tests have been conducted. If it is feasible entirely  to drain the foundation  material before and during the placement of embankment, about 60 percent of the final settlement can be attained by the time the embankment has been raised to a height of about 20 feet. Special attention. must be given to the abutment contact and the existing overburden and the composition of the underlying rock should be carefully studied. Porous and unstable material must be removed, sometimes to considerable depth. When the cut-off trenches can be extended to rock, a concrete cut-off should be constructed, bonded into sound bedrock and the bedrock grouted along the line of the cut-off to form a continuous grout curtain. The depth of grout holes will depend upon the nature of the bedrock formation and the head of water to be brought against the abutment.<br />Abutments in earth material, such as cut banks, should be sloped not steeper than 1 1/2: 1, in order that effective bonding may be accomplished by the roller. All rock overhangs must be removed and the resultants slope brought to 1/4:1 if feasible. Seepage along rock abutments can be prevented by one or more well-founded concrete cut-off walls. Dowel bars of large diameter well bonded into the rock are often used to tie the wall to the abutment rock.<br />DESIGN<br />Under the latest methods of testing and earth placing control, a fair prediction can be made of the saturation slope through the embankment. Checks on the assumptions may be made by the electrical analogy and model test methods. The saturation slope should be designed so as to fall within the downstream toe with only a moderate amount of seepage.<br />Hydrostatic pressure cells are now being installed in all bureau of reclamation earth dams to indicate any approaching<br />dangerous conditions as the reservoir is filled and emptied during the first few years of operation. A record is being kept of the pressure head at some 60 to 80 points in each  dam. This will eventually lead to very valuable information on the design and construction of earth dams.<br />the embankment material should be designed and placed so as to prevent water reaching the downstream  end under any remaining pressure or in dangerous quantity.<br />Adequate cut-offs should be provided to prevent water from passing through the foundation material with sufficient velocity to move fine particles of foundations at the downstream toe. In the absence of bedrock, a long percolation distance from the upstream to the downstream toe must be provided. In some cases where a sand and gravel foundation exists this distance has been taken as 10 to 12 times the depth of water in the reservoir.<br />The existence of fine material of low shear value along  <br />the downstream toe often  present difficult problem in dam design. This material should be removed to a solid foundation and deep drains provided downstream from the toe.<br />The designed slopes of the dam many vary widely, depending on the embankment materials available. It is imperative that the designer have the results of all laboratory tests on embankment materials and that he satisfy himself that all borrow pits within economical hauling distance have been thoroughly investigated to determine the nature of each material and the available quantities from each pit.<br />The upstream slope is designed with sufficient shear value to withstand the pressure exerted by the hydrostatic head in the dam as the water in the reservoir is drawn down. The rate of draw-down, therefore, has much to do with the safe design of upstream slopes.<br />Where only fine materials of low shear values is available,<br />it is necessary to construct a very flat upstream slope. If a free-draining material, such as sand and gravel, is available to hold dows the fine material, a great saving in cost can be made. This may also be accomplished where an excess of rock exists in required excavation. However, in this case a filter of sand and gravel, or fines from the rock quarry, is essential between the fine and coarse material to prevent washing out the fines by saturation and wave action. Upstream slopes may vary from 2 1/2: 1 to as flat as 8:1 depending on available materials. The percolation or creep distance may be greatly increased by designing a flat upstream toe blanket on slopes of 8:1 or 6:1. These slopes will require no rock riprap near the bottom of the reservoir. Thus the longer percolation distance can be obtained with a large saving in the cost of riprap or concrete facing.<br />The material to be used for paving on the upstream slope is again dependent on the materials available. Where rock can be obtained from required excavation, quarries, or cobble pits, a facing of dumped rock of about 3 feet for large dams and 2 feet for small dams is the most economical. A concrete facing is expensive and is generally used only where dumped riprap is not feasible.  A long haul on rock can generally be justified in lieu of concrete.<br />The downstream slope of the dam will depend to some extent on the percolation distance; but is generally established within closer limits than the upstream slope. If rock to be used both for erosion protection and weight, the outer rock slope is generally designed as 2:1 or 2 1/2 :1; and the underlying earth slope, not steeper than 1 1/2:1. A rock blanket downstream from the earth section may be constructed on slopes of 4:1 to 8:1, to extend the percolation distance. These designed percolation distance should fall within the limits of the blanket.<br />the crest widths of small earth dams depend on the steepness of the outer slopes and the desired distance through the embankment at the maximum water surface in the reservoir. The widht may vary from 15 feet for small dams to 35 feet for largo dams. The width should take into consideration the amount of freeboard and the construction details requiered in securing the freeboard. It has been found economical to secure 3 feet of freeboard by the use of a concrete parapet wall for all dams over 20 feet high ( see fig. 1). In the case of a dam having a 3:1 upstream slope and a 2:1 downstream slope, the parapet would account for 15 feet of width if the crest were not increased to take care of this detail. the criterion should therefore be the desired distance through the dam on the water line rather than the elevation where the earth crest is terminated. The freeboard distance varies from 5 feet on small dams to 11 feet on the high dam. each case, however, deserves special attention taking into consideration the fetch length of the reservoir, height of the dam, and the climatic conditions.<br />toe drains are of no value in earth dams founded on rock;<br />
Dams and control works
Dams and control works

Mais conteúdo relacionado

Mais procurados

Control Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTSControl Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTS
comsats
 
LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELS
ANURAG YADAV
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
Anshuman Tyagi
 
Dewatering process and control in building projects
Dewatering process and control in building projectsDewatering process and control in building projects
Dewatering process and control in building projects
Umar Faruk
 
Civil Engineering-Dewatering
Civil Engineering-DewateringCivil Engineering-Dewatering
Civil Engineering-Dewatering
Moe Abadla
 

Mais procurados (20)

Control Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTSControl Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTS
 
Check dams
Check damsCheck dams
Check dams
 
MODULE 5 EG.pdf
MODULE 5 EG.pdfMODULE 5 EG.pdf
MODULE 5 EG.pdf
 
LINING OF CHANNELS
LINING OF CHANNELSLINING OF CHANNELS
LINING OF CHANNELS
 
Dam engineering i 2
Dam engineering i 2Dam engineering i 2
Dam engineering i 2
 
Earthen Dam
Earthen DamEarthen Dam
Earthen Dam
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
seepage through earthen dam
seepage through earthen damseepage through earthen dam
seepage through earthen dam
 
Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
 
Canal lining
Canal liningCanal lining
Canal lining
 
Latest technology used for underwater lining of canal
Latest technology used for underwater lining of canalLatest technology used for underwater lining of canal
Latest technology used for underwater lining of canal
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Dewatering process and control in building projects
Dewatering process and control in building projectsDewatering process and control in building projects
Dewatering process and control in building projects
 
OK
OKOK
OK
 
Geotechnical engineering 2
Geotechnical engineering   2Geotechnical engineering   2
Geotechnical engineering 2
 
Civil Engineering-Dewatering
Civil Engineering-DewateringCivil Engineering-Dewatering
Civil Engineering-Dewatering
 
Seepage analyisis in earthen dam by flow net method
Seepage analyisis in earthen dam by flow net methodSeepage analyisis in earthen dam by flow net method
Seepage analyisis in earthen dam by flow net method
 
Ceng chapter 1
Ceng chapter 1Ceng chapter 1
Ceng chapter 1
 
Pradipta Banik- Buet 1204012- thesis presentation
Pradipta Banik- Buet 1204012- thesis presentationPradipta Banik- Buet 1204012- thesis presentation
Pradipta Banik- Buet 1204012- thesis presentation
 

Semelhante a Dams and control works

Semelhante a Dams and control works (20)

Design consideration Of Earth Dams
Design consideration Of Earth DamsDesign consideration Of Earth Dams
Design consideration Of Earth Dams
 
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
ENVIRONMENTAL POLLUTION CONTROL METHOD ADOPTED BY NTPC LTD. IN ASH DYKE (STAR...
 
Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
Dams
DamsDams
Dams
 
Dams
DamsDams
Dams
 
Break waters
Break watersBreak waters
Break waters
 
Lecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptxLecture-6 Earthdams.pptx
Lecture-6 Earthdams.pptx
 
Dam engineering i 5
Dam engineering i 5Dam engineering i 5
Dam engineering i 5
 
2 tunnels
2 tunnels2 tunnels
2 tunnels
 
3873
38733873
3873
 
project on dam and dam safety with application of geophysics
project on dam and dam safety with application of geophysicsproject on dam and dam safety with application of geophysics
project on dam and dam safety with application of geophysics
 
Factors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis methodFactors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis method
 
Well completion.
Well completion.Well completion.
Well completion.
 
What is an embankment and why is it important in road.pdf
What is an embankment and why is it important in road.pdfWhat is an embankment and why is it important in road.pdf
What is an embankment and why is it important in road.pdf
 
GeoManitobaPaper373
GeoManitobaPaper373GeoManitobaPaper373
GeoManitobaPaper373
 
EARTHERN DAM
EARTHERN DAMEARTHERN DAM
EARTHERN DAM
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainage
 
Grouting n gunintung
Grouting n gunintungGrouting n gunintung
Grouting n gunintung
 
pile wall
pile wallpile wall
pile wall
 
Dewatering
DewateringDewatering
Dewatering
 

Último

Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
Probe Gold
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Sheetaleventcompany
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Best investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice DiscountingBest investment platform in india-Falcon Invoice Discounting
Best investment platform in india-Falcon Invoice Discounting
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...Dattawadi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready Fo...
Dattawadi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready Fo...
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Junagadh 7001035870 Whatsapp Number, 24/07 Booking
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
VVIP Pune Call Girls Handewadi WhatSapp Number 8005736733 With Elite Staff An...
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 

Dams and control works

  • 1. Test pits. These should show the exact locations of the various materials and the presence and locations of cobbles and boulders. Mechanical analyses and percolation tests should be made for foundation and abutment materials to determine their adequacy or the necessity for their removal.<br /> Preliminary test, consisting of mechanical analysis, percolation, and density at standard compaction, should be run on all available borrow pit materials to determine their suitability and to permit intelligent selection of the most desirable material from the various short-haul areas.<br />The investigations on important dams should include an examination by a competent geologist whose interpretations of the testing result and collaboration in deciding on the adequacy of the foundation are essential.<br />FOUNDATION<br />The adequacy of the foundation materials to provide against shearing, settlement, and excessive percolation which may cause piping at the downstream toe, is of first importance. the weak points in earth-dam construction are generally found in the foundation and at the contacts of the natural ground surface an the placed embankment many of former difficulties with the construction of the embankment proper have been removed by proper laboratory analysis of the embankment material and by improved methods of compaction and moisture control. preliminary testing give some idea of the amount of undesirable material to strip from the foundation area; but this operation should be carefully watched during construction to assure the removal of all material containing vegetable matter and of all material that will be rendered unstable by saturation. Test pits for further explorations should be put down during construction if any doubt exists about the presence of unstable or otherwise unsuitable material.<br />the character of materials in the foundation will dictate the design for the foundation cut-offs. A concrete diaphragm extending from to the crest of the dam is not recommended. Where bedrock is present, concrete walls, bonded 2 to 3 feet into rock and projecting 5 to 10 feet into the fill, will suffice. The number of walls thus constructed, will vary from one to three, depending on geologic conditions and the maximum depth of the water. Where bedrock is not within economical reach, open cut-off trenches should be used. These will vary in bottom width and depth, depending on the reservoir water depth and porosity of the material. Ordinarily, trenches about onethird of the water depth are adequate in most of the western river bed alluviums. Where earth dams are founded on bedrock with comparatively thin layers of the gravel overlying, at least three-fourths of the area should be stripped to bedrock to prevent a concentrated flow of the seepage water at high velocity through the gravel. Such dams should have.<br />a considerable length of impervious material bonded carefully to clean bedrock.<br />Dams founded on rather porous and deep alluvium should have a central clay core brought the dam from the cut-off trench ; also a long percolation distance through the base with an adequate rock-fill blanket extending downstream from the toe of the earth-fill section. Where cut-off trenches are in sand and gravel, with voids filled with fine sand and silt, it is generally preferable not to unwater the trench but to puddle a good grave of watertight clay back into the trench. Unwatering tends to wash out all the fines and render the foundation more porous.<br />Presence of river silt, sandy clay, or fine sand demands careful consideration in foundation design. Such materials should ordinarily stripped to gravel. This is generally expensive and may greatly affect the economic feasibility of the dam.This item very often is grossly underestimated in preparing the preliminary estimates. a decision to leave such material in place can only be made after careful settlement, consolidation, tests have been conducted. If it is feasible entirely to drain the foundation material before and during the placement of embankment, about 60 percent of the final settlement can be attained by the time the embankment has been raised to a height of about 20 feet. Special attention. must be given to the abutment contact and the existing overburden and the composition of the underlying rock should be carefully studied. Porous and unstable material must be removed, sometimes to considerable depth. When the cut-off trenches can be extended to rock, a concrete cut-off should be constructed, bonded into sound bedrock and the bedrock grouted along the line of the cut-off to form a continuous grout curtain. The depth of grout holes will depend upon the nature of the bedrock formation and the head of water to be brought against the abutment.<br />Abutments in earth material, such as cut banks, should be sloped not steeper than 1 1/2: 1, in order that effective bonding may be accomplished by the roller. All rock overhangs must be removed and the resultants slope brought to 1/4:1 if feasible. Seepage along rock abutments can be prevented by one or more well-founded concrete cut-off walls. Dowel bars of large diameter well bonded into the rock are often used to tie the wall to the abutment rock.<br />DESIGN<br />Under the latest methods of testing and earth placing control, a fair prediction can be made of the saturation slope through the embankment. Checks on the assumptions may be made by the electrical analogy and model test methods. The saturation slope should be designed so as to fall within the downstream toe with only a moderate amount of seepage.<br />Hydrostatic pressure cells are now being installed in all bureau of reclamation earth dams to indicate any approaching<br />dangerous conditions as the reservoir is filled and emptied during the first few years of operation. A record is being kept of the pressure head at some 60 to 80 points in each dam. This will eventually lead to very valuable information on the design and construction of earth dams.<br />the embankment material should be designed and placed so as to prevent water reaching the downstream end under any remaining pressure or in dangerous quantity.<br />Adequate cut-offs should be provided to prevent water from passing through the foundation material with sufficient velocity to move fine particles of foundations at the downstream toe. In the absence of bedrock, a long percolation distance from the upstream to the downstream toe must be provided. In some cases where a sand and gravel foundation exists this distance has been taken as 10 to 12 times the depth of water in the reservoir.<br />The existence of fine material of low shear value along <br />the downstream toe often present difficult problem in dam design. This material should be removed to a solid foundation and deep drains provided downstream from the toe.<br />The designed slopes of the dam many vary widely, depending on the embankment materials available. It is imperative that the designer have the results of all laboratory tests on embankment materials and that he satisfy himself that all borrow pits within economical hauling distance have been thoroughly investigated to determine the nature of each material and the available quantities from each pit.<br />The upstream slope is designed with sufficient shear value to withstand the pressure exerted by the hydrostatic head in the dam as the water in the reservoir is drawn down. The rate of draw-down, therefore, has much to do with the safe design of upstream slopes.<br />Where only fine materials of low shear values is available,<br />it is necessary to construct a very flat upstream slope. If a free-draining material, such as sand and gravel, is available to hold dows the fine material, a great saving in cost can be made. This may also be accomplished where an excess of rock exists in required excavation. However, in this case a filter of sand and gravel, or fines from the rock quarry, is essential between the fine and coarse material to prevent washing out the fines by saturation and wave action. Upstream slopes may vary from 2 1/2: 1 to as flat as 8:1 depending on available materials. The percolation or creep distance may be greatly increased by designing a flat upstream toe blanket on slopes of 8:1 or 6:1. These slopes will require no rock riprap near the bottom of the reservoir. Thus the longer percolation distance can be obtained with a large saving in the cost of riprap or concrete facing.<br />The material to be used for paving on the upstream slope is again dependent on the materials available. Where rock can be obtained from required excavation, quarries, or cobble pits, a facing of dumped rock of about 3 feet for large dams and 2 feet for small dams is the most economical. A concrete facing is expensive and is generally used only where dumped riprap is not feasible. A long haul on rock can generally be justified in lieu of concrete.<br />The downstream slope of the dam will depend to some extent on the percolation distance; but is generally established within closer limits than the upstream slope. If rock to be used both for erosion protection and weight, the outer rock slope is generally designed as 2:1 or 2 1/2 :1; and the underlying earth slope, not steeper than 1 1/2:1. A rock blanket downstream from the earth section may be constructed on slopes of 4:1 to 8:1, to extend the percolation distance. These designed percolation distance should fall within the limits of the blanket.<br />the crest widths of small earth dams depend on the steepness of the outer slopes and the desired distance through the embankment at the maximum water surface in the reservoir. The widht may vary from 15 feet for small dams to 35 feet for largo dams. The width should take into consideration the amount of freeboard and the construction details requiered in securing the freeboard. It has been found economical to secure 3 feet of freeboard by the use of a concrete parapet wall for all dams over 20 feet high ( see fig. 1). In the case of a dam having a 3:1 upstream slope and a 2:1 downstream slope, the parapet would account for 15 feet of width if the crest were not increased to take care of this detail. the criterion should therefore be the desired distance through the dam on the water line rather than the elevation where the earth crest is terminated. The freeboard distance varies from 5 feet on small dams to 11 feet on the high dam. each case, however, deserves special attention taking into consideration the fetch length of the reservoir, height of the dam, and the climatic conditions.<br />toe drains are of no value in earth dams founded on rock;<br />