Contents:
 Substation
 Conventional substations (AIS)
 Limitations of AIS
 The need for GIS
 Introduction to GIS
 Properties of SF6
 GIS assembly
 Advantages of GIS
 Design features
 Drawbacks
 SF6 – Environmental concerns
 SF6 /N2 mixtures
 Future trends in GIS
 Conclusion.
10-Sep-12 3
Substation:
• An assembly of apparatus installed to control
transmission and distribution of electric power.
10-Sep-12 4
A:Primary power lines' side B:Secondary power lines' side
1.Primary power lines 2.Ground wire 3.Overhead lines 4.Transformer for measurement of electric
voltage 5.Disconnect switch 6.Circuit breaker 7.Current transformer 8.Lightning arrester 9.Main
transformer 10.Control building 11.Security fence 12.Secondary power lines
Air Insulated Substation(AIS):
 Air used as a dielectric.
 Normally used for outdoor substations.
 In very few cases used for indoor substations.
 Easy to expand (in case that space is not an issue)
 Excellent overview, simple handling and easy
access.
10-Sep-12 5
Limitations of AIS:
 Large dimensions due to statutory clearances and
poor dielectric strength of air.
 Insulation deterioration with ambient conditions and
susceptibility to pollutants.
 Wastage of space.
 Life of steel structures degrades.
 Seismic instability.
 Large planning & execution time.
 Regular maintenance of the substation required.
10-Sep-12 6
The need for G.I.S:
 Non availability of sufficient space.
 Difficult climatic and seismic conditions at site.
 Urban site (high rise building).
 High altitudes.
 Limitations of AIS.
10-Sep-12 7
Gas Insulated Substation:
Introduction:
 Compact, multi-component assembly.
 Enclosed in a ground metallic housing.
 Sulphur Hexaflouride (SF6) gas – the primary
insulating medium.
 (SF6) gas- superior dielectric properties used at
moderate pressure for phase to phase and phase
to ground insulation
 Preferred for voltage ratings of 72.5 kV, 145 kV,
300 kV and 420 kV and above.
 Various equipments like Circuit Breakers, Bus-
Bars, Isolators, Load Break Switches, Current
Transformers, Voltage Transformers, Earthing
Switches, etc. housed in metal enclosed modules
filled with SF6 gas.
10-Sep-12 8
Properties of SF6:
• Non-toxic, very stable chemically.
• Man-made.
• Lifetime – Very long (800 to 3200 years!).
• Insulating properties 3-times that of air.
• Colorless & heavier than air.
• Almost water insoluble.
• Non inflammable.
10-Sep-12 9
Gas insulated substation
10-Sep-12 10
GIS Assembly:
ESSENTIAL PARTS OF GIS:
1. Bus bar
2. Circuit Breaker
3. Disconnector (line or bus)
4. Earthing switch (line or bus)
5. Current transformer (feeder / bus)
6. Voltage transformer (feeder/ bus)
7. Feeder Disconnector
8. Feeder Earthing switch
9. Lightning / Surge Arrester
10. Cable termination
11. Control Panel.
10-Sep-12 11
10-Sep-12 12
Fig: essential parts of Gas insulated substation
10-Sep-12 13
Fig:36 KV Gas insulated substation with 3-phase
double bus
10-Sep-12 14
Fig: Gas insulated substation with double bus
arrangement
GIS assembly:
10-Sep-12 15
Advantages :
 Occupies very less space (1/10th) compared to
ordinary substations.
 Hence, most preferred where area for substation is
small (eg: Cities)
 Most reliable compared to Air Insulated
Substations.
 Number of outages due to the fault is less
 Maintenance Free.
 Can be assembled at workshop and modules can
be commissioned in the plant easily.
10-Sep-12 16
10-Sep-12 17
10-Sep-12 18
Design Challenges:
1. Safety:
• Optimizing operating electrical stresses to safe
levels by better inter electrode spacing .
• Increasing the gas volume and the thermal inertia
of the system to enhance cooling and retain
insulation strength.
2. High reliability:
• Superior contact systems for Circuit Breakers
and
Disconnectors.
• Multi-contact and friction free surfaces
incorporated for long operating cycles.
• Rugged, time proven operating drives used.
10-Sep-12 19
GIS Failure Statistics:
10-Sep-12 20
57.30%
18.10%
12.40%
12.30%
INSULATION FAILURE
MECHANICAL
TROUBLE
GAS LEAK
OTHERS
10-Sep-12 21
In-service fault rate (faults/station-year)
vs.
years in service for 25 North American
Main Drawbacks:
• High cost compared to conventional
substation(AIS).
• Excessive damage in case of internal fault.
• Diagnosis of internal fault and rectifying takes
very long time (high outage time).
• SF6 gas pressure must be monitored in each
compartment.
• Reduction in the pressure of the SF6 gas in any
module results in flash over and faults.
• SF6 causes ozone depletion and global warming.
10-Sep-12 22
SF6 – Environmental
Concerns:
• Currently, 80% used by Electrical Power industry.
• Other Uses – micro-electronics; Al & Mg
production.
• 7000 metric tons/yr in 1993.
• Reached 10,000 metric tons/yr by 2010.
• Two areas of Health and Environmental impact:
I. Through its normal use in a work place – Arcing
byproducts.
II. Global Environmental impact - Ozone depletion
and Global warming.
10-Sep-12 23
10-Sep-12 24
SF6/N2 Mixtures for GIS?
• SF6 gas – specifically mentioned in Kyoto
protocol.
• Small quantities of SF6 in N2 can improve
dielectric strength drastically.
• All of the dielectric strength of SF6, nearly, can be
achieved by adding less than 20% SF6 into N2.
• SF6/N2 mixtures less susceptible to effects of field
non uniformity than pure SF6.
• Thus mitigating the effects of particles and surface
protrusions.
10-Sep-12 25
Future trends:
• Compact design of switch gear by using three
phase modules.
• Use of vacuum circuit breaker cells in the medium
high voltage GIS.
• Optimization of GIS design to allow easier
maintenance.
• Development of DC GIS for incorporating into
expanding national/international HVDC systems.
• Search for replacement gases for SF6.
• The most promising - an 80%/20% N2/SF6
mixture.
• Replacement of existing AIS by GIS will accelerate
especially near urban centers.
10-Sep-12 26
CONCLUSION:
• GIS – necessary for Extra HV & Ultra HV
• Some important areas to be studied include:
• More conservative design.
• Improved gas handling.
• Decomposition product management techniques.
• Achieving & maintaining high levels of availability
require – more integrated approach to quality
control by both users and manufactures.
10-Sep-12 27
References:
• G.F. Montillet, E. Mikes et al. "Underground transmission and
distribution GIS solutions" IEEE/PES T&D Exposition and
Conference, Dallas USA, 2003.
• E. Mikes, Ch. Tschannen, et al. "GIS substation extensions and
upgrades" CEPSI Paper T1-068, 2000, Manila, Philippines.
• CIGRE WG 23.10; Paper 23-102, 1998, Report on the Second
International Survey on High-Voltage Gas Insulated Substations
(GIS) Service Experience, Paris, France 1998.
• E. Mikes, H. Aeschbach et al. "Innovative GIS based solutions
for substations" CIGRE SC23 Colloquium Venezuela, Paper 3.1,
2001.
• D. Dufournet, C. Lindner et al. "Technical Trends in Circuit
Breaker Switching Technologies" CIGRE SC A3 Colloquium
paper, Sarajevo, Bosnia, 2003.
• H. Aeschbach, E. Mikes, et al. "Space saving GIS based hybrid
modules and innovative solutions influencing substation
space and life cycle cost judgments" CEPSI Paper T2-A-7,
2002. 10-Sep-12 28
10-Sep-12 29

Mais conteúdo relacionado

Mais procurados

Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substationMOHDFAIZAN75
 
Surge arrester ppt
Surge arrester pptSurge arrester ppt
Surge arrester pptIrinElsa
 
GAS INSULATED SUB-STATION
GAS INSULATED SUB-STATIONGAS INSULATED SUB-STATION
GAS INSULATED SUB-STATIONsujitmandalsk
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substationRaushanKumar582
 
GIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniGIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniBHARATKUMAR RATHOD
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Power system protection
Power system protectionPower system protection
Power system protectionAnu Priya
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substationhimanshu kumar
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclVISHAL VERMA
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chartvishalgohel12195
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)kaushal boghani
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation ControlBirju Besra
 

Mais procurados (20)

Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Gas insulated substation.
Gas insulated substation.Gas insulated substation.
Gas insulated substation.
 
Surge arrester ppt
Surge arrester pptSurge arrester ppt
Surge arrester ppt
 
GAS INSULATED SUB-STATION
GAS INSULATED SUB-STATIONGAS INSULATED SUB-STATION
GAS INSULATED SUB-STATION
 
Facts devices
Facts devicesFacts devices
Facts devices
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Substation
SubstationSubstation
Substation
 
GIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniGIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & Shanni
 
Protective relay
Protective relay Protective relay
Protective relay
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
Smart grid communications and measurement technology
Smart grid communications and measurement technologySmart grid communications and measurement technology
Smart grid communications and measurement technology
 
Switchgear
SwitchgearSwitchgear
Switchgear
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chart
 
Capacitive voltage transformer (1)
Capacitive voltage transformer (1)Capacitive voltage transformer (1)
Capacitive voltage transformer (1)
 
Power system security
Power system security Power system security
Power system security
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation Control
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 

Semelhante a Ppt

Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstationraja sukumar
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxborapring
 
Internship ppt(santhosh).pptx
Internship ppt(santhosh).pptxInternship ppt(santhosh).pptx
Internship ppt(santhosh).pptxBasavarajbanakar6
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substationAjay Kuriakose
 
substation 101
substation 101substation 101
substation 101danica11
 
Compact DC switch gear
Compact DC switch gearCompact DC switch gear
Compact DC switch gearVeenaVK
 
27072013140225 gas-insulated-substations
27072013140225 gas-insulated-substations27072013140225 gas-insulated-substations
27072013140225 gas-insulated-substationsMugdha Jhanjhote
 
Gas insulated substation 1
Gas insulated substation 1Gas insulated substation 1
Gas insulated substation 1Ronal Parmar
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Substation_fundamental.pptx
Substation_fundamental.pptxSubstation_fundamental.pptx
Substation_fundamental.pptxSatish Pydimarla
 
GSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURGSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURHARISH KUMAR
 
Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2naga pooja
 
Gis substation
Gis substationGis substation
Gis substationAsif Eqbal
 

Semelhante a Ppt (20)

Gases insulation powerstation
Gases  insulation powerstationGases  insulation powerstation
Gases insulation powerstation
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
 
Internship ppt(santhosh).pptx
Internship ppt(santhosh).pptxInternship ppt(santhosh).pptx
Internship ppt(santhosh).pptx
 
GIS(GAS INSULATED SUBSTATION)
GIS(GAS  INSULATED  SUBSTATION) GIS(GAS  INSULATED  SUBSTATION)
GIS(GAS INSULATED SUBSTATION)
 
Gas insulated substation
Gas insulated substationGas insulated substation
Gas insulated substation
 
substation 101
substation 101substation 101
substation 101
 
Substation
Substation Substation
Substation
 
Compact DC switch gear
Compact DC switch gearCompact DC switch gear
Compact DC switch gear
 
27072013140225 gas-insulated-substations
27072013140225 gas-insulated-substations27072013140225 gas-insulated-substations
27072013140225 gas-insulated-substations
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
Gas insulated substation 1
Gas insulated substation 1Gas insulated substation 1
Gas insulated substation 1
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Substation_fundamental.pptx
Substation_fundamental.pptxSubstation_fundamental.pptx
Substation_fundamental.pptx
 
Gagan
GaganGagan
Gagan
 
GIS PRESENTATION.pdf
GIS PRESENTATION.pdfGIS PRESENTATION.pdf
GIS PRESENTATION.pdf
 
GSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPURGSS (GIS) OLD POWER HOUSE JODHPUR
GSS (GIS) OLD POWER HOUSE JODHPUR
 
Gas insulated substation 2
Gas insulated substation 2Gas insulated substation 2
Gas insulated substation 2
 
Power supply
Power supplyPower supply
Power supply
 
Govind S N.pptx
Govind S N.pptxGovind S N.pptx
Govind S N.pptx
 
Gis substation
Gis substationGis substation
Gis substation
 

Mais de gudlavalleru engineering college (14)

Stld
StldStld
Stld
 
Formula sheet for ec&ee
Formula sheet for ec&eeFormula sheet for ec&ee
Formula sheet for ec&ee
 
Engineering mathematics, fifth edition(1)
Engineering mathematics, fifth edition(1)Engineering mathematics, fifth edition(1)
Engineering mathematics, fifth edition(1)
 
Control systems
Control systemsControl systems
Control systems
 
Induction motors
Induction motorsInduction motors
Induction motors
 
joseph sathvik
joseph sathvikjoseph sathvik
joseph sathvik
 
Ppt by joseph sathvik
Ppt by joseph sathvikPpt by joseph sathvik
Ppt by joseph sathvik
 
Power system-analysis-psr murthy
Power system-analysis-psr murthyPower system-analysis-psr murthy
Power system-analysis-psr murthy
 
building construction
building constructionbuilding construction
building construction
 
State space models
State space modelsState space models
State space models
 
Ai chap2 state (1)
Ai chap2 state (1)Ai chap2 state (1)
Ai chap2 state (1)
 
9.ppt
9.ppt9.ppt
9.ppt
 
Thermal power-plant
Thermal power-plantThermal power-plant
Thermal power-plant
 
Introduction to iso22000 101106
Introduction to iso22000 101106Introduction to iso22000 101106
Introduction to iso22000 101106
 

Último

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Último (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Ppt

  • 1. GAS INSULATED SUBSTATION By: Mohd. Zuhaib Mohammad Sharique Alam Junaid Ahmed 10-Sep-12 1
  • 3. Contents:  Substation  Conventional substations (AIS)  Limitations of AIS  The need for GIS  Introduction to GIS  Properties of SF6  GIS assembly  Advantages of GIS  Design features  Drawbacks  SF6 – Environmental concerns  SF6 /N2 mixtures  Future trends in GIS  Conclusion. 10-Sep-12 3
  • 4. Substation: • An assembly of apparatus installed to control transmission and distribution of electric power. 10-Sep-12 4 A:Primary power lines' side B:Secondary power lines' side 1.Primary power lines 2.Ground wire 3.Overhead lines 4.Transformer for measurement of electric voltage 5.Disconnect switch 6.Circuit breaker 7.Current transformer 8.Lightning arrester 9.Main transformer 10.Control building 11.Security fence 12.Secondary power lines
  • 5. Air Insulated Substation(AIS):  Air used as a dielectric.  Normally used for outdoor substations.  In very few cases used for indoor substations.  Easy to expand (in case that space is not an issue)  Excellent overview, simple handling and easy access. 10-Sep-12 5
  • 6. Limitations of AIS:  Large dimensions due to statutory clearances and poor dielectric strength of air.  Insulation deterioration with ambient conditions and susceptibility to pollutants.  Wastage of space.  Life of steel structures degrades.  Seismic instability.  Large planning & execution time.  Regular maintenance of the substation required. 10-Sep-12 6
  • 7. The need for G.I.S:  Non availability of sufficient space.  Difficult climatic and seismic conditions at site.  Urban site (high rise building).  High altitudes.  Limitations of AIS. 10-Sep-12 7
  • 8. Gas Insulated Substation: Introduction:  Compact, multi-component assembly.  Enclosed in a ground metallic housing.  Sulphur Hexaflouride (SF6) gas – the primary insulating medium.  (SF6) gas- superior dielectric properties used at moderate pressure for phase to phase and phase to ground insulation  Preferred for voltage ratings of 72.5 kV, 145 kV, 300 kV and 420 kV and above.  Various equipments like Circuit Breakers, Bus- Bars, Isolators, Load Break Switches, Current Transformers, Voltage Transformers, Earthing Switches, etc. housed in metal enclosed modules filled with SF6 gas. 10-Sep-12 8
  • 9. Properties of SF6: • Non-toxic, very stable chemically. • Man-made. • Lifetime – Very long (800 to 3200 years!). • Insulating properties 3-times that of air. • Colorless & heavier than air. • Almost water insoluble. • Non inflammable. 10-Sep-12 9
  • 11. GIS Assembly: ESSENTIAL PARTS OF GIS: 1. Bus bar 2. Circuit Breaker 3. Disconnector (line or bus) 4. Earthing switch (line or bus) 5. Current transformer (feeder / bus) 6. Voltage transformer (feeder/ bus) 7. Feeder Disconnector 8. Feeder Earthing switch 9. Lightning / Surge Arrester 10. Cable termination 11. Control Panel. 10-Sep-12 11
  • 12. 10-Sep-12 12 Fig: essential parts of Gas insulated substation
  • 13. 10-Sep-12 13 Fig:36 KV Gas insulated substation with 3-phase double bus
  • 14. 10-Sep-12 14 Fig: Gas insulated substation with double bus arrangement
  • 16. Advantages :  Occupies very less space (1/10th) compared to ordinary substations.  Hence, most preferred where area for substation is small (eg: Cities)  Most reliable compared to Air Insulated Substations.  Number of outages due to the fault is less  Maintenance Free.  Can be assembled at workshop and modules can be commissioned in the plant easily. 10-Sep-12 16
  • 19. Design Challenges: 1. Safety: • Optimizing operating electrical stresses to safe levels by better inter electrode spacing . • Increasing the gas volume and the thermal inertia of the system to enhance cooling and retain insulation strength. 2. High reliability: • Superior contact systems for Circuit Breakers and Disconnectors. • Multi-contact and friction free surfaces incorporated for long operating cycles. • Rugged, time proven operating drives used. 10-Sep-12 19
  • 20. GIS Failure Statistics: 10-Sep-12 20 57.30% 18.10% 12.40% 12.30% INSULATION FAILURE MECHANICAL TROUBLE GAS LEAK OTHERS
  • 21. 10-Sep-12 21 In-service fault rate (faults/station-year) vs. years in service for 25 North American
  • 22. Main Drawbacks: • High cost compared to conventional substation(AIS). • Excessive damage in case of internal fault. • Diagnosis of internal fault and rectifying takes very long time (high outage time). • SF6 gas pressure must be monitored in each compartment. • Reduction in the pressure of the SF6 gas in any module results in flash over and faults. • SF6 causes ozone depletion and global warming. 10-Sep-12 22
  • 23. SF6 – Environmental Concerns: • Currently, 80% used by Electrical Power industry. • Other Uses – micro-electronics; Al & Mg production. • 7000 metric tons/yr in 1993. • Reached 10,000 metric tons/yr by 2010. • Two areas of Health and Environmental impact: I. Through its normal use in a work place – Arcing byproducts. II. Global Environmental impact - Ozone depletion and Global warming. 10-Sep-12 23
  • 25. SF6/N2 Mixtures for GIS? • SF6 gas – specifically mentioned in Kyoto protocol. • Small quantities of SF6 in N2 can improve dielectric strength drastically. • All of the dielectric strength of SF6, nearly, can be achieved by adding less than 20% SF6 into N2. • SF6/N2 mixtures less susceptible to effects of field non uniformity than pure SF6. • Thus mitigating the effects of particles and surface protrusions. 10-Sep-12 25
  • 26. Future trends: • Compact design of switch gear by using three phase modules. • Use of vacuum circuit breaker cells in the medium high voltage GIS. • Optimization of GIS design to allow easier maintenance. • Development of DC GIS for incorporating into expanding national/international HVDC systems. • Search for replacement gases for SF6. • The most promising - an 80%/20% N2/SF6 mixture. • Replacement of existing AIS by GIS will accelerate especially near urban centers. 10-Sep-12 26
  • 27. CONCLUSION: • GIS – necessary for Extra HV & Ultra HV • Some important areas to be studied include: • More conservative design. • Improved gas handling. • Decomposition product management techniques. • Achieving & maintaining high levels of availability require – more integrated approach to quality control by both users and manufactures. 10-Sep-12 27
  • 28. References: • G.F. Montillet, E. Mikes et al. "Underground transmission and distribution GIS solutions" IEEE/PES T&D Exposition and Conference, Dallas USA, 2003. • E. Mikes, Ch. Tschannen, et al. "GIS substation extensions and upgrades" CEPSI Paper T1-068, 2000, Manila, Philippines. • CIGRE WG 23.10; Paper 23-102, 1998, Report on the Second International Survey on High-Voltage Gas Insulated Substations (GIS) Service Experience, Paris, France 1998. • E. Mikes, H. Aeschbach et al. "Innovative GIS based solutions for substations" CIGRE SC23 Colloquium Venezuela, Paper 3.1, 2001. • D. Dufournet, C. Lindner et al. "Technical Trends in Circuit Breaker Switching Technologies" CIGRE SC A3 Colloquium paper, Sarajevo, Bosnia, 2003. • H. Aeschbach, E. Mikes, et al. "Space saving GIS based hybrid modules and innovative solutions influencing substation space and life cycle cost judgments" CEPSI Paper T2-A-7, 2002. 10-Sep-12 28