F05: CASE STUDY: How the Dutch
Police Force consolidated 26
datacenters into eight.
Jan Wiersma
The Netherlands
4
30-01-15
The Netherlands
• Constitutional monarchy
• Size:
– About 41.528 km2
– Population: 16.372.715 (2007)
(This is 2x New Jersey state for size and population.)
5
30-01-15
40% Below sea level
7
30-01-15
Dutch Police Force
26 police regions
60.000 employees
55.000 workstations
High secure and high
available IT environment ?
8
30-01-15
Information and communication:
anytime , anywhere
9
30-01-15
Emergency dispatch
C2000
(EU TETRA standard)
10
30-01-15
IT Division
Mission:
1. Information sharing
2. Consolidation. (26 to
7+1)
3. Standardization. (single
vendor policy)
For the datacenter:
1. Capacity management.
2. Managing power and
cooling issues.
Migration and Move
Think about:
• Project scope
• Stakeholders
• Project managers
• Project planning
Our scope:
• Legacy
• New Infrastructure
• Virtualization ?
• (-> new 24x7 SLA)
• (- >Terrorism Prevention)
11
30-01-15
DC site selection
DC (re)Build
Consolidate
(C&C
(legacy &) new infrastructure
Organization
13
30-01-15
Datacenter Management
& design
Between facilities and ICT management
Power
Cooling Cabling
Racks & physical
infrastructure
Management
systems
Physical
security
Fire protection
Datacenter tiers
Tier 1: composed of a single path for power and cooling distribution,
without redundant components, providing 99.671% availability.
Tier II: composed of a single path for power and cooling distribution, with
redundant components, providing 99.741% availability
Tier III: composed of multiple active power and cooling distribution paths,
but only one path active, has redundant components, and is
concurrently maintainable, providing 99.982% availability
Tier IV: composed of multiple active power and cooling distribution
paths, has redundant components, and is fault tolerant, providing
99.995% availability.
(The Uptime Institute)
14
30-01-15
Tiers
• near Tier-3 data center ? Tier-3 plus ?
• Look for the weakst link….
15
30-01-15
7x twin-center setup with
min 5km and max 35km fiber
connection
EU standaards
17
30-01-15
EN 50173-5 Information technology – Data Centers.
Smaller scope than TIA942 but from a European perspective.
BS/EN1047 - 2:2000
European standard providing clearly defined performance criteria for operating conditions
within rooms and containers ie; R60D for Data Rooms and C60D for Data
Containers.
Relationship of CENELEC Standards
18
30-01-15
Physical location
TIA – 942 Data Centre Location Recommendations:
• The building should not be in the flight path of any nearby airports.
• The building should be no closer than 0.8 km (½ mile) from a railroad or major
interstate highway to minimize risk of chemical spills.
• The building should not be within 0.4 km (¼ mile) of an airport, research lab,
chemical plant, landfill, river, coastline, or dam.
• The building should not be within 0.8 km (½ mile) of a military base.
• The building should not be within 1.6 km (1 mile) of nuclear, munitions, or
defence plant.
• The building should not be located adjacent to a foreign embassy.
• The building should not be located in high crime areas.
• EMC risks must be minimised by locating away from radar transmitters and
mobile ‘phone masts.
• The building should not be located below sea level or flood area’s.
19
30-01-15
Security (1)
Think layers
20
30-01-15
Security (2)
21
30-01-15
Threat Type Threat Security Design Considerations
Vandal Malicious damage
…….
Harden facility using cage, fencing, locks
Use appropriate signage and lighting
Provide intrusion alarm
………
Criminal Equipment theft
…….
Chain and lock portable equipment
Install card access system
……..
Saboteur/Terrorist Destroy or disable facility
systems
Injure employees
……
Install CCTV at facility perimeter
Install alarmed entry
……..
Insider/Additional
Considerations
Revenge, personal gain
……..
Restrict access by job function
……
Fire detection and suppression
• Type of fire detection.
• Types of fire suppression.
• Fire rating interior walls.
22
30-01-15
Power
• Power distribution in the Netherlands.
• Emergency power (GenSet / UPS)
• Blade servers
24
30-01-15
Cooling
• Blade servers
• Water cooling ?
• Raised floor still needed ?
25
30-01-15
Cable infrastructure
• The ‘TIA942-way’
• Copper cable (CAT5 / 6 / 7 )
• Fiber cable (OS1 / OM2 / OM3)
26
30-01-15
Green ?
European Comission:
The EU code of Conduct for Data Centres (draft).
http://re.jrc.cec.eu.int/energyefficiency/html/standby_initiative_data%20centers.htm
(using The Green Grid metrics)
The European GreenBuilding
Programme.
http://re.jrc.cec.eu.int/energyefficiency/
27
30-01-15
Gartner:
Know your IT and Data Center Infrastructure
strategy or vision and shape it to your
organization – be cautious of vendor driven
visions.
(Keynote address at Gartner’s 26th Annual Data Center Conference)
One size does NOT fit all
28
30-01-15
Questions ?
29
30-01-15
jan.wiersma@vtspn.nl
Codes and Regulations to Consider
• Physical location of the data centre (Insurance Codes)
• TIA 942 / EN 50173-5
• Health and Human Safety (National Codes)
• Physical sizing and capabilities codes (power, cooling, etc.)
• Electrical and utility systems to and within the data centre (utility codes)
• Fire minimization, detection, alarm and suppression (Fire Codes)
• Civil Security and Emergency Codes (Police and Fire Codes)
• Heating, Ventilation and Air Conditioning (HVAC) (ASHRAE Standards)
• Communications Cabling within and to the data centre (TIA Standards)
• Cabling containment within the data centre (including raised floors)
• Information Technology Equipment (Equipment Vendor Requirements)
• Security, Access and CCTV (Privacy Codes)
• Data Security and Recovery (National and International regulations)
• NEN-EN-IEC 62347 Guidance on system dependability specifications
31
30-01-15

Mais conteúdo relacionado

Semelhante a How the Dutch Police Force consolidated 26 datacenters into eight.

IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)iGrid T&D
 
2. Jan Vorrink - TenneT TSO
2. Jan Vorrink - TenneT TSO2. Jan Vorrink - TenneT TSO
2. Jan Vorrink - TenneT TSODutch Power
 
E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1Poul Froesig
 
IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreDerek Webster
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_FujitsuAgora Group
 
Global Switch Sydney West data centre Technical Specification
Global Switch Sydney West data centre Technical SpecificationGlobal Switch Sydney West data centre Technical Specification
Global Switch Sydney West data centre Technical SpecificationGlobal Switch
 
Edge Data Center Solutions
Edge Data Center SolutionsEdge Data Center Solutions
Edge Data Center SolutionsRittal India
 
Government and Defense Fixed Communications
Government and Defense Fixed CommunicationsGovernment and Defense Fixed Communications
Government and Defense Fixed CommunicationsST Engineering iDirect
 
MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.MEPdoo
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsIbrahim Al-Hudhaif
 
Ukdctrends2015
Ukdctrends2015Ukdctrends2015
Ukdctrends2015KMBreed
 
Ukdctrends2015
Ukdctrends2015Ukdctrends2015
Ukdctrends2015KMBreed
 
RAYCOM - Vratkov_EN
RAYCOM - Vratkov_ENRAYCOM - Vratkov_EN
RAYCOM - Vratkov_ENAdam Haminda
 
[Pipeline Support Solutions] CLH Case Study
[Pipeline Support Solutions] CLH Case Study[Pipeline Support Solutions] CLH Case Study
[Pipeline Support Solutions] CLH Case StudySchneider Electric
 
Ukdctrends2016
Ukdctrends2016Ukdctrends2016
Ukdctrends2016KMBreed
 
8 July 2015: Persistent surveillance from the air themed competition
8 July 2015: Persistent surveillance from the air themed competition8 July 2015: Persistent surveillance from the air themed competition
8 July 2015: Persistent surveillance from the air themed competitionDefence and Security Accelerator
 
Scandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard AaroeScandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard AaroeRussell Publishing
 
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...paul_mathews
 
SMi Group's 8th annual Mobile Deployable Communications Conference 2015
SMi Group's 8th annual Mobile Deployable Communications Conference 2015SMi Group's 8th annual Mobile Deployable Communications Conference 2015
SMi Group's 8th annual Mobile Deployable Communications Conference 2015Dale Butler
 
IT Infrastructure
IT InfrastructureIT Infrastructure
IT InfrastructureSindhu Rao
 

Semelhante a How the Dutch Police Force consolidated 26 datacenters into eight. (20)

IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
IEC61850: Use of IEC61850 to telecontrol MV grids (Article)
 
2. Jan Vorrink - TenneT TSO
2. Jan Vorrink - TenneT TSO2. Jan Vorrink - TenneT TSO
2. Jan Vorrink - TenneT TSO
 
E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1E2-Per-Erik-Ingels-Poul-FrosigV1
E2-Per-Erik-Ingels-Poul-FrosigV1
 
IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data Centre
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_Fujitsu
 
Global Switch Sydney West data centre Technical Specification
Global Switch Sydney West data centre Technical SpecificationGlobal Switch Sydney West data centre Technical Specification
Global Switch Sydney West data centre Technical Specification
 
Edge Data Center Solutions
Edge Data Center SolutionsEdge Data Center Solutions
Edge Data Center Solutions
 
Government and Defense Fixed Communications
Government and Defense Fixed CommunicationsGovernment and Defense Fixed Communications
Government and Defense Fixed Communications
 
MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.MDC mini data center presentation by MEP d.o.o.
MDC mini data center presentation by MEP d.o.o.
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh Environments
 
Ukdctrends2015
Ukdctrends2015Ukdctrends2015
Ukdctrends2015
 
Ukdctrends2015
Ukdctrends2015Ukdctrends2015
Ukdctrends2015
 
RAYCOM - Vratkov_EN
RAYCOM - Vratkov_ENRAYCOM - Vratkov_EN
RAYCOM - Vratkov_EN
 
[Pipeline Support Solutions] CLH Case Study
[Pipeline Support Solutions] CLH Case Study[Pipeline Support Solutions] CLH Case Study
[Pipeline Support Solutions] CLH Case Study
 
Ukdctrends2016
Ukdctrends2016Ukdctrends2016
Ukdctrends2016
 
8 July 2015: Persistent surveillance from the air themed competition
8 July 2015: Persistent surveillance from the air themed competition8 July 2015: Persistent surveillance from the air themed competition
8 July 2015: Persistent surveillance from the air themed competition
 
Scandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard AaroeScandinavian Rail Development 2013 - Richard Aaroe
Scandinavian Rail Development 2013 - Richard Aaroe
 
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...Commercial Overview   DC Session 1   Introduction To Cabling Standards And Th...
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
 
SMi Group's 8th annual Mobile Deployable Communications Conference 2015
SMi Group's 8th annual Mobile Deployable Communications Conference 2015SMi Group's 8th annual Mobile Deployable Communications Conference 2015
SMi Group's 8th annual Mobile Deployable Communications Conference 2015
 
IT Infrastructure
IT InfrastructureIT Infrastructure
IT Infrastructure
 

Último

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 

Último (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

How the Dutch Police Force consolidated 26 datacenters into eight.

  • 1.
  • 2. F05: CASE STUDY: How the Dutch Police Force consolidated 26 datacenters into eight. Jan Wiersma
  • 3.
  • 5. The Netherlands • Constitutional monarchy • Size: – About 41.528 km2 – Population: 16.372.715 (2007) (This is 2x New Jersey state for size and population.) 5 30-01-15
  • 7. 7 30-01-15 Dutch Police Force 26 police regions 60.000 employees 55.000 workstations High secure and high available IT environment ?
  • 10. 10 30-01-15 IT Division Mission: 1. Information sharing 2. Consolidation. (26 to 7+1) 3. Standardization. (single vendor policy) For the datacenter: 1. Capacity management. 2. Managing power and cooling issues.
  • 11. Migration and Move Think about: • Project scope • Stakeholders • Project managers • Project planning Our scope: • Legacy • New Infrastructure • Virtualization ? • (-> new 24x7 SLA) • (- >Terrorism Prevention) 11 30-01-15
  • 12. DC site selection DC (re)Build Consolidate (C&C (legacy &) new infrastructure Organization
  • 13. 13 30-01-15 Datacenter Management & design Between facilities and ICT management Power Cooling Cabling Racks & physical infrastructure Management systems Physical security Fire protection
  • 14. Datacenter tiers Tier 1: composed of a single path for power and cooling distribution, without redundant components, providing 99.671% availability. Tier II: composed of a single path for power and cooling distribution, with redundant components, providing 99.741% availability Tier III: composed of multiple active power and cooling distribution paths, but only one path active, has redundant components, and is concurrently maintainable, providing 99.982% availability Tier IV: composed of multiple active power and cooling distribution paths, has redundant components, and is fault tolerant, providing 99.995% availability. (The Uptime Institute) 14 30-01-15
  • 15. Tiers • near Tier-3 data center ? Tier-3 plus ? • Look for the weakst link…. 15 30-01-15
  • 16. 7x twin-center setup with min 5km and max 35km fiber connection
  • 17. EU standaards 17 30-01-15 EN 50173-5 Information technology – Data Centers. Smaller scope than TIA942 but from a European perspective. BS/EN1047 - 2:2000 European standard providing clearly defined performance criteria for operating conditions within rooms and containers ie; R60D for Data Rooms and C60D for Data Containers.
  • 18. Relationship of CENELEC Standards 18 30-01-15
  • 19. Physical location TIA – 942 Data Centre Location Recommendations: • The building should not be in the flight path of any nearby airports. • The building should be no closer than 0.8 km (½ mile) from a railroad or major interstate highway to minimize risk of chemical spills. • The building should not be within 0.4 km (¼ mile) of an airport, research lab, chemical plant, landfill, river, coastline, or dam. • The building should not be within 0.8 km (½ mile) of a military base. • The building should not be within 1.6 km (1 mile) of nuclear, munitions, or defence plant. • The building should not be located adjacent to a foreign embassy. • The building should not be located in high crime areas. • EMC risks must be minimised by locating away from radar transmitters and mobile ‘phone masts. • The building should not be located below sea level or flood area’s. 19 30-01-15
  • 21. Security (2) 21 30-01-15 Threat Type Threat Security Design Considerations Vandal Malicious damage ……. Harden facility using cage, fencing, locks Use appropriate signage and lighting Provide intrusion alarm ……… Criminal Equipment theft ……. Chain and lock portable equipment Install card access system …….. Saboteur/Terrorist Destroy or disable facility systems Injure employees …… Install CCTV at facility perimeter Install alarmed entry …….. Insider/Additional Considerations Revenge, personal gain …….. Restrict access by job function ……
  • 22. Fire detection and suppression • Type of fire detection. • Types of fire suppression. • Fire rating interior walls. 22 30-01-15
  • 23.
  • 24. Power • Power distribution in the Netherlands. • Emergency power (GenSet / UPS) • Blade servers 24 30-01-15
  • 25. Cooling • Blade servers • Water cooling ? • Raised floor still needed ? 25 30-01-15
  • 26. Cable infrastructure • The ‘TIA942-way’ • Copper cable (CAT5 / 6 / 7 ) • Fiber cable (OS1 / OM2 / OM3) 26 30-01-15
  • 27. Green ? European Comission: The EU code of Conduct for Data Centres (draft). http://re.jrc.cec.eu.int/energyefficiency/html/standby_initiative_data%20centers.htm (using The Green Grid metrics) The European GreenBuilding Programme. http://re.jrc.cec.eu.int/energyefficiency/ 27 30-01-15
  • 28. Gartner: Know your IT and Data Center Infrastructure strategy or vision and shape it to your organization – be cautious of vendor driven visions. (Keynote address at Gartner’s 26th Annual Data Center Conference) One size does NOT fit all 28 30-01-15
  • 30.
  • 31. Codes and Regulations to Consider • Physical location of the data centre (Insurance Codes) • TIA 942 / EN 50173-5 • Health and Human Safety (National Codes) • Physical sizing and capabilities codes (power, cooling, etc.) • Electrical and utility systems to and within the data centre (utility codes) • Fire minimization, detection, alarm and suppression (Fire Codes) • Civil Security and Emergency Codes (Police and Fire Codes) • Heating, Ventilation and Air Conditioning (HVAC) (ASHRAE Standards) • Communications Cabling within and to the data centre (TIA Standards) • Cabling containment within the data centre (including raised floors) • Information Technology Equipment (Equipment Vendor Requirements) • Security, Access and CCTV (Privacy Codes) • Data Security and Recovery (National and International regulations) • NEN-EN-IEC 62347 Guidance on system dependability specifications 31 30-01-15

Notas do Editor

  1. This is a case study of how the Dutch Police Force consolidated 26 smaller data centers into seven twin-center data centers and one high-secure data center. This was a six-year project that encompassed 55,000 workstations and approximately 60,000 employees. The discussion covers how they handled consolidation, availability (Tier I–IV), security, EU standards, disaster/recovery planning and more.
  2. Oud naar nieuw
  3. The Netherlands size: 41.528 km² [8] (18,41% water) Polulation: 16.105.285 (2002[9]), 16.372.715 (2007[10]) (394,3 / km² (2007)) New Jersey size 22.608 km² (15,0% water) Polulation (2004) 8.698.879 (438,00/km²)
  4. Historie in ICT
  5. Vmware Legacy
  6. Blauwdruk 10 jaar
  7. Twin-center
  8. http://en.wikipedia.org/wiki/CIA_triad#Key_concepts
  9. http://datacenterjournal.com/index.php?Itemid=43&id=1358&option=com_content&task=view