SlideShare uma empresa Scribd logo
1 de 42
CASE STUDY : INDIAN HABITAT
CENTRE
AND
NBC STANDARDS FOR BUSINESS
BUILDING
CONTENT
•BUSINESS BUILDING
•CASE STUDY : INTRODUCTION
-ABOUT IHC
•SITE PLANNING
•FIRE PUMP ROOM
-FIRE ALARM SYSTEM
a) SMOKE DETECTORS
b) FIRE ALARM
- CORRIDORS AND PASSAGEWAYS
- EXITS
- PRESSURISATION FAN
- BASEMENT
a) SPRINKLER
b) SMOKE OUTLET DUCTS
• FIRE CONTROL ROOM
• QUESTIONNAIRE
• SWOT ANALYSIS
BUSINESS BUILDING
THESE SHALL INCLUDE ANY BUILDING OR ANY PART OF A BUILDING
WHICH IS USED FOR TRANSACTION OF BUSINESS; FOR KEEPING OF
ACCOUNTS AND RECORDS AND SIMILAR PURPOSES, PROFESSIONAL
ESTABLISHMENTS, SERVICE FACILITIES, ETC.
CITY HALLS, TOWN HALLS, COURT HOUSES AND LIBRARIES SHALL
BE CLASSIFIED IN THIS GROUP SO FAR AS THE PRINCIPAL FUNCTION
OF THESE IS TRANSACTION OF PUBLIC BUSINESS AND KEEPING OF
BOOKS AND RECORDS.
NBC STANDARD
IHC- INDIAN HABITAT CENTRE
LOCATION- LODHI ROAD, DELHI
INDIAN HABITAT CENTRE IS A MULTIPURPOSE BUILDING IN NEW DELHI
INDIA. MIXING WORK, BUSINESS AND SOCIAL SPACES, THE INDIAN
HABITAT CENTRE IS INDIA’S MOST COMPREHENSIVE CONVENTION
CENTRE.
•THE WHOLE COMPLEX CONSISTS OF FIVE MAIN BUILDING BLOCKS WITH
AERIAL WALKWAYS INTERCONNECTING THE BUILDING BLOCKS.
•THESE BUILDING BLOCKS BEING SEPARATED MANAGE TO CREATE
INTERESTING COURTYARDS THAT ARE PARTIALLY OPEN TO THE
ELEMENTS.
•THERE ARE 2 BASEMENTS THAT HOUSE ALL THE PARKING AND SERVICES.
THE FIRST BASEMENT HAS ONLY PARKING WHILE THE SECOND HOUSES
PARKING AS WELL AS SERVICES AREA, MAINTENANCE ETC.
SITE PLANNING
•THE COMPLEX IS BUILT ON AN AREA OF 9 ACRES WITH A SUPER BUILT
UP AREA OF 97,000 SQ. MT. AND CAN BE ACCESSED THROUGH THREE
SIDES HAVING LODHI ROAD ON THE NORTHERN SIDE SEGREGATING
VEHICULAR AND PEDESTRAIN MOVEMENT.
• BASEMENT FLOORS ARE FOR PARKING AROUND 1000 CARS.
FIRE PUMP ROOM
LOCATION- BASEMENT 2
DESCRIPTION AUTO
STARTING
PRESSURE
CUT OFF PRESSURE
JOCKEY PUMP 5KG/CM SQU 7KG/CM SQU
SPRINKLER PUMP
(ELECTRICAL DRIVEN)
4KG/CM SQU MANUALLY CUT OFF
DG DRIVEN PUMP 3KG/CM SQU MANUALLY CUT OFF
HYDRANT PUMP
(ELECTRICAL DRIVEN)
25KG/CM SQU MANUALLY CUT OFF
IT CONSIST OF FOUR TYPES OF PUMPS WHICH SUPPLY WATER IN CASE OF
FIRE IN EACH FLOOR OF IHC (INDIAN HABITAT CENTRE)
JOCKEY PUMP
THIS PUMP
GENERATES
PRESSURE
SPRINKLER PUMP
DELIVERY
PIPE
SUCTION
PIPE
DG PUMP
HYDRANT PUMP
11’’
PLATFORM
 JOCKEY PUMP-MAINTAIN PRESSURE
20 HORSE POWER
 SPRINKLER PUMP-
 DG DRIVEN PUMP-
 HYDRANT PUMP- 75 HORSE POWER
•THESE PUMPS ARE TESTED EVERY MONDAY BY THE FIRETEAM OF IHC
ITSELF
.
•2 OVERHEAD TANKS OF 25000 LITRE CAPACITY EACH, MAKES AUTOMATIC
PRESSURE ON GROUND BECAUSE OF THE BUILDING HEIGHT.
•UNDERGROUND TANK OF 3,50,000 LITRE CAPACITY.
•FIRE RATED DOORS
- MATERIAL : WOOD PLUS THERE ARE WIRES USED IN THAT DOOR
THAT INCREASES THE BURNING POINT OF THE DOOR.
- DURATION : 4 HRS.
WIDTH- 2.2 M
HEIGHT- 2.5 M
THERE IS ONE MORE EXIT IN THE FIRE PUMP ROOM FOR THE ESCAPE OF
THE FIRE OFFICERS IN CASE OF FIRE IN THE FIRE PUMP ROOM. THIS EXIT
OPENS ON THE GROUND FLOOR.
ALSO THERE IS FIRE STORE ROOM IN THE FIRE PUMP ROOM AND ONE
EMPLOYEE REST ROOM.
•ONE FHC (FIRE HYDRANT CABINATE) ON EACH FLOOR
CONSIST OF THREE EXTINGUISHER
-WATER CO2-9 LITERS
-CO2-4.5 KG
-ABC-6KG
•REFILLING OF EXTINGUISHER ARE DONE
IN EVERY THREE YEAR.
• COMPANY : SAFEGUARD
CEASE FIRE
FIRE CONTROL PANEL
FIRE
SWITCH
SPEAKER
FIRE ALARM SYSTEM
ALL BUILDINGS OF 15M IN HEIGHT OR ABOVE SHALL BE EQUIPPED WITH
MANUALLY OPERATED ELECTRICAL FIRE ALARM(MOEFA)
MANUALLY OPERATED FIRE ALARM SYSTEM SHALL BE INSTALLED IN
BUILDING WITH ONE OR MORE CALL BOXES LOCATED AT EACH FLOOR.
NBC STANDARD
A FIRE ALARM SYSTEM
HAS A NUMBER OF
DEVICES WORKING
TOGETHER TO DETECT
AND WARN PEOPLE
THROUGH VISUAL AND
AUDIO APPLIANCES WHEN
SMOKE, FIRE, CARBON
MONOXIDE OR OTHER
EMERGENCIES ARE
PRESENT.
THERE ARE 3 FIRE
ALARMS ON EACH
FLOOR. 2 FIRE ALARMS IN
OFFICES AND 1 IN LIFT
LOBBY.
FIRE ALARM
SMOKE DETECTORS
THERE ARE SMOKE DETECTORS ON EACH FLOOR EXCEPT PARKING AREA
IN THE BASEMENTS.
DISTANCE BETWEEN SMOKE DETECTORS IS
APPROX 4 MTR.
NO. OF SMOKE DETECTORS IN THE BUILDING-
2869.
COMPANY :
-APOLLO
-XP
CORRIDORS AND PASSAGEWAYS
•WHEN STAIRWAYS DISCHARGE THROUGH CORRIDORS AND
PASSAGEWAYS,THE HEIGHT OF CORRIDORS AND PASSAGEWAYS SHALL
NOT BE LESS THAN 2.4MTR.
•ALL MEANS OF EXITS INCLUDING STAIRS,LIFTS ,LOBBIES AND
CORRIDORS SHALL BE ADEQUATELY VENTILATED.
NBC STANDARD
CORRIDORS AND PASSAGEWAYS
•WIDTH OF THE CORRIDOR IS 1.8
MTR.
•COMBUSTIBLE MATERIAL IN
INTERIOR FINISHES.
•SMOKE DETECTORS ARE
LOCATED AT INTERVALS OF 4M
DISTANCE.
•FLOOR FINISH- MARBLE, KOTA
STONE.
•AN EXIT MAY BE A DOORWAY,CORRIDOR ,PASSAGEWAY LEADING TO
INTERNAL STAIRCASE OR EXTERNAL STAIRCASE OR TO VERANDAH OR
TERRACE WHICH HAVE ACCESS TO A STREET OR ROOF OF BUILDING OR
TO REFUGEE AREA.
•LIFTS AND ESCALATORS SHALL NOT BE CONSIDERED AS EXITS.
•EXITS SHALL BE CLEARLY VISIBLE AND ROUTE TO REACH.
• THE EXITS SHALL BE CLEARLY MARKED AND SIGNS POSTED TO GUIDE
THE OCCUPANTS OF THE FLOOR CONCERNED.THE COLOR OF THE SIGN
EXITS SHOULD BE GREEN. THE SIGNS SHOULD BE PROPERLY
ILLUMINATED AND WIRED TO AN ELECTRICAL SOURCE OF SUPPLY.
EXITS
•ALL BULDINGS WHICH ARE 15M IN HEIGHT OR ABOVE HAVING AN
AREA OF 500 SQM ON EACH FLOOR SHALL HAVE MIN.TWO
STAIRCASE.THEY SHALL BE OF ENCLOSED TYPE,
•SHOULD BE CONSTRUCTED WITH NON COMBUSTIBLE MATERIAL
THROUGHOUT.
NBC STANDARD
•ONE FIRE EXIT ON EACH FLOOR
•2 LIFTS
•AGGREGATES ON CONCRETE (NON COMBUSTIBLE MATERIAL)
-SIGNAGES ARE THERE ON THE STAIRS
-NO PROPER LIGHTING
-NO ESCAPE LIGHTS
PRESSURIZATION OF STAIRCASE
PRESSURIZATION IS A METHOD ADOPTED FOR PROTECTED ESCAPE
ROUTES AGAINST SMOKE, ESPECIALLY IN HIGH RISE BUILDINGS.IN
PRESSURIZATION,AIR IS INJECTED IN STAIRCASES,LOBBIES OR
CORRIDORS TO RAISE THEIR PRESSURE SLIGHTLY ABOVE THE PRESSURE
IN ADJACENT PARTS OF BUILDING.AS A RESULT INGRESS OF SMOKE OR
TOXIC GASE IN TO ESCAPE CAN BE PREVENTED.
NBC STANDARD
•PRESSURISATION FAN IN STAIRS
•OPENING OF PRESSURISATION FAN ON
EACH FLOOR.
• GROUND- 6TH FLOOR
PRESSURISATION
FAN
AUTOMATIC SPRINKLERS
•AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN BASEMENTS
USED AS CAR PARKS AND IF AREA EXCEEDS 200SQM
ANY ROOM OR OTHER COMPARTMENT OF BUILDING EXCEEDING
1125 SQM IN AREA
ON ALL FLOORS OF BUILDING IF HEIGHT OF BUILDING EXCEEDS 15M
BASEMENTS
• EACH BASEMENT SHALL BE SEPARATELY VENTILATED.A SYSTEM
OF AIR INLETS SHALL BE PROVIDED AT BASEMENT FLOOR AND
SMOKE OUTLETS AT BASEMENT CEILING LEVEL.
•THE STAIRCASE OF BASEMENTS SHALL BE OF ENCLOSED TYPE
HAVING FIRE RESISTANCE OF NOT LESS THAN 2H AND SITUATED AT
PERIPHERY OF BASEMENT TO BE ENTERED AT GROUND LEVEL
ONLY FROM OPEN AIR AND IN SUCH POSITIONS THAT SMOKE FROM
ANY FIRE IN BASEMENT SHALL NOT OBSTRUCT ANY EXIT SERVING
THE GROUND.
•IN MULTI STOREY BASEMENT ,INTAKE DUCTS MAY SERVE AT ALL
LEVELS BUT EACH BASEMENT LEVEL HAVE SEPARATE SMOKE
OUTLET DUCT.
NBC STANDARD
BASEMENT
FIRE ALARMS
DELIVERY
PUMP
150 MM
DIA.
300 MM DIA.
DELIVERY
PUMP
SPRINKLERS ON
BASEMENT
•THE SPRINKLERS ARE ON BASEMENT 1 AND BASEMENT 2
IN THE PARKING AREA.
•SPRINKLERS ARE PLACED AT 3 MTR. OF DISTANCE.
3 M
COMPANY-
OMAX
IN BOTH THE BASEMENTS THESE DUCTS
ARE USED TO SUCK THE WARM AIR IN THE
BASEMENT.
SMOKE OUTLET DUCTS
DUCT INSTALLED IN FIRE PUMP
ROOM FOR EXHAUST
DUCT IN PARKING
FIRE CONTROL
ROOM
LOCATION- GROUND FLOOR
FIRE CONTROL ROOM
•FOR ALL BUILDINGS 15M IN HEIGHT OR ABOVE ,THERE SHALL BE A
CONTROL ROOM ON THE ENTRANCE FLOOR OF THE BUILDING WITH
THE COMMUNICATION SYSTEM THAT IS SUITABLE PUBLIC
ADDRESS SYSTEM TO ALL FLOORS AND FACILITIES FOR
RECEIVING MESSAGE FROM DIFFERENT FLOORS
•DETAILS OF ALL FLOOR PLANS ALONG WITH DETAILS OF FIRE
FIGHTING EQUIPMENT AND INSTALLATION SHALL BE MAINTAINED
IN FIRE CONTROL ROOM
•THE FIRE CONTROL ROOM SHALL HAVE FACILITIES TO DETECT FIRE
ON ANY FLOOR THROUGH INDICATORS BOARD CONNECTION,FIRE
DETECTION AND ALARM SYSTEMSON ALL FLOORS
NBC STANDARD
•PUBLIC ADDRESSABLE SYSTEM
IN THE WHOLE BUILDING.
•THREE HOOTER ON EACH
FLOOR FOR ANNOUNCEMENT.
-NEITHER ANY FLOOR PLANS NOR ANY
EVACUATION PLAN WAS THERE.
QUESTIONNAIRE
Item Satisfactory Unsatisfactory Not Available
OUTSIDE/INSIDE BUILDING
1. Entry/Exit (If area is designed to be accessible)
 Are parking spaces signed?
 Are parking spaces accessible?
 Is route from parking spaces to bldg. in good
repair?
 Are ramps accessible and clear?
 Are ramps in good repair?





OUTSIDE BUILDING
1. Stairs
 Are stairs according to IS codes?
 Are there broken treads/nosings?
 Do stairs have depressions due to wear?
 Are stairs slippery?




2. Handrails
 Is there a handrail when there are four or more
risers?
 Will they withstand normal use?


Item Satisfactory Unsatisfactory Not Available
INSIDE BUILDING
1. Walking surfaces
 Are they in good condition?
 Are there missing tiles, torn carpeting?
 Are they slippery?



2. Stairs
 Are stairs according to IS codes?
 Are there broken treads/nosings?
 Do stairs have depressions due to wear?



Item Satisfactory Unsatisfactory Not Available
3. Handrails
Is there a handrail when there are four or more
risers?
Will they withstand normal use?


4. Guardrails
Are they at all floor openings?
Are they at least 900-1000mm high, secured,
with no balusters
missing?


5. Lighting in corridors
Is there sufficient lighting?
Are fixtures in good condition?


6. Lighting in stairwells
Is there sufficient lighting on all steps and
platforms?
Are fixtures in good condition?


7. Lighting at exits
Are directions to exits posted on all floors?
Are exits regularly illuminated?
Are exit signs illuminated?



8. Emergency lighting (battery
powered units)
 Are lights in working order?
 Are fixtures in good condition?


9. Storage-corridors
 Are corridors being used for storage? 
10. Storage-stairwells
 Are stairwells being used for storage? 
11. Sand buckets
 Are Sand buckets checked and refilled
regularly?
 Are there sufficient containers?
 Are they in good condition?



12. Trash-accumulation
 Is trash being accumulated in exits, hallways or
stairwells?

13. Fire Doors
 Are fire rated doors equipped with self-closing
devices, latching hardware?
 Are fire doors uninhibited by wedges or stops?


14. Door hardware
 Is all hardware operable? 
15. Doors-exit
 Is access clear?
.

16. Wall openings
 Are there holes in walls? 
17. Ceiling openings
 Are all ceiling tiles in place?
 Are there holes in ceiling?


18. Fire extinguishers
 Are all fire extinguishers working and in place?
 Is access clear?
 Have they been inspected in the last month?



19. Fire alarm system
 Is there visible damage?
 Is the sprinkler riser area free of storage or
obstruction?
 Is combustible storage within 18" of ceiling in
sprinklered area?
 Are there any damaged or painted sprinkler
heads?
.




20. Ventilation
 Is there good air movement?
 Local exhaust (i.e. hoods)


21. General air quality
 Are strong or offensive odours present?
 Does irritation to eyes or mucus membranes
occur?


22. General right-to-know
 Are posters obvious?
 Are unlabelled chemical containers present?


23. Flammable/Combustible
liquids
 Are liquids in proper
containers?
 Are containers labelLed?
 Is there excessive storage of chemicals?
 Are liquid waste containers in secondary
containment?




1 FIRE SAFETY MEASURES
Whether the following requirements of Fire extinguishers,
hose real, down comer installations and capacity of water
storage tanks and fire pumps are provided as given below as
per Table 23, Part 4, National Building Code of India, 2005?
Yes No NA
2 Twelve fire buckets of 12 inches height and 10 inches deep
always filled half the number with water and half with sand
arranged to a stand should be provided and maintained
separately at kitchen room, library and auditorium areas,
YES
3 Twelve fire buckets of 12 inches height and 10 inches deep
always filled with dry sand arranged to stand should be provided
and maintained at laboratory area.
No
4* EMERGENCY AND ESCAPE LIGHTING
Whether the emergency lighting is powered from a source
independent of that supplying normal lighting? No
--
*5 Whether the emergency lighting system is of adequate capacity
of continuous operation for minimum duration of 1 1/2 hour even
for smallest premises. As per clause 15.5 of I.S 14435:1997?
N.A
6* Whether the emergency lighting system is well maintained by
conducting periodical inspections and tests so as to ensure their
perfect serviceability at all times as per clause 15.6 of I.S
14435:1997?
N.A
7* Whether the escape lighting is capable of the following as per
clause 15.7 of I.S 14435:1997?
a) Indicating clearly under un-ambiguously the escape routes.
a) Providing adequate illumination along such routes to allow
safe movements.
a) Ensuring that fire alarm call point, fire fighting equipment
provided along the escape routes can be readily located
N.A
8* Whether all the main gates and the doorways of all classrooms
9 ADVISORY FIRE SAFETY MEASURES
Whether the teaching and non-teaching staff or any of the able students
under went any first aid fire fighting training?
YES
10 Whether “FIRE DRILLS” are conducting involving all the concerned once in 3
months for an initial period of one year and subsequently once in 6 months? No
11 Whether the available first aid fire fighting appliances are well maintained by
conducting periodical inspections and tests to ensure perfect serviceability of
them?
Yes
12 Whether any record is being maintained to the above extent? No
13 Whether any special care towards the physically handicapped persons is
planned to help them during fire or similar emergencies No
SWOT ANALYSIS
STRENGTH
• DEFINED ENTRY/ EXIT OUTSIDE THE
BUILDING
• HANDRAILS/ GUARDRAILS IN GOOD
CONDITION
• ADEQUATE CORRIDOR LIGHTING
• FIRE EXTINGUISHERS IN PLACE
• ABSENCE OF FLAMMABLE LIQUIDS
• AVAILABLE FIRST AID.
• EXIT/ENTRY IN PARKING IS PROPER
• VENTILATION IN STAIRS AND
BASEMENTS AND ON ALL THE FLOORS
ARE PROPER
• PUBLIC ADDRESSABLE SYSTEM
WEAKNESS
• STAIRCASES NOT TOO GOOD IN
CONDITION
• MISSING/ SLIPPERY FLOOR TILES
• POORLY LIT EXITS
• UNCLEAR/ MISSING SIGNAGES
• NO EVACUATION PLAN
• ONLY ONE FIRE EXIT FOR EACH BLOCK
• NO ESCAPE LIGHTS
OPPORTUNITY
• FIRST AID AND FIRE TRAINING SESSIONS
• INTELLIGENT BUILDING – SMART
BUILDING, TELECOM SERVICES,
AUTOMATION SYSTEM
• INSTALLATION OF EMERGENCY
LIGHTING
• USAGE OF COMBUSTIBLE LIQUID
THREAT
• UNILLUMINATED SIGNS
• DIRECTIONS TO EXIT NOT PROVIDED
• NO EVACUATION PLANS
• NO FIRE DRILLS

Mais conteúdo relacionado

Mais procurados

college campus Case study
college campus Case studycollege campus Case study
college campus Case studyAdyasha Adyasha
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)tivar rose
 
Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Saurav Chaudhary
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyIrene Devakirubai
 
University campus literature study
University campus literature studyUniversity campus literature study
University campus literature studyKiruthika Selvi K J
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...DhvaniR2
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshikusha Ahmed
 
American institute of indian studies. Lighting.
American institute of indian studies. Lighting.American institute of indian studies. Lighting.
American institute of indian studies. Lighting.sanjaydeovrat
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention centerKiruthika Selvi K J
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyARYAN GUPTA
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case studyAr. Prerna Chouhan
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...UdayGotetiStudios
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)Mansi Pushpakar
 
Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)Sahil Kaundal
 
Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE Siddiq Salim
 
Case study- ATS Group housing
Case study- ATS Group housingCase study- ATS Group housing
Case study- ATS Group housingAyushi Agrawal
 
Jaipur building bye laws
Jaipur building bye lawsJaipur building bye laws
Jaipur building bye lawsvikashsaini78
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Vinay M
 

Mais procurados (20)

college campus Case study
college campus Case studycollege campus Case study
college campus Case study
 
Indian habitat centre (6)
Indian habitat centre (6)Indian habitat centre (6)
Indian habitat centre (6)
 
Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida Thesis report on Habitat Centre, Noida
Thesis report on Habitat Centre, Noida
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case study
 
University campus literature study
University campus literature studyUniversity campus literature study
University campus literature study
 
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
buildings rated by GRIHA and LEED, sustainable buildings around the wold, gre...
 
HOUSING CASE STUDY
HOUSING CASE STUDYHOUSING CASE STUDY
HOUSING CASE STUDY
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshi
 
Wall house
Wall houseWall house
Wall house
 
American institute of indian studies. Lighting.
American institute of indian studies. Lighting.American institute of indian studies. Lighting.
American institute of indian studies. Lighting.
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention center
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
sustainable housing case study
sustainable housing case studysustainable housing case study
sustainable housing case study
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
 
Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)Energy Efficiency Case Studies(India and Abroad)
Energy Efficiency Case Studies(India and Abroad)
 
Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE Case Study : EXHIBITION AND CONVENTION CENTRE
Case Study : EXHIBITION AND CONVENTION CENTRE
 
Case study- ATS Group housing
Case study- ATS Group housingCase study- ATS Group housing
Case study- ATS Group housing
 
Jaipur building bye laws
Jaipur building bye lawsJaipur building bye laws
Jaipur building bye laws
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 

Destaque

2.01 environmental safety
2.01 environmental safety2.01 environmental safety
2.01 environmental safetymelodiekernahan
 
National building code for residential apartments in india
National building code for residential apartments in indiaNational building code for residential apartments in india
National building code for residential apartments in indiaVinod Kumar Nehta
 
Fundamentals of Environmental Health and Safety
Fundamentals of Environmental Health and SafetyFundamentals of Environmental Health and Safety
Fundamentals of Environmental Health and SafetyGAURAV. H .TANDON
 
Final Folio Template
Final Folio TemplateFinal Folio Template
Final Folio TemplateFrank Bannon
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4vakil jagdish
 
National building codes 2005 history overview
National building codes 2005 history overviewNational building codes 2005 history overview
National building codes 2005 history overviewShourya Puri
 
Lab+safety+rules+ppt
Lab+safety+rules+pptLab+safety+rules+ppt
Lab+safety+rules+pptaimorales
 
Fire Safety Management
Fire Safety ManagementFire Safety Management
Fire Safety ManagementNc Das
 
national builiding codes
national builiding codesnational builiding codes
national builiding codesShourya Puri
 

Destaque (14)

Safety Symbols
Safety SymbolsSafety Symbols
Safety Symbols
 
2.01 environmental safety
2.01 environmental safety2.01 environmental safety
2.01 environmental safety
 
National building code for residential apartments in india
National building code for residential apartments in indiaNational building code for residential apartments in india
National building code for residential apartments in india
 
Fundamentals of Environmental Health and Safety
Fundamentals of Environmental Health and SafetyFundamentals of Environmental Health and Safety
Fundamentals of Environmental Health and Safety
 
Final Folio Template
Final Folio TemplateFinal Folio Template
Final Folio Template
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4
 
National building codes 2005 history overview
National building codes 2005 history overviewNational building codes 2005 history overview
National building codes 2005 history overview
 
Lab safety good ppt
Lab safety   good pptLab safety   good ppt
Lab safety good ppt
 
Lab Safety
Lab SafetyLab Safety
Lab Safety
 
National Building Code 2005
National Building Code 2005National Building Code 2005
National Building Code 2005
 
Lab+safety+rules+ppt
Lab+safety+rules+pptLab+safety+rules+ppt
Lab+safety+rules+ppt
 
Fire Safety Management
Fire Safety ManagementFire Safety Management
Fire Safety Management
 
national builiding codes
national builiding codesnational builiding codes
national builiding codes
 
Iso 14000
Iso 14000Iso 14000
Iso 14000
 

Semelhante a FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY

Fire legislation - architecture legislation
Fire legislation - architecture legislation Fire legislation - architecture legislation
Fire legislation - architecture legislation Ar. Prerna Chouhan
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Mr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case studyMr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case studyRUSHALI SRIVASTAVA
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
Service core
Service coreService core
Service coreaduiti
 
Case_study_on_Auditorium_(2)[1].pptx
Case_study_on_Auditorium_(2)[1].pptxCase_study_on_Auditorium_(2)[1].pptx
Case_study_on_Auditorium_(2)[1].pptxssuserad339c
 
Building Design and Construction FIRE 1102 – Principle.docx
Building Design and Construction FIRE 1102 – Principle.docxBuilding Design and Construction FIRE 1102 – Principle.docx
Building Design and Construction FIRE 1102 – Principle.docxhartrobert670
 
buildingby-laws-170216060116.pdf
buildingby-laws-170216060116.pdfbuildingby-laws-170216060116.pdf
buildingby-laws-170216060116.pdf21MTECHCE023
 
SpohnHome presentation @ 2021 HVACR Symposium
SpohnHome presentation @ 2021 HVACR SymposiumSpohnHome presentation @ 2021 HVACR Symposium
SpohnHome presentation @ 2021 HVACR SymposiumBill Spohn
 
Office building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxOffice building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxNashmilYahya
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high riseAnamikaAntora
 
Chandak Borivali Apartments In Mumbai E-Brochure.pdf
Chandak Borivali  Apartments In Mumbai  E-Brochure.pdfChandak Borivali  Apartments In Mumbai  E-Brochure.pdf
Chandak Borivali Apartments In Mumbai E-Brochure.pdfManishSaxena95
 
Barrierfree design and services literature study
Barrierfree design and services literature studyBarrierfree design and services literature study
Barrierfree design and services literature studyAndhra University
 

Semelhante a FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY (20)

Fire legislation - architecture legislation
Fire legislation - architecture legislation Fire legislation - architecture legislation
Fire legislation - architecture legislation
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Mr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case studyMr delhi 99 and jasmine grove live case study
Mr delhi 99 and jasmine grove live case study
 
GROUP 4 LITERATURE.pptx
GROUP 4 LITERATURE.pptxGROUP 4 LITERATURE.pptx
GROUP 4 LITERATURE.pptx
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Case study low raise appartment
Case study  low raise appartmentCase study  low raise appartment
Case study low raise appartment
 
Service core
Service coreService core
Service core
 
Case_study_on_Auditorium_(2)[1].pptx
Case_study_on_Auditorium_(2)[1].pptxCase_study_on_Auditorium_(2)[1].pptx
Case_study_on_Auditorium_(2)[1].pptx
 
Report on High Rise buildings.
Report  on High Rise buildings.  Report  on High Rise buildings.
Report on High Rise buildings.
 
Building Design and Construction FIRE 1102 – Principle.docx
Building Design and Construction FIRE 1102 – Principle.docxBuilding Design and Construction FIRE 1102 – Principle.docx
Building Design and Construction FIRE 1102 – Principle.docx
 
buildingby-laws-170216060116.pdf
buildingby-laws-170216060116.pdfbuildingby-laws-170216060116.pdf
buildingby-laws-170216060116.pdf
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 
SpohnHome presentation @ 2021 HVACR Symposium
SpohnHome presentation @ 2021 HVACR SymposiumSpohnHome presentation @ 2021 HVACR Symposium
SpohnHome presentation @ 2021 HVACR Symposium
 
Dry riser system
Dry riser systemDry riser system
Dry riser system
 
Office building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptxOffice building [Autosaved] [Recovered] one dirve.pptx
Office building [Autosaved] [Recovered] one dirve.pptx
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high rise
 
Chandak Borivali Apartments In Mumbai E-Brochure.pdf
Chandak Borivali  Apartments In Mumbai  E-Brochure.pdfChandak Borivali  Apartments In Mumbai  E-Brochure.pdf
Chandak Borivali Apartments In Mumbai E-Brochure.pdf
 
Barrierfree design and services literature study
Barrierfree design and services literature studyBarrierfree design and services literature study
Barrierfree design and services literature study
 
group housing - Library study
group housing - Library studygroup housing - Library study
group housing - Library study
 

Último

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 

Último (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 

FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY

  • 1. CASE STUDY : INDIAN HABITAT CENTRE AND NBC STANDARDS FOR BUSINESS BUILDING
  • 2. CONTENT •BUSINESS BUILDING •CASE STUDY : INTRODUCTION -ABOUT IHC •SITE PLANNING •FIRE PUMP ROOM -FIRE ALARM SYSTEM a) SMOKE DETECTORS b) FIRE ALARM - CORRIDORS AND PASSAGEWAYS - EXITS - PRESSURISATION FAN - BASEMENT a) SPRINKLER b) SMOKE OUTLET DUCTS • FIRE CONTROL ROOM • QUESTIONNAIRE • SWOT ANALYSIS
  • 3. BUSINESS BUILDING THESE SHALL INCLUDE ANY BUILDING OR ANY PART OF A BUILDING WHICH IS USED FOR TRANSACTION OF BUSINESS; FOR KEEPING OF ACCOUNTS AND RECORDS AND SIMILAR PURPOSES, PROFESSIONAL ESTABLISHMENTS, SERVICE FACILITIES, ETC. CITY HALLS, TOWN HALLS, COURT HOUSES AND LIBRARIES SHALL BE CLASSIFIED IN THIS GROUP SO FAR AS THE PRINCIPAL FUNCTION OF THESE IS TRANSACTION OF PUBLIC BUSINESS AND KEEPING OF BOOKS AND RECORDS. NBC STANDARD
  • 4. IHC- INDIAN HABITAT CENTRE LOCATION- LODHI ROAD, DELHI INDIAN HABITAT CENTRE IS A MULTIPURPOSE BUILDING IN NEW DELHI INDIA. MIXING WORK, BUSINESS AND SOCIAL SPACES, THE INDIAN HABITAT CENTRE IS INDIA’S MOST COMPREHENSIVE CONVENTION CENTRE. •THE WHOLE COMPLEX CONSISTS OF FIVE MAIN BUILDING BLOCKS WITH AERIAL WALKWAYS INTERCONNECTING THE BUILDING BLOCKS. •THESE BUILDING BLOCKS BEING SEPARATED MANAGE TO CREATE INTERESTING COURTYARDS THAT ARE PARTIALLY OPEN TO THE ELEMENTS. •THERE ARE 2 BASEMENTS THAT HOUSE ALL THE PARKING AND SERVICES. THE FIRST BASEMENT HAS ONLY PARKING WHILE THE SECOND HOUSES PARKING AS WELL AS SERVICES AREA, MAINTENANCE ETC.
  • 6.
  • 7.
  • 8. •THE COMPLEX IS BUILT ON AN AREA OF 9 ACRES WITH A SUPER BUILT UP AREA OF 97,000 SQ. MT. AND CAN BE ACCESSED THROUGH THREE SIDES HAVING LODHI ROAD ON THE NORTHERN SIDE SEGREGATING VEHICULAR AND PEDESTRAIN MOVEMENT. • BASEMENT FLOORS ARE FOR PARKING AROUND 1000 CARS.
  • 10. DESCRIPTION AUTO STARTING PRESSURE CUT OFF PRESSURE JOCKEY PUMP 5KG/CM SQU 7KG/CM SQU SPRINKLER PUMP (ELECTRICAL DRIVEN) 4KG/CM SQU MANUALLY CUT OFF DG DRIVEN PUMP 3KG/CM SQU MANUALLY CUT OFF HYDRANT PUMP (ELECTRICAL DRIVEN) 25KG/CM SQU MANUALLY CUT OFF IT CONSIST OF FOUR TYPES OF PUMPS WHICH SUPPLY WATER IN CASE OF FIRE IN EACH FLOOR OF IHC (INDIAN HABITAT CENTRE)
  • 11. JOCKEY PUMP THIS PUMP GENERATES PRESSURE SPRINKLER PUMP DELIVERY PIPE SUCTION PIPE DG PUMP HYDRANT PUMP 11’’ PLATFORM
  • 12.  JOCKEY PUMP-MAINTAIN PRESSURE 20 HORSE POWER  SPRINKLER PUMP-  DG DRIVEN PUMP-  HYDRANT PUMP- 75 HORSE POWER •THESE PUMPS ARE TESTED EVERY MONDAY BY THE FIRETEAM OF IHC ITSELF .
  • 13. •2 OVERHEAD TANKS OF 25000 LITRE CAPACITY EACH, MAKES AUTOMATIC PRESSURE ON GROUND BECAUSE OF THE BUILDING HEIGHT. •UNDERGROUND TANK OF 3,50,000 LITRE CAPACITY. •FIRE RATED DOORS - MATERIAL : WOOD PLUS THERE ARE WIRES USED IN THAT DOOR THAT INCREASES THE BURNING POINT OF THE DOOR. - DURATION : 4 HRS. WIDTH- 2.2 M HEIGHT- 2.5 M
  • 14. THERE IS ONE MORE EXIT IN THE FIRE PUMP ROOM FOR THE ESCAPE OF THE FIRE OFFICERS IN CASE OF FIRE IN THE FIRE PUMP ROOM. THIS EXIT OPENS ON THE GROUND FLOOR. ALSO THERE IS FIRE STORE ROOM IN THE FIRE PUMP ROOM AND ONE EMPLOYEE REST ROOM.
  • 15. •ONE FHC (FIRE HYDRANT CABINATE) ON EACH FLOOR CONSIST OF THREE EXTINGUISHER -WATER CO2-9 LITERS -CO2-4.5 KG -ABC-6KG •REFILLING OF EXTINGUISHER ARE DONE IN EVERY THREE YEAR. • COMPANY : SAFEGUARD CEASE FIRE
  • 17. FIRE ALARM SYSTEM ALL BUILDINGS OF 15M IN HEIGHT OR ABOVE SHALL BE EQUIPPED WITH MANUALLY OPERATED ELECTRICAL FIRE ALARM(MOEFA) MANUALLY OPERATED FIRE ALARM SYSTEM SHALL BE INSTALLED IN BUILDING WITH ONE OR MORE CALL BOXES LOCATED AT EACH FLOOR. NBC STANDARD
  • 18. A FIRE ALARM SYSTEM HAS A NUMBER OF DEVICES WORKING TOGETHER TO DETECT AND WARN PEOPLE THROUGH VISUAL AND AUDIO APPLIANCES WHEN SMOKE, FIRE, CARBON MONOXIDE OR OTHER EMERGENCIES ARE PRESENT. THERE ARE 3 FIRE ALARMS ON EACH FLOOR. 2 FIRE ALARMS IN OFFICES AND 1 IN LIFT LOBBY. FIRE ALARM
  • 19. SMOKE DETECTORS THERE ARE SMOKE DETECTORS ON EACH FLOOR EXCEPT PARKING AREA IN THE BASEMENTS. DISTANCE BETWEEN SMOKE DETECTORS IS APPROX 4 MTR. NO. OF SMOKE DETECTORS IN THE BUILDING- 2869. COMPANY : -APOLLO -XP
  • 20. CORRIDORS AND PASSAGEWAYS •WHEN STAIRWAYS DISCHARGE THROUGH CORRIDORS AND PASSAGEWAYS,THE HEIGHT OF CORRIDORS AND PASSAGEWAYS SHALL NOT BE LESS THAN 2.4MTR. •ALL MEANS OF EXITS INCLUDING STAIRS,LIFTS ,LOBBIES AND CORRIDORS SHALL BE ADEQUATELY VENTILATED. NBC STANDARD
  • 21. CORRIDORS AND PASSAGEWAYS •WIDTH OF THE CORRIDOR IS 1.8 MTR. •COMBUSTIBLE MATERIAL IN INTERIOR FINISHES. •SMOKE DETECTORS ARE LOCATED AT INTERVALS OF 4M DISTANCE. •FLOOR FINISH- MARBLE, KOTA STONE.
  • 22. •AN EXIT MAY BE A DOORWAY,CORRIDOR ,PASSAGEWAY LEADING TO INTERNAL STAIRCASE OR EXTERNAL STAIRCASE OR TO VERANDAH OR TERRACE WHICH HAVE ACCESS TO A STREET OR ROOF OF BUILDING OR TO REFUGEE AREA. •LIFTS AND ESCALATORS SHALL NOT BE CONSIDERED AS EXITS. •EXITS SHALL BE CLEARLY VISIBLE AND ROUTE TO REACH. • THE EXITS SHALL BE CLEARLY MARKED AND SIGNS POSTED TO GUIDE THE OCCUPANTS OF THE FLOOR CONCERNED.THE COLOR OF THE SIGN EXITS SHOULD BE GREEN. THE SIGNS SHOULD BE PROPERLY ILLUMINATED AND WIRED TO AN ELECTRICAL SOURCE OF SUPPLY. EXITS •ALL BULDINGS WHICH ARE 15M IN HEIGHT OR ABOVE HAVING AN AREA OF 500 SQM ON EACH FLOOR SHALL HAVE MIN.TWO STAIRCASE.THEY SHALL BE OF ENCLOSED TYPE, •SHOULD BE CONSTRUCTED WITH NON COMBUSTIBLE MATERIAL THROUGHOUT. NBC STANDARD
  • 23. •ONE FIRE EXIT ON EACH FLOOR •2 LIFTS •AGGREGATES ON CONCRETE (NON COMBUSTIBLE MATERIAL) -SIGNAGES ARE THERE ON THE STAIRS -NO PROPER LIGHTING -NO ESCAPE LIGHTS
  • 24. PRESSURIZATION OF STAIRCASE PRESSURIZATION IS A METHOD ADOPTED FOR PROTECTED ESCAPE ROUTES AGAINST SMOKE, ESPECIALLY IN HIGH RISE BUILDINGS.IN PRESSURIZATION,AIR IS INJECTED IN STAIRCASES,LOBBIES OR CORRIDORS TO RAISE THEIR PRESSURE SLIGHTLY ABOVE THE PRESSURE IN ADJACENT PARTS OF BUILDING.AS A RESULT INGRESS OF SMOKE OR TOXIC GASE IN TO ESCAPE CAN BE PREVENTED. NBC STANDARD
  • 25. •PRESSURISATION FAN IN STAIRS •OPENING OF PRESSURISATION FAN ON EACH FLOOR. • GROUND- 6TH FLOOR PRESSURISATION FAN
  • 26. AUTOMATIC SPRINKLERS •AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN BASEMENTS USED AS CAR PARKS AND IF AREA EXCEEDS 200SQM ANY ROOM OR OTHER COMPARTMENT OF BUILDING EXCEEDING 1125 SQM IN AREA ON ALL FLOORS OF BUILDING IF HEIGHT OF BUILDING EXCEEDS 15M BASEMENTS • EACH BASEMENT SHALL BE SEPARATELY VENTILATED.A SYSTEM OF AIR INLETS SHALL BE PROVIDED AT BASEMENT FLOOR AND SMOKE OUTLETS AT BASEMENT CEILING LEVEL. •THE STAIRCASE OF BASEMENTS SHALL BE OF ENCLOSED TYPE HAVING FIRE RESISTANCE OF NOT LESS THAN 2H AND SITUATED AT PERIPHERY OF BASEMENT TO BE ENTERED AT GROUND LEVEL ONLY FROM OPEN AIR AND IN SUCH POSITIONS THAT SMOKE FROM ANY FIRE IN BASEMENT SHALL NOT OBSTRUCT ANY EXIT SERVING THE GROUND. •IN MULTI STOREY BASEMENT ,INTAKE DUCTS MAY SERVE AT ALL LEVELS BUT EACH BASEMENT LEVEL HAVE SEPARATE SMOKE OUTLET DUCT. NBC STANDARD
  • 28. SPRINKLERS ON BASEMENT •THE SPRINKLERS ARE ON BASEMENT 1 AND BASEMENT 2 IN THE PARKING AREA. •SPRINKLERS ARE PLACED AT 3 MTR. OF DISTANCE. 3 M COMPANY- OMAX
  • 29. IN BOTH THE BASEMENTS THESE DUCTS ARE USED TO SUCK THE WARM AIR IN THE BASEMENT. SMOKE OUTLET DUCTS DUCT INSTALLED IN FIRE PUMP ROOM FOR EXHAUST DUCT IN PARKING
  • 31. FIRE CONTROL ROOM •FOR ALL BUILDINGS 15M IN HEIGHT OR ABOVE ,THERE SHALL BE A CONTROL ROOM ON THE ENTRANCE FLOOR OF THE BUILDING WITH THE COMMUNICATION SYSTEM THAT IS SUITABLE PUBLIC ADDRESS SYSTEM TO ALL FLOORS AND FACILITIES FOR RECEIVING MESSAGE FROM DIFFERENT FLOORS •DETAILS OF ALL FLOOR PLANS ALONG WITH DETAILS OF FIRE FIGHTING EQUIPMENT AND INSTALLATION SHALL BE MAINTAINED IN FIRE CONTROL ROOM •THE FIRE CONTROL ROOM SHALL HAVE FACILITIES TO DETECT FIRE ON ANY FLOOR THROUGH INDICATORS BOARD CONNECTION,FIRE DETECTION AND ALARM SYSTEMSON ALL FLOORS NBC STANDARD
  • 32.
  • 33. •PUBLIC ADDRESSABLE SYSTEM IN THE WHOLE BUILDING. •THREE HOOTER ON EACH FLOOR FOR ANNOUNCEMENT. -NEITHER ANY FLOOR PLANS NOR ANY EVACUATION PLAN WAS THERE.
  • 35. Item Satisfactory Unsatisfactory Not Available OUTSIDE/INSIDE BUILDING 1. Entry/Exit (If area is designed to be accessible)  Are parking spaces signed?  Are parking spaces accessible?  Is route from parking spaces to bldg. in good repair?  Are ramps accessible and clear?  Are ramps in good repair?      OUTSIDE BUILDING 1. Stairs  Are stairs according to IS codes?  Are there broken treads/nosings?  Do stairs have depressions due to wear?  Are stairs slippery?     2. Handrails  Is there a handrail when there are four or more risers?  Will they withstand normal use?   Item Satisfactory Unsatisfactory Not Available INSIDE BUILDING 1. Walking surfaces  Are they in good condition?  Are there missing tiles, torn carpeting?  Are they slippery?    2. Stairs  Are stairs according to IS codes?  Are there broken treads/nosings?  Do stairs have depressions due to wear?   
  • 36. Item Satisfactory Unsatisfactory Not Available 3. Handrails Is there a handrail when there are four or more risers? Will they withstand normal use?   4. Guardrails Are they at all floor openings? Are they at least 900-1000mm high, secured, with no balusters missing?   5. Lighting in corridors Is there sufficient lighting? Are fixtures in good condition?   6. Lighting in stairwells Is there sufficient lighting on all steps and platforms? Are fixtures in good condition?   7. Lighting at exits Are directions to exits posted on all floors? Are exits regularly illuminated? Are exit signs illuminated?    8. Emergency lighting (battery powered units)  Are lights in working order?  Are fixtures in good condition?   9. Storage-corridors  Are corridors being used for storage?  10. Storage-stairwells  Are stairwells being used for storage? 
  • 37. 11. Sand buckets  Are Sand buckets checked and refilled regularly?  Are there sufficient containers?  Are they in good condition?    12. Trash-accumulation  Is trash being accumulated in exits, hallways or stairwells?  13. Fire Doors  Are fire rated doors equipped with self-closing devices, latching hardware?  Are fire doors uninhibited by wedges or stops?   14. Door hardware  Is all hardware operable?  15. Doors-exit  Is access clear? .  16. Wall openings  Are there holes in walls?  17. Ceiling openings  Are all ceiling tiles in place?  Are there holes in ceiling?   18. Fire extinguishers  Are all fire extinguishers working and in place?  Is access clear?  Have they been inspected in the last month?   
  • 38. 19. Fire alarm system  Is there visible damage?  Is the sprinkler riser area free of storage or obstruction?  Is combustible storage within 18" of ceiling in sprinklered area?  Are there any damaged or painted sprinkler heads? .     20. Ventilation  Is there good air movement?  Local exhaust (i.e. hoods)   21. General air quality  Are strong or offensive odours present?  Does irritation to eyes or mucus membranes occur?   22. General right-to-know  Are posters obvious?  Are unlabelled chemical containers present?   23. Flammable/Combustible liquids  Are liquids in proper containers?  Are containers labelLed?  Is there excessive storage of chemicals?  Are liquid waste containers in secondary containment?    
  • 39. 1 FIRE SAFETY MEASURES Whether the following requirements of Fire extinguishers, hose real, down comer installations and capacity of water storage tanks and fire pumps are provided as given below as per Table 23, Part 4, National Building Code of India, 2005? Yes No NA 2 Twelve fire buckets of 12 inches height and 10 inches deep always filled half the number with water and half with sand arranged to a stand should be provided and maintained separately at kitchen room, library and auditorium areas, YES 3 Twelve fire buckets of 12 inches height and 10 inches deep always filled with dry sand arranged to stand should be provided and maintained at laboratory area. No 4* EMERGENCY AND ESCAPE LIGHTING Whether the emergency lighting is powered from a source independent of that supplying normal lighting? No -- *5 Whether the emergency lighting system is of adequate capacity of continuous operation for minimum duration of 1 1/2 hour even for smallest premises. As per clause 15.5 of I.S 14435:1997? N.A 6* Whether the emergency lighting system is well maintained by conducting periodical inspections and tests so as to ensure their perfect serviceability at all times as per clause 15.6 of I.S 14435:1997? N.A 7* Whether the escape lighting is capable of the following as per clause 15.7 of I.S 14435:1997? a) Indicating clearly under un-ambiguously the escape routes. a) Providing adequate illumination along such routes to allow safe movements. a) Ensuring that fire alarm call point, fire fighting equipment provided along the escape routes can be readily located N.A 8* Whether all the main gates and the doorways of all classrooms
  • 40. 9 ADVISORY FIRE SAFETY MEASURES Whether the teaching and non-teaching staff or any of the able students under went any first aid fire fighting training? YES 10 Whether “FIRE DRILLS” are conducting involving all the concerned once in 3 months for an initial period of one year and subsequently once in 6 months? No 11 Whether the available first aid fire fighting appliances are well maintained by conducting periodical inspections and tests to ensure perfect serviceability of them? Yes 12 Whether any record is being maintained to the above extent? No 13 Whether any special care towards the physically handicapped persons is planned to help them during fire or similar emergencies No
  • 42. STRENGTH • DEFINED ENTRY/ EXIT OUTSIDE THE BUILDING • HANDRAILS/ GUARDRAILS IN GOOD CONDITION • ADEQUATE CORRIDOR LIGHTING • FIRE EXTINGUISHERS IN PLACE • ABSENCE OF FLAMMABLE LIQUIDS • AVAILABLE FIRST AID. • EXIT/ENTRY IN PARKING IS PROPER • VENTILATION IN STAIRS AND BASEMENTS AND ON ALL THE FLOORS ARE PROPER • PUBLIC ADDRESSABLE SYSTEM WEAKNESS • STAIRCASES NOT TOO GOOD IN CONDITION • MISSING/ SLIPPERY FLOOR TILES • POORLY LIT EXITS • UNCLEAR/ MISSING SIGNAGES • NO EVACUATION PLAN • ONLY ONE FIRE EXIT FOR EACH BLOCK • NO ESCAPE LIGHTS OPPORTUNITY • FIRST AID AND FIRE TRAINING SESSIONS • INTELLIGENT BUILDING – SMART BUILDING, TELECOM SERVICES, AUTOMATION SYSTEM • INSTALLATION OF EMERGENCY LIGHTING • USAGE OF COMBUSTIBLE LIQUID THREAT • UNILLUMINATED SIGNS • DIRECTIONS TO EXIT NOT PROVIDED • NO EVACUATION PLANS • NO FIRE DRILLS

Notas do Editor

  1. SMOKE