What is DAM?
A dam is a barrier that impounds water or underground
streams. The reservoirs created by dams not only
suppress floods but provide water for various needs to
include irrigation, human consumption, industrial use,
aquaculture and navigability. Hydropower is often used
in conjunction with dams to generate electricity. A dam
can also be used to collect water or for storage of water
which can be evenly distributed between locations. Dams
generally serve the primary purpose of retaining water,
while other structures such as floodgates or levees (also
known as dikes) are used to manage or prevent water
flow into specific land regions.
Source: http://en.wikipedia.org/wiki/Dam
Should SAFETY MANAGEMENT be implemented
during DAM CONSTRUCTION? OF COURSE
DURING THE HOOVER DAM CONSTRUCTION
There were 112 deaths associated with the construction of the dam.
The first was J. G. Tierney, a surveyor who drowned on December 20,
1922, while looking for an ideal spot for the dam. His son, Patrick W.
Tierney, was the last man to die working on the dam, 13 years to the day
later. Ninety-six of the deaths occurred during construction at the site.Of
the 112 fatalities, 91 were Six Companies employees, three were BOR
employees, and one was a visitor to the site, with the remainder
employees of various contractors not part of Six Companies.
Not included in the official fatalities number were deaths that were
recorded as pneumonia. Workers alleged that this diagnosis was a cover
for death from carbon monoxide poisoning, brought on by the use of
gasoline-fueled vehicles in the diversion tunnels, and a classification used
by Six Companies to avoid paying compensation claims. The site's
diversion tunnels frequently reached 140 °F (60 °C), enveloped in thick
plumes of vehicle exhaust gases. A total of 42 workers were recorded as
having died from pneumonia; none were listed as having died from
carbon monoxide poisoning. No deaths of non-workers from pneumonia
were recorded in Boulder City during the construction period.
Source: http://en.wikipedia.org/wiki/Hoover_Dam
Roles and Responsibilities
• CONTRACTOR
 responsible for having a safety management plan in place
and for assuring safety on site, the safe and healthful
performance of their work, preventing accidents or damage to
adjacent public and private property, and safety training of
their employees. When a contractor is advised by the Agency
of a safety violation, the contractor should respond in writing
and immediately take corrective action as set out in their
safety management plan.
 enforce safety by developing a Job Hazard Analysis for the
work to be undertaken and discussing actions needed to
provide safety at jobsite planning meetings. Supervisors draw
on their safety experience to direct the actions of those under
their direction. Contractor staff should include a safety
professional who undertakes surveillance of operations to
eliminate sources of potential accidents.
 give newly employed, promoted, and/or transferred
personnel comprehensive safety indoctrination on topics such as:
workplace hazards, required protective equipment, procedures for
reporting unsafe job conditions, procedures for reporting
accidents, contractor job rules, location of first-aid and medical
facilities, and tool box safety meeting requirements. Safety should
be a standing item at site meetings. Foremen or shift supervisors
should also hold regular crew training (toolbox) meetings to cover
specific safety procedures pertinent to the crew’s on-going activity.
 should display signs and posters at the job site to reinforce
safety training
 Accidents should be investigated without delay by the
contractor and the investigation should generate
recommendations for corrective actions to prevent recurrence of
similar accidents. The contractor’s accident report, project
records, progress reports, and daily time reports may become
important evidential material in any ensuing legal action. The
contractor prepares monthly accident summary reports for
submission to the CM. These reports will allow the CM to assess
contractor safety performance as measured by recordable and lost
time accident frequency rates and the type and cause of accidents.
The federal and state regulations mandate reporting of certain
injury accidents to the authorities.
• PERMIT HOLDER
 to ensure that the site which is chosen
for the dam is well clear of all easements,
rights of way, reserves, and for all purposes
such as access, pipelines, cables, power lines.
Where property of neighbors will be affected
by a dam, the permit holder will need to make
all necessary arrangements with the
neighbors.
 to ensure that no utilities such as
electricity, natural gas, water and sewage
infrastructure can be damaged during the
construction of their dam. It can be a very
expensive exercise to have these repaired and
the permit holder is generally responsible.
TRAINING
• Best to have designer involved in
training
 Present key aspects of the design, critical
issues. Helps to focus site staff on the key
issues
 Designer to have at least annual review of
performance – field inspection and review
of documentation
• All personnel that will be in vicinity of
facility should be trained to identify
conditions that could lead to failure
• All personnel should know how to
report a potential problem
JOB SITE INSPECTIONS
1. Removing the hazard.
2. Guarding against the hazard as required.
3. Providing personal protective equipment and enforcing its
use.
4. Training workers in safe work practices.
5. Coordinating protection of workers through other
contractors.
Common SAFETY EQUIPMENTS that should be worn in
DAM CONSTRUCTION SITE
SAFETY SIGNAGES during
DAM CONSTRUCTION
Common Causes of Dam Construction Site Accidents
 Fires and Explosions
 Because of unfinished piping, leaking gases, and incomplete electrical systems,
fires and explosions are a common occurrence on construction sites.
 Slips and Trips on Scaffoldings
 Construction workers may slip on a wet patch or trip over a cable . • Can lead
to many different injuries and ill health outcomes, from musculoskeletal
disorders (e.g. strained ankle) to puncture wounds (from falling on sharp
materials).
 Fall from Height
 According to OSHA, fall accidents are the number one cause of construction
site fatalities, causing 36 percent of all construction worksite deaths in 2012.
Falls are often the result of: • Failure to properly install scaffolding, • Failure
to use proper safety gear, • Inappropriate use of inappropriate ladders and
hoists.
 Drowning
 Falling Debris (e.g. rocks)
ACCIDENT INVESTIGATION
All accidents resulting in injury or property damage will be investigated. The purpose of
the investigation is NOT to find fault, but to find the cause of the accident so similar
incidents can be prevented in the future.
1. All accidents, no matter how minor must be reported to the Foreman immediately.
2. Foremen must report all accidents to the Safety Coordinator as soon as possible.
3. Foremen must complete an initial written accident investigation the day of the
accident, if possible.
4. All workers involved in the accident or who witnessed the accident must complete a
written statement describing the incident.
5. The Safety Coordinator will complete a thorough accident investigation to determine
root causes and corrective actions.
6. Near misses (situations where an accident almost happened) should be reported.
Corrective action must be taken to prevent the same situation from occurring again
with the potential for serious injury. Foremen should make a note of near misses and
the corrective actions taken and report them to the Safety Coordinator, so that the
same corrections may be made on all the company’s job sites.
Additional Discussion:
Compliance with the design intent during the implementation of a scheme is essential for
dam safety and ongoing involvement of the designer in the construction, either as an
adviser, reviewer or resident staff is highly desirable and has not always occurred in the
past leading to dam safety incidents, failures or potential deficiencies where the designers
intent has not been fulfilled in the construction of the structure. There is always the
danger in believing that the design report, specifications and drawings can fully impart
the understanding and design intent of the designers, whose role is often curtailed at the
completion of these documents.
Construction is a critical phase in achieving a safe dam. Any project must be continuously
evaluated, and "re-engineered" as required, during construction to assure that the final
design is compatible with conditions encountered during construction. Quality of
construction is also critical to safety. Deficiencies in materials or construction practices
can occur during all stages of the construction, and constant vigilance is necessary to
prevent them. Sampling and testing at a completed project cannot be relied on as an
effective substitute for inspection and quality control during construction.
MAINTENANCE AND INSPECTIONS
Once the dam has been constructed, regular maintenance and
inspections are required to ensure it remains in a good
operating condition.
Dams over 10 meters in height and dams with hazard
categories of ‘Significant’ and higher require the following
regular inspections to be carried out:
• Weekly or more frequent inspection to be carried out by the
owner.
• Biennial or intermediate inspections and surveillance
reports carried out by a suitably qualified person (as
defined by the Water Management (Safety of Dams ) 2003
Regulations).
• Comprehensive surveillance reports carried out every 5
years by a suitably qualified person such as a Class A
competent Engineer as defined by the Water Management
(Safety of Dams ) 2003 Regulations.
The maintenance and inspection requirements detailed above do not always apply to
Lower hazard category dams. In such cases the dam owner should read their dam permit
to verify what maintenance and inspection requirements must be undertaken.
It is good practice for the dam owner to inspect their dam on a regular basis to ensure
that the dam is operating in a safe manner. Such inspections should include the
following as well as any other matters the dam owner thinks necessary to inspect:
• Inspection of the spillway to ensure it is not blocked by logs or trees growing in the
spillway or deliberately blocked to increase the capacity of the dam (section 3.16
provides information on spillways);
• Inspection to ensure that trees have not become established on or near a dam
embankment. Tree roots can cause the embankment to crack leading to dam stability
problems (section 3.15 provides information on vegetation). The highest plant growth
that should be allowed on a dam embankment is pasture grass to protect against
erosion.
• Seepage from the dam should be monitored on a regular basis. Seepage is generally
normal in all dams and should not be a concern unless it increases over a time or the
water becomes turbid (dirty). An increase in turbid water is an indication that the
embankment may be eroding internally which may lead to piping failure. If concerned,
a suitably qualified and experienced person should be consulted.
It is suggested that the dam owner use a logbook to record observations from any dam
maintenance and inspections visits for future reference.
LAS NAVAS DAM in DANGER
“PREVENTION IS BETTER THAN CURE”
“NO JOB OR NO TASK IS MORE IMPORTANT THAN
WORKER HEALTH AND SAFETY.”
References:
• HTTP://EN.WIKIPEDIA.ORG/WIKI/DAM
• HTTP://EN.WIKIPEDIA.ORG/WIKI/HOOVER_DAM
• FTA CONSTRUCTION PROJECT MANAGEMENT HANDBOOK
• GUIDELINES FOR THE CONSTRUCTION OF EARTH-FILL DAMS
• DAM SAFETY DURING DESIGN, CONSTRUCTION AND OPERATION
• CONSTRUCTION SAFETY & HEALTH MANAGEMENT SYSTEM
PREPARED BY:
GROUP 2, 7TH REPORTER
BASISTA, JEFFERSON P.
BALANQUIT, ELVIE
BALLETA, JANETH
BERGORO, GLENDA

Mais conteúdo relacionado

Mais procurados

Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
Abhishek Gupta
 

Mais procurados (20)

113 site layout design
113 site layout design113 site layout design
113 site layout design
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniques
 
Demolition pptx
Demolition pptxDemolition pptx
Demolition pptx
 
Construction Of A Viaduct/Bridge: An Overview
Construction Of A Viaduct/Bridge: An OverviewConstruction Of A Viaduct/Bridge: An Overview
Construction Of A Viaduct/Bridge: An Overview
 
Safety in construction
Safety in constructionSafety in construction
Safety in construction
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitation
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Tremie concreting
Tremie concretingTremie concreting
Tremie concreting
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Construction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdfConstruction Management full lecture note-By Melese Mengistu.pdf
Construction Management full lecture note-By Melese Mengistu.pdf
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Bar bending schedule
Bar bending scheduleBar bending schedule
Bar bending schedule
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of construction
 

Destaque

Dam construction
Dam constructionDam construction
Dam construction
alizay41
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
Mohammed Salahat
 
The social impacts of dam construction4.17.14
The social impacts of dam construction4.17.14The social impacts of dam construction4.17.14
The social impacts of dam construction4.17.14
Victor Ha-Kã Azevedo
 

Destaque (20)

Dam construction
Dam constructionDam construction
Dam construction
 
Dam Construction
Dam ConstructionDam Construction
Dam Construction
 
Ppt of design of dams
Ppt of design of damsPpt of design of dams
Ppt of design of dams
 
Dam
DamDam
Dam
 
Dam PPT
Dam PPTDam PPT
Dam PPT
 
Dam safety
Dam safetyDam safety
Dam safety
 
KALA BAGH DAM Presentation by WAPDA . . .
KALA BAGH DAM Presentation by WAPDA . . .KALA BAGH DAM Presentation by WAPDA . . .
KALA BAGH DAM Presentation by WAPDA . . .
 
Reservoir Dam Safety
Reservoir Dam SafetyReservoir Dam Safety
Reservoir Dam Safety
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety Devices
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
 
The social impacts of dam construction4.17.14
The social impacts of dam construction4.17.14The social impacts of dam construction4.17.14
The social impacts of dam construction4.17.14
 
Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13
 
Twitter presentation for University of IL presentation 4 12 12 with toby
Twitter presentation for University of IL presentation 4 12 12 with tobyTwitter presentation for University of IL presentation 4 12 12 with toby
Twitter presentation for University of IL presentation 4 12 12 with toby
 
Team c; w5; oral presbestprac; 08.16.11 Copyright 2013 Edward F. T. Charfauro...
Team c; w5; oral presbestprac; 08.16.11 Copyright 2013 Edward F. T. Charfauro...Team c; w5; oral presbestprac; 08.16.11 Copyright 2013 Edward F. T. Charfauro...
Team c; w5; oral presbestprac; 08.16.11 Copyright 2013 Edward F. T. Charfauro...
 
Galgotias University Presentation
Galgotias University PresentationGalgotias University Presentation
Galgotias University Presentation
 
Changemaker Campus Presentation for University Jan 2015
Changemaker Campus Presentation for University Jan 2015Changemaker Campus Presentation for University Jan 2015
Changemaker Campus Presentation for University Jan 2015
 
FME Usage in Dynamic Flood Calculations
FME Usage in Dynamic Flood CalculationsFME Usage in Dynamic Flood Calculations
FME Usage in Dynamic Flood Calculations
 
Layout
LayoutLayout
Layout
 

Semelhante a Dam construction safety management (group 2, 7th reporter)

PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR MANE
 
WGM Pipeline Project Orientation
WGM Pipeline Project OrientationWGM Pipeline Project Orientation
WGM Pipeline Project Orientation
txheaven
 
H & S at Power Grid Corpn. of India Ltd
H & S at Power Grid Corpn. of India LtdH & S at Power Grid Corpn. of India Ltd
H & S at Power Grid Corpn. of India Ltd
MANOJ KUMAR
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINAL
Melissa Spencer
 
TS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.pptTS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.ppt
ajith30276
 
Construction Accident Risk Management
Construction Accident Risk ManagementConstruction Accident Risk Management
Construction Accident Risk Management
DJS Assocites & Cowan Associates
 

Semelhante a Dam construction safety management (group 2, 7th reporter) (20)

2017 Safety Professional
2017 Safety Professional2017 Safety Professional
2017 Safety Professional
 
2017 Safety Professional
2017 Safety Professional2017 Safety Professional
2017 Safety Professional
 
Mdg 41 review - Gary Nauer
Mdg 41 review - Gary NauerMdg 41 review - Gary Nauer
Mdg 41 review - Gary Nauer
 
Erau webinar january 2017 airport construction
Erau webinar january 2017 airport construction Erau webinar january 2017 airport construction
Erau webinar january 2017 airport construction
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
 
PRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - CopyPRAVEENKUMAR SAFETY CV (7).doc - Copy
PRAVEENKUMAR SAFETY CV (7).doc - Copy
 
Safety equipments
Safety equipments Safety equipments
Safety equipments
 
2016 Safety Inspector
2016 Safety Inspector2016 Safety Inspector
2016 Safety Inspector
 
WGM Pipeline Project Orientation
WGM Pipeline Project OrientationWGM Pipeline Project Orientation
WGM Pipeline Project Orientation
 
Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...
 
Ensuring Safety for the Construction Workers involved in Metro Tunnelling Pro...
Ensuring Safety for the Construction Workers involved in Metro Tunnelling Pro...Ensuring Safety for the Construction Workers involved in Metro Tunnelling Pro...
Ensuring Safety for the Construction Workers involved in Metro Tunnelling Pro...
 
H & S at Power Grid Corpn. of India Ltd
H & S at Power Grid Corpn. of India LtdH & S at Power Grid Corpn. of India Ltd
H & S at Power Grid Corpn. of India Ltd
 
Safety plan
Safety planSafety plan
Safety plan
 
Industrial safety
Industrial safetyIndustrial safety
Industrial safety
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINAL
 
Tfnsw safety alert 18 310
Tfnsw safety alert 18 310Tfnsw safety alert 18 310
Tfnsw safety alert 18 310
 
TS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.pptTS-1 - PPT - VISHNURAJ G.ppt
TS-1 - PPT - VISHNURAJ G.ppt
 
Qbe flood advice
Qbe flood adviceQbe flood advice
Qbe flood advice
 
Construction Accident Risk Management
Construction Accident Risk ManagementConstruction Accident Risk Management
Construction Accident Risk Management
 
David Gibbs BSc Linkedin
David Gibbs BSc LinkedinDavid Gibbs BSc Linkedin
David Gibbs BSc Linkedin
 

Último

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Último (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

Dam construction safety management (group 2, 7th reporter)

  • 2. I N T R O D U C T I O N What is DAM? A dam is a barrier that impounds water or underground streams. The reservoirs created by dams not only suppress floods but provide water for various needs to include irrigation, human consumption, industrial use, aquaculture and navigability. Hydropower is often used in conjunction with dams to generate electricity. A dam can also be used to collect water or for storage of water which can be evenly distributed between locations. Dams generally serve the primary purpose of retaining water, while other structures such as floodgates or levees (also known as dikes) are used to manage or prevent water flow into specific land regions. Source: http://en.wikipedia.org/wiki/Dam
  • 3. Should SAFETY MANAGEMENT be implemented during DAM CONSTRUCTION? OF COURSE DURING THE HOOVER DAM CONSTRUCTION There were 112 deaths associated with the construction of the dam. The first was J. G. Tierney, a surveyor who drowned on December 20, 1922, while looking for an ideal spot for the dam. His son, Patrick W. Tierney, was the last man to die working on the dam, 13 years to the day later. Ninety-six of the deaths occurred during construction at the site.Of the 112 fatalities, 91 were Six Companies employees, three were BOR employees, and one was a visitor to the site, with the remainder employees of various contractors not part of Six Companies. Not included in the official fatalities number were deaths that were recorded as pneumonia. Workers alleged that this diagnosis was a cover for death from carbon monoxide poisoning, brought on by the use of gasoline-fueled vehicles in the diversion tunnels, and a classification used by Six Companies to avoid paying compensation claims. The site's diversion tunnels frequently reached 140 °F (60 °C), enveloped in thick plumes of vehicle exhaust gases. A total of 42 workers were recorded as having died from pneumonia; none were listed as having died from carbon monoxide poisoning. No deaths of non-workers from pneumonia were recorded in Boulder City during the construction period. Source: http://en.wikipedia.org/wiki/Hoover_Dam
  • 4. Roles and Responsibilities • CONTRACTOR  responsible for having a safety management plan in place and for assuring safety on site, the safe and healthful performance of their work, preventing accidents or damage to adjacent public and private property, and safety training of their employees. When a contractor is advised by the Agency of a safety violation, the contractor should respond in writing and immediately take corrective action as set out in their safety management plan.  enforce safety by developing a Job Hazard Analysis for the work to be undertaken and discussing actions needed to provide safety at jobsite planning meetings. Supervisors draw on their safety experience to direct the actions of those under their direction. Contractor staff should include a safety professional who undertakes surveillance of operations to eliminate sources of potential accidents.
  • 5.  give newly employed, promoted, and/or transferred personnel comprehensive safety indoctrination on topics such as: workplace hazards, required protective equipment, procedures for reporting unsafe job conditions, procedures for reporting accidents, contractor job rules, location of first-aid and medical facilities, and tool box safety meeting requirements. Safety should be a standing item at site meetings. Foremen or shift supervisors should also hold regular crew training (toolbox) meetings to cover specific safety procedures pertinent to the crew’s on-going activity.  should display signs and posters at the job site to reinforce safety training  Accidents should be investigated without delay by the contractor and the investigation should generate recommendations for corrective actions to prevent recurrence of similar accidents. The contractor’s accident report, project records, progress reports, and daily time reports may become important evidential material in any ensuing legal action. The contractor prepares monthly accident summary reports for submission to the CM. These reports will allow the CM to assess contractor safety performance as measured by recordable and lost time accident frequency rates and the type and cause of accidents. The federal and state regulations mandate reporting of certain injury accidents to the authorities.
  • 6. • PERMIT HOLDER  to ensure that the site which is chosen for the dam is well clear of all easements, rights of way, reserves, and for all purposes such as access, pipelines, cables, power lines. Where property of neighbors will be affected by a dam, the permit holder will need to make all necessary arrangements with the neighbors.  to ensure that no utilities such as electricity, natural gas, water and sewage infrastructure can be damaged during the construction of their dam. It can be a very expensive exercise to have these repaired and the permit holder is generally responsible.
  • 7. TRAINING • Best to have designer involved in training  Present key aspects of the design, critical issues. Helps to focus site staff on the key issues  Designer to have at least annual review of performance – field inspection and review of documentation • All personnel that will be in vicinity of facility should be trained to identify conditions that could lead to failure • All personnel should know how to report a potential problem
  • 8. JOB SITE INSPECTIONS 1. Removing the hazard. 2. Guarding against the hazard as required. 3. Providing personal protective equipment and enforcing its use. 4. Training workers in safe work practices. 5. Coordinating protection of workers through other contractors.
  • 9. Common SAFETY EQUIPMENTS that should be worn in DAM CONSTRUCTION SITE
  • 10.
  • 11.
  • 13.
  • 14.
  • 15. Common Causes of Dam Construction Site Accidents  Fires and Explosions  Because of unfinished piping, leaking gases, and incomplete electrical systems, fires and explosions are a common occurrence on construction sites.  Slips and Trips on Scaffoldings  Construction workers may slip on a wet patch or trip over a cable . • Can lead to many different injuries and ill health outcomes, from musculoskeletal disorders (e.g. strained ankle) to puncture wounds (from falling on sharp materials).  Fall from Height  According to OSHA, fall accidents are the number one cause of construction site fatalities, causing 36 percent of all construction worksite deaths in 2012. Falls are often the result of: • Failure to properly install scaffolding, • Failure to use proper safety gear, • Inappropriate use of inappropriate ladders and hoists.  Drowning  Falling Debris (e.g. rocks)
  • 16. ACCIDENT INVESTIGATION All accidents resulting in injury or property damage will be investigated. The purpose of the investigation is NOT to find fault, but to find the cause of the accident so similar incidents can be prevented in the future. 1. All accidents, no matter how minor must be reported to the Foreman immediately. 2. Foremen must report all accidents to the Safety Coordinator as soon as possible. 3. Foremen must complete an initial written accident investigation the day of the accident, if possible. 4. All workers involved in the accident or who witnessed the accident must complete a written statement describing the incident. 5. The Safety Coordinator will complete a thorough accident investigation to determine root causes and corrective actions. 6. Near misses (situations where an accident almost happened) should be reported. Corrective action must be taken to prevent the same situation from occurring again with the potential for serious injury. Foremen should make a note of near misses and the corrective actions taken and report them to the Safety Coordinator, so that the same corrections may be made on all the company’s job sites.
  • 17. Additional Discussion: Compliance with the design intent during the implementation of a scheme is essential for dam safety and ongoing involvement of the designer in the construction, either as an adviser, reviewer or resident staff is highly desirable and has not always occurred in the past leading to dam safety incidents, failures or potential deficiencies where the designers intent has not been fulfilled in the construction of the structure. There is always the danger in believing that the design report, specifications and drawings can fully impart the understanding and design intent of the designers, whose role is often curtailed at the completion of these documents. Construction is a critical phase in achieving a safe dam. Any project must be continuously evaluated, and "re-engineered" as required, during construction to assure that the final design is compatible with conditions encountered during construction. Quality of construction is also critical to safety. Deficiencies in materials or construction practices can occur during all stages of the construction, and constant vigilance is necessary to prevent them. Sampling and testing at a completed project cannot be relied on as an effective substitute for inspection and quality control during construction.
  • 18.
  • 19. MAINTENANCE AND INSPECTIONS Once the dam has been constructed, regular maintenance and inspections are required to ensure it remains in a good operating condition. Dams over 10 meters in height and dams with hazard categories of ‘Significant’ and higher require the following regular inspections to be carried out: • Weekly or more frequent inspection to be carried out by the owner. • Biennial or intermediate inspections and surveillance reports carried out by a suitably qualified person (as defined by the Water Management (Safety of Dams ) 2003 Regulations). • Comprehensive surveillance reports carried out every 5 years by a suitably qualified person such as a Class A competent Engineer as defined by the Water Management (Safety of Dams ) 2003 Regulations.
  • 20. The maintenance and inspection requirements detailed above do not always apply to Lower hazard category dams. In such cases the dam owner should read their dam permit to verify what maintenance and inspection requirements must be undertaken. It is good practice for the dam owner to inspect their dam on a regular basis to ensure that the dam is operating in a safe manner. Such inspections should include the following as well as any other matters the dam owner thinks necessary to inspect: • Inspection of the spillway to ensure it is not blocked by logs or trees growing in the spillway or deliberately blocked to increase the capacity of the dam (section 3.16 provides information on spillways); • Inspection to ensure that trees have not become established on or near a dam embankment. Tree roots can cause the embankment to crack leading to dam stability problems (section 3.15 provides information on vegetation). The highest plant growth that should be allowed on a dam embankment is pasture grass to protect against erosion. • Seepage from the dam should be monitored on a regular basis. Seepage is generally normal in all dams and should not be a concern unless it increases over a time or the water becomes turbid (dirty). An increase in turbid water is an indication that the embankment may be eroding internally which may lead to piping failure. If concerned, a suitably qualified and experienced person should be consulted. It is suggested that the dam owner use a logbook to record observations from any dam maintenance and inspections visits for future reference.
  • 21. LAS NAVAS DAM in DANGER
  • 22. “PREVENTION IS BETTER THAN CURE”
  • 23. “NO JOB OR NO TASK IS MORE IMPORTANT THAN WORKER HEALTH AND SAFETY.”
  • 24. References: • HTTP://EN.WIKIPEDIA.ORG/WIKI/DAM • HTTP://EN.WIKIPEDIA.ORG/WIKI/HOOVER_DAM • FTA CONSTRUCTION PROJECT MANAGEMENT HANDBOOK • GUIDELINES FOR THE CONSTRUCTION OF EARTH-FILL DAMS • DAM SAFETY DURING DESIGN, CONSTRUCTION AND OPERATION • CONSTRUCTION SAFETY & HEALTH MANAGEMENT SYSTEM
  • 25. PREPARED BY: GROUP 2, 7TH REPORTER BASISTA, JEFFERSON P. BALANQUIT, ELVIE BALLETA, JANETH BERGORO, GLENDA