Southern CaliforniaSouthern California
Milano ApartmentsMilano Apartments
Torrance, CATorrance, CA
Emerald Terrace ApartmentsEmerald Terrace Apartments
Los Angeles, CALos Angeles, CA
Milano ApartmentsMilano Apartments
Torrance, CATorrance, CA
Garage Structural RepairsGarage Structural Repairs
Roof Structural RepairsRoof Structural Repairs
Garage Structural DamageGarage Structural Damage
 Steel beams &Steel beams &
columns severelycolumns severely
corroded.corroded.
 Structural integrityStructural integrity
has beenhas been
compromised.compromised.
 Water intrusion fromWater intrusion from
expansion joints overexpansion joints over
several years.several years.
Garage AsbestosGarage Asbestos
AbatementAbatement
 Existing fireproofing &Existing fireproofing &
stucco containingstucco containing
asbestos to beasbestos to be
removed beforeremoved before
repairs.repairs.
 Steel beams &Steel beams &
columns to becolumns to be
sandblasted tosandblasted to
remove rust andremove rust and
corrosion.corrosion.
Garage Structural RepairsGarage Structural Repairs
 Shoring of each damagedShoring of each damaged
section.section.
 Excavation of footing toExcavation of footing to
inspect any potentialinspect any potential
damage.damage.
 Welding of new steel toWelding of new steel to
repair failing beams.repair failing beams.
 All repairs completed perAll repairs completed per
structural engineerstructural engineer
specifications.specifications.
 New fireproofing installedNew fireproofing installed
per fire code.per fire code.
Roof Structural DamageRoof Structural Damage
 Wood beamsWood beams
damaged due todamaged due to
termite & dryrot.termite & dryrot.
 Structural integrityStructural integrity
has beenhas been
compromised.compromised.
 Poor drainage on flatPoor drainage on flat
roof contributed toroof contributed to
structural failure.structural failure.
Roof Structural RepairsRoof Structural Repairs
 Roofing repairsRoofing repairs
were completedwere completed
to certifiedto certified
engineerengineer
specifications.specifications.
 Scaffolding andScaffolding and
pedestrianpedestrian
walkway installedwalkway installed
to completeto complete
repairs.repairs.
Emerald TerraceEmerald Terrace
Apartments Los Angeles,Apartments Los Angeles,
CACA
Plumbing Retrofit (CPVCPlumbing Retrofit (CPVC
Complete Re-Pipe)Complete Re-Pipe)
Existing Galvanized WaterExisting Galvanized Water
SystemSystem
 Existing galvanizedExisting galvanized
water system cloggedwater system clogged
with scale restrictingwith scale restricting
water pressure.water pressure.
 Existing galvanizedExisting galvanized
pipe failing causingpipe failing causing
leaks within the entireleaks within the entire
system.system.
Asbestos Abatement ForAsbestos Abatement For
Re-PipeRe-Pipe
 Existing 1970’sExisting 1970’s
construction utilizedconstruction utilized
asbestos in drywallasbestos in drywall
construction.construction.
 All drywallAll drywall
penetrations neededpenetrations needed
for re-pipe must befor re-pipe must be
abated prior toabated prior to
plumbing.plumbing.
 Certified hygienist toCertified hygienist to
certify air clearance.certify air clearance.
CPVC Re-PipeCPVC Re-Pipe
 Replacing all existingReplacing all existing
hot/cold galvanizedhot/cold galvanized
water distributionwater distribution
system.system.
 Install new scheduleInstall new schedule
80 Corzan CPVC pipe.80 Corzan CPVC pipe.
 Install all new showerInstall all new shower
valves & watervalves & water
stops/supply lines.stops/supply lines.
ArizonaArizona
Versante ApartmentsVersante Apartments
Tempe, AZTempe, AZ
Versante ApartmentsVersante Apartments
Tempe, AZTempe, AZ
HVAC RetrofitHVAC Retrofit
Sub MeteringSub Metering
HVAC RetrofitHVAC Retrofit
 Removal of existingRemoval of existing
fan coil units & chillerfan coil units & chiller
waterlines.waterlines.
 Installation ofInstallation of
individual A/C &individual A/C &
heating systems.heating systems.
 Removal andRemoval and
dismantlement of olddismantlement of old
chiller system.chiller system.
Sub MeteringSub Metering
 Installed 480Installed 480
electrical meters toelectrical meters to
monitor usage in eachmonitor usage in each
unit.unit.
 Installed 240 metersInstalled 240 meters
to monitor HVACto monitor HVAC
usage.usage.

Mais conteúdo relacionado

Semelhante a Current Projects

NuflowCommericalServicesBrochure
NuflowCommericalServicesBrochureNuflowCommericalServicesBrochure
NuflowCommericalServicesBrochureRyan Luxton
 
J&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An IntroductionJ&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An IntroductionJ and P Building Systems
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiberjamieram
 
Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]DennisConTech
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRPdewcraig
 
Don’T Let Your Cooling Towers Look Like This
Don’T Let Your Cooling Towers Look Like ThisDon’T Let Your Cooling Towers Look Like This
Don’T Let Your Cooling Towers Look Like ThisE M
 
Jan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionJan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionCity of Tempe, Arizona
 
101 Pipe & Casing Inc
101 Pipe & Casing Inc101 Pipe & Casing Inc
101 Pipe & Casing IncBrendan Cohn
 
Reverse Engineering
Reverse EngineeringReverse Engineering
Reverse EngineeringAtul Saxena
 
Brochure precastwalls
Brochure precastwallsBrochure precastwalls
Brochure precastwallsRamin Vaghei
 

Semelhante a Current Projects (14)

NuflowCommericalServicesBrochure
NuflowCommericalServicesBrochureNuflowCommericalServicesBrochure
NuflowCommericalServicesBrochure
 
J&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An IntroductionJ&P Building Systems Ltd - An Introduction
J&P Building Systems Ltd - An Introduction
 
Carbon Fiber
Carbon FiberCarbon Fiber
Carbon Fiber
 
Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]
 
SGS Brochure 2012-1
SGS Brochure 2012-1SGS Brochure 2012-1
SGS Brochure 2012-1
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 
Don’T Let Your Cooling Towers Look Like This
Don’T Let Your Cooling Towers Look Like ThisDon’T Let Your Cooling Towers Look Like This
Don’T Let Your Cooling Towers Look Like This
 
introduction
introductionintroduction
introduction
 
Metal Bronze Brass Valves
Metal Bronze Brass ValvesMetal Bronze Brass Valves
Metal Bronze Brass Valves
 
Jan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionJan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long version
 
Product of the Week Showcase - May
Product of the Week Showcase - MayProduct of the Week Showcase - May
Product of the Week Showcase - May
 
101 Pipe & Casing Inc
101 Pipe & Casing Inc101 Pipe & Casing Inc
101 Pipe & Casing Inc
 
Reverse Engineering
Reverse EngineeringReverse Engineering
Reverse Engineering
 
Brochure precastwalls
Brochure precastwallsBrochure precastwalls
Brochure precastwalls
 

Current Projects

  • 1. Southern CaliforniaSouthern California Milano ApartmentsMilano Apartments Torrance, CATorrance, CA Emerald Terrace ApartmentsEmerald Terrace Apartments Los Angeles, CALos Angeles, CA
  • 2. Milano ApartmentsMilano Apartments Torrance, CATorrance, CA Garage Structural RepairsGarage Structural Repairs Roof Structural RepairsRoof Structural Repairs
  • 3. Garage Structural DamageGarage Structural Damage  Steel beams &Steel beams & columns severelycolumns severely corroded.corroded.  Structural integrityStructural integrity has beenhas been compromised.compromised.  Water intrusion fromWater intrusion from expansion joints overexpansion joints over several years.several years.
  • 4. Garage AsbestosGarage Asbestos AbatementAbatement  Existing fireproofing &Existing fireproofing & stucco containingstucco containing asbestos to beasbestos to be removed beforeremoved before repairs.repairs.  Steel beams &Steel beams & columns to becolumns to be sandblasted tosandblasted to remove rust andremove rust and corrosion.corrosion.
  • 5. Garage Structural RepairsGarage Structural Repairs  Shoring of each damagedShoring of each damaged section.section.  Excavation of footing toExcavation of footing to inspect any potentialinspect any potential damage.damage.  Welding of new steel toWelding of new steel to repair failing beams.repair failing beams.  All repairs completed perAll repairs completed per structural engineerstructural engineer specifications.specifications.  New fireproofing installedNew fireproofing installed per fire code.per fire code.
  • 6. Roof Structural DamageRoof Structural Damage  Wood beamsWood beams damaged due todamaged due to termite & dryrot.termite & dryrot.  Structural integrityStructural integrity has beenhas been compromised.compromised.  Poor drainage on flatPoor drainage on flat roof contributed toroof contributed to structural failure.structural failure.
  • 7. Roof Structural RepairsRoof Structural Repairs  Roofing repairsRoofing repairs were completedwere completed to certifiedto certified engineerengineer specifications.specifications.  Scaffolding andScaffolding and pedestrianpedestrian walkway installedwalkway installed to completeto complete repairs.repairs.
  • 8. Emerald TerraceEmerald Terrace Apartments Los Angeles,Apartments Los Angeles, CACA Plumbing Retrofit (CPVCPlumbing Retrofit (CPVC Complete Re-Pipe)Complete Re-Pipe)
  • 9. Existing Galvanized WaterExisting Galvanized Water SystemSystem  Existing galvanizedExisting galvanized water system cloggedwater system clogged with scale restrictingwith scale restricting water pressure.water pressure.  Existing galvanizedExisting galvanized pipe failing causingpipe failing causing leaks within the entireleaks within the entire system.system.
  • 10. Asbestos Abatement ForAsbestos Abatement For Re-PipeRe-Pipe  Existing 1970’sExisting 1970’s construction utilizedconstruction utilized asbestos in drywallasbestos in drywall construction.construction.  All drywallAll drywall penetrations neededpenetrations needed for re-pipe must befor re-pipe must be abated prior toabated prior to plumbing.plumbing.  Certified hygienist toCertified hygienist to certify air clearance.certify air clearance.
  • 11. CPVC Re-PipeCPVC Re-Pipe  Replacing all existingReplacing all existing hot/cold galvanizedhot/cold galvanized water distributionwater distribution system.system.  Install new scheduleInstall new schedule 80 Corzan CPVC pipe.80 Corzan CPVC pipe.  Install all new showerInstall all new shower valves & watervalves & water stops/supply lines.stops/supply lines.
  • 13. Versante ApartmentsVersante Apartments Tempe, AZTempe, AZ HVAC RetrofitHVAC Retrofit Sub MeteringSub Metering
  • 14. HVAC RetrofitHVAC Retrofit  Removal of existingRemoval of existing fan coil units & chillerfan coil units & chiller waterlines.waterlines.  Installation ofInstallation of individual A/C &individual A/C & heating systems.heating systems.  Removal andRemoval and dismantlement of olddismantlement of old chiller system.chiller system.
  • 15. Sub MeteringSub Metering  Installed 480Installed 480 electrical meters toelectrical meters to monitor usage in eachmonitor usage in each unit.unit.  Installed 240 metersInstalled 240 meters to monitor HVACto monitor HVAC usage.usage.