LTE Release Management Process
Application of PMGB tool sets for improvement
PMGB Workbook V34_engl
Application of PMGB tool sets for improvement
06.07.2013Process name : LTE System Release Management 1
6 Sigma Process Management : Jeffrey Gardner
Description of Release Management
System
Acceptance
Quality
MS
Supplier (LTE)
shipment
Integration
and Test
Pilot RolloutI/P
Quality
MS
Quality
MS
Quality
MS
System Development Life cycle
New Release
(N+1)
Start Stop
Preamble
Release Management is a sub process of the Software Delivery Life-cycle (SDLC)
LTE (Long Term Evolution) is a Global standard of 4th Generation Network deployed by Mobile
Operators to provide communications and broadband services.
A centralised Skill Centre owns the SDLC and Release Management approval through a ‘Test-
Release Management process
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 2
A centralised Skill Centre owns the SDLC and Release Management approval through a ‘Test-
it-once’ approach.
Release Management process is sub-optimal with No. of defects above target level.
Objective is to modify the Process to achieve Operational & Service excellence.
The target outcome is better quality for internal customers and end users/consumers.
The optimised Release Management process is repeatable.
Release Management model – what is the target
performance?
Total Number of defects identified in Lab & Field
No. of
Defects
RFA RFP RRO SAS
Time
Joint System
Test
Pilot Rollout
Improve Test Improve Improve Quality
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 3
Target outcome :deal with the root cause and reduce impact of
managing the effects
Reduction in effort expended to identify defects during lab testing and remedial actions in the field.
Measurable improvement in defects detected in Lab compared to those in the field.
RFA
MS
RFP
MS
RRO
MS
SAS
MS
Improve Test
Quality
Improve
Quality
Improve Quality
SIPOC: Release Management
Do we have a common understanding of how the process works today?
Process Name: LTE Release Management
Supplier Input Process Output Customer
START
Supplier of LTE
System/s
System Release
Patch
Execute Patch
Release Testing
Patch under Pilot
Patch passes
Pilot
Patch Rollout
START
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 4
Complete Rollout
System Release
Acceptance
Recommendation
to National
Companies
Mobile Network
Operators/multiple
markets
STOP
CTQ / CTB Matrix
What is critical for the customer’s satisfaction?
Critical to Customer (CTQ)
Voice of the Customer Central Topic CTQ / Requirements
I want the minimum number of
SW faults in the Network
Quality/Operational
Each SW release shall be
thoroughly tested prior to
release to Field
Critical to Business (CTB)
SW faults in the Network
release to Field
Faults in the network should be
within acceptable levels
Efficiency
Defect statistics (KPI’s) are
within Target
Minimum delivery time for SW
patch
Quality/Time
Minimum delivery time for SW
patch
Faults are increasing
accumulatively over time
Quality
Problem Reports are as few as
possible
Voice of the Business Central Topic CTB / Requirements
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 5
Voice of the Business Central Topic CTB / Requirements
The total effort is increasing over
the lifecycle
Cost efficiency
Effort shall be minimised with no
more than 4 FTE’s allocated at
one time.
The defects may impact
customer experience
CEM/Revenue
Minimise the impact to end
customers
CTQs / CTBs
Output Variable Matrix
Through which output variables would CTQs and CTBs be best described?
CTQ
Each SW release shall be thoroughly
tested prior to release to Pilot
0 3 9 0 0
Fault statistics (KPI’s) are within Target 0 9 9 3 0
Minimum delivery time for SW patch 0 0 3 9 0
Problem Reports are as few as possible 0 3 9 0 0
CTB
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 6
CTB
Effort shall be minimised with no more
than 4 FTE’s allocated at one time
(applicable to RN Business Unit)
9 0 0 3 9
Minimise the impact to end customers 3 3 9 0 0
Correspondence 9 strong, 3 medium, 1 low, 0 none
Data Collection Plan
How do we get the data in order to measure the project performance?
Measurement Type of
measureme
nt
(Output/
Process/
Type of data
(continuous/
discrete)
Operational
Definition
Responsible
for data
collection
Method of data
collection
Data /time /
frequency of
measure-
ment
Data source /
place of
measurement
Target
value
(Output/
Process/
Input)
ment
No. Priority
1, 2 PR’s in
Pilot
Output Continuous Fault
removal
efficiency
PR ratio
Lab/Field
Release
Manager
Trouble
Ticket
System
(TIS)
Date/time
stamped
Release
Manager/K
PI
calculation
3:1 Ratio
(Lab to
Field)
No. Priority
1,2 PR’s in
Rollout
Ouput Continuous Quality
Risk
exposure
PR ratio
Lab/Field
Release
Manager
Trouble
Ticket
System
(TIS)
Date/time
stamped
Release
Manager/K
PI
calculation
9:1 Ratio
(Lab to
Field)
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 7
Lab/Field
Patch
availability
for Field
Output Continuous Supplier
;First-
in/First-out
Test
Leader
Observed Date/time
stamped
Test Leader </=5 days
Contain
effort to
minimum
Output Continuous FTE run
rate
Release
Manager
Reporting of
actual effort
Monthly ITG/Remaid Max 4 x
FTE
Graphic display of the Output Measurements
How well are we fulfilling customer requirements today?
Diagram
Operational definition of the measurement
No. of Priority PR’s in Pilot : Relationship between defects found in the Lab and defects found in the
field Pilot of the new release. Formulaic based on number of faults generated in the 2 phases.
ResultDiagram
Bar Graph shows the Target results
for Testing efficiencies over the last 4
System Releases.
In all cases the target was exceeded
although the internal customer
experience was unsatisfactory
(internal effort, disruption and
unplanned events).
The customer experience (VOC)
Result
100
50
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 8
The customer experience (VOC)
requires reduction in Operational
impact.
Efficiency KPI defined as a measure of
the effectiveness of test assignment:-
Efficiency KPI = No. of faults identified in test phase A
Total No. of faults identified during testing
Efficiency
Release A
Target 75%
Target range 0 – 100 %
80.95
0
96.3
Efficiency
Relese B
Efficiency
Release C
Efficiency
Release D
83.3392.86
Graphic display of the Output Measurements
How well are we fulfilling customer requirements today?
Diagram
Operational definition of the measurement
No. of priority PR’s in Rollout : Relationship between Defects found in the Lab and Defects found in the early
Operational lifecycle of the new Release. Formulaic based on number of faults generated in the 2 phases.
ResultDiagram Result
75
Bar Graph shows the Target results for
Testing efficiencies over last 4 releases.
In all cases the target was not achieved and
the internal customer experience was
unsatisfactory (internal effort, disruption and
unplanned events).
The customer experience (VOC) requires
reduction in Operational impact.
In target achievement the quality is a step
25
50
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 9
Quality Risk Exposure
Release A
Target 10%
Target range 5 – 25 %
35.71
0
30.2352.6321.6
Quality Risk Exposure
Release B
Quality Risk Exposure
Release C
Quality Risk Exposure
Release D
In target achievement the quality is a step
improvement to the first Pilot Phase.
Total defects reduce with increase in quality.
Quality risk exposure KPI defined as
adherence to quality targets and value add:-
QRI KPI= No. of unidentified faults during testing
Total No. of faults identified over all testing
Graphic display of the Output Measurements
How well are we fulfilling customer requirements today?
Diagram
Operational definition of the measurement
Effort : Radio Network BU - Adherence to Planning of effort - relationship between planned and actual effort.
Calculation is proportion of planned vs actual effort (Effort = actual/planned)
ResultDiagram Result
1
2
Bar Graph shows the Target
achievement for project planning over
the last 4 System Releases.
In 1 out of 4 projects the target was not
achieved due to overrun.
The delay resulted in increased staffing
costs - OPEX estimation.
Total FTE allocation shall be maximum
of 4 FTE’s (planned & actual).
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 10
Effort
Release A
Target 1
Target range 0,5 – 1,5
0.98
0
1.34
Effort
Release B
Effort
Release C
Effort
Release D
0.850.85
of 4 FTE’s (planned & actual).
Cost efficiencies are upheld.
Effort KPI defined as ratio of planned vs
actual:-
Effort KPI= Actual Test Effort (person days)
Planned Test Effort (person days)
Graphic display of the Output Measurements
How well are we fulfilling customer requirements today?
Diagram
Operational definition of the measurement
Patch availability : FIFO model (First-in, first-out), time period (days) between receiving patch from
supplier to availability for Pilot/Rollout. Calculation is time based and variable in units of days.
ResultDiagram Result
5
10
Bar Graph shows the average
turnaround (Test process cycle) time
for Patch releases (Release D).
Operates on FIFO basis with Lab Test
execution (FTE’s) as sole constraint.
Rapid turnaround time increases fault
likelihood.
Better to define SLA as 5 day
turnaround and offer <5d delivery on a
Yr 2012 Release D
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 11
JAN
Target 5d
Target range 2d –5d
0
turnaround and offer <5d delivery on a
per case basis.
Cost efficiencies and Quality are
upheld.
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
6.7 2.7 1.7 2.7 2 2 10 3 4 4 3.5 5
Process Function Diagram (‘Swim Lane’)
What does the current process flow look like?
Division Process stepsStart Stop
LTE System
System release
patch available
New patch
required
New patch
required
RN Business
Unit
Operations
(Central)
LTE System
Supplier:
Optimization Confirm
Pilot
Pass
y
N
patch available
VE 1d
required
NVA <40d
required
NVA <40d
Execute Patch
Release
Testing
VA 11d
Patch under
Pilot
VA 10
d
1
2 Patch
Rollout
VA 7d
NOK
3
Confirm as
Rollout gating
NVA 2d
4
Patch Rollout
completion
VE 2d
5
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 12
Optimization
Functional
Team
VA Value Adding
VE Value Enabling
NVA Non Value Adding
Confirm
Rollout OK
NVA 0.5d
MNO Market
Units
OK
NOK
System Release
Acceptance
NVA 2d
Value Stream Map
How does material and information flow within the process?
Supplier CustomerSupplier Release ManagerTest Lead
1 FTE – 6 days
effort
1 FTE – 8 days
effort
Delivery to Test Lab
Lab Install
Define Test Template
1 FTE – 1 days effort
Defect
3 FTE - 5 days effort
1 FTE – 0.5 days effort
2.5 FTE – 1 day
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 13
System Test Assess Pass/Fail Roll out
1 FTE –
0.5 days effort
Test Report Pilot Readiness
1-7 days (Tues)
3 FTE - 5 days effort
Major Release
5 FTE – 5 days
effort
1 days – 1 FTE’s
Pilot
1 FTE – 7 days
effort
1 FTE – 75 days
effort
2.5 FTE – 1 day
effort
Results of the process analysis
What are the critical factors in the process flow – where have you identified potential problems?
Number Process Step Problem
1
Execute Patch Release
Testing
The Quality of the SW received from Supplier is not ‘error free‘.
Supplier provides Change note information to enable captive Testing to
be scoped within known constraints of environment and manpower.
2
Patch under Pilot The Pilot activity offers the best opportunity to establish defects to
Operations and/or end customers. Depending on Fault (PR) priority the
resulting leadtime to provide a resolution is between 1-40 days.
3
Patch passes Pilot As a quality gate (MS) the Pilot network experience provides data to
support the Ready for Rollout decision.
It does not full fill the following :-
a) Guarantee of a Rollout free from defects
b) A time extension of the Pilot phase
4
Patch Rollout During the rollout phase new defects may occur which often results in a
request for new SW patch/es. This has 2 primary effects :-
a) As SW footprint expands so do the related defects with broader
impact
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 14
4 impact
b) If rate of patches through the supply channel exceeds the rollout plan
(patch deploy rate), the network suffers a dip in SW performance.
5
Patch Rollout complete Ideal outcome is one final patch satisfying customer quality expectation.
In practice emerging defects neccessitate further release management
(extension of project into Operations ‘maintenance mode‘) with
extended delays and effort for MNO Business Unit.
Process RACI Matrix
Who is responsible for what in the process?
Process name / description
Process Steps Divison / Area
Input Output CommentsDescription of the
Operations
Optimization
Input Output Comments
Nr.
Description of the
process Step
Supplier
RN
Business
Unit
Operations
Central
Optimization
MNO
Markets
1
Execute Patch Release
Testing
C
R/
A
I I
Release
patch
2 Patch under Pilot A R R I
3 Patch passes Pilot
R/
A
C C I
4 Patch Rollout A R C I
Recommend
Market MNO have
sole authority for
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 15
R = Responsible - Person who is competent fof executing the task.
A = Accountable – Person who has the responsability over the task.
C = Consulted – Person who must be consulted about a decision.
I = Informed – Person who must be notified of a decision.
5 Patch Rollout complete A C R R SAS to MNO
Markets
sole authority for
SAS milestone
decision
Failure Mode and Effect Analysis (FMEA)
Where in the process flow can defects occur?
Procedure:Procedure:
1. Determine process steps
2. Determine which defects may occur
3. Determine what the consequences of the defects are
4. Determine the magnitude of the consequences of the defects (Intensity from 1-10)
5. Determine what the possible causes for the defect are
6. Determine the likelihood of occurrence of the identified causes (Occurrence from 1-10)
7. Determine which existing controls are in place
8. Determine the likelihood of detection of the defect causes (Detection from 1-10)
9. Calculate the Risk Priority Number (I x O x D)
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 16
9. Calculate the Risk Priority Number (I x O x D)
10. Define and take appropriate measures
11. Calculate/Estimate new Risk Priority Number
Failure Mode and Effect Analysis (FMEA)
“Where can defects occur in the process flow?
Process
step
Potential
defect
possibility
Potential
effect
Intensity
Defect cause
Occurrence
Existing
controls
Detection
RPN
Actions
Intensity
Occurrence
Detection
RPN
Execute
Patch
Release
Testing
Defect/s not
identified in
Lab Testing
Defect
slips to
Pilot.
Operability
and/or end
customer
impact
5 Patch release
too rapid. Lab
not fully
representative of
Field Pilot
(limited
investment
policy).
8 Y: appropriate
allocation of
Resource and
expertise
4 160 Detection; patch
content based decision
that allows appropriate
time for Patch testing.
Drive ‘Release when
ready’ of patch.
5 8 3 120
Patch
under
Pilot
Defect not
identified in
Field Pilot
Defect
slips to
Pilot.
Operability
and/or end
5 Unstable Pilot
network. Patch
related event
data lost in high
number of
8 Y :
Implemented
Operational
Network
surveillance
4 160 Detection; statistically
rule out ‘interferers’ by
implementing network
freeze of Pilot area.
5 8 2* 80
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 17
and/or end
customer
impact
number of
network events.
surveillance
unit
Patch
passes
Pilot
Performanc
e reports
(KPI) not
available
No data to
evaluate
Pilot exit
5 Data not
reported by in-
house
Performance
Management
unit
8 Y :
Implemented
Operational
Network
surveillance
unit
3 120 Detection; Source
Performance data from
LTE Supplier
5 8 2* 80
*Preliminary assessment – actual implementation will provide measurement data
Process Management Storyboard – Results & learning’s
During System Introduction Operability and Customer experience are treated with equal importance.
Historically the quality KPI’s measured during Rollout phase are not achieved.
The RN Release Management capability is fit-for-purpose (skill set + manpower) but with Lab/Test Plant constraints
The CTQ’s and Function are acceptable to Central Op’s and thus are mapped to Output Matrix and data collection.
Improvement opportunities in Lab test coverage (scope and time) and Pilot extension are focus of 6 Sigma study.
Partial implementation of improvements in current ‘N’ Release XXYY (Patch turnaround time + Effort).
Full implementation of improvements with benefits expected in ‘N+1’ Release Introduction (AABB).Full implementation of improvements with benefits expected in ‘N+1’ Release Introduction (AABB).
Key Learning’s from describing &
Measuring Process
Analysis of defects found in field - 65% of defects are
reproducible in Lab
Results of key measures since applying
PMGB tools and techniques
Effected extension of Test process cycle
time (5d minimum) with measured increase
in Lab defect ‘capture’ rate
Effort KPI contained to ca 3.75 x FTE’s
(Work force reporting Feb 2012 –Dec 2012)
35%
Not Reproducible
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 18
(Work force reporting Feb 2012 –Dec 2012)
Investment uplift in Lab necessary to
increase defect capture rate
35%
65%
Reproducible
Glossary
RN – Radio Networks ; central skill centre tasked
with Release Management
BU – Business Unit
FTE – Full Time EmployeeFTE – Full Time Employee
SLA – Service Level Agreement
PR – Problem Report
KPI – Key Performance Indicator
SW – Software
MS – Milestone
Lab – Representative system for Release Testing
PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 19
Lab – Representative system for Release Testing
System – Supplier’s aggregate of equipment & SW
LTE – Long Term Evolution : 4th generation 3GPP
standardised system for Mobile communication
Required (‘7+1’)Tools for PMGB Workbook
5S (incl. photos before/after)
CAN DO - Tools
(select one for certification)
SIPOC
Seven MUST DO – Tools
(all are required for certification) ++
5S (incl. photos before/after)
Value Analysis
Time Analysis (incl. process
balancing)
FMEA
Poka Yoke
SIPOC
VoC CTQ (Tool 1)
Output Measurement Variables
(Tool 2)
Data Collection / Measurement
Plan ( incl. Operational Definition)
Graphical display of process
performance
Value Stream Map/Swim-Lane
PMGB Workbook V34_engl Process name : LTE System Release Management 20
Value Stream Map/Swim-Lane
RACI (Responsibility Matrix)
06.07.2013

Mais conteúdo relacionado

Mais procurados

Oracle Cloud Infrastructure:2021年6月度サービス・アップデート
Oracle Cloud Infrastructure:2021年6月度サービス・アップデートOracle Cloud Infrastructure:2021年6月度サービス・アップデート
Oracle Cloud Infrastructure:2021年6月度サービス・アップデートオラクルエンジニア通信
 
AJRA Test Strategy Discussion
AJRA Test Strategy DiscussionAJRA Test Strategy Discussion
AJRA Test Strategy Discussionajrhem
 
【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]
【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]
【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]オラクルエンジニア通信
 
事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)
事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)
事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)オラクルエンジニア通信
 
Effective Software Release Management
Effective Software Release ManagementEffective Software Release Management
Effective Software Release ManagementMichael Degnan
 
Idexcel Independent Testing Services Presentation
Idexcel Independent Testing Services PresentationIdexcel Independent Testing Services Presentation
Idexcel Independent Testing Services PresentationIdexcel
 
DMBOKをベースにしたデータマネジメント
DMBOKをベースにしたデータマネジメントDMBOKをベースにしたデータマネジメント
DMBOKをベースにしたデータマネジメントKent Ishizawa
 
PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」
PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」
PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」PC Cluster Consortium
 
SoR 2.0 基幹システムの再定義と再構築
SoR 2.0 基幹システムの再定義と再構築SoR 2.0 基幹システムの再定義と再構築
SoR 2.0 基幹システムの再定義と再構築増田 亨
 
オラクルのHPC/GPUソリューションご紹介(2021/08版)
オラクルのHPC/GPUソリューションご紹介(2021/08版)オラクルのHPC/GPUソリューションご紹介(2021/08版)
オラクルのHPC/GPUソリューションご紹介(2021/08版)オラクルエンジニア通信
 
Setting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in HealthcareSetting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in HealthcareCitiusTech
 
Writing Test Cases 20110808
Writing Test Cases 20110808Writing Test Cases 20110808
Writing Test Cases 20110808slovejoy
 
IT Service Level Agreement
IT Service Level AgreementIT Service Level Agreement
IT Service Level AgreementKHNOG
 
自律型データベース Oracle Autonomous Database 最新情報
自律型データベース Oracle Autonomous Database 最新情報自律型データベース Oracle Autonomous Database 最新情報
自律型データベース Oracle Autonomous Database 最新情報オラクルエンジニア通信
 
Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012
Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012
Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012Treasure Data, Inc.
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsWynyard Group
 
Static white box testing lecture 12
Static white box testing lecture 12Static white box testing lecture 12
Static white box testing lecture 12Abdul Basit
 

Mais procurados (20)

Oracle Cloud Infrastructure:2021年6月度サービス・アップデート
Oracle Cloud Infrastructure:2021年6月度サービス・アップデートOracle Cloud Infrastructure:2021年6月度サービス・アップデート
Oracle Cloud Infrastructure:2021年6月度サービス・アップデート
 
AJRA Test Strategy Discussion
AJRA Test Strategy DiscussionAJRA Test Strategy Discussion
AJRA Test Strategy Discussion
 
API Gatewayご紹介
API Gatewayご紹介API Gatewayご紹介
API Gatewayご紹介
 
【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]
【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]
【旧版】Oracle Database Cloud Service:サービス概要のご紹介 [2021年7月版]
 
事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)
事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)
事例から見る規模別クラウド・データベースの選び方 (Oracle Database) (Oracle Cloudウェビナーシリーズ: 2021年6月30日)
 
Effective Software Release Management
Effective Software Release ManagementEffective Software Release Management
Effective Software Release Management
 
Idexcel Independent Testing Services Presentation
Idexcel Independent Testing Services PresentationIdexcel Independent Testing Services Presentation
Idexcel Independent Testing Services Presentation
 
DMBOKをベースにしたデータマネジメント
DMBOKをベースにしたデータマネジメントDMBOKをベースにしたデータマネジメント
DMBOKをベースにしたデータマネジメント
 
PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」
PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」
PCCC20 日本オラクル株式会社「Oracle Cloud Infrastructure for HPC」
 
SoR 2.0 基幹システムの再定義と再構築
SoR 2.0 基幹システムの再定義と再構築SoR 2.0 基幹システムの再定義と再構築
SoR 2.0 基幹システムの再定義と再構築
 
オラクルのHPC/GPUソリューションご紹介(2021/08版)
オラクルのHPC/GPUソリューションご紹介(2021/08版)オラクルのHPC/GPUソリューションご紹介(2021/08版)
オラクルのHPC/GPUソリューションご紹介(2021/08版)
 
Installing Groovy engine in Apache Jmeter
Installing Groovy engine in Apache JmeterInstalling Groovy engine in Apache Jmeter
Installing Groovy engine in Apache Jmeter
 
Setting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in HealthcareSetting up Center of Excellence for QA in Healthcare
Setting up Center of Excellence for QA in Healthcare
 
Writing Test Cases 20110808
Writing Test Cases 20110808Writing Test Cases 20110808
Writing Test Cases 20110808
 
IT Service Level Agreement
IT Service Level AgreementIT Service Level Agreement
IT Service Level Agreement
 
自律型データベース Oracle Autonomous Database 最新情報
自律型データベース Oracle Autonomous Database 最新情報自律型データベース Oracle Autonomous Database 最新情報
自律型データベース Oracle Autonomous Database 最新情報
 
Types of performance testing
Types of performance testingTypes of performance testing
Types of performance testing
 
Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012
Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012
Fluentd loves MongoDB, at MongoDB SV User Group, July 17, 2012
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business Requirements
 
Static white box testing lecture 12
Static white box testing lecture 12Static white box testing lecture 12
Static white box testing lecture 12
 

Destaque

Release Management
Release Management Release Management
Release Management Vyom Labs
 
Itil v3 release and deployment management
Itil v3 release and deployment managementItil v3 release and deployment management
Itil v3 release and deployment managementkunaljoy11
 
ITIL, Release Management and Automation
ITIL, Release Management and AutomationITIL, Release Management and Automation
ITIL, Release Management and AutomationIBM UrbanCode Products
 
Release Management: Successful Software Releases Start with a Plan
Release Management: Successful Software Releases Start with a PlanRelease Management: Successful Software Releases Start with a Plan
Release Management: Successful Software Releases Start with a Planconnielharper
 
Agile Release Planning
Agile Release PlanningAgile Release Planning
Agile Release PlanningAdnan Aziz
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionAxios Systems
 
Evolution of service transition
Evolution of service transitionEvolution of service transition
Evolution of service transitionStuart Rance
 
Praxisbericht: Agil skalierte Produktentwicklung im regulierten Umfeld
Praxisbericht: Agil skalierte Produktentwicklung im regulierten UmfeldPraxisbericht: Agil skalierte Produktentwicklung im regulierten Umfeld
Praxisbericht: Agil skalierte Produktentwicklung im regulierten UmfeldHOOD Group
 
3g-lte-oss-performance-management
3g-lte-oss-performance-management3g-lte-oss-performance-management
3g-lte-oss-performance-managementvishal123
 
From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...
From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...
From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...Serena Software
 
Apereo OAE development and release process
Apereo OAE development and release processApereo OAE development and release process
Apereo OAE development and release processBert Pareyn
 
Release Manager Data sheet
Release Manager Data sheetRelease Manager Data sheet
Release Manager Data sheetAnalytiX DS
 
Forrester total-economic-impact-of-ca-release-automation
Forrester total-economic-impact-of-ca-release-automationForrester total-economic-impact-of-ca-release-automation
Forrester total-economic-impact-of-ca-release-automationSathish Nagarajan
 
Continuous integrations - Basics
Continuous integrations - BasicsContinuous integrations - Basics
Continuous integrations - BasicsBarış İNANÇ
 
Business Intelligence Release Management Best Practices
Business Intelligence Release Management Best PracticesBusiness Intelligence Release Management Best Practices
Business Intelligence Release Management Best PracticesJohn Heaton
 
BDD in Java using Cucumber
BDD in Java using CucumberBDD in Java using Cucumber
BDD in Java using Cucumberslavkurochkin
 
Leading DevOps Application Release and Deployment - Best Practices for Organi...
Leading DevOps Application Release and Deployment - Best Practices for Organi...Leading DevOps Application Release and Deployment - Best Practices for Organi...
Leading DevOps Application Release and Deployment - Best Practices for Organi...IBM UrbanCode Products
 

Destaque (20)

Release Management
Release Management Release Management
Release Management
 
Itil v3 release and deployment management
Itil v3 release and deployment managementItil v3 release and deployment management
Itil v3 release and deployment management
 
ITIL, Release Management and Automation
ITIL, Release Management and AutomationITIL, Release Management and Automation
ITIL, Release Management and Automation
 
Release Management: Successful Software Releases Start with a Plan
Release Management: Successful Software Releases Start with a PlanRelease Management: Successful Software Releases Start with a Plan
Release Management: Successful Software Releases Start with a Plan
 
Agile Release Planning
Agile Release PlanningAgile Release Planning
Agile Release Planning
 
Mapa mental ITIL
Mapa mental ITILMapa mental ITIL
Mapa mental ITIL
 
ITIL Practical Guide - Service Transition
ITIL Practical Guide - Service TransitionITIL Practical Guide - Service Transition
ITIL Practical Guide - Service Transition
 
Evolution of service transition
Evolution of service transitionEvolution of service transition
Evolution of service transition
 
Praxisbericht: Agil skalierte Produktentwicklung im regulierten Umfeld
Praxisbericht: Agil skalierte Produktentwicklung im regulierten UmfeldPraxisbericht: Agil skalierte Produktentwicklung im regulierten Umfeld
Praxisbericht: Agil skalierte Produktentwicklung im regulierten Umfeld
 
Release Management Plan
Release Management PlanRelease Management Plan
Release Management Plan
 
3g-lte-oss-performance-management
3g-lte-oss-performance-management3g-lte-oss-performance-management
3g-lte-oss-performance-management
 
From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...
From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...
From Release Bottleneck to Deployment Flow - how Eaton Vance revolutionized t...
 
Apereo OAE development and release process
Apereo OAE development and release processApereo OAE development and release process
Apereo OAE development and release process
 
Release Manager Data sheet
Release Manager Data sheetRelease Manager Data sheet
Release Manager Data sheet
 
Forrester total-economic-impact-of-ca-release-automation
Forrester total-economic-impact-of-ca-release-automationForrester total-economic-impact-of-ca-release-automation
Forrester total-economic-impact-of-ca-release-automation
 
Continuous integrations - Basics
Continuous integrations - BasicsContinuous integrations - Basics
Continuous integrations - Basics
 
Business Intelligence Release Management Best Practices
Business Intelligence Release Management Best PracticesBusiness Intelligence Release Management Best Practices
Business Intelligence Release Management Best Practices
 
BDD in Java using Cucumber
BDD in Java using CucumberBDD in Java using Cucumber
BDD in Java using Cucumber
 
Leading DevOps Application Release and Deployment - Best Practices for Organi...
Leading DevOps Application Release and Deployment - Best Practices for Organi...Leading DevOps Application Release and Deployment - Best Practices for Organi...
Leading DevOps Application Release and Deployment - Best Practices for Organi...
 
How To Plan a Software Project
How To Plan a Software ProjectHow To Plan a Software Project
How To Plan a Software Project
 

Semelhante a 6 sigma LTE release management process improvement

Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2Gurpreet singh
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Acceptance test driven development
Acceptance test driven developmentAcceptance test driven development
Acceptance test driven developmentEditor Jacotech
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Poulomi Mondal_Final Resume
Poulomi Mondal_Final ResumePoulomi Mondal_Final Resume
Poulomi Mondal_Final ResumePoulomi Roy
 
Lean for Competitive Advantage and Customer Delight
Lean for Competitive Advantage and Customer DelightLean for Competitive Advantage and Customer Delight
Lean for Competitive Advantage and Customer DelightLean India Summit
 
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)Priti Mule
 
UAT for a Major US Banking Conglomerate
UAT for a Major US Banking ConglomerateUAT for a Major US Banking Conglomerate
UAT for a Major US Banking ConglomerateThinksoft Global
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 EstimationLawrence Bernstein
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
Case Study on Automation Capability CT ARROW
Case Study on Automation Capability CT ARROWCase Study on Automation Capability CT ARROW
Case Study on Automation Capability CT ARROWThe Digital Group
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...Cisco Canada
 
Traf testing requirement analysis framework
Traf testing requirement analysis frameworkTraf testing requirement analysis framework
Traf testing requirement analysis frameworkTarun Aarya
 

Semelhante a 6 sigma LTE release management process improvement (20)

Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Acceptance test driven development
Acceptance test driven developmentAcceptance test driven development
Acceptance test driven development
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Poulomi Mondal_Final Resume
Poulomi Mondal_Final ResumePoulomi Mondal_Final Resume
Poulomi Mondal_Final Resume
 
Lean for Competitive Advantage and Customer Delight
Lean for Competitive Advantage and Customer DelightLean for Competitive Advantage and Customer Delight
Lean for Competitive Advantage and Customer Delight
 
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
Priti_Mule_ETL and ManualTesting(7.6+yrs Exp)
 
Test Automation in Agile
Test Automation in AgileTest Automation in Agile
Test Automation in Agile
 
UAT for a Major US Banking Conglomerate
UAT for a Major US Banking ConglomerateUAT for a Major US Banking Conglomerate
UAT for a Major US Banking Conglomerate
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 Estimation
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
Case Study on Automation Capability CT ARROW
Case Study on Automation Capability CT ARROWCase Study on Automation Capability CT ARROW
Case Study on Automation Capability CT ARROW
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
 
Traf testing requirement analysis framework
Traf testing requirement analysis frameworkTraf testing requirement analysis framework
Traf testing requirement analysis framework
 

Último

Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 

Último (20)

Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 

6 sigma LTE release management process improvement

  • 1. LTE Release Management Process Application of PMGB tool sets for improvement PMGB Workbook V34_engl Application of PMGB tool sets for improvement 06.07.2013Process name : LTE System Release Management 1 6 Sigma Process Management : Jeffrey Gardner
  • 2. Description of Release Management System Acceptance Quality MS Supplier (LTE) shipment Integration and Test Pilot RolloutI/P Quality MS Quality MS Quality MS System Development Life cycle New Release (N+1) Start Stop Preamble Release Management is a sub process of the Software Delivery Life-cycle (SDLC) LTE (Long Term Evolution) is a Global standard of 4th Generation Network deployed by Mobile Operators to provide communications and broadband services. A centralised Skill Centre owns the SDLC and Release Management approval through a ‘Test- Release Management process PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 2 A centralised Skill Centre owns the SDLC and Release Management approval through a ‘Test- it-once’ approach. Release Management process is sub-optimal with No. of defects above target level. Objective is to modify the Process to achieve Operational & Service excellence. The target outcome is better quality for internal customers and end users/consumers. The optimised Release Management process is repeatable.
  • 3. Release Management model – what is the target performance? Total Number of defects identified in Lab & Field No. of Defects RFA RFP RRO SAS Time Joint System Test Pilot Rollout Improve Test Improve Improve Quality PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 3 Target outcome :deal with the root cause and reduce impact of managing the effects Reduction in effort expended to identify defects during lab testing and remedial actions in the field. Measurable improvement in defects detected in Lab compared to those in the field. RFA MS RFP MS RRO MS SAS MS Improve Test Quality Improve Quality Improve Quality
  • 4. SIPOC: Release Management Do we have a common understanding of how the process works today? Process Name: LTE Release Management Supplier Input Process Output Customer START Supplier of LTE System/s System Release Patch Execute Patch Release Testing Patch under Pilot Patch passes Pilot Patch Rollout START PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 4 Complete Rollout System Release Acceptance Recommendation to National Companies Mobile Network Operators/multiple markets STOP
  • 5. CTQ / CTB Matrix What is critical for the customer’s satisfaction? Critical to Customer (CTQ) Voice of the Customer Central Topic CTQ / Requirements I want the minimum number of SW faults in the Network Quality/Operational Each SW release shall be thoroughly tested prior to release to Field Critical to Business (CTB) SW faults in the Network release to Field Faults in the network should be within acceptable levels Efficiency Defect statistics (KPI’s) are within Target Minimum delivery time for SW patch Quality/Time Minimum delivery time for SW patch Faults are increasing accumulatively over time Quality Problem Reports are as few as possible Voice of the Business Central Topic CTB / Requirements PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 5 Voice of the Business Central Topic CTB / Requirements The total effort is increasing over the lifecycle Cost efficiency Effort shall be minimised with no more than 4 FTE’s allocated at one time. The defects may impact customer experience CEM/Revenue Minimise the impact to end customers
  • 6. CTQs / CTBs Output Variable Matrix Through which output variables would CTQs and CTBs be best described? CTQ Each SW release shall be thoroughly tested prior to release to Pilot 0 3 9 0 0 Fault statistics (KPI’s) are within Target 0 9 9 3 0 Minimum delivery time for SW patch 0 0 3 9 0 Problem Reports are as few as possible 0 3 9 0 0 CTB PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 6 CTB Effort shall be minimised with no more than 4 FTE’s allocated at one time (applicable to RN Business Unit) 9 0 0 3 9 Minimise the impact to end customers 3 3 9 0 0 Correspondence 9 strong, 3 medium, 1 low, 0 none
  • 7. Data Collection Plan How do we get the data in order to measure the project performance? Measurement Type of measureme nt (Output/ Process/ Type of data (continuous/ discrete) Operational Definition Responsible for data collection Method of data collection Data /time / frequency of measure- ment Data source / place of measurement Target value (Output/ Process/ Input) ment No. Priority 1, 2 PR’s in Pilot Output Continuous Fault removal efficiency PR ratio Lab/Field Release Manager Trouble Ticket System (TIS) Date/time stamped Release Manager/K PI calculation 3:1 Ratio (Lab to Field) No. Priority 1,2 PR’s in Rollout Ouput Continuous Quality Risk exposure PR ratio Lab/Field Release Manager Trouble Ticket System (TIS) Date/time stamped Release Manager/K PI calculation 9:1 Ratio (Lab to Field) PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 7 Lab/Field Patch availability for Field Output Continuous Supplier ;First- in/First-out Test Leader Observed Date/time stamped Test Leader </=5 days Contain effort to minimum Output Continuous FTE run rate Release Manager Reporting of actual effort Monthly ITG/Remaid Max 4 x FTE
  • 8. Graphic display of the Output Measurements How well are we fulfilling customer requirements today? Diagram Operational definition of the measurement No. of Priority PR’s in Pilot : Relationship between defects found in the Lab and defects found in the field Pilot of the new release. Formulaic based on number of faults generated in the 2 phases. ResultDiagram Bar Graph shows the Target results for Testing efficiencies over the last 4 System Releases. In all cases the target was exceeded although the internal customer experience was unsatisfactory (internal effort, disruption and unplanned events). The customer experience (VOC) Result 100 50 PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 8 The customer experience (VOC) requires reduction in Operational impact. Efficiency KPI defined as a measure of the effectiveness of test assignment:- Efficiency KPI = No. of faults identified in test phase A Total No. of faults identified during testing Efficiency Release A Target 75% Target range 0 – 100 % 80.95 0 96.3 Efficiency Relese B Efficiency Release C Efficiency Release D 83.3392.86
  • 9. Graphic display of the Output Measurements How well are we fulfilling customer requirements today? Diagram Operational definition of the measurement No. of priority PR’s in Rollout : Relationship between Defects found in the Lab and Defects found in the early Operational lifecycle of the new Release. Formulaic based on number of faults generated in the 2 phases. ResultDiagram Result 75 Bar Graph shows the Target results for Testing efficiencies over last 4 releases. In all cases the target was not achieved and the internal customer experience was unsatisfactory (internal effort, disruption and unplanned events). The customer experience (VOC) requires reduction in Operational impact. In target achievement the quality is a step 25 50 PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 9 Quality Risk Exposure Release A Target 10% Target range 5 – 25 % 35.71 0 30.2352.6321.6 Quality Risk Exposure Release B Quality Risk Exposure Release C Quality Risk Exposure Release D In target achievement the quality is a step improvement to the first Pilot Phase. Total defects reduce with increase in quality. Quality risk exposure KPI defined as adherence to quality targets and value add:- QRI KPI= No. of unidentified faults during testing Total No. of faults identified over all testing
  • 10. Graphic display of the Output Measurements How well are we fulfilling customer requirements today? Diagram Operational definition of the measurement Effort : Radio Network BU - Adherence to Planning of effort - relationship between planned and actual effort. Calculation is proportion of planned vs actual effort (Effort = actual/planned) ResultDiagram Result 1 2 Bar Graph shows the Target achievement for project planning over the last 4 System Releases. In 1 out of 4 projects the target was not achieved due to overrun. The delay resulted in increased staffing costs - OPEX estimation. Total FTE allocation shall be maximum of 4 FTE’s (planned & actual). PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 10 Effort Release A Target 1 Target range 0,5 – 1,5 0.98 0 1.34 Effort Release B Effort Release C Effort Release D 0.850.85 of 4 FTE’s (planned & actual). Cost efficiencies are upheld. Effort KPI defined as ratio of planned vs actual:- Effort KPI= Actual Test Effort (person days) Planned Test Effort (person days)
  • 11. Graphic display of the Output Measurements How well are we fulfilling customer requirements today? Diagram Operational definition of the measurement Patch availability : FIFO model (First-in, first-out), time period (days) between receiving patch from supplier to availability for Pilot/Rollout. Calculation is time based and variable in units of days. ResultDiagram Result 5 10 Bar Graph shows the average turnaround (Test process cycle) time for Patch releases (Release D). Operates on FIFO basis with Lab Test execution (FTE’s) as sole constraint. Rapid turnaround time increases fault likelihood. Better to define SLA as 5 day turnaround and offer <5d delivery on a Yr 2012 Release D PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 11 JAN Target 5d Target range 2d –5d 0 turnaround and offer <5d delivery on a per case basis. Cost efficiencies and Quality are upheld. FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 6.7 2.7 1.7 2.7 2 2 10 3 4 4 3.5 5
  • 12. Process Function Diagram (‘Swim Lane’) What does the current process flow look like? Division Process stepsStart Stop LTE System System release patch available New patch required New patch required RN Business Unit Operations (Central) LTE System Supplier: Optimization Confirm Pilot Pass y N patch available VE 1d required NVA <40d required NVA <40d Execute Patch Release Testing VA 11d Patch under Pilot VA 10 d 1 2 Patch Rollout VA 7d NOK 3 Confirm as Rollout gating NVA 2d 4 Patch Rollout completion VE 2d 5 PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 12 Optimization Functional Team VA Value Adding VE Value Enabling NVA Non Value Adding Confirm Rollout OK NVA 0.5d MNO Market Units OK NOK System Release Acceptance NVA 2d
  • 13. Value Stream Map How does material and information flow within the process? Supplier CustomerSupplier Release ManagerTest Lead 1 FTE – 6 days effort 1 FTE – 8 days effort Delivery to Test Lab Lab Install Define Test Template 1 FTE – 1 days effort Defect 3 FTE - 5 days effort 1 FTE – 0.5 days effort 2.5 FTE – 1 day PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 13 System Test Assess Pass/Fail Roll out 1 FTE – 0.5 days effort Test Report Pilot Readiness 1-7 days (Tues) 3 FTE - 5 days effort Major Release 5 FTE – 5 days effort 1 days – 1 FTE’s Pilot 1 FTE – 7 days effort 1 FTE – 75 days effort 2.5 FTE – 1 day effort
  • 14. Results of the process analysis What are the critical factors in the process flow – where have you identified potential problems? Number Process Step Problem 1 Execute Patch Release Testing The Quality of the SW received from Supplier is not ‘error free‘. Supplier provides Change note information to enable captive Testing to be scoped within known constraints of environment and manpower. 2 Patch under Pilot The Pilot activity offers the best opportunity to establish defects to Operations and/or end customers. Depending on Fault (PR) priority the resulting leadtime to provide a resolution is between 1-40 days. 3 Patch passes Pilot As a quality gate (MS) the Pilot network experience provides data to support the Ready for Rollout decision. It does not full fill the following :- a) Guarantee of a Rollout free from defects b) A time extension of the Pilot phase 4 Patch Rollout During the rollout phase new defects may occur which often results in a request for new SW patch/es. This has 2 primary effects :- a) As SW footprint expands so do the related defects with broader impact PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 14 4 impact b) If rate of patches through the supply channel exceeds the rollout plan (patch deploy rate), the network suffers a dip in SW performance. 5 Patch Rollout complete Ideal outcome is one final patch satisfying customer quality expectation. In practice emerging defects neccessitate further release management (extension of project into Operations ‘maintenance mode‘) with extended delays and effort for MNO Business Unit.
  • 15. Process RACI Matrix Who is responsible for what in the process? Process name / description Process Steps Divison / Area Input Output CommentsDescription of the Operations Optimization Input Output Comments Nr. Description of the process Step Supplier RN Business Unit Operations Central Optimization MNO Markets 1 Execute Patch Release Testing C R/ A I I Release patch 2 Patch under Pilot A R R I 3 Patch passes Pilot R/ A C C I 4 Patch Rollout A R C I Recommend Market MNO have sole authority for PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 15 R = Responsible - Person who is competent fof executing the task. A = Accountable – Person who has the responsability over the task. C = Consulted – Person who must be consulted about a decision. I = Informed – Person who must be notified of a decision. 5 Patch Rollout complete A C R R SAS to MNO Markets sole authority for SAS milestone decision
  • 16. Failure Mode and Effect Analysis (FMEA) Where in the process flow can defects occur? Procedure:Procedure: 1. Determine process steps 2. Determine which defects may occur 3. Determine what the consequences of the defects are 4. Determine the magnitude of the consequences of the defects (Intensity from 1-10) 5. Determine what the possible causes for the defect are 6. Determine the likelihood of occurrence of the identified causes (Occurrence from 1-10) 7. Determine which existing controls are in place 8. Determine the likelihood of detection of the defect causes (Detection from 1-10) 9. Calculate the Risk Priority Number (I x O x D) PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 16 9. Calculate the Risk Priority Number (I x O x D) 10. Define and take appropriate measures 11. Calculate/Estimate new Risk Priority Number
  • 17. Failure Mode and Effect Analysis (FMEA) “Where can defects occur in the process flow? Process step Potential defect possibility Potential effect Intensity Defect cause Occurrence Existing controls Detection RPN Actions Intensity Occurrence Detection RPN Execute Patch Release Testing Defect/s not identified in Lab Testing Defect slips to Pilot. Operability and/or end customer impact 5 Patch release too rapid. Lab not fully representative of Field Pilot (limited investment policy). 8 Y: appropriate allocation of Resource and expertise 4 160 Detection; patch content based decision that allows appropriate time for Patch testing. Drive ‘Release when ready’ of patch. 5 8 3 120 Patch under Pilot Defect not identified in Field Pilot Defect slips to Pilot. Operability and/or end 5 Unstable Pilot network. Patch related event data lost in high number of 8 Y : Implemented Operational Network surveillance 4 160 Detection; statistically rule out ‘interferers’ by implementing network freeze of Pilot area. 5 8 2* 80 PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 17 and/or end customer impact number of network events. surveillance unit Patch passes Pilot Performanc e reports (KPI) not available No data to evaluate Pilot exit 5 Data not reported by in- house Performance Management unit 8 Y : Implemented Operational Network surveillance unit 3 120 Detection; Source Performance data from LTE Supplier 5 8 2* 80 *Preliminary assessment – actual implementation will provide measurement data
  • 18. Process Management Storyboard – Results & learning’s During System Introduction Operability and Customer experience are treated with equal importance. Historically the quality KPI’s measured during Rollout phase are not achieved. The RN Release Management capability is fit-for-purpose (skill set + manpower) but with Lab/Test Plant constraints The CTQ’s and Function are acceptable to Central Op’s and thus are mapped to Output Matrix and data collection. Improvement opportunities in Lab test coverage (scope and time) and Pilot extension are focus of 6 Sigma study. Partial implementation of improvements in current ‘N’ Release XXYY (Patch turnaround time + Effort). Full implementation of improvements with benefits expected in ‘N+1’ Release Introduction (AABB).Full implementation of improvements with benefits expected in ‘N+1’ Release Introduction (AABB). Key Learning’s from describing & Measuring Process Analysis of defects found in field - 65% of defects are reproducible in Lab Results of key measures since applying PMGB tools and techniques Effected extension of Test process cycle time (5d minimum) with measured increase in Lab defect ‘capture’ rate Effort KPI contained to ca 3.75 x FTE’s (Work force reporting Feb 2012 –Dec 2012) 35% Not Reproducible PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 18 (Work force reporting Feb 2012 –Dec 2012) Investment uplift in Lab necessary to increase defect capture rate 35% 65% Reproducible
  • 19. Glossary RN – Radio Networks ; central skill centre tasked with Release Management BU – Business Unit FTE – Full Time EmployeeFTE – Full Time Employee SLA – Service Level Agreement PR – Problem Report KPI – Key Performance Indicator SW – Software MS – Milestone Lab – Representative system for Release Testing PMGB Workbook V34_engl 06.07.2013Process name : LTE System Release Management 19 Lab – Representative system for Release Testing System – Supplier’s aggregate of equipment & SW LTE – Long Term Evolution : 4th generation 3GPP standardised system for Mobile communication
  • 20. Required (‘7+1’)Tools for PMGB Workbook 5S (incl. photos before/after) CAN DO - Tools (select one for certification) SIPOC Seven MUST DO – Tools (all are required for certification) ++ 5S (incl. photos before/after) Value Analysis Time Analysis (incl. process balancing) FMEA Poka Yoke SIPOC VoC CTQ (Tool 1) Output Measurement Variables (Tool 2) Data Collection / Measurement Plan ( incl. Operational Definition) Graphical display of process performance Value Stream Map/Swim-Lane PMGB Workbook V34_engl Process name : LTE System Release Management 20 Value Stream Map/Swim-Lane RACI (Responsibility Matrix) 06.07.2013