PRELIMINARY REPORT ON REQUIREMENT FOR WATER SUPPLY

SEWERAGE AND DRAINAGE FOR THE PROPOSED OF SPECIFIC

ELECTRONIC /IT /ITES SPECIAL ECONOMIC ZONE VILLAGE

SIKOHPUR TEHSIL SOHNA DISTT. GURGAON.

GENERAL:

Total Plot Area : 70 Acres

. The It is proposed to develop Residential, Commercial, Institutional, Electronic IT Centre etc. in the
above area approximate proposed area of various activities is as under:

Sl.    Type of                 Area in        Built up         Basis of            Total
No.    Development             Acres          Area in Sqft.    Population          Population

 1.    Residential 50% of         17.50       13,22,000        Considering         880x5=
       35 acres                                                average unit
                                                               area of 1500        4400
                                                               Sqft. With 5
                                                               occupants

2.     Commercial 15% of           5025       4,00,000         Table 20 of         6196
       35 acres                                                NBC Occupant
                                                               load 6              Say: 6200
                                                               Sqm/person or
                                                               (64.55 Sqft)

 3.    Institutional 5% of         1075       1,40,000         Table 20 of         836
       35 acres                                                NBC Occupant
                                                               load 15             Say: 6200
                                                               Sqm/person or
                                                               (167.4 Sqft.)

4.     IT Park etc.               10.50       7,73,000         NBC Occupant        7184
                                                               load 10
       30% of 35 acres                                         Sqm/person or       Say: 7200
                                                               (107.6 Sqft)

5.     Processing                35 Acres     38,11,500        Table 20 of         30,000
                                                               NBC Occupant
                                                               load 12             Say: 30,000
                                                               Sqm/person or
                                                               (129.1 Sqft.)

       TOTAL                     70 Acres     64,46,500
WATER SUPPLY:
Domestic water required per head per day as per National Building Code 2005, Table 1, Part 9, and P
19, Plumbing services:

a) Residential : 150 Litres

b) Commercial : 45 Litres

c) Institutional : 45 Litres

d) Factories/IT parks

With no Bathroom : 30 Litres

Total Water requirement:

a) Residential : 4400x150 = 6, 60,000 Litres or 660 KL

b) Commercial & Institutional

(6200+840+30000=37040) : 37000X45 = 16, 65,000 Litres or 1665 KL

Say: 37,000

c) IT parks

With no Bathroom : 7200X30 = 2, 16,000 Litres or 216 KL
_____________


2541 KL

Say : 2550 KL

In addition to daily domestic requirement water will be required for Horticultural proposes considering
20% green area – 14 acres

Water required for Horticultural : 14 X 28000 = 3,92,000 Litres or 392 KL

Grand Total : 2550+392 = 2942 KL Say: 2950 KL

Sources of water : Three Sources of water are considered as under:

City Supply from Govt./Local Authority.
Development of deep Tube wells at site.
Recirculation of treated sewerage effluent after Tertiary treatment of Horticultural & Flushing proposes
for urinals and water closets.
City supply will be supplying water to the complex when it is available from the local authorities.
Development or Tube well : A detail Geophysical survey of the site was got5 done through M/s The
reliable water supply Service of India (P) Ltd. new Delhi at there different point. The water / Aquifer is
available 27-65 Mtr. Depth with expected field of 1000-12000 LPH (Report Attach). Considering a
discharge of 10,000 – 12,000 Litres/hr and working for 12 hr. per day.

            Expected discharge for one tube well : 12000 x 12 = 1,44,000 Litres or 180 KL

            Number of tube well of required : 2950 / 144 = 20.48 Nos.

Available water from Horticultural & flushing purpose.

               C) Recirculation of Sewerage Effluent : 80% of water supply will flow as Sewerage.

            = 0.80 x 2550 KL = 2040 KL Say : 2040 KL

            Horticultural water required per day

            Flushing water required per day:

            a) Residential flushing requirement = 4400 x 50 Litres/head/day = 220 KL

            b) Commercial Flushing requirement = 42465 x 15 Litres/head/day = 637 KL

            c) IT Park flushing requirement = 7200 x 15 Litres/head/day = 108 KL
            _________________


            1357 KL
            _____________________


            Say : 1360 KL

Balance treated sewage effluent will be recharge to Ground

= 2040 - 1360 = 680 KL

Therefore actual no. of Tube wells required = (2250-1360) = 1190 Nos. 1190 say 8.26 Nos.
________


            144

Provide 20% as stand by = 8.26 + 1.65 = 9.81 say : 10 Nos.

Total No. of Tube wells required: 10 Nos. Till city supply 9s available at full development of site.

STORM WATER DRAINAGE:
The total rainfall in the area as per table 1 rainfall data from major cities by Indian metrological
Development is 794 mm as per Rain Water Harvesting and Conservation manual.

Total rain water based on anove basis per year considering 80% of rainfall recharging the ground water
table.

X 40000 X 0.794 X 0.90 = 2,00,088 KL per year

This rain water is completely recharged to ground water by providing 20-25 rain water harvesting well,
each rain water harvesting well will cover an area of approximately 3 acres.

Total recharge from rain water per year = 2, 00,088 KL

Sewerage treatment plant effluent

Recharged to ground water per year = 365 X 680 = 2, 48,200 KL
________________________


4, 48,288 KL
__________________________


Say : 4, 50,000 KL

Total water withdrawal from ground water by developing tube wells per year

= 1190 X 365 = 4, 34,350 KL

Thus there is no effect on Ground water table in the area as water recharge and withdrawal are almost
equal. Detail of Rain Harvesting well and sewage treatment plant are attached.

RAIN HARVESTING WELLS

The total site of 70 acres will be divided into small pockets varying from 2.5-4 acres depending upon
layout. Each pocket will have independent harvesting well. The rain water from roofs will be taken
down through vertical stacks. The sizing will be as per national Building Code Table No. 28 part -9
Section 2 Pages -70. The vertical drain pipe will be connected to manhole at ground level. Manhole
will be interconnected and finally taken to harvesting well. A desilting chamber will be provided to
desilt and remove floating material through bar screen. The overflow will lead to chamber having filter
media of coarse sand 1.5 to 2mm. Gravel 5-10 mm and boulders 5-20mm with minimum 300mm thick
each layer/ One deep bore up to sub soil water table will be drilled and 160mm PVC 3mm perforated
pipe will be installed up to sub soil water table with P – Gravel around the pipe. The solid pipe will be
provided between filtering media and ground level to clean in case of blockage through Air
Compressor etc. The schematic diagram is attached.

Working of Sewerage Treatment Plant:
The complex will be decided into four – five zones and sewage under ground plants will be on 80% of
water supply rate. . Incoming sewage is at a level of 4-5m depth from ground. This is collected in an
incoming sump which has a screen fixed at the entry of the sump. A cat ladder and manhole is provided
for maintenance point of view. Two automatic sewage submersible pumps are provided to lift the liquid
to grease chamber and then to tube settler system with level control or ensuring automatic operation.
And than to aeration tank the sewage undergoes aeration and subsequent attached growth. This results
in increased aerobic suspended growth and attached growth systems. From aeration tank the effluent
over floors to clarifier for setting solid & the tanked effluent to tank and than pumped to filter.

Sewerage is collected in an incoming sump which has a screen fixed at the entry of the sump. A cat
ladder and manhcle is provided for maintenance point of view. Two automatic sewage submersible
pumps are provided to transport liquid to the bio-reactor system with level control for ensuring
automatic operation. The incoming sewage is lifted to the bio- reactor system.

Further treatment in the form of Tertiary treatment through Filter Vessels is done. Before feeding water
to Filter vessels, slight dose of chlorine is added to stream and water is passed on the twin set off
aesthetically designed Pressure sand filter and Activated Carbon filter.

Whereas Pressure Sand filter removes very fine suspended particles in the Discharge Stream, Activated
Carbon Filter removes traces of any impurity as well as any dour or colour inherent in the stream. BOD
and COD of water is further reduced during filtration. Water after Tertiary Treatment is fit for use for
flushing water for water closets, irrigation in kitchen gardens, lawns for Horticulture purposes.

       Proposed Plotted Development at SEZ at Village Sikohpur, Tehsil Sohna



                 Dist. Gurgaon, Haryana.



                                    Design Concept Report
1. Objective:-

       The design concept report aims to highlight the design parameters adopted along with scheme
       for power distribution for 70 Acres SEZ at Village Sikohpur, Tehsil Sohna, and District.
       Gurgaon, Haryana.

2. Load Criteria:-

       An overall diversity of 80% has been considered. These have been considered on the basis of
       norms given by Local Electricity Board.

3. Source of Power.-

      It has been assumed that multi point supply connection shall be taken from Local Power Supply
      Company.
As per the load calculations enclosed in the report, the total demand load envisaged is 21.50
      MW. Power shall be received from DHBVNL at 66KV depending upon the availability of line
      in the near by area. The 66KV power received shall be stepped down to 11 KV at one location
      based on load pattern of site. The 11 KV power shall then be distributed with 11 KV overhead
      lines in all the areas. The total power required for immediate construction shall be 500 KW.

Street Lighting

Distribution

       Proposed Plotted Development at SEZ at Village Sikohpur, Tehsil Sohna



               Dist. Gurgaon, Haryana.



      The power for street-lighting shall be distributed through distribution pillar which shall be
      located in various load centers. From the distribution pillars, the street- lighting shall be
      connected through XLPE insulated Aluminium conductor armoured cables laid in ground of
      required size, considering voltage drop and current carrying capacity.

Illumination Levels

SL.    Road           Mounting            Level of       Type of Fixture
No.    Width          Height              Lighting



1.     18.0 Meters    10 Meters           15 Lux         1 Nos. 250 W HPMV fix/
                                                         150W SON fixture


2.     12.0 Meters    10 Meters           15 Lux         1 Nos. 250 W HPMV fix/
                                                         150W SON fixture.


3.     9.0 Meters     10 Meters           15 Lux         1 Nos. 250 W HPMV fix/
                                                         150W SON fixture.


4.3 Pole Design

      18 Meter wide roads shall be provided with one single arm pole with 2 meters overhang
      installed on either side of the road in staggered manner.
Plotted Development at SEZ at Village Sikohpur, Tehsil Sohna



              Dist. Gurgaon, Haryana.



       12 Meter wide roads shall be provided with single arm pole with 1.5 meters overhang installed
       on one side of the road.

       9 Meter wide roads shall be provided with single arm pole with 1.5 meters overhang on one side
       of the road .

Operation & Maintenance

       The street-lighting is proposed to be operated with timers located in the distribution pillars and
       shall be operated as follows:

       6 PM to 10 PM - 100% Lights on

       10 PM to 2AM - 66% Lights on

       2 AM to 6 AM - 33% Lights on

       This system shall facilitate in energy saving as well there is no need to switch on the lights
       throughout the night. This shall also facilitate control of level of illumination with reference to
       the density of traffic. The distribution o street- lighting shall be done on 3 phase system.

       For designing conventional poles shall be considered.

Mais conteúdo relacionado

Semelhante a R.E.Capital ramesh

Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Cairn India Limited
 
Presentation on Kolkata Water Supply.pptx
Presentation on Kolkata Water Supply.pptxPresentation on Kolkata Water Supply.pptx
Presentation on Kolkata Water Supply.pptxisharaman2000
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboAnton Ricalovskis
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply schemeAby Mundackal
 
Reducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer ExtensionsReducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer ExtensionsChesapeake Bay Foundation
 
WATER AND WASTEWATER ENGINEERING-FINAL.pptx
WATER AND WASTEWATER ENGINEERING-FINAL.pptxWATER AND WASTEWATER ENGINEERING-FINAL.pptx
WATER AND WASTEWATER ENGINEERING-FINAL.pptxsalman906788
 
NJFuture Redevelopment Forum 13 Building Capacity Alderman
NJFuture Redevelopment Forum 13 Building Capacity AldermanNJFuture Redevelopment Forum 13 Building Capacity Alderman
NJFuture Redevelopment Forum 13 Building Capacity AldermanNew Jersey Future
 
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013India Water Portal
 
Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013India Water Portal
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET Journal
 
Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015JGNelson
 
TIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATER
TIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATERTIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATER
TIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATERwle-ss
 
Rainwater harvesting at APD
Rainwater harvesting at APDRainwater harvesting at APD
Rainwater harvesting at APDbiometrust
 

Semelhante a R.E.Capital ramesh (20)

Assessing the impacts of existing and planned water resources development in ...
Assessing the impacts of existing and planned water resources development in ...Assessing the impacts of existing and planned water resources development in ...
Assessing the impacts of existing and planned water resources development in ...
 
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
 
Presentation on Kolkata Water Supply.pptx
Presentation on Kolkata Water Supply.pptxPresentation on Kolkata Water Supply.pptx
Presentation on Kolkata Water Supply.pptx
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Reducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer ExtensionsReducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer Extensions
 
Gbm dec 2 2012
Gbm dec 2 2012Gbm dec 2 2012
Gbm dec 2 2012
 
Kalabagh dam-1289 & 1292
Kalabagh dam-1289 & 1292Kalabagh dam-1289 & 1292
Kalabagh dam-1289 & 1292
 
WATER AND WASTEWATER ENGINEERING-FINAL.pptx
WATER AND WASTEWATER ENGINEERING-FINAL.pptxWATER AND WASTEWATER ENGINEERING-FINAL.pptx
WATER AND WASTEWATER ENGINEERING-FINAL.pptx
 
Efficient water usage improvement
Efficient water usage improvementEfficient water usage improvement
Efficient water usage improvement
 
Bod sizing
Bod sizingBod sizing
Bod sizing
 
NJFuture Redevelopment Forum 13 Building Capacity Alderman
NJFuture Redevelopment Forum 13 Building Capacity AldermanNJFuture Redevelopment Forum 13 Building Capacity Alderman
NJFuture Redevelopment Forum 13 Building Capacity Alderman
 
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
 
Poster
PosterPoster
Poster
 
Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013Water resources in Bangalore_Ramasesha_2013
Water resources in Bangalore_Ramasesha_2013
 
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...IRJET-  	  Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
IRJET- Planning and Analysis of Sewage Treatment Plant (43 MLD) in Sagar ...
 
Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015Wastewater Treatment Plant Capacity Report 3-18-2015
Wastewater Treatment Plant Capacity Report 3-18-2015
 
Paul Helliker - BDCP
Paul Helliker - BDCPPaul Helliker - BDCP
Paul Helliker - BDCP
 
TIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATER
TIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATERTIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATER
TIME SAVING ELECTRO-OXIDATION TECHNOLOGY FOR TREATING PRODUCED WATER
 
Rainwater harvesting at APD
Rainwater harvesting at APDRainwater harvesting at APD
Rainwater harvesting at APD
 

Mais de Adarsh K. Jain

Pan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar JainPan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar JainAdarsh K. Jain
 
Glass of drink on over head
Glass of drink on over headGlass of drink on over head
Glass of drink on over headAdarsh K. Jain
 
Climate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at CopClimate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at CopAdarsh K. Jain
 
QUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANYQUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANYAdarsh K. Jain
 
Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009Adarsh K. Jain
 
Copy of Scrapbook Album
Copy of Scrapbook AlbumCopy of Scrapbook Album
Copy of Scrapbook AlbumAdarsh K. Jain
 
party at suraj kund.jpeg 2
party at suraj kund.jpeg 2party at suraj kund.jpeg 2
party at suraj kund.jpeg 2Adarsh K. Jain
 
Copy of Circles Resume
Copy of Circles ResumeCopy of Circles Resume
Copy of Circles ResumeAdarsh K. Jain
 
Luncheon at suraj kund
Luncheon at suraj kundLuncheon at suraj kund
Luncheon at suraj kundAdarsh K. Jain
 

Mais de Adarsh K. Jain (20)

Pan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar JainPan American Development Foundation Haiti..Adarsh Kumar Jain
Pan American Development Foundation Haiti..Adarsh Kumar Jain
 
2
22
2
 
Glass of drink on over head
Glass of drink on over headGlass of drink on over head
Glass of drink on over head
 
Climate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at CopClimate activists fast to push leaders to sign strong deal at Cop
Climate activists fast to push leaders to sign strong deal at Cop
 
flag 4 indian pride
flag 4 indian prideflag 4 indian pride
flag 4 indian pride
 
incoming
incomingincoming
incoming
 
Resume
ResumeResume
Resume
 
QUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANYQUATATION FROM CALCUTTA TRADING COMPANY
QUATATION FROM CALCUTTA TRADING COMPANY
 
Resting
RestingResting
Resting
 
IDs
IDsIDs
IDs
 
Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009Royal Palace hotel uk_online_international_interviewform2009
Royal Palace hotel uk_online_international_interviewform2009
 
re_capitol
re_capitolre_capitol
re_capitol
 
Copy of Scrapbook Album
Copy of Scrapbook AlbumCopy of Scrapbook Album
Copy of Scrapbook Album
 
party at suraj kund.jpeg 2
party at suraj kund.jpeg 2party at suraj kund.jpeg 2
party at suraj kund.jpeg 2
 
Copy of Circles Resume
Copy of Circles ResumeCopy of Circles Resume
Copy of Circles Resume
 
Luncheon at suraj kund
Luncheon at suraj kundLuncheon at suraj kund
Luncheon at suraj kund
 
cv_1
cv_1cv_1
cv_1
 
ADARSH KUMAR JAIN,
ADARSH KUMAR JAIN,ADARSH KUMAR JAIN,
ADARSH KUMAR JAIN,
 
Untitled
UntitledUntitled
Untitled
 
New App format
New App formatNew App format
New App format
 

Último

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 

Último (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 

R.E.Capital ramesh

  • 1. PRELIMINARY REPORT ON REQUIREMENT FOR WATER SUPPLY SEWERAGE AND DRAINAGE FOR THE PROPOSED OF SPECIFIC ELECTRONIC /IT /ITES SPECIAL ECONOMIC ZONE VILLAGE SIKOHPUR TEHSIL SOHNA DISTT. GURGAON. GENERAL: Total Plot Area : 70 Acres . The It is proposed to develop Residential, Commercial, Institutional, Electronic IT Centre etc. in the above area approximate proposed area of various activities is as under: Sl. Type of Area in Built up Basis of Total No. Development Acres Area in Sqft. Population Population 1. Residential 50% of 17.50 13,22,000 Considering 880x5= 35 acres average unit area of 1500 4400 Sqft. With 5 occupants 2. Commercial 15% of 5025 4,00,000 Table 20 of 6196 35 acres NBC Occupant load 6 Say: 6200 Sqm/person or (64.55 Sqft) 3. Institutional 5% of 1075 1,40,000 Table 20 of 836 35 acres NBC Occupant load 15 Say: 6200 Sqm/person or (167.4 Sqft.) 4. IT Park etc. 10.50 7,73,000 NBC Occupant 7184 load 10 30% of 35 acres Sqm/person or Say: 7200 (107.6 Sqft) 5. Processing 35 Acres 38,11,500 Table 20 of 30,000 NBC Occupant load 12 Say: 30,000 Sqm/person or (129.1 Sqft.) TOTAL 70 Acres 64,46,500
  • 2. WATER SUPPLY: Domestic water required per head per day as per National Building Code 2005, Table 1, Part 9, and P 19, Plumbing services: a) Residential : 150 Litres b) Commercial : 45 Litres c) Institutional : 45 Litres d) Factories/IT parks With no Bathroom : 30 Litres Total Water requirement: a) Residential : 4400x150 = 6, 60,000 Litres or 660 KL b) Commercial & Institutional (6200+840+30000=37040) : 37000X45 = 16, 65,000 Litres or 1665 KL Say: 37,000 c) IT parks With no Bathroom : 7200X30 = 2, 16,000 Litres or 216 KL _____________ 2541 KL Say : 2550 KL In addition to daily domestic requirement water will be required for Horticultural proposes considering 20% green area – 14 acres Water required for Horticultural : 14 X 28000 = 3,92,000 Litres or 392 KL Grand Total : 2550+392 = 2942 KL Say: 2950 KL Sources of water : Three Sources of water are considered as under: City Supply from Govt./Local Authority. Development of deep Tube wells at site. Recirculation of treated sewerage effluent after Tertiary treatment of Horticultural & Flushing proposes for urinals and water closets.
  • 3. City supply will be supplying water to the complex when it is available from the local authorities. Development or Tube well : A detail Geophysical survey of the site was got5 done through M/s The reliable water supply Service of India (P) Ltd. new Delhi at there different point. The water / Aquifer is available 27-65 Mtr. Depth with expected field of 1000-12000 LPH (Report Attach). Considering a discharge of 10,000 – 12,000 Litres/hr and working for 12 hr. per day. Expected discharge for one tube well : 12000 x 12 = 1,44,000 Litres or 180 KL Number of tube well of required : 2950 / 144 = 20.48 Nos. Available water from Horticultural & flushing purpose. C) Recirculation of Sewerage Effluent : 80% of water supply will flow as Sewerage. = 0.80 x 2550 KL = 2040 KL Say : 2040 KL Horticultural water required per day Flushing water required per day: a) Residential flushing requirement = 4400 x 50 Litres/head/day = 220 KL b) Commercial Flushing requirement = 42465 x 15 Litres/head/day = 637 KL c) IT Park flushing requirement = 7200 x 15 Litres/head/day = 108 KL _________________ 1357 KL _____________________ Say : 1360 KL Balance treated sewage effluent will be recharge to Ground = 2040 - 1360 = 680 KL Therefore actual no. of Tube wells required = (2250-1360) = 1190 Nos. 1190 say 8.26 Nos. ________ 144 Provide 20% as stand by = 8.26 + 1.65 = 9.81 say : 10 Nos. Total No. of Tube wells required: 10 Nos. Till city supply 9s available at full development of site. STORM WATER DRAINAGE:
  • 4. The total rainfall in the area as per table 1 rainfall data from major cities by Indian metrological Development is 794 mm as per Rain Water Harvesting and Conservation manual. Total rain water based on anove basis per year considering 80% of rainfall recharging the ground water table. X 40000 X 0.794 X 0.90 = 2,00,088 KL per year This rain water is completely recharged to ground water by providing 20-25 rain water harvesting well, each rain water harvesting well will cover an area of approximately 3 acres. Total recharge from rain water per year = 2, 00,088 KL Sewerage treatment plant effluent Recharged to ground water per year = 365 X 680 = 2, 48,200 KL ________________________ 4, 48,288 KL __________________________ Say : 4, 50,000 KL Total water withdrawal from ground water by developing tube wells per year = 1190 X 365 = 4, 34,350 KL Thus there is no effect on Ground water table in the area as water recharge and withdrawal are almost equal. Detail of Rain Harvesting well and sewage treatment plant are attached. RAIN HARVESTING WELLS The total site of 70 acres will be divided into small pockets varying from 2.5-4 acres depending upon layout. Each pocket will have independent harvesting well. The rain water from roofs will be taken down through vertical stacks. The sizing will be as per national Building Code Table No. 28 part -9 Section 2 Pages -70. The vertical drain pipe will be connected to manhole at ground level. Manhole will be interconnected and finally taken to harvesting well. A desilting chamber will be provided to desilt and remove floating material through bar screen. The overflow will lead to chamber having filter media of coarse sand 1.5 to 2mm. Gravel 5-10 mm and boulders 5-20mm with minimum 300mm thick each layer/ One deep bore up to sub soil water table will be drilled and 160mm PVC 3mm perforated pipe will be installed up to sub soil water table with P – Gravel around the pipe. The solid pipe will be provided between filtering media and ground level to clean in case of blockage through Air Compressor etc. The schematic diagram is attached. Working of Sewerage Treatment Plant:
  • 5. The complex will be decided into four – five zones and sewage under ground plants will be on 80% of water supply rate. . Incoming sewage is at a level of 4-5m depth from ground. This is collected in an incoming sump which has a screen fixed at the entry of the sump. A cat ladder and manhole is provided for maintenance point of view. Two automatic sewage submersible pumps are provided to lift the liquid to grease chamber and then to tube settler system with level control or ensuring automatic operation. And than to aeration tank the sewage undergoes aeration and subsequent attached growth. This results in increased aerobic suspended growth and attached growth systems. From aeration tank the effluent over floors to clarifier for setting solid & the tanked effluent to tank and than pumped to filter. Sewerage is collected in an incoming sump which has a screen fixed at the entry of the sump. A cat ladder and manhcle is provided for maintenance point of view. Two automatic sewage submersible pumps are provided to transport liquid to the bio-reactor system with level control for ensuring automatic operation. The incoming sewage is lifted to the bio- reactor system. Further treatment in the form of Tertiary treatment through Filter Vessels is done. Before feeding water to Filter vessels, slight dose of chlorine is added to stream and water is passed on the twin set off aesthetically designed Pressure sand filter and Activated Carbon filter. Whereas Pressure Sand filter removes very fine suspended particles in the Discharge Stream, Activated Carbon Filter removes traces of any impurity as well as any dour or colour inherent in the stream. BOD and COD of water is further reduced during filtration. Water after Tertiary Treatment is fit for use for flushing water for water closets, irrigation in kitchen gardens, lawns for Horticulture purposes. Proposed Plotted Development at SEZ at Village Sikohpur, Tehsil Sohna Dist. Gurgaon, Haryana. Design Concept Report 1. Objective:- The design concept report aims to highlight the design parameters adopted along with scheme for power distribution for 70 Acres SEZ at Village Sikohpur, Tehsil Sohna, and District. Gurgaon, Haryana. 2. Load Criteria:- An overall diversity of 80% has been considered. These have been considered on the basis of norms given by Local Electricity Board. 3. Source of Power.- It has been assumed that multi point supply connection shall be taken from Local Power Supply Company.
  • 6. As per the load calculations enclosed in the report, the total demand load envisaged is 21.50 MW. Power shall be received from DHBVNL at 66KV depending upon the availability of line in the near by area. The 66KV power received shall be stepped down to 11 KV at one location based on load pattern of site. The 11 KV power shall then be distributed with 11 KV overhead lines in all the areas. The total power required for immediate construction shall be 500 KW. Street Lighting Distribution Proposed Plotted Development at SEZ at Village Sikohpur, Tehsil Sohna Dist. Gurgaon, Haryana. The power for street-lighting shall be distributed through distribution pillar which shall be located in various load centers. From the distribution pillars, the street- lighting shall be connected through XLPE insulated Aluminium conductor armoured cables laid in ground of required size, considering voltage drop and current carrying capacity. Illumination Levels SL. Road Mounting Level of Type of Fixture No. Width Height Lighting 1. 18.0 Meters 10 Meters 15 Lux 1 Nos. 250 W HPMV fix/ 150W SON fixture 2. 12.0 Meters 10 Meters 15 Lux 1 Nos. 250 W HPMV fix/ 150W SON fixture. 3. 9.0 Meters 10 Meters 15 Lux 1 Nos. 250 W HPMV fix/ 150W SON fixture. 4.3 Pole Design 18 Meter wide roads shall be provided with one single arm pole with 2 meters overhang installed on either side of the road in staggered manner.
  • 7. Plotted Development at SEZ at Village Sikohpur, Tehsil Sohna Dist. Gurgaon, Haryana. 12 Meter wide roads shall be provided with single arm pole with 1.5 meters overhang installed on one side of the road. 9 Meter wide roads shall be provided with single arm pole with 1.5 meters overhang on one side of the road . Operation & Maintenance The street-lighting is proposed to be operated with timers located in the distribution pillars and shall be operated as follows: 6 PM to 10 PM - 100% Lights on 10 PM to 2AM - 66% Lights on 2 AM to 6 AM - 33% Lights on This system shall facilitate in energy saving as well there is no need to switch on the lights throughout the night. This shall also facilitate control of level of illumination with reference to the density of traffic. The distribution o street- lighting shall be done on 3 phase system. For designing conventional poles shall be considered.