SlideShare uma empresa Scribd logo
1 de 9
PROJECT QUALITY MANAGEMENT PLAN TEMPLATE
This Project Quality Management Template is free for you to copy and use on your project
and within your organization. We hope that you find this template useful and
welcome your comments. Public distribution of this document is only permitted
from the Project Management Docs official website at:
www.ProjectManagementDocs.com
QUALITY MANAGEMENT PLAN
<PROJECT NAME>
COMPANY NAME
STREET ADDRESS
CITY, STATE ZIP CODE
DATE
Quality Management Plan Template
www.ProjectManagementDocs.com
1
TABLE OF CONTENTS
INTRODUCTION ................................................................................................................................ 2
QUALITY MANAGEMENT APPROACH ............................................................................................... 2
QUALITY REQUIREMENTS / STANDARDS.......................................................................................... 3
QUALITY ASSURANCE...................................................................................................................... 4
QUALITY CONTROL.......................................................................................................................... 5
QUALITY CONTROL MEASUREMENTS .............................................................................................. 6
Quality Management Plan Template
www.ProjectManagementDocs.com
2
INTRODUCTION
The Quality Management Plan is an integral part of any project management plan. The purpose
of the Quality Management Plan is to describe how quality will be managed throughout the
lifecycle of the project. It also includes the processes and procedures for ensuring quality
planning, assurance, and control are all conducted. All stakeholders should be familiar with how
quality will be planned, assured, and controlled.
The Quality Management Plan for the Loose Tube Fiber Cable (LTFC) project will establish the
activities, processes, and procedures for ensuring a quality product upon the conclusion of the
project. The purpose of this plan is to:
Ensure quality is planned
Define how quality will be managed
Define quality assurance activities
Define quality control activities
Define acceptable quality standards
QUALITY MANAGEMENT APPROACH
This section describes the approach the organization will use for managing quality throughout
the project’s life cycle. Quality must always be planned into a project in order to prevent
unnecessary rework, waste, cost, and time. Quality should also be considered from both a
product and process perspective. The organization may already have a standardized approach to
quality, however, whether it is standard or not, the approach must be defined and communicated
to all project stakeholders.
The quality management approach for the LTFC project will ensure quality is planned for both
the product and processes. In order to be successful, this project will meet its quality objectives
by utilizing an integrated quality approach to define quality standards, measure quality and
continuously improve quality.
Product quality for the LTFC project will be defined by the company’s current standards and
criteria for its fiber optic cable family. The focus is on the project’s deliverable and the
standards and criteria being used will ensure the product meets established quality standards and
customer satisfaction.
Process quality for the LTFC project will focus on the processes by which the project deliverable
will be manufactured. Establishing process quality standards will ensure that all activities
conform to an organizational standard which results in the successful delivery of the product.
The project team will work with the Quality Group to define and document all organizational
and project specific quality standards for both product and processes. All quality documentation
will become part of the LTFC Project Plan and will be transitioned to operations upon the
successful completion of the project.
Metrics will be established and used to measure quality throughout the project life cycle for the
product and processes. The Quality Group Manager will be responsible for working with the
Quality Management Plan Template
www.ProjectManagementDocs.com
3
project team to define these metrics, conduct measurements, and analyze results. These product
and process measurements will be used as one criterion in determining the success of the project
and must be reviewed by the project sponsor. Metrics will include:
Schedule
Resources
Cost
Process performance
o Manufacturing line utilization
o Material waste
Product performance
o Attenuation
o Tensile strength
Customer Satisfaction (as a result of field trials)
Quality improvements will be identified by any member of the project team or quality group.
Each recommendation will be reviewed to determine the cost versus benefit of implementing the
improvement and how the improvement will impact the product or processes. If an improvement
is implemented the project manager will update all project documentation to include the
improvement and the quality manager will update the organizational documentation the
improvement affects.
QUALITY REQUIREMENTS / STANDARDS
This section should describe how the project team and/or quality group will identify and
document the quality requirements and standards. Additionally, there should also be an
explanation of how the project will demonstrate compliance with those identified quality
standards. The quality standards and requirements should include both the product and
processes.
Product Quality:
The product quality standards and requirements will be determined by the project team and
quality group. These standards will primarily be based on the company’s documented standards
for all fiber optic cables. There may be product-specific quality standards identified that are not
currently part of the documented organizational standards. In this case, the quality group will
review these newly identified standards and incorporate them into organizational documentation
if approved. The project team will also document any newly identified quality standards into the
LTFC project plan and ensure communication with all stakeholders.
As trial products are measured at pre-determined intervals, we will know that the product is
compliant with quality standards once we achieve ten consecutive trial runs resulting of cable
which is 100% within acceptable quality control margins.
Process Quality:
The process quality standards and requirements will be determined by the project team and
quality group. Many of these standards will be based on existing company process standards.
Quality Management Plan Template
www.ProjectManagementDocs.com
4
However, it is anticipated that there will be several unique steps in the manufacturing of the
LTFC product which will require new quality standards. The LTFC project team will work with
the quality group to establish acceptable standards and document these standards for
incorporation into both organizational process documents as well as the LTFC project plan.
These standards will be communicated to all project stakeholders.
As trial products are created, the process metrics will be measured and analyzed to determine the
quality of the process. Once the LTFC product meets quality compliance and all process metrics
fall within acceptable quality assurance margins, we will achieve process compliance for the
LTFC project.
QUALITY ASSURANCE
This section should explain how you will define and document the process for auditing the
quality requirements and results from quality control measurements in order to ensure that
quality standards and operational definitions are used. This section should also document the
actual quality assurance metrics used for this project.
The quality assurance of the LTFC Project focuses on the processes used in the manufacturing of
the LTFC product. In order to ensure quality, an iterative quality process will be used
throughout the project life cycle. This iterative process includes measuring process metrics,
analyzing process data, and continuously improving the processes.
The LTFC Project Manager and the project team will perform assessments at planned intervals
throughout the project to ensure all processes are being correctly implemented and executed.
Key performance metrics for the manufacturing of the LTFC product include polyethylene (PE)
waste, fiber waste, and time per cable run for each phase of cable creation (buffering, stranding,
and jacketing). The established project tolerances for these metrics are the organizational
standards for all other cable products. The table below provides the key quality assurance
metrics for the LTFC Project.
Process Action Acceptable Process
Standards
Process Phase Assessment Interval
Fiber Tube Buffering - < 20 feet fiber waste
per tube
- < 0.5 lbs PR waste per
tube
- < 8 minutes per linear
km of buffer tube
Buffering Daily or per run
Fiber Tube Stranding - < 10 feet of waste per
stranded core
- < 12 minutes per linear
km of stranded core
Stranding Daily or per run
Core Jacketing - < 15 feet of waste per Jacketing Daily or per run
Quality Management Plan Template
www.ProjectManagementDocs.com
5
jacketed cable
- < 3 lbs PE waste per
cable
- < 12 minutes per linear
km of jacketed cable
The quality manager will provide day to day quality management and conduct process audits on
a weekly basis, monitor process performance metrics, and assure all processes comply with
project and organizational standards. If discrepancies are found, the quality manager will meet
with the Project Manager and review the identified discrepancies.
The Project Manager will schedule regularly occurring project, management, and document
reviews. In these reviews, an agenda item will include a review of project processes, any
discrepancies and/or audit findings from the quality manager, and a discussion on process
improvement initiatives.
Process improvement is another aspect of quality assurance. Quality assurance reviews,
findings, and assessments should always result in some form of process improvement and, as a
result, product improvement. All process improvement efforts must be documented,
implemented, and communicated to all stakeholders as changes are made.
QUALITY CONTROL
This section describes how you will define and document the process for monitoring and
recording the results of executing the quality activities to assess performance and recommend
necessary changes. Quality control applies to the project’s product as opposed to its processes.
It should include what the acceptable standards and/or performance are for the product and how
these measurements will be conducted.
The quality control of the LTFC project focuses primarily on the LTFC product and the
acceptable standards and performance. The quality performance standards for the LTFC Project
are in accordance with the organizational standards of performance of all fiber optic cable
products. However, there are several project-specific quality standards which were established
specifically for the LTFC Product. All trial cables which are produced will be submitted to the
characterization group for standard loose tube cable performance testing. Additionally, all
physical measurements will conducted on each produced cable to ensure compliance with
established quality standards. The table below illustrates all performance and physical quality
standards for the LTFC Product:
Product Physical/Performance
Standards
Quality Assessment
Activities
Assessment Intervals
6-36 fiber loose tube
cable
0.75” +/- 0.01”
diameter
> 300 N/m2
Tensile
Lab and field testing Per produced cable
length
Quality Management Plan Template
www.ProjectManagementDocs.com
6
Strength
< 5% attenuation at
625nm wavelength
42-188 fiber loose
tube cable
1.5” +/- 0.01” diameter
> 450 N/m2
Tensile
strength
< 5% attenuation at
625nm wavelength
Lab and field testing Per produced cable
length
194-288 fiber loose
tube cable
2.25” +/- 0.001”
diameter
> 600 N/m2
Tensile
strength
< 5% attenuation at
625nm wavelength
Lab and field testing Per produced cable
length
The project team will perform all physical measurements on their trial cables. The
characterization group will perform attenuation testing and will provide the results back to the
project team within 3 business days after the test sample is submitted. The quality group will
ensure all physical and performance standards are met for each trial cable, perform audits, and
assist the project team with creating or updating all documentation related to product quality.
The Project Manager will schedule regularly occurring project, management, and document
reviews. In these reviews, an agenda item will include a review of products, any discrepancies
and/or audit findings from the quality manager, and a discussion on product improvement
initiatives.
It is imperative to the success of the project that all of the established physical and performance
standards are met. By doing so, the LTFC Project Team will ensure that the product achieves the
high level of customer satisfaction anticipated and that future operational cable production will
be in line with budget and resource allocations.
QUALITY CONTROL MEASUREMENTS
This section should contain a sample or useable table/log to be used in taking quality
measurements and comparing them against standards/requirements. These forms may be found
in many different styles or formats. The most important aspect of this log is to provide
documentation of the findings. If actual measurements do not meet the standards or
requirements then some action must be taken. This may be done in regularly scheduled project
status meetings or as necessary throughout the project lifecycle.
All LTFC Project products and processes must be measured and fall within the established
standards and tolerances. The below logs will be used by the project and quality teams in
conducting these measurements and will be maintained for use as supporting documentation for
the project’s acceptance.
Quality Management Plan Template
www.ProjectManagementDocs.com
7
Quality Assurance Log
Trial
#
Date Process
Measured
Required
Value
Actual
Measured
Acceptable?
(Y/N)
Recommendation Date
Resolved
Quality Control Log
Cable
#
Date Item
Measured
Required
Value
Actual
Measured
Acceptable?
(Y/N)
Recommendation Date
Resolved
Quality Management Plan Template
www.ProjectManagementDocs.com
8
SPONSOR ACCEPTANCE
Approved by the Project Sponsor:
__________________________________________ Date: ___________________
<Project Sponsor>
<Project Sponsor Title>
This free Project Quality Management Plan Template is brought to you by www.ProjectManagementDocs.com

Mais conteúdo relacionado

Mais procurados

Ppt on design and modelling of residential society
Ppt on design and modelling of residential societyPpt on design and modelling of residential society
Ppt on design and modelling of residential societyGLAU, Mathura, UP, India
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONSubhendu Datta
 
Basic concepts and terminology for the Requirements Management application
Basic concepts and terminology for the Requirements Management applicationBasic concepts and terminology for the Requirements Management application
Basic concepts and terminology for the Requirements Management applicationIBM Rational software
 
Design of sewage treatment plant
Design of sewage treatment plantDesign of sewage treatment plant
Design of sewage treatment plantGARRE RAVI KUMAR
 
Sp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free DownloadSp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free DownloadGowtham Raja
 
construction management system final year report
construction management system final year reportconstruction management system final year report
construction management system final year reportchiragbarasiya
 
Design & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro SoftwareDesign & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro SoftwareIRJET Journal
 
EV5104 TRANSPORT OF WATER AND WASTEWATER
EV5104 TRANSPORT OF WATER AND WASTEWATEREV5104 TRANSPORT OF WATER AND WASTEWATER
EV5104 TRANSPORT OF WATER AND WASTEWATERArun Kumar
 
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET Journal
 

Mais procurados (16)

Ppt on design and modelling of residential society
Ppt on design and modelling of residential societyPpt on design and modelling of residential society
Ppt on design and modelling of residential society
 
Bio toilet
Bio toiletBio toilet
Bio toilet
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
 
Introduction to BIM 360 Docs
Introduction to BIM 360 DocsIntroduction to BIM 360 Docs
Introduction to BIM 360 Docs
 
Basic concepts and terminology for the Requirements Management application
Basic concepts and terminology for the Requirements Management applicationBasic concepts and terminology for the Requirements Management application
Basic concepts and terminology for the Requirements Management application
 
Design of sewage treatment plant
Design of sewage treatment plantDesign of sewage treatment plant
Design of sewage treatment plant
 
Sp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free DownloadSp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free Download
 
construction management system final year report
construction management system final year reportconstruction management system final year report
construction management system final year report
 
Pre and Post Contract BIM Execution Plans
Pre and Post Contract BIM Execution PlansPre and Post Contract BIM Execution Plans
Pre and Post Contract BIM Execution Plans
 
Design & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro SoftwareDesign & Analysis of Circular Water Tank by Using Staad Pro Software
Design & Analysis of Circular Water Tank by Using Staad Pro Software
 
EV5104 TRANSPORT OF WATER AND WASTEWATER
EV5104 TRANSPORT OF WATER AND WASTEWATEREV5104 TRANSPORT OF WATER AND WASTEWATER
EV5104 TRANSPORT OF WATER AND WASTEWATER
 
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
 
Pm unit 1,2,3,4,5,6
Pm unit 1,2,3,4,5,6Pm unit 1,2,3,4,5,6
Pm unit 1,2,3,4,5,6
 
Digital reality
Digital realityDigital reality
Digital reality
 
Software design
Software designSoftware design
Software design
 
Septic tank
Septic tankSeptic tank
Septic tank
 

Destaque

A Proposed Paper Template for improving the Quality of Practitioner Written P...
A Proposed Paper Template for improving the Quality of Practitioner Written P...A Proposed Paper Template for improving the Quality of Practitioner Written P...
A Proposed Paper Template for improving the Quality of Practitioner Written P...Joseph KAsser
 
Process flow map
Process flow map   Process flow map
Process flow map adimak
 
SHS ASQ 2010 Conference Presentation: Hospital System Patient Flow
SHS ASQ 2010 Conference Presentation: Hospital System Patient FlowSHS ASQ 2010 Conference Presentation: Hospital System Patient Flow
SHS ASQ 2010 Conference Presentation: Hospital System Patient FlowAlexander Kolker
 
Web anatics strategy_process_map
Web anatics strategy_process_mapWeb anatics strategy_process_map
Web anatics strategy_process_mapUpstarts.tv
 
Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1evil66_in
 
SAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSubhrajyoti (Subhra) Bhattacharjee
 

Destaque (8)

Process flow
Process flowProcess flow
Process flow
 
Sales flow i gip
Sales flow i gipSales flow i gip
Sales flow i gip
 
A Proposed Paper Template for improving the Quality of Practitioner Written P...
A Proposed Paper Template for improving the Quality of Practitioner Written P...A Proposed Paper Template for improving the Quality of Practitioner Written P...
A Proposed Paper Template for improving the Quality of Practitioner Written P...
 
Process flow map
Process flow map   Process flow map
Process flow map
 
SHS ASQ 2010 Conference Presentation: Hospital System Patient Flow
SHS ASQ 2010 Conference Presentation: Hospital System Patient FlowSHS ASQ 2010 Conference Presentation: Hospital System Patient Flow
SHS ASQ 2010 Conference Presentation: Hospital System Patient Flow
 
Web anatics strategy_process_map
Web anatics strategy_process_mapWeb anatics strategy_process_map
Web anatics strategy_process_map
 
Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1Sap Customer Service In Manufacturing Industry1
Sap Customer Service In Manufacturing Industry1
 
SAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration document
 

Semelhante a Template quality management-plan2

Quality management review template
Quality management review templateQuality management review template
Quality management review templateselinasimpson2801
 
Quality management templates
Quality management templatesQuality management templates
Quality management templatesselinasimpson371
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan templateVivek Srivastava
 
www.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docxwww.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docxericbrooks84875
 
Quality_Management_Plan Template.docx
Quality_Management_Plan Template.docxQuality_Management_Plan Template.docx
Quality_Management_Plan Template.docxZiyad Zaidi
 
Quality management strategy template
Quality management strategy templateQuality management strategy template
Quality management strategy templateselinasimpson2701
 
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...cscpconf
 
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...cscpconf
 
Requirements management-plan template
Requirements management-plan templateRequirements management-plan template
Requirements management-plan templateVivek Srivastava
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1reddvise
 
Develop quality characteristics
Develop quality characteristicsDevelop quality characteristics
Develop quality characteristicscsandit
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualDien Ha The
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualDien Ha The
 
7.quality management chapter 7
7.quality management chapter 77.quality management chapter 7
7.quality management chapter 7Warui Maina
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagementFahad Saleem
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assuranceLeola Ramirez
 
Quality Management
Quality ManagementQuality Management
Quality ManagementBuchiri
 

Semelhante a Template quality management-plan2 (20)

Quality management review template
Quality management review templateQuality management review template
Quality management review template
 
Quality management templates
Quality management templatesQuality management templates
Quality management templates
 
Quality management forms
Quality management formsQuality management forms
Quality management forms
 
Quality management-plan template
Quality management-plan templateQuality management-plan template
Quality management-plan template
 
www.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docxwww.FASTProjectPlans.comQuality Management Plan Template· .docx
www.FASTProjectPlans.comQuality Management Plan Template· .docx
 
Quality_Management_Plan Template.docx
Quality_Management_Plan Template.docxQuality_Management_Plan Template.docx
Quality_Management_Plan Template.docx
 
Quality management strategy template
Quality management strategy templateQuality management strategy template
Quality management strategy template
 
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
 
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
 
Requirements management-plan template
Requirements management-plan templateRequirements management-plan template
Requirements management-plan template
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
Develop quality characteristics
Develop quality characteristicsDevelop quality characteristics
Develop quality characteristics
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manual
 
Catalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manualCatalog busbar ls 10. quality manual
Catalog busbar ls 10. quality manual
 
Software Quality.pptx
Software Quality.pptxSoftware Quality.pptx
Software Quality.pptx
 
7.quality management chapter 7
7.quality management chapter 77.quality management chapter 7
7.quality management chapter 7
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagement
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Pmb
PmbPmb
Pmb
 
Quality Management
Quality ManagementQuality Management
Quality Management
 

Último

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Último (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Template quality management-plan2

  • 1. PROJECT QUALITY MANAGEMENT PLAN TEMPLATE This Project Quality Management Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome your comments. Public distribution of this document is only permitted from the Project Management Docs official website at: www.ProjectManagementDocs.com QUALITY MANAGEMENT PLAN <PROJECT NAME> COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE
  • 2. Quality Management Plan Template www.ProjectManagementDocs.com 1 TABLE OF CONTENTS INTRODUCTION ................................................................................................................................ 2 QUALITY MANAGEMENT APPROACH ............................................................................................... 2 QUALITY REQUIREMENTS / STANDARDS.......................................................................................... 3 QUALITY ASSURANCE...................................................................................................................... 4 QUALITY CONTROL.......................................................................................................................... 5 QUALITY CONTROL MEASUREMENTS .............................................................................................. 6
  • 3. Quality Management Plan Template www.ProjectManagementDocs.com 2 INTRODUCTION The Quality Management Plan is an integral part of any project management plan. The purpose of the Quality Management Plan is to describe how quality will be managed throughout the lifecycle of the project. It also includes the processes and procedures for ensuring quality planning, assurance, and control are all conducted. All stakeholders should be familiar with how quality will be planned, assured, and controlled. The Quality Management Plan for the Loose Tube Fiber Cable (LTFC) project will establish the activities, processes, and procedures for ensuring a quality product upon the conclusion of the project. The purpose of this plan is to: Ensure quality is planned Define how quality will be managed Define quality assurance activities Define quality control activities Define acceptable quality standards QUALITY MANAGEMENT APPROACH This section describes the approach the organization will use for managing quality throughout the project’s life cycle. Quality must always be planned into a project in order to prevent unnecessary rework, waste, cost, and time. Quality should also be considered from both a product and process perspective. The organization may already have a standardized approach to quality, however, whether it is standard or not, the approach must be defined and communicated to all project stakeholders. The quality management approach for the LTFC project will ensure quality is planned for both the product and processes. In order to be successful, this project will meet its quality objectives by utilizing an integrated quality approach to define quality standards, measure quality and continuously improve quality. Product quality for the LTFC project will be defined by the company’s current standards and criteria for its fiber optic cable family. The focus is on the project’s deliverable and the standards and criteria being used will ensure the product meets established quality standards and customer satisfaction. Process quality for the LTFC project will focus on the processes by which the project deliverable will be manufactured. Establishing process quality standards will ensure that all activities conform to an organizational standard which results in the successful delivery of the product. The project team will work with the Quality Group to define and document all organizational and project specific quality standards for both product and processes. All quality documentation will become part of the LTFC Project Plan and will be transitioned to operations upon the successful completion of the project. Metrics will be established and used to measure quality throughout the project life cycle for the product and processes. The Quality Group Manager will be responsible for working with the
  • 4. Quality Management Plan Template www.ProjectManagementDocs.com 3 project team to define these metrics, conduct measurements, and analyze results. These product and process measurements will be used as one criterion in determining the success of the project and must be reviewed by the project sponsor. Metrics will include: Schedule Resources Cost Process performance o Manufacturing line utilization o Material waste Product performance o Attenuation o Tensile strength Customer Satisfaction (as a result of field trials) Quality improvements will be identified by any member of the project team or quality group. Each recommendation will be reviewed to determine the cost versus benefit of implementing the improvement and how the improvement will impact the product or processes. If an improvement is implemented the project manager will update all project documentation to include the improvement and the quality manager will update the organizational documentation the improvement affects. QUALITY REQUIREMENTS / STANDARDS This section should describe how the project team and/or quality group will identify and document the quality requirements and standards. Additionally, there should also be an explanation of how the project will demonstrate compliance with those identified quality standards. The quality standards and requirements should include both the product and processes. Product Quality: The product quality standards and requirements will be determined by the project team and quality group. These standards will primarily be based on the company’s documented standards for all fiber optic cables. There may be product-specific quality standards identified that are not currently part of the documented organizational standards. In this case, the quality group will review these newly identified standards and incorporate them into organizational documentation if approved. The project team will also document any newly identified quality standards into the LTFC project plan and ensure communication with all stakeholders. As trial products are measured at pre-determined intervals, we will know that the product is compliant with quality standards once we achieve ten consecutive trial runs resulting of cable which is 100% within acceptable quality control margins. Process Quality: The process quality standards and requirements will be determined by the project team and quality group. Many of these standards will be based on existing company process standards.
  • 5. Quality Management Plan Template www.ProjectManagementDocs.com 4 However, it is anticipated that there will be several unique steps in the manufacturing of the LTFC product which will require new quality standards. The LTFC project team will work with the quality group to establish acceptable standards and document these standards for incorporation into both organizational process documents as well as the LTFC project plan. These standards will be communicated to all project stakeholders. As trial products are created, the process metrics will be measured and analyzed to determine the quality of the process. Once the LTFC product meets quality compliance and all process metrics fall within acceptable quality assurance margins, we will achieve process compliance for the LTFC project. QUALITY ASSURANCE This section should explain how you will define and document the process for auditing the quality requirements and results from quality control measurements in order to ensure that quality standards and operational definitions are used. This section should also document the actual quality assurance metrics used for this project. The quality assurance of the LTFC Project focuses on the processes used in the manufacturing of the LTFC product. In order to ensure quality, an iterative quality process will be used throughout the project life cycle. This iterative process includes measuring process metrics, analyzing process data, and continuously improving the processes. The LTFC Project Manager and the project team will perform assessments at planned intervals throughout the project to ensure all processes are being correctly implemented and executed. Key performance metrics for the manufacturing of the LTFC product include polyethylene (PE) waste, fiber waste, and time per cable run for each phase of cable creation (buffering, stranding, and jacketing). The established project tolerances for these metrics are the organizational standards for all other cable products. The table below provides the key quality assurance metrics for the LTFC Project. Process Action Acceptable Process Standards Process Phase Assessment Interval Fiber Tube Buffering - < 20 feet fiber waste per tube - < 0.5 lbs PR waste per tube - < 8 minutes per linear km of buffer tube Buffering Daily or per run Fiber Tube Stranding - < 10 feet of waste per stranded core - < 12 minutes per linear km of stranded core Stranding Daily or per run Core Jacketing - < 15 feet of waste per Jacketing Daily or per run
  • 6. Quality Management Plan Template www.ProjectManagementDocs.com 5 jacketed cable - < 3 lbs PE waste per cable - < 12 minutes per linear km of jacketed cable The quality manager will provide day to day quality management and conduct process audits on a weekly basis, monitor process performance metrics, and assure all processes comply with project and organizational standards. If discrepancies are found, the quality manager will meet with the Project Manager and review the identified discrepancies. The Project Manager will schedule regularly occurring project, management, and document reviews. In these reviews, an agenda item will include a review of project processes, any discrepancies and/or audit findings from the quality manager, and a discussion on process improvement initiatives. Process improvement is another aspect of quality assurance. Quality assurance reviews, findings, and assessments should always result in some form of process improvement and, as a result, product improvement. All process improvement efforts must be documented, implemented, and communicated to all stakeholders as changes are made. QUALITY CONTROL This section describes how you will define and document the process for monitoring and recording the results of executing the quality activities to assess performance and recommend necessary changes. Quality control applies to the project’s product as opposed to its processes. It should include what the acceptable standards and/or performance are for the product and how these measurements will be conducted. The quality control of the LTFC project focuses primarily on the LTFC product and the acceptable standards and performance. The quality performance standards for the LTFC Project are in accordance with the organizational standards of performance of all fiber optic cable products. However, there are several project-specific quality standards which were established specifically for the LTFC Product. All trial cables which are produced will be submitted to the characterization group for standard loose tube cable performance testing. Additionally, all physical measurements will conducted on each produced cable to ensure compliance with established quality standards. The table below illustrates all performance and physical quality standards for the LTFC Product: Product Physical/Performance Standards Quality Assessment Activities Assessment Intervals 6-36 fiber loose tube cable 0.75” +/- 0.01” diameter > 300 N/m2 Tensile Lab and field testing Per produced cable length
  • 7. Quality Management Plan Template www.ProjectManagementDocs.com 6 Strength < 5% attenuation at 625nm wavelength 42-188 fiber loose tube cable 1.5” +/- 0.01” diameter > 450 N/m2 Tensile strength < 5% attenuation at 625nm wavelength Lab and field testing Per produced cable length 194-288 fiber loose tube cable 2.25” +/- 0.001” diameter > 600 N/m2 Tensile strength < 5% attenuation at 625nm wavelength Lab and field testing Per produced cable length The project team will perform all physical measurements on their trial cables. The characterization group will perform attenuation testing and will provide the results back to the project team within 3 business days after the test sample is submitted. The quality group will ensure all physical and performance standards are met for each trial cable, perform audits, and assist the project team with creating or updating all documentation related to product quality. The Project Manager will schedule regularly occurring project, management, and document reviews. In these reviews, an agenda item will include a review of products, any discrepancies and/or audit findings from the quality manager, and a discussion on product improvement initiatives. It is imperative to the success of the project that all of the established physical and performance standards are met. By doing so, the LTFC Project Team will ensure that the product achieves the high level of customer satisfaction anticipated and that future operational cable production will be in line with budget and resource allocations. QUALITY CONTROL MEASUREMENTS This section should contain a sample or useable table/log to be used in taking quality measurements and comparing them against standards/requirements. These forms may be found in many different styles or formats. The most important aspect of this log is to provide documentation of the findings. If actual measurements do not meet the standards or requirements then some action must be taken. This may be done in regularly scheduled project status meetings or as necessary throughout the project lifecycle. All LTFC Project products and processes must be measured and fall within the established standards and tolerances. The below logs will be used by the project and quality teams in conducting these measurements and will be maintained for use as supporting documentation for the project’s acceptance.
  • 8. Quality Management Plan Template www.ProjectManagementDocs.com 7 Quality Assurance Log Trial # Date Process Measured Required Value Actual Measured Acceptable? (Y/N) Recommendation Date Resolved Quality Control Log Cable # Date Item Measured Required Value Actual Measured Acceptable? (Y/N) Recommendation Date Resolved
  • 9. Quality Management Plan Template www.ProjectManagementDocs.com 8 SPONSOR ACCEPTANCE Approved by the Project Sponsor: __________________________________________ Date: ___________________ <Project Sponsor> <Project Sponsor Title> This free Project Quality Management Plan Template is brought to you by www.ProjectManagementDocs.com