Study on Procurement Method Selection Procedure in Construction Industry
•
2 gostaram
•
177 visualizações
IRJET Journal
Seguir
https://www.irjet.net/archives/V4/i8/IRJET-V4I861.pdf
Leia menos
Leia mais
Engenharia
Denunciar
Compartilhar
Denunciar
Compartilhar
1 de 9
Baixar agora
Baixar para ler offline
Recomendados
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
IRJET Journal
Training _ZK _Rev3_Final
Training _ZK _Rev3_Final
Ziad Khleif
Lecture 1 introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
Aszahari Aie
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET Journal
PP1 assignment presentation slides
PP1 assignment presentation slides
Doreen Yeo
ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)
Anne Arundel Community College
Fme procurement-plan-template
Fme procurement-plan-template
Muhlis Çevik
Recomendados
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
IRJET Journal
Training _ZK _Rev3_Final
Training _ZK _Rev3_Final
Ziad Khleif
Lecture 1 introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
Aszahari Aie
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET Journal
PP1 assignment presentation slides
PP1 assignment presentation slides
Doreen Yeo
ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)
Anne Arundel Community College
Fme procurement-plan-template
Fme procurement-plan-template
Muhlis Çevik
Quality management in construction
Quality management in construction
selinasimpson0801
Session 19 4th edition PMP
Session 19 4th edition PMP
محمد عصمت عبد الرازق
Procurement Methods
Procurement Methods
Lilian Nwachukwu
Procurement plan-template-1.2
Procurement plan-template-1.2
Sandeep Sharma IIMK Smart City,IoT,Bigdata,Cloud,BI,DW
Single stage design and build method & construction project management
Single stage design and build method & construction project management
John Constance
Specification writting civil construction
Specification writting civil construction
diasawada12345
Session 20 4th edition PMP
Session 20 4th edition PMP
محمد عصمت عبد الرازق
Professional Practice 1 Assignment
Professional Practice 1 Assignment
Melvin Lim
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscm
Est
Procurement management-plan template
Procurement management-plan template
Vivek Srivastava
SPECIFICATIONS
SPECIFICATIONS
Joedy Mae Mangampo
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET Journal
9. project procurement management
9. project procurement management
Mohamed Salah Eldien Mohamed Ali
Professional practice 1 report
Professional practice 1 report
Ngo Jia Haur
Guide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
Sarah Fox
12 project procurement management
12 project procurement management
Omer Alsayed PhD,MBA, PMP®
Quality Management System at Construction Project: A Questionnaire Survey
Quality Management System at Construction Project: A Questionnaire Survey
IJERA Editor
Procurement in construction
Procurement in construction
MahSobeh
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
Pavitr1203
Technical feasibility ppt
Technical feasibility ppt
Chandan Singh
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET Journal
Professional Practice 1
Professional Practice 1
Lee Pei Gie
Mais conteúdo relacionado
Mais procurados
Quality management in construction
Quality management in construction
selinasimpson0801
Session 19 4th edition PMP
Session 19 4th edition PMP
محمد عصمت عبد الرازق
Procurement Methods
Procurement Methods
Lilian Nwachukwu
Procurement plan-template-1.2
Procurement plan-template-1.2
Sandeep Sharma IIMK Smart City,IoT,Bigdata,Cloud,BI,DW
Single stage design and build method & construction project management
Single stage design and build method & construction project management
John Constance
Specification writting civil construction
Specification writting civil construction
diasawada12345
Session 20 4th edition PMP
Session 20 4th edition PMP
محمد عصمت عبد الرازق
Professional Practice 1 Assignment
Professional Practice 1 Assignment
Melvin Lim
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscm
Est
Procurement management-plan template
Procurement management-plan template
Vivek Srivastava
SPECIFICATIONS
SPECIFICATIONS
Joedy Mae Mangampo
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET Journal
9. project procurement management
9. project procurement management
Mohamed Salah Eldien Mohamed Ali
Professional practice 1 report
Professional practice 1 report
Ngo Jia Haur
Guide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
Sarah Fox
12 project procurement management
12 project procurement management
Omer Alsayed PhD,MBA, PMP®
Quality Management System at Construction Project: A Questionnaire Survey
Quality Management System at Construction Project: A Questionnaire Survey
IJERA Editor
Procurement in construction
Procurement in construction
MahSobeh
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
Pavitr1203
Technical feasibility ppt
Technical feasibility ppt
Chandan Singh
Mais procurados
(20)
Quality management in construction
Quality management in construction
Session 19 4th edition PMP
Session 19 4th edition PMP
Procurement Methods
Procurement Methods
Procurement plan-template-1.2
Procurement plan-template-1.2
Single stage design and build method & construction project management
Single stage design and build method & construction project management
Specification writting civil construction
Specification writting civil construction
Session 20 4th edition PMP
Session 20 4th edition PMP
Professional Practice 1 Assignment
Professional Practice 1 Assignment
CSCM Chapter 9 sl as cscm
CSCM Chapter 9 sl as cscm
Procurement management-plan template
Procurement management-plan template
SPECIFICATIONS
SPECIFICATIONS
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
9. project procurement management
9. project procurement management
Professional practice 1 report
Professional practice 1 report
Guide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
12 project procurement management
12 project procurement management
Quality Management System at Construction Project: A Questionnaire Survey
Quality Management System at Construction Project: A Questionnaire Survey
Procurement in construction
Procurement in construction
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
Technical feasibility ppt
Technical feasibility ppt
Semelhante a Study on Procurement Method Selection Procedure in Construction Industry
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET Journal
Professional Practice 1
Professional Practice 1
Lee Pei Gie
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET Journal
Pp1 report
Pp1 report
ahmong4
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
IRJET Journal
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET Journal
Professional practice 1 (1)
Professional practice 1 (1)
tfkc1212
Estimating Seminar (QS)
Estimating Seminar (QS)
Hasif Alias
Pp1 assignment group 8
Pp1 assignment group 8
lohwenjun
KENA PRE.pptx
KENA PRE.pptx
dagneabera13
Claims Management And Assessment Through Documentation
Claims Management And Assessment Through Documentation
vivatechijri
IRJET- Construction Quality Management on Site
IRJET- Construction Quality Management on Site
IRJET Journal
Professional Practice I Assignment
Professional Practice I Assignment
ashleyyeap
Cbb 512 assignment_1
Cbb 512 assignment_1
Maatla Moadi
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
IRJET Journal
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
ijtsrd
Estamating seminar chapter 1 (QS)
Estamating seminar chapter 1 (QS)
Hasif Alias
Unit-4.pptxhhhghbfgvgtghvfgbbghbbhgfccvbtt
Unit-4.pptxhhhghbfgvgtghvfgbbghbbhgfccvbtt
manisha61981
Control procurement
Control procurement
Shereef Sabri
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET Journal
Semelhante a Study on Procurement Method Selection Procedure in Construction Industry
(20)
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
Professional Practice 1
Professional Practice 1
IRJET- Review on Study of Factors Affecting Quality of Construction Project
IRJET- Review on Study of Factors Affecting Quality of Construction Project
Pp1 report
Pp1 report
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
IRJET- Importance of Proper Cost Management in Construction Industry
IRJET- Importance of Proper Cost Management in Construction Industry
Professional practice 1 (1)
Professional practice 1 (1)
Estimating Seminar (QS)
Estimating Seminar (QS)
Pp1 assignment group 8
Pp1 assignment group 8
KENA PRE.pptx
KENA PRE.pptx
Claims Management And Assessment Through Documentation
Claims Management And Assessment Through Documentation
IRJET- Construction Quality Management on Site
IRJET- Construction Quality Management on Site
Professional Practice I Assignment
Professional Practice I Assignment
Cbb 512 assignment_1
Cbb 512 assignment_1
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
Factors Influencing Contractors Selection in Construction Projects
Estamating seminar chapter 1 (QS)
Estamating seminar chapter 1 (QS)
Unit-4.pptxhhhghbfgvgtghvfgbbghbbhgfccvbtt
Unit-4.pptxhhhghbfgvgtghvfgbbghbbhgfccvbtt
Control procurement
Control procurement
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
Mais de IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
Mais de IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Último
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Soham Mondal
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
SIVASHANKAR N
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
KurinjimalarL3
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
upamatechverse
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
simmis5
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
roncy bisnoi
Extrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
120cr0395
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Call Girls in Nagpur High Profile
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
ranjana rawat
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
upamatechverse
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur High Profile
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
ranjana rawat
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
pranjaldaimarysona
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
Último
(20)
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Extrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Study on Procurement Method Selection Procedure in Construction Industry
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 340 STUDY ON PROCUREMENT METHOD SELECTION PROCEDURE IN CONSTRUCTION INDUSTRY Chandrashekhar R. Patil1, Prof. Mahaboobali Nadaf2 1Student M.Tech(Construction Technologgy), Chandrashekhar R. Patil, Dept. of Civil Engineering, Jain College of Engineering, Belagavi, Karnataka,India 2 Asst.Professor Mahaboobali Nadaf, Dept. of Civil Engineering, Jain College of Engineering, Belagavi, Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - This Project helps in selection of appropriate procurement method in the construction industry to achieve the requirements and needs of the clients and gives more detailed information about the how does the procurement system involved in the construction industry. This study consists of different procurement methods like traditional, design & build and management procurement, comparison of different procurement systems, influencing factors, effecting factors, key actions, variables , theoretical frame work, mechanism for analyzing the different procurement system, development of procurement strategy, advantages , detailed method selection procedure and case study. Brief study has carried out in the project work; about the procurement method selection procedure. Key Words: Procurement, Variables, Frame Work, Mechanism, Case Study 1.INTRODUCTION A procurement system can be defined as “an organizational system that assigns specific responsibilities and authorities to people and organizations, and defines the various elements in the construction industry”. It is not only applicable to developed market economics, but also construction industry development in less advanced economy. The procurement system benefits the organization to manage procurement process effectively and efficiently in construction industry. The system canassistanorganization to achieve successful outcome for their project with necessary guidance and support. It will also control therisks involved in the construction industry and minimize the cost variation problems.Theprocurementsysteminconstruction industry is useful in following ways: It helps in preparing tender documents and contracts Selection of contractors and consultants based on their earlier records This system includes checklist for effective maintenance of the contract It increases the efficiency and effectiveness of the management system by constant monitoring and reporting The disputes arising are resolved with help of this system Procurement advice an appropriate contracting strategy, offering and preparation of tender documents, choice of experts and contractors, contract organizationandavoid the un-necessary discussions 1.1 Objectives of procurement system The goal of the procurement systemisforsuccessful completion and implementation of the project. Some of the objectives are mentioned below: To carry out justifiably and truthfully Perform assigned work in timely manner with honesty Have to Satisfy the all rules of legislation and principles To reach the all requirements of the client’s needs Controls construction related dispute 1.2 Procurement activities and key actions Table-1: Activity and key action Activity Sub activity Key action 1 Defining the objectives for the procurement 1.1 Organize wide range of activities. To improve the title for procurement to recognize and define scope of the project. 1.2 Evaluation of economic value for planned procuremen t. For budgeting, it is necessary for evaluation of the economic value of the proposed contract.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 341 1.3 Scope This study helps in establishing a construction procurement system for: 1. Goods, services, engineering andconstructionwork relating to the construction industry in a fair, balanced, transparent, competitive and cost effective manner. 2. It deals with procurement methods which help to proper implementation and successful completion of the project as per client requirements. 3. It accomplishes future requirements, and develops the industry to give early and best adorable results to the clients with respect to cost, quality and time. 1.4 Objectives of the study Main objectives of the present project work are as follows: 1) Study of various procurement methods involved in the construction industry 2) To determine factors influencing the selection of procurement systems in construction industry 3) Mechanism for analyzing the different procurement system 4) Procedure to develop and implement a procurement strategy 5) To determine the suitable procurement method for Dr. Prabhu Halakatti hospital building, Belagavi 2. METHODOLOGY By referring different literatures, technical reports, case study and other resources related to the current study, an outline of the methodology of the present work has been discussed briefly below, to achieve the objectives of the project. • Study involves different methods of procurement system, influence of procurement methods on project performance, mechanism for analyzing different procurement system, procedure to develop and implement a procurement strategy • Comparison of different procurement systems and their advantages • Based on the studies, proposal have made on Dr. Prabhu Halakatti hospital building carried out during the period of internship, problems are analyzed and solved with the procurement system and few suggestions are made. 2.1 Procurement systems Different methods of procurements are a. Traditional b. Design and construct c. Management a. Traditional procurement method:Itistheoldesttypeof construction procurement as well as one of the most common types of procurement method. It is defined as a project delivery strategy, wherein two different companies will carry out all project processes. Contracts are mainly divided in to three types Lump sum contracts: Prior to the starting the construction project, the contract amount is determined with consulting various stakeholders. The amount of Lump sum contracts is decided on the basis of bill of quantities and thing which is not able to find can be found by accurate evaluation Measurement contracts: Here, only after thecompletionof the project and re-measurement, the precise amount is known and it is additionally alluded towards as re- quantification contracts. Cost reimbursement: It is as well recognized as cost plus contracts, wherein the contract amount is calculated based on actual cost of labour and materials also the profit and overhead charges are considered. Advantages of traditional procurement Help full for the contractor to apply for the tender on the same premise. Client can have immediate impact which can encourage high state of usefulness and enhance the quality in the design. Circumstances in which traditional procurement to be used are Wherein the design consultant is necessary. The designers and contractors are hired independently. If superiority of the work is essential for the clients. b. Design and Construct Procurement: Here,theclientwill give all needs desires for the project and assigns different task to the contractor. The association of the D&C methods and relative freedom of the contractor helps the client in obtaining the best price for the project, which may lead to cost benefits. Advantages of design and construct procurement Client can deal properly with one firm Overlap of design and construction performance will minimize the project time CircumstancesinwhichD&Cprocurementtobeusedare When project does not require any specialized development Design scope is likely to change
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 342 When project is technically difficult to understand c. Management Procurement system: This consists of management contracting and construction management. Management contracting: The management contractor is working with the clients. The contractors are involved at every stage of the construction and are responsible for works that are executed with direct contracts. Due to its flexibility, this type of contracts allow the clients to change the design during the construction process as well as the project can be started early and completed on time. Construction management: A contractor will pay amount as per the completely to control, build up a schedule and arrange the outline and development exercises, The administration contractual worker is chosen later than a vigilant determination procedure and is paid via administration prise. Various advantages have been recognized on CM approach summarized as follows Construction management expertise involve met in the beginning of the project Overlap of design and construction 2.2 Factors influencing the selection of procurement systems in construction industry External environment: Factors from the external environment consist of variables like market competition, information technology, regulatory environment, natural causes and globalization, politics, finance etc. Internal environment: This can be divided under three main factors such as project characteristics, client’s characteristics andclient’srequirement.Clientrequirements can be sub-divided into cost related factors, time related factors and quality related factors. Some of the important factors mainly influence while choosing of procurement system arebrieflyexplained below a) Socio–economic thought: It has derived from the four factors: political thought, government (public) or private segment venture, market or monetary condition and developing innovation. b) Client requirements: This factor incorporates: customer's particular prerequisites, political obstructions, globalization and customer's level of information. c) Capital cost/cash flow: This Factor clarifies the total variation; in any case, it is hard to clarify this component, since just a single variable impact upon it. Customer and fee related variable. If this componentmeasurescapital cost,itis identified with factors of customer necessities variables. d) Project characteristics: This Factor is obtained from variance that clarifies the total fluctuation. In particular, impact of the life cycle on venture, range and technical complexity of the venture. 2.3 A theoretical framework on influence of procurement methods on project performance Fig. 1 shows, a theoretical system that simplifies, the acquisition choice criteria, in order to help in discovering their effects on construction execution. All of the certainty would affect distinctively on duration, price and quality, dependent upon the appropriateness of the details as for a given acquirement technique. The level of impact of every fact on given venture can be dictated by allocating with a use of number utilizing a range of 1-7, where 1-3 demonstrates pessimistic impact on execution and 5-7 shows optimisticimpact,4asnoimpactor nonpartisan. Fig-1: Theoretical framework 2.4 Mechanism for analyzing the different procurement systems This settled structure clarifies and investigation both hard and flexible parts of authoritative administration, for example, procedure, structure, frameworks, shared values, staff and skills. It is additionally firmly related and appropriate to a venture conveyance approach,asthemodel is perceived for its all necessaries and substantial extension. The details of the Seven S Model and its extension and clarification for the construction project are: Strategy: Describes as an arrangement in dispensing assets to accomplish recognized objectives at the time. Structure: It characterizes a framework for the organization. Though, in construction project level, it is about the general venture delivery system, especially to organize the undertakings involved and its procedure of administration. Systems: These are the standard procedures and methods followed within the association. It is comparative for the extent of works and employment exercises at the venture level. Shared esteems: It eludes to the noteworthy implications or managing ideas that authoritative
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 343 individuals share. The way of life of the overall management would decide the common values produced from alternate models at the venture level. Staff: Describes as work force classes within the organization. This identifies with the level of capacities required for the workforce at the project level. Skills: It alludes to the genuine level of abilities and capabilities of the representatives working for the organization. In the development setting, it is about the level of specialization required for the project delivery approach. 2.5 Procurement Strategies Procurement technique, which is regularly created amidthe assessment periods of a venture, is a key component for effective venture conveyance. The acquisition system is a core venture document, which shows the result of an exact acquirement alternative assessment undertaken by the project proprietor, to differentiate the suggested conveyance model and procurement technique for a venture while considering the venture's individual qualities, risk and conditions To build up a powerful acquirement methodology, it is critical to Thoroughly comprehend the venture including key drivers, imperatives and dangers Determine organization and market abilities and limit Involve key partners and specialists at right time in the arranging and improvement process 2.5.1 Procedure to develop and implement a procurement strategy Appropriatelyprogramming theimprovementandexecution of the acquisition methodology with financing viewpoint, is the piece of good venture administration, as further discussed below. a) Informing the funding decision: It is essential that the procurement system is created in an opportune way, as offices might be required to present the points of interest of acquisition alternatives under contemplations to organizations, as a feature of the business case, in help of a speculation choice for the project. Last acquisition methodology will likewise should be endorsed by association before conveyance of the project. In creating acquirement procedures, the proprietors must permit adequate time for a capable investigation of all accessible obtainment alternatives, approval activities and surveys, and association endorsements. Organization will have their own particular procedures for procurement, to follow so as to get administration approval for the assumption, and whether this ought to happen at the same time with a choice on the favored procurement technique. b) Programming for development: venture conveyance,It can be depicted as the procedure by objective of a venture has acknowledged, it has to boost through a suitable acquisition strategy, to guarantee the necessary works are not postponed Programming the growth of the acquisition strategy is subsequently significant for a project administration perspective. To accomplish best possible timing, the obtainment strategy development process ought to initiate as right on time as venture lifecycle, as a major aspect of the venture's assessment and definition stages c) Programming for implementation: Guideline of the procurement strategy will usuallystartsattheinitial stageof the construction venture and it will carry out till the end of the phase, with that transition to function stage, it will be conditional on which kind of deliver model has considered. 3. CASE STUDY A Proposal is made by taking a hospital building as case study, through studying thevariousdocumentsanddifferent procurement system.Fromtheobservations,problemsfaced in the construction project are documented and suggestions were made for successful completion of project. Project title : Dr. Prabhu Halakatti Hospital Building Procurement method used: Traditional Lump Sum Project Value: Rs. 4, 27, 00,000 Contractor: Anoop Javalkar Client: Dr. Prabhu Halakatti Architect: Sangolli and Associates Project Overview The choice to add a Traditional Lump Sum procurement strategy on this venture is intensely affected through the diverse features of the venture. All things considered, adequate time and assets were dispensed to ensure definite plan and determinations has framed. Moreover, it is an interesting undertaking wherein, the design and requirements must be precise with particular criteria. It is consolidated with the TLS strategy for acquisition proposed to contractual worker with offering of the venture so that, procurement determination handle for this venture is moderately straight-forward. With construction is expected to finish by 2017 with total cost of Rs 4.27cr. The new heart hospital center will provide the best heart related treatment accessible in the Belagavi city and considerably decrease the waiting time forpatients.
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 344 The hospital right now care for around 1200 heart patients utilizing distinctive treatment every year, with 4000 treatment will visit, the opening of the latestHospital center, extra 200 heart patients will be there dealt with every year. Detailed Documentation: More attention on the plan and design was necessary. Ventures relating to health are more intricate than the most projects carried out by architects. Detailed documentation is taken into thought for expectations works and its coordination into existing structures was likewise of critical significance. The acquirement technique embraced for this venture must be adequate to help the contribution of reasonable advisors. High Quality End Product: Effect of contributing adequate duration and assets, in the direction of deliver complete records at the major stage of plans and particular, this point of scheduling will deal by means of the coveted necessity with high quality final result. The significance of a high quality venture will be highlighted bytheventuresupervisor A Balance of Risk between Client and Contractor: Importance of time and assets interested ina completeset of plans and determinations, among each of the offering that contractor offers would guarantee a more focused choice process and value affirmation of the venture. The TLS strategy, being an attemptedandtriedtechniquefor acquisition alternative for venture proprietor and the market encouraged a decent balance of risk between the customer and contractors. Problems occurred during construction Lagging in supply of deign during construction progress Delay in project due to in-sufficient supply of materials There is not much proper communication between clients, contractor and management team Over run of time due to making changes in designin middle of construction Variation in cost due to market rates andchangesin material selection by client Improper management makes failure of scheduled plan Project Procurement Selection Process The procurement method selection procedureisdetermined by means of the case project, the project is based on typical criteria. In this example, the client is the Dr. Prabhu Halakatti, has given the proposal for new hospital building with disabilities. Above problems have influenced to choose suitable procurement method, it is determined with the following process. Step 1: Identifying project objectives and constraints Objectives of projects: Proper programmingandphasingshouldbeontime Design criteria has to meet the needs of the client Projects have to complete within the agreed rate There should not be any over run or delay in the project Cost conviction will berequiredprecedinginitiation of development Project Constraints: Programme Constraints: Well information about the hospital building designs are prepare for the entire project to check clearly completion of the work at the different stages of construction. Planning: The design proposition has satisfied the requirements of the planning experts and local partners in the advancement. Site Availability: The site ought to be accessible in the best possible area Site Condition: Site had clearlysurveyedbeforethe start of project, by under taking it as a major aspect of plan improvement. Degree of Client Involvement: It is the most important in the construction management and Dr. Prabhu Halakatti involvement in the all stages of construction process. Flexibility for Change during Design and Construction: Design of the building had carried earlier & found good prise certainty, hence there is not required to change during the execution stage. The procurement options examined here and alternative procurement methods identified based upon preliminary discussions are: a. Traditional b. Design and Build c. Management Step 2: Identify Procurement Selection Criteria Identification of Procurement Selection Criteria carried on the following basis, Time: Early completion of the project is necessary Certainty of time: Project completion time is most important Certainty of cost: Firm prise needed before commitment to construction Price competition: Selection of the construction team by price competition as needed
6.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 345 Flexibility: Variations are needed after work has begun on- site Complexity: Building need to be highly specialised, technologically advanced Quality: High quality of the product,intermsofmaterial and workmanship and design concept are required Responsibility: Client had the more accountabilityfrom the architecture and cost consultants. Risk: The transfer of the risk of cost and time slippage from the client is vital Step 3: Weightages of Client Criteria and Procurement Methods The procurement assessment criterion for the client’sneeds and for each procurement methods has clearly found below Table-2: Determination of the importance of client criteria for the project Procurement Assessment Criteria Weig hting Time: Is early completion required? 5 Certainty of time: Is project completion on time important? 5 Certainty of cost: Is a firm price needed before any commitment to construction given? 3 Price competition: Is the selection of the construction team by price competition important? 3 Flexibility: Are variations necessary after work has begun on-site? 4 Complexity: Does the building need to be highly specialized, technologically advanced or highly serviced? 5 Quality: Is high quality of the product, in terms of material and workmanship and design concept important? 4 Responsibility: Is single point of responsibility to the client from the designers and cost consultants desired? 3 Risk: Is the transfer of the risk of cost and time slippage from the client important? 2 Table-3: Criteria weighting with respect to procurement method Procurement Assessment Criteria Traditional Procurement (P1) D & B Procur ement (P2) Manageme nt Procureme nt (P3) Time 3 5 4 Certainty of time 3 5 4 Certainty of cost 2 4 4 Price competition 4 3 3 Flexibility 4 4 3 Complexity 4 5 4 Quality 3 4 4 Responsibility 2 5 4 Risk 2 3 2 Table-4: Weighted procurement method scoring table From the above results can say traditional andmanagement procurement methods are less scored than D&B procurement method. Hence, D&B can be considered as the best suitable procurement method for the proper implementation of the project to get successful out comes as per client needs. Procureme nt evaluation criteria Weig htage (W) Traditiona l Procurem ent W x P1= D&C procurem ent W x P2= Manageme nt procurem ent W xP3= Time 5 15 25 20 Certainty of time 5 15 25 20 Certainty of cost 3 6 12 12 Price competitio n 3 12 9 9 Flexibility 4 16 16 12 Complexity 5 20 25 20 Quality 4 12 16 16 Responsibi lity 3 6 15 12 Risk 2 4 6 4 Σ = Rank 106(3) 149(1) 125(2)
7.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 346 Step 4: Procurement Appropriateness Chart Below tables gives a suggestion on the suitability of every choice against the objectives and key criteria for the project. Table-5: Time Time Traditional Procuremen t D&B Procuremen t Managemen t Procuremen t Completion date certainty Poor Good Average Traditional procurement takes more time to complete the project Ability to meet current programme Poor Good Average The program has to give sufficient time for characterizing the customer’s necessities. Facility to phase constructio n Average good Average Opportunity for contractual worker contribution to preplanning for staged conveyance Table-6: Cost Cost Traditional Procurement D&B Procurement Management Procurement Fixing the total amount of the project before making the any bonds. Average Good Average Conventional technique gives agreatlevelofprice sureness furnish so as to complete outline is delivered preceding to offering Similarly with D&C gives a huge level of rate assurance giving the customer’s necessities is completely characterized up to execution phase. Shifting of amount related problems Poor Average Poor In D&C configuration hazard will howeverremain with the customer through the plan group. Under customary frameworks danger of configurationis held by the customer. In D&C design risk will however stay with the client through the design team. Under traditional systems risk of design is retained by the client. Focused offering in current market situations Average Good Average The D&C seems, by all accounts, to be the mainly appealing alternative for the present market circumstance. Table-7: Quality Step 5: Procurement Review Session Every perspective from the above Table5to7isexaminedat the procurement review session. The following points were audited in connection with elective procurementtechniques accessible: Client will be monetarily risk hesitant: D&Cwill givemost significant cost assurance at every key choice period. Client will discourage late changes: D&C is a lesser amount of adaptable to tardy changes. Therefore, it is favoured more. An unmistakable and subtle element of Client's prerequisites up to proper level will be required. Programme is essential: For early complete,D&Cwill offer the best program favourable circumstances. Quality is vital: D&C technique gives the best chance to design quality control, atanexpandedcostrisk evaluatewith D&C. D&C can give a satisfactory level of plan. Market conditions: A prior approach and prior participation of the contractor is valuable in present economic situations. Partnering: The Client support's partnering arrangements; D&C will bring early contractual workerparticipationand so it proposes the most excellent alternative option to associates. Preferred Option The assent favored choice at this stage is a Design and Construct procurement method. Key contemplationsare the Quality Traditional Procureme nt D&B Procurem ent Management Procurement Capacity for temporary worker to include an assess plan improvement. Average Good Average Conventional: Contractor hasparticipatedindesign, it may cause a few issues as far as zones, for example, buildability. Offering will get huge quality at points of interest. D&B: Gives most extreme capacity for contractual worker to include an incentive in outline. Adaptable to suit modify instructions Average Average Poor Development organize changes ought to be stayed away from while embracing D&C Single point duty regarding design and development Poor good Average In customary the outline and development duties are divided Capacity to manage/react to location circumstances Good Good Average Temporary workers can examine the location surroundings completely
8.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 347 possibilities, to achieve the finish of the procurement method choice in development of project Advantages Ability of the design team and customer to have an immediate impact. This will achieve a high level of usefulness and upgrade the nature of the general design. Client is certain about the venture's cost at the conferring phase of the agreement. Differences in the venture are generally simple to direct. Limitations Incomplete reports and configuration can compromisecostconviction andincrementtheodds of troubles that might occur. Restricting the contribution of design or arranging skill from the contractual worker may not be to the greatest advantage of the venture. Lessons Learned Enough allotment of assets is necessary to guarantee design and documentationoftheventure will conclude at the calling for tender phase of the venture. For superlative activities, for example,those related with health, the traditional method of procurement gives the customer the choice for alternatives in expert advisors to help with the outline. This can likewise be a convenient procedure and if the documentation is notfinished,theadvantagesof cost certainty can be extreme. Suggestions By implementing the D&Cprocurementsystem,one can achieve the requirements of the client’s andcan complete the project on time. Design and build method give the appropriate solution for the above problems occurred on construction organization. The procurement system should be used to give specific responsibility to participants in the construction project. The suitable system must be selected, to complete the project successfully and efficiently. 4. CONCLUSIONS AND FUTURE SCOPE It has proposed, choice of appropriate procurement method is the beginning step to achieve goals in construction related projects. Mainly, three most three critical parameter of project performers are Cost, time and quality. More effective in monitoring and control to accurate implementation and to progress the work Who are related to the construction industry, they may be from public or private sector must be well known about the different procurement system, hence it will support to get good results Client's authentic needs, necessities, destinations and project objectives should be properly suggested to the project group, keeping in mind the end goal is to make proper procurement strategy A apparent, common system has to built up at an early phase of the project which will decide extensively what has be done, how it has be done, by whom it must be done, where it have to be done and when it must be properly finished Improved utilize and equivalence of data innovation is probably going to be the key, all together for development industry to have the capacity to meet the administrative, specialized and social difficulties. Improving the procurement strategy in building administration will get more advantages to deal with workforce, proprietor of the building, and the clients who are identified with support industry. Future scope of study This study can be extended to other procurement system such as E-procurement Collaborative Joint venture Private financing initiative REFERENCES 1) Associate Prof. Dr. Anuar Alias et al., Selection of Procurement Method for Building Maintenance Management 2) Christopher N. Preece, Improving Construction Procurement Systems Using Organizational Strategies, Vol. 11, No. 1 (2014). 3) David Baccarini et al., Building Procurement Methods, Research ProjectNo:2006-034-C-02,June 2008 4) Dissanayaka Sunil et al., Comparing Procurement And Non-Procurement Related Contributors to Project Performance, 1998. 5) Mathonsi, M. D. et al., Factors Influencing The Selection Of Procurement Systems In The South African Construction Industry ISSN 1993-8233,Vol. 6(10), 14 March, 2012, pp. 3583-3594. 6) Peter Bamford, Buildingand Construction Procurement Guide, ISBN 978-1-925037-19-7,
9.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 08 | Aug -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 348 Austroads Publications Number AP-G92-14(2014), pp. 56. 7) Shamil Naoum.et al., Critical review ofprocurement method research in construction Journals, No.6-13 (2015). 8) Zuleha R. Kadima.et al., An Analysis of procurement procedures on the implementation of government construction projects in Kenyan public Universities, ISSN: 2278 – 0211, Vol 2 Issue 11, November, 2013. BIOGRAPHIES Mr. Chandrashekhar R. Patil Pursuing M.Tech (Construction Technology) Jain College of Engineering, Belagavi, Karnataka, India. Prof. Mahaboobali Nadaf Guide & Asst. Professor at Jain College of Engineering, Belagavi, Karnataka, India.
Baixar agora