International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1503
Er. Shriyank Sen1, Er. Sandeep verma2
1MTech Scholar BTIRT, Sagar
2Head of Department, Department of Civil Engineering, BTIRT, Sagar
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Productivity has for many years been an issue
for the construction industry in India. The industry is deeply
concerned that construction productivity is not only below
that of the manufacturing sector, but is also below the
national average. The industry has identified several factors
that have impeded construction productivity, namely, a
shortage of suitably trained, skilledsupervisorsandworkers;a
weakening local construction workforce; and a large, mostly
unskilled and transient pool of foreign workers. The main
objective of the research programme was toassist contractors
improve their site productivity performance. A three-pronged
approach was adopted, comprising a review of current
construction productivity issues affecting the India
construction industry; a survey of top civil engineering and
building contractors to understand their perceptions on
productivity; and a study of measurement techniques of site
productivity for on-going building projects.
Key Words: NPC, HAB, RAB, HOB, CIDB
1. INTRODUCTION
The first phase of the research programme comprised a
comprehensive study of construction productivity issues in
the Gandhi medical college, Bhopal context,followedby an
extensive questionnaire survey. The objective of the survey
was to identify the perceptions of senior management of
large civil engineering and building contractors with regard
to: factors that would improve construction productivity;
and problems encountered at construction sites. This phase
of the research resulted in several recommendations to be
made to industry in order to improve construction
productivity. These recommendations included the
recruitment and training of a new generation of skilled local
workers; continuous upgrading of management and
technical skills of supervisory staff; the study of long-term
viability of constructionautomationprocesses;promotionof
buildable designs. The second phase of the research
comprised a study of productivity measurement techniques
for various on-going building projects in India. Two areas
were investigated, namely: measurement of overall site
productivity of projects on a monthly basis; and
measurement of labour productivity of formwork,
reinforcement and concreting operations. A prescribed
productivity equation was used for measuring overall
productivity, and data included monthly site manpowerand
monthly progress payments certified by the project
consultants. Three categories of building projects were
investigated, namely buildings, public residential buildings
and private residential buildings.
Figure 1: Satellite of Gandhi Medical College
Unlike several other industries, the level oftechnologyinthe
construction industry has remained relatively unchanged
over several decades. The lower pace of technological
development in construction places the industry at a
disadvantage when compared with other industries where
enhanced productivity is achieved through the use of
modern technology. As the constructionindustryisa diverse
sector of the national economy which involves a wide range
of scarce resources, its productivity is therefore not only
concerned with many individual activities, but the industry
as a whole. The issue of raising the level of construction
productivity has been discussed time and again. There are
many fundamental and wide-ranging topics that need
detailed discussion before the industry can improve its
status.
2. METHODOLOGY
In brief, the research methodology can be summed up as
follows:
• literature review of books, journals and conference
papers on various aspects of construction productivity,both
globally and in India;
Analysis of Constructions Productivity based on Progress Payment
Certified (PPC)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1504
• gathering of manpower data and other information for
the purposeofmeasuringoverallconstructionproductivityof
building projects in India;
• gathering of manpower data and material quantities
from selected construction sitesforthepurposeofevaluating
the productivity of formwork, reinforcement and concreting
operations in building projects;
• verifying and checking all data received for
correctness and
Analysing the information obtained;
• presenting all data and analysis through tables and
graphs;
• dialogue with contractors on validity and usefulness of
data obtained;
• conclusions and recommendations for future research
work related to construction productivity.
Data Analysis
There are a few ways of obtaining data for productivity
computation of buildings under construction. One method is
to station a supervisor on site daily to work out the daily
quantities of: formwork installed (in square metres);
reinforcement bars installed (in tonnes); and concrete
poured (in cubic metres).
Figure 2: View of Gandhi Medical College Constructions
Site.
The supervisor has also to record the daily workforce
under the three categories of formwork, reinforcement and
concreting. The number of hours spent daily by the workers
for each of the trades above are also monitored. From the
above records, it is then possible to computethefollowingon
a daily basis:
• Labour productivity (formwork)
Area of formwork installed (m2)
No. of man-hours
Unit of measurement: m2/man-hour
Quantity of rebars installed (tonnes)
• Labour productivity (reinforcement)
Unit of measurement: tonnes/man-hour
• Labour productivity (concreting)
Unit of measurement: m 3 man-hour
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1505
Quantity of concrete poured(m3)
No. of man-hours
One of the difficulties of the above method is that, in
addition to monitoring the number of workers foreachofthe
above trades and their daily working hours, the supervisor
also has the audios task of calculating the daily quantities of
formwork installed, reinforcement bars installed and
concrete poured. In order to obtain meaningful data, the
supervisor has to keep such records for several months in
order to monitor the trends in labour productivity. It has
been found that such a method is not practical on
construction sites as contractors are unable to spend time
and manpower to monitor the daily quantities of formwork,
reinforcement bars and concrete used. Further, it is doubtful
as to whether the quantities collected would be at all
accurate, especially for reinforcementbarinstallation,where
the supervisor has to count the actual number, length and
diameter of bars used daily. In order to overcome this
difficulty, it is proposed to exclude the task of calculating the
daily quantities used. Instead, the numberofworkersandthe
number of working hours are identified daily for the three
structural trades for the construction of a consecutive
number of floors. The only quantities needed are the form
work area, the reinforcement tonnage and the concrete
volume used foreach of the floors underinvestigation. These
quantities are provided by the Quantity Surveyor and this
takes the responsibility off the site supervisor. This will
eliminatethe task of obtaining the quantities on a dailybasis.
At the end of construction of a particular floor, the total man-
hours for each of the three trades are calculated and the
labour productivities are then obtained, using the same
equations as mentioned earlier.
This technique is much simpler to adopt in practiceandis
used in this research programme.Inordertostudyvariations
in labour productivity from floor to floor, it was further
suggested to study identical floors for a few high-rise
buildings under construction in India. The decision to use
identical floors is a valid one as it eliminates the problem of
differences in floor layouts and floor areas if non-identical
floors are selected. Different floor layouts would mean
different beam lengths and sizes and other structural
configurations anditwouldmakeafloor-to-floorcomparison
of labour productivity difficult.
In the productivity computation, it is also the task of the
supervisor to take note of the type of formwork used, the
floor system adopted by the design engineer and any other
features of the structural frame of the building that would
affect labour productivity. Inthereinforcementcomputation,
it is important to note the floor system used and whether or
not reinforcement cages, prestressing tendons and 200
welded wire mesh reinforcement are used.
As for the concreting works, it is useful to note the source of
the supply, i.e. whether it is site mixed or ready mixed
concrete, the type and number of concrete pumps used and
the availability of tower cranes forlifting of concreteasthese
items can affect productivity. It is also important to note if
any precast concrete units are used, as then the number of
man days forthe precast works would have to beallocatedto
the factory. Unless otherwise stated, the labour productivity
in this research programme is for activities on site only and
excludes works executed in the factory.
RESULT AND DISCUSSION
Table 1: Technical factors affecting formwork productivity
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1506
Table 2: Technical factors affecting reinforcement
productivity
Table 3: Technical factors affecting concreting
productivity
0.482
0.529
0.349
0.55
APRIL MAY JUNE JULY
BLOCK A RESEARCH
BLOCK (RAB)
Graph 1: Constructions productivity based on pavement
certified of Block – A Research Block (RAB)
0.564 0.467
0.513 0.432
APRIL MAY JUNE JULY
BLOCK B
ADMINISTRATIVE BLOCK
(HAB)
Graph 2: Constructions productivity based on pavement
certified of Block – B Administrative Block (HAB)
0.515
0.54
0.681
0.62
APRIL MAY JUNE JULY
HAMIDIA OUTER BLOCK
(HOB)
Graph 3: Constructions productivity based on pavement
certified of Hamidia outer block (HOB)
0.482
0.529
0.349
0.55
0.564
0.467
0.513
0.432
0.515
0.54
0.681
0.62
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
APRIL MAY JUNE JULY
Comparison of Overall Labour Producutivity
RAB HAB OUTER BLOCK
The issues raised by the survey on constructionproductivity
is only qualitative in nature anda completeunderstandingof
productivity must therefore include some quantitative
analysis. The availability of data from various on-going
projects in India enabled an in-depth investigation of
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1507
productivity measurements to fulfil the quantitativeaspects
of productivity.
Hence, the major part of this research programme involved
the development of techniques for measuring construction
productivity of on-going building projects in India. It was
found that overall construction productivity can be reliably
measured by using the prescribed productivity equation of
this Research paper. Although the accuracy of the results
given by the above equation is subjected to:
• the monthly progress payments being truly representative
of the actual work
done; and
• the correct manpower figures being reported by the
contractors,
the productivity equation is nevertheless a useful one to
adopt for measuring site productivity. This research
concludes that monthly productivity of individual
projects can vary considerably and values are:
(i) generally low during the start of projects due to the
learning curve effect; and
(ii) generally high during the months when there is an
increase in architectural works, especially so for buildings
with expensive architectural finishes.
Item is endorsed by the fact that when there is an increase in
the architectural workforce, theproductivityfigurerisesdue
to the increase in progress payments arising fromthehigher
payments received from increased architectural works.This
is the case with and private residential projectsastheyhave
more elaborate architectural finishes compared to public
residential projects.
3. CONCLUSIONS
The research concludes that collectively, the productivity
values of public residential projects are higher than those of
private residential projects. The reason for the above
phenomenon is that public residential projects are more
buildable, since their designs arebasic andsimple,compared
to the intricate designs of the other two categories of
buildings. However, the users of the productivity equation
must be cautioned against calculating productivity values of
projects for only a few month's duration of the construction
works. The productivity values have tobemonitoredover as
long a period of construction as possible and certainly not
less than say fifty percent of the total construction period. If
a building takes two years to complete, itisrecommended to
monitor the productivity values foratleasttwelvemonths to
study the behavioural pattern of the productivity figures,
manpower usage and progresspayments.Itisunwisetotake
readings for a merethree monthsandthenmakeconclusions
as to the productivity pattern.
The results of the productivity survey indicated that of the
ten groups of items surveyed, the following were identified
as being the most important in improving construction
productivity:
• guidance from consultants;
•collaboration between contractors and sub-
contractors/suppliers
• collaboration between contractor's head office/site office;
and
• attributes of managers and supervisors.
However, with emphasis by the Construction Industry
Development Board on buildability,qualityandproductivity,
it is very likely that the use of prefabrication has recently
been given more importance by contractors. From the
results of the construction productivity survey and the
findings of the NPC (National Productivity Council) report,it
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1508
is possible to identify several manpower issues that have
impeded construction productivity, namely:
• a shortage of suitably trained, skilled supervisors and
workers in the construction industry;
• a weakening local constructionworkforce, withjobseekers
keeping away from the construction sector; and
• a large, mostly unskilled and transient pool of foreign
workers.
Construction trades are increasingly unattractive to Indians
for various reasons such as the severe and more hazardous
working environment, the presence of too many foreign
workers and the general lack of recognition. Contractors
have to meet stiff competition for manpower from at his
more aggressive and attractive sectors. The difficulty in
recruitment may be due to outdated strategies used by
employers. For example, very few contractors recruit
engineering trainees before they graduate from the
universities and polytechnics, as is practised by large
corporations in other sectors of industry. The answer to the
manpower problems encountered by the construction
industry in India lies in bettertrainedand skilledmanpower,
more attractive employment incentives, improved
management techniques and increased use of plant and
equipment.
REFERENCES
1. https://archive.org/details/gov.in.is.7272.1.1974/page/
n17
2. http://www.npcindia.gov.in/wp-
content/uploads/2018/11/Theme-Paper-Circular-
Economy-for-Productivity-Sustainability-dated-
06.12.2018.pdf
3. https://www.ilo.org/global/research/lang--
en/index.htm
4. http://www.npcindia.gov.in/publications/
Er. Sandeep Verma is currently
Associate Professor and Head of
Civil Engineering Department at
Babulal Tarabai Institute of
Research & Technology, Sagar. He
has an extensive Industrial
experience of 25 years and
Teaching Experience of 12 years.
Er. Shriyank Sen is Pursuing With
his M.Tech in Constructions
Technology & Managementbranch
from BTIRT and undergoing
Research Work on Constructions
Productivity.

Mais conteúdo relacionado

Mais procurados

IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET Journal
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIRJET Journal
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET Journal
 
A study of professional advantages to manufacturing organizations by the way ...
A study of professional advantages to manufacturing organizations by the way ...A study of professional advantages to manufacturing organizations by the way ...
A study of professional advantages to manufacturing organizations by the way ...IJERA Editor
 
Introduction to Precision Engineering
Introduction to Precision EngineeringIntroduction to Precision Engineering
Introduction to Precision Engineeringshemsss
 
Profiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyProfiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyLiu PeiLing
 
CSCM @Qlassic
CSCM @QlassicCSCM @Qlassic
CSCM @QlassicEst
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelCCT International
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projectsKapugantikapuganti Gupta
 
IRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET Journal
 
3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...SJVijay
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...IRJET Journal
 
Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysisanshagrawal2121
 
JUST IN TIME MANUFACTURING - module 1
JUST IN TIME MANUFACTURING -  module 1JUST IN TIME MANUFACTURING -  module 1
JUST IN TIME MANUFACTURING - module 1Rashmi Srinivas
 
A Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningA Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningDr. Amarjeet Singh
 
Die casting - Engineering Analysis
Die casting -  Engineering AnalysisDie casting -  Engineering Analysis
Die casting - Engineering AnalysisRavichandran Natesan
 

Mais procurados (20)

IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 
IIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction ProjectIIRJET-Cost Control Techniques for Construction Project
IIRJET-Cost Control Techniques for Construction Project
 
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
IRJET- Evaluation of Rework Factors Affecting Cost and Schedule Performance i...
 
A study of professional advantages to manufacturing organizations by the way ...
A study of professional advantages to manufacturing organizations by the way ...A study of professional advantages to manufacturing organizations by the way ...
A study of professional advantages to manufacturing organizations by the way ...
 
Introduction to Precision Engineering
Introduction to Precision EngineeringIntroduction to Precision Engineering
Introduction to Precision Engineering
 
Profiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technologyProfiting with competitive sustainable machining technology
Profiting with competitive sustainable machining technology
 
CSCM @Qlassic
CSCM @QlassicCSCM @Qlassic
CSCM @Qlassic
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
Ac04606177183
Ac04606177183Ac04606177183
Ac04606177183
 
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
IRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional ConstructionIRJET- A Comparative Study on Precast Construction and Conventional Construction
IRJET- A Comparative Study on Precast Construction and Conventional Construction
 
3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...3D Monolithic Modular- Defence seminar on new construction technologies and m...
3D Monolithic Modular- Defence seminar on new construction technologies and m...
 
Improvement of Process and Product Layout for Metro Coach using Craft Method...
Improvement of Process and  Product Layout for Metro Coach using Craft Method...Improvement of Process and  Product Layout for Metro Coach using Craft Method...
Improvement of Process and Product Layout for Metro Coach using Craft Method...
 
Ppc 2mark answer
Ppc 2mark answerPpc 2mark answer
Ppc 2mark answer
 
Technical Analysis & Financial Analysis
Technical Analysis & Financial AnalysisTechnical Analysis & Financial Analysis
Technical Analysis & Financial Analysis
 
JUST IN TIME MANUFACTURING - module 1
JUST IN TIME MANUFACTURING -  module 1JUST IN TIME MANUFACTURING -  module 1
JUST IN TIME MANUFACTURING - module 1
 
A Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningA Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in Machining
 
Biotech Facility Modular Construction
Biotech Facility Modular ConstructionBiotech Facility Modular Construction
Biotech Facility Modular Construction
 
Die casting - Engineering Analysis
Die casting -  Engineering AnalysisDie casting -  Engineering Analysis
Die casting - Engineering Analysis
 

Semelhante a IRJET- Analysis of Constructions Productivity based on Progress Payment Certified (PPC)

Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...IRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork systemIRJET Journal
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPIRJET Journal
 
Productivity in Building Construction
Productivity in Building ConstructionProductivity in Building Construction
Productivity in Building ConstructionIOSR Journals
 
Analysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionAnalysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionIRJET Journal
 
IRJET- Systematic Construction Equipment Handling in Construction Industr...
IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...
IRJET- Systematic Construction Equipment Handling in Construction Industr...IRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
IRJET- U-Boot Technology
IRJET-  	  U-Boot TechnologyIRJET-  	  U-Boot Technology
IRJET- U-Boot TechnologyIRJET Journal
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectIRJET Journal
 
Analysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSAnalysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSIRJET Journal
 
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGPLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGIRJET Journal
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET Journal
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET Journal
 
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...IRJET Journal
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...IRJET Journal
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”IRJET Journal
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECTOPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECTIRJET Journal
 

Semelhante a IRJET- Analysis of Constructions Productivity based on Progress Payment Certified (PPC) (20)

Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
 
Productivity in Building Construction
Productivity in Building ConstructionProductivity in Building Construction
Productivity in Building Construction
 
Analysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionAnalysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional Construction
 
IRJET- Systematic Construction Equipment Handling in Construction Industr...
IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...IRJET-  	  Systematic Construction Equipment Handling in Construction Industr...
IRJET- Systematic Construction Equipment Handling in Construction Industr...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
IRJET- U-Boot Technology
IRJET-  	  U-Boot TechnologyIRJET-  	  U-Boot Technology
IRJET- U-Boot Technology
 
Resource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction ProjectResource Optimization in Mivan Construction Project
Resource Optimization in Mivan Construction Project
 
Analysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSAnalysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABS
 
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDINGPLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
PLANNING AND ANALYSIS OF MULTI-SPECIALITY HOSPITAL BUILDING
 
IRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in ConstructionIRJET- Review on Study of Quality Practices in Construction
IRJET- Review on Study of Quality Practices in Construction
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
IRJET- A Study on Use of Building Information Modelling for Cost Estimation P...
 
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECTOPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
OPTIMIZATION OF PRODUCTION COST IN CONSTRUCTION PROJECT
 

Mais de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Mais de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Último

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Último (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

IRJET- Analysis of Constructions Productivity based on Progress Payment Certified (PPC)

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1503 Er. Shriyank Sen1, Er. Sandeep verma2 1MTech Scholar BTIRT, Sagar 2Head of Department, Department of Civil Engineering, BTIRT, Sagar ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Productivity has for many years been an issue for the construction industry in India. The industry is deeply concerned that construction productivity is not only below that of the manufacturing sector, but is also below the national average. The industry has identified several factors that have impeded construction productivity, namely, a shortage of suitably trained, skilledsupervisorsandworkers;a weakening local construction workforce; and a large, mostly unskilled and transient pool of foreign workers. The main objective of the research programme was toassist contractors improve their site productivity performance. A three-pronged approach was adopted, comprising a review of current construction productivity issues affecting the India construction industry; a survey of top civil engineering and building contractors to understand their perceptions on productivity; and a study of measurement techniques of site productivity for on-going building projects. Key Words: NPC, HAB, RAB, HOB, CIDB 1. INTRODUCTION The first phase of the research programme comprised a comprehensive study of construction productivity issues in the Gandhi medical college, Bhopal context,followedby an extensive questionnaire survey. The objective of the survey was to identify the perceptions of senior management of large civil engineering and building contractors with regard to: factors that would improve construction productivity; and problems encountered at construction sites. This phase of the research resulted in several recommendations to be made to industry in order to improve construction productivity. These recommendations included the recruitment and training of a new generation of skilled local workers; continuous upgrading of management and technical skills of supervisory staff; the study of long-term viability of constructionautomationprocesses;promotionof buildable designs. The second phase of the research comprised a study of productivity measurement techniques for various on-going building projects in India. Two areas were investigated, namely: measurement of overall site productivity of projects on a monthly basis; and measurement of labour productivity of formwork, reinforcement and concreting operations. A prescribed productivity equation was used for measuring overall productivity, and data included monthly site manpowerand monthly progress payments certified by the project consultants. Three categories of building projects were investigated, namely buildings, public residential buildings and private residential buildings. Figure 1: Satellite of Gandhi Medical College Unlike several other industries, the level oftechnologyinthe construction industry has remained relatively unchanged over several decades. The lower pace of technological development in construction places the industry at a disadvantage when compared with other industries where enhanced productivity is achieved through the use of modern technology. As the constructionindustryisa diverse sector of the national economy which involves a wide range of scarce resources, its productivity is therefore not only concerned with many individual activities, but the industry as a whole. The issue of raising the level of construction productivity has been discussed time and again. There are many fundamental and wide-ranging topics that need detailed discussion before the industry can improve its status. 2. METHODOLOGY In brief, the research methodology can be summed up as follows: • literature review of books, journals and conference papers on various aspects of construction productivity,both globally and in India; Analysis of Constructions Productivity based on Progress Payment Certified (PPC)
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1504 • gathering of manpower data and other information for the purposeofmeasuringoverallconstructionproductivityof building projects in India; • gathering of manpower data and material quantities from selected construction sitesforthepurposeofevaluating the productivity of formwork, reinforcement and concreting operations in building projects; • verifying and checking all data received for correctness and Analysing the information obtained; • presenting all data and analysis through tables and graphs; • dialogue with contractors on validity and usefulness of data obtained; • conclusions and recommendations for future research work related to construction productivity. Data Analysis There are a few ways of obtaining data for productivity computation of buildings under construction. One method is to station a supervisor on site daily to work out the daily quantities of: formwork installed (in square metres); reinforcement bars installed (in tonnes); and concrete poured (in cubic metres). Figure 2: View of Gandhi Medical College Constructions Site. The supervisor has also to record the daily workforce under the three categories of formwork, reinforcement and concreting. The number of hours spent daily by the workers for each of the trades above are also monitored. From the above records, it is then possible to computethefollowingon a daily basis: • Labour productivity (formwork) Area of formwork installed (m2) No. of man-hours Unit of measurement: m2/man-hour Quantity of rebars installed (tonnes) • Labour productivity (reinforcement) Unit of measurement: tonnes/man-hour • Labour productivity (concreting) Unit of measurement: m 3 man-hour
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1505 Quantity of concrete poured(m3) No. of man-hours One of the difficulties of the above method is that, in addition to monitoring the number of workers foreachofthe above trades and their daily working hours, the supervisor also has the audios task of calculating the daily quantities of formwork installed, reinforcement bars installed and concrete poured. In order to obtain meaningful data, the supervisor has to keep such records for several months in order to monitor the trends in labour productivity. It has been found that such a method is not practical on construction sites as contractors are unable to spend time and manpower to monitor the daily quantities of formwork, reinforcement bars and concrete used. Further, it is doubtful as to whether the quantities collected would be at all accurate, especially for reinforcementbarinstallation,where the supervisor has to count the actual number, length and diameter of bars used daily. In order to overcome this difficulty, it is proposed to exclude the task of calculating the daily quantities used. Instead, the numberofworkersandthe number of working hours are identified daily for the three structural trades for the construction of a consecutive number of floors. The only quantities needed are the form work area, the reinforcement tonnage and the concrete volume used foreach of the floors underinvestigation. These quantities are provided by the Quantity Surveyor and this takes the responsibility off the site supervisor. This will eliminatethe task of obtaining the quantities on a dailybasis. At the end of construction of a particular floor, the total man- hours for each of the three trades are calculated and the labour productivities are then obtained, using the same equations as mentioned earlier. This technique is much simpler to adopt in practiceandis used in this research programme.Inordertostudyvariations in labour productivity from floor to floor, it was further suggested to study identical floors for a few high-rise buildings under construction in India. The decision to use identical floors is a valid one as it eliminates the problem of differences in floor layouts and floor areas if non-identical floors are selected. Different floor layouts would mean different beam lengths and sizes and other structural configurations anditwouldmakeafloor-to-floorcomparison of labour productivity difficult. In the productivity computation, it is also the task of the supervisor to take note of the type of formwork used, the floor system adopted by the design engineer and any other features of the structural frame of the building that would affect labour productivity. Inthereinforcementcomputation, it is important to note the floor system used and whether or not reinforcement cages, prestressing tendons and 200 welded wire mesh reinforcement are used. As for the concreting works, it is useful to note the source of the supply, i.e. whether it is site mixed or ready mixed concrete, the type and number of concrete pumps used and the availability of tower cranes forlifting of concreteasthese items can affect productivity. It is also important to note if any precast concrete units are used, as then the number of man days forthe precast works would have to beallocatedto the factory. Unless otherwise stated, the labour productivity in this research programme is for activities on site only and excludes works executed in the factory. RESULT AND DISCUSSION Table 1: Technical factors affecting formwork productivity
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1506 Table 2: Technical factors affecting reinforcement productivity Table 3: Technical factors affecting concreting productivity 0.482 0.529 0.349 0.55 APRIL MAY JUNE JULY BLOCK A RESEARCH BLOCK (RAB) Graph 1: Constructions productivity based on pavement certified of Block – A Research Block (RAB) 0.564 0.467 0.513 0.432 APRIL MAY JUNE JULY BLOCK B ADMINISTRATIVE BLOCK (HAB) Graph 2: Constructions productivity based on pavement certified of Block – B Administrative Block (HAB) 0.515 0.54 0.681 0.62 APRIL MAY JUNE JULY HAMIDIA OUTER BLOCK (HOB) Graph 3: Constructions productivity based on pavement certified of Hamidia outer block (HOB) 0.482 0.529 0.349 0.55 0.564 0.467 0.513 0.432 0.515 0.54 0.681 0.62 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 APRIL MAY JUNE JULY Comparison of Overall Labour Producutivity RAB HAB OUTER BLOCK The issues raised by the survey on constructionproductivity is only qualitative in nature anda completeunderstandingof productivity must therefore include some quantitative analysis. The availability of data from various on-going projects in India enabled an in-depth investigation of
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1507 productivity measurements to fulfil the quantitativeaspects of productivity. Hence, the major part of this research programme involved the development of techniques for measuring construction productivity of on-going building projects in India. It was found that overall construction productivity can be reliably measured by using the prescribed productivity equation of this Research paper. Although the accuracy of the results given by the above equation is subjected to: • the monthly progress payments being truly representative of the actual work done; and • the correct manpower figures being reported by the contractors, the productivity equation is nevertheless a useful one to adopt for measuring site productivity. This research concludes that monthly productivity of individual projects can vary considerably and values are: (i) generally low during the start of projects due to the learning curve effect; and (ii) generally high during the months when there is an increase in architectural works, especially so for buildings with expensive architectural finishes. Item is endorsed by the fact that when there is an increase in the architectural workforce, theproductivityfigurerisesdue to the increase in progress payments arising fromthehigher payments received from increased architectural works.This is the case with and private residential projectsastheyhave more elaborate architectural finishes compared to public residential projects. 3. CONCLUSIONS The research concludes that collectively, the productivity values of public residential projects are higher than those of private residential projects. The reason for the above phenomenon is that public residential projects are more buildable, since their designs arebasic andsimple,compared to the intricate designs of the other two categories of buildings. However, the users of the productivity equation must be cautioned against calculating productivity values of projects for only a few month's duration of the construction works. The productivity values have tobemonitoredover as long a period of construction as possible and certainly not less than say fifty percent of the total construction period. If a building takes two years to complete, itisrecommended to monitor the productivity values foratleasttwelvemonths to study the behavioural pattern of the productivity figures, manpower usage and progresspayments.Itisunwisetotake readings for a merethree monthsandthenmakeconclusions as to the productivity pattern. The results of the productivity survey indicated that of the ten groups of items surveyed, the following were identified as being the most important in improving construction productivity: • guidance from consultants; •collaboration between contractors and sub- contractors/suppliers • collaboration between contractor's head office/site office; and • attributes of managers and supervisors. However, with emphasis by the Construction Industry Development Board on buildability,qualityandproductivity, it is very likely that the use of prefabrication has recently been given more importance by contractors. From the results of the construction productivity survey and the findings of the NPC (National Productivity Council) report,it
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1508 is possible to identify several manpower issues that have impeded construction productivity, namely: • a shortage of suitably trained, skilled supervisors and workers in the construction industry; • a weakening local constructionworkforce, withjobseekers keeping away from the construction sector; and • a large, mostly unskilled and transient pool of foreign workers. Construction trades are increasingly unattractive to Indians for various reasons such as the severe and more hazardous working environment, the presence of too many foreign workers and the general lack of recognition. Contractors have to meet stiff competition for manpower from at his more aggressive and attractive sectors. The difficulty in recruitment may be due to outdated strategies used by employers. For example, very few contractors recruit engineering trainees before they graduate from the universities and polytechnics, as is practised by large corporations in other sectors of industry. The answer to the manpower problems encountered by the construction industry in India lies in bettertrainedand skilledmanpower, more attractive employment incentives, improved management techniques and increased use of plant and equipment. REFERENCES 1. https://archive.org/details/gov.in.is.7272.1.1974/page/ n17 2. http://www.npcindia.gov.in/wp- content/uploads/2018/11/Theme-Paper-Circular- Economy-for-Productivity-Sustainability-dated- 06.12.2018.pdf 3. https://www.ilo.org/global/research/lang-- en/index.htm 4. http://www.npcindia.gov.in/publications/ Er. Sandeep Verma is currently Associate Professor and Head of Civil Engineering Department at Babulal Tarabai Institute of Research & Technology, Sagar. He has an extensive Industrial experience of 25 years and Teaching Experience of 12 years. Er. Shriyank Sen is Pursuing With his M.Tech in Constructions Technology & Managementbranch from BTIRT and undergoing Research Work on Constructions Productivity.