SlideShare uma empresa Scribd logo
1 de 7
Baixar para ler offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4103
An Overview on Project Management
Ku. Shuhashree P. Deshmukh1, Prof. Dr. Manish M. Bais2
PG Studen, PRMCEAM, Badnera, Amravati
Dean of Civil Department, PRMCEAM, Badnera, Amravati
--------------------------------------------------------------------------***----------------------------------------------------------------------------
Abstract - Project Planning and Management is key framework for successful completion of any project. Planning is a procedural
step in project management, where appropriate and standard documents are required to create an intact and comprehensive
project. Knowledge, skills, tools and techniques are applied to various project activities to meet the project requirements. Planning
without management is of no use. In order to develop a successful project, different project management techniques have been
widely established in the areas such as planning and control. In this, various project management methodologies, success and
failure, planning activity etc have been proposed.
Keywords: Project Management, Controlling, Scheduling.
1. INTRODUCTION
A project is composed of jobs, activities, functions or tasks that related one to the other in some manner, and all of these
should e completed in order to complete the project. Every project has one specific purpose: it starts at some specific moment
and it is finished when its objectives have been fulfilled. For completion of a project two basic things are required:
i) Material Resources
ii) Manpower Resources
Many countries, rich in material resources are exceedingly poor in terms of level of production or plan achievement, while
there are other countries which have very limited natural resources but have achieved higher level of productivity mainly
because of talents, skills experience and know-how of their people. Availability, quality and use of human resources is a single
determinant factor in accomplishing project objectives.
Rapid accumulation of scientific technique in the recent past has not been matched by a corresponding improvement in the
sphere of human group relations. In other words sociology has not kept pace with technology. We are not in position to utilize
fully our technology advancement unless we are also ale to advance in social sphere. Here comes the role of management.
While technology deals with material things, management deals with both material things as well as human-beings.
2. SUCCESS AND FAILURE OF PROJECT MANAGEMENT
The meaning of undertaking administration proposes a shorter term and more particular connection for achievement. For the
fulfillment of the plan, the evident markers are incorporated, thereby fulfilling the undertaking timetable, satisfactory quality
principles, and hence meeting the task objective. The various elements which cause’s the venture administration to neglect to
accomplish this task include the following:
1. insufficient premise for venture;
2. wrong individual as task chief;
3. top administration unsupportive;
4. deficiently characterized undertakings;
5. absence of task administration systems;
6. administration procedures miss-utilized;
7. venture closedown not arranged;
8. Absence of responsibility to extend.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4104
These components would propose that effective venture administration obliges arranging with a pledge to finish the task;
watchful arrangement of a talented undertaking supervisor; investing time to characterize the undertaking enough; accurately
arranging the exercises in the venture; guaranteeing right and satisfactory data streams; changing exercises to oblige
successive changes on dynamic; obliging representatives' close to home objectives with execution and prizes; furthermore
committing a new beginning when errors in execution have been distinguished.
Management increases the productivity through technological innovation taking into account human factors involved in these
advances.
Each project, whether big or small has three objectives:
i) The project should be completed with a minimum of elapsed time.
ii) It should use available manpower and other resources as sparingly as possible without delay.
iii) It should be completed with a minimum of capital investment, without delay.
iv) Project management is a highly specified job, to achieve the above objectives.
Project management involves, the following three phases:
1. Project Planning
2. Project Scheduling
3. Project Controlling
Out of the above three phases of project management the first two phases are accomplished before the actual project start. The
third phase is operative during the execution of the project, and its aim is to recognize the difficulties during the execution and
to apply measures to deal with these difficulties.
3. PROJECT PLANNING
Planning is the most important phase of project management. Planning involves defining objectives of the project, listing of
tasks or jobs that must be performed, determining gross requirements for material, equipment and manpower and preparing
estimates of costs and durations for the various jobs or activities to bring about the satisfactory completion of the project.
Planning is important because:
i) It provides direction
ii) It provides unifying framework
iii) It helps to reveal future opportunities and threats
iv) It provide performance standards
In the planning phase, plan is made and strategies are set, taking into consideration the company’s policies, procedures and
rules.
Plan
It is a statement of intent, i.e., what is to e done. It is interpreted in terms of what has to be done to resources achieve the
intent. The resource to be used may be : office staff, tradesmen, labor, materials, plant and machinery, space and funds. Plans
are detailed methods, formulated before hand for doing or making something. Plans simply list the goals (targets) and define
the means of achieving them. These listed goals are called events and means of achieving these goals are known as operations
or activities in attaining final target set aside by the plan. The size of the activities depends on the nature and scale of project ;
however, each activity should be sufficiently well defined, for work on them to proceed without interruption from other tasks.
Activities are those operations of the plan which take time to carry out and on which resources are expended.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4105
Strategies
Strategy is one of the important type of plan. It specifies the central concept or purpose of the enterprise as well as the means
by which it intend to carry that purpose.
Policies, Procedures and rules
Policies, procedures and rules differ from each other in degree of specificity. Policies usually set broad guide-lines for the
enterprise. For example, it might be the policy of a departmental store that if a customer is dissatisfied with any of its sale
article, his/her money will be refunded.
Procedure specify how to proceed in some situation. For example, ‘before refunding the money of the customer, the salesman
should carefully inspect the article to be returned and then obtain approval from the manager for the refund.’
A rule is even more specific guide for action. For example, the departmental store may have a rule that ‘under no conditions
will the money be refunded to the costumer if he/she brings the defective article after 15 days of purchase.’
Thus, plans should e finalized and strategies should be set only after taking into considerations the company’s policies,
procedures and rules.
3.1 Steps in Project Planning
Following eight steps are generally recognized in the planning process of project :
1. DEFINE : the objectives of the project in definite words.
2. ESTABLISH : goals and stages intermediate to attain the final
target.
3. DEVELOP : forecast and means of achieving goals, i.e. ,
activities.
4. EVALUATE : organizations resources-financial, managerial
And operational- to carry out activities and to
determine what is feasible and what is not.
5. DETERMINE : alternatives-individual courses of action that will
allow to accomplish goals.
6. TEST : for consistency with companies policy.
7. CHOOSE : an alternative which is not only consistent with
its goals and concept but also one that can be
accomplished with the evaluated resources
8. DECIDE : on a plan.
During the planning phase, the information needed is about all those operations or activities, which have to be carried out
before the project is completed, their sequence and their logical interrelationship.
Resources
In running a project, there is a basic need of resources. These resources classified as under:
i) Material resources
ii) Equipment resources
iii) Space resources
iv) Effort or man power resources
v) Time resources
Resources are the starting point of many problems that have to be solved by the manager in the planning phase, before
proceeding for scheduling phase of the project
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4106
4. SCHEDULING
Scheduling is the allocation of resources. These resources, in conceptual sense, are time and energy, but in practical sense are
time, space, equipment and effort applied to material. More specifically, scheduling is the mechanical process of formalizing
the planned functions assigning the starting and completion dates to each part( or activity) of the working such a manner that
the whole work( or project) proceeds in a logical sequence and in an orderly and systematic manner. In other words,
scheduling is the laying out of the actual activities of the project in time order in which they are to be performed, and
calculating the manpower and material requirements ( or resources requirements,, in general) needed at each stage of
production, along with the expected completion time of each of the activity.
Steps in Project Scheduling Phase
4.1 Scheduling done in the following steps:
1. CALCULATE : detailed control information.
2. ASSIGN : timings to event and activities.
3. GIVE : consideration to the resources.
The manager is generally
concerned with those resources
whose availability is limited
and which thereby impose a
constraint on the project. The
important ones are usually
skilled, technical and supervisory
manpower and capital investment.
4. ALLOCATE : the resources.
In traditional techniques, the term scheduling a project is somewhat is leading because actually some attempt at planning and
scheduling are performed as one step.
5. CONTROLLING
As stated earlier, the planning and scheduling phases of a project are undertaken before the actual project starts while the
controlling phase is undertaken during the actual project operations. Controlling consists of reviewing the difference between
the schedule and actual performance once the project has begun. Project control is the formal mechanism establish to
determine deviations from the basic plan, to determine the precise effect of these deviations on the plan, and to replan and
reschedule to compensate for the deviations.
Steps in Control Process
5.1 Controlling is accomplished in the following well recognized steps:
1.ESTABLISH : standards or targets. These targets are
generally expressed in terms of time.
2. MEASURE : performance against the standards set
down in the first step.
3.IDENTITY : the deviations from the standards.
4. SUGGEST AND SELECT : correcting measures. This will involve
all the problems-identifying, decision-
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4107
making and organizing and leadership
skill of the decision-maker.
6. Role of Decision in Project Management
While planning organizing, staffing, leading, scheduling and controlling are the basic functions of management, each of these
clearly involve decisions-decision as to which plan to implement, what goals to achieve, what ways to use, and so forth. The
success or failure of management is judged from the decisions it takes at various stages. A poor or erroneous decision may
lead to the failure of a project. If a poor decision is made and a wrong road is choosen none but luckiest survive.
Steps in Decision-making
Following are steps for a better decision-making:
1. IDENTITY: the central problem.
2. DEVELOP : alternatives.
3. ANALYSE: the alternatives.
4. MAKE: final decision.
Techniques for analyzing alternatives: Operation Research
Generally, we have several alternatives, and it is essential to evaluate the before we can choose the best out of these. This can
be successfully done through operation research. The term ‘operation research’ usually refers to asset of mathematical
techniques through which a variety of organizational problems can be analyzed and solved.
6.1 Steps in Operational Research Techniques:
1. FORMULATE : the problem.
2. CONSTRUCT: a mathematical model to
represent the system under study.
3. DERIVE: a solution for the model.
4. TEST: the model and solution derived
from it.
5. ESTABLISH: controls over the solution.
6. PUT: the solution to work and
Implementation.
7. METHODS OF PLANNING
As stated earlier, complex research and development projects can be managed effectively if project managers have the means
to plan and control the schedules and costs of the work required to achieve their technical performance objectives.
When the planning of a project is undertaken a host of questions arise : How should the work be accomplished ? What
resources will be needed ? How long will it take ? How much will it cost ? The answer to all these questions can be found by
following the modern techniques of project management.
Managers at all levels need improved techniques at all stages in a project to :
i) Define the work to be performed.
ii) Develop more realistic schedule and cost estimates based or resources planned to perform the work.
iii) Determine where resources should be applied to best achieve the time, cost and technical performance objectives.
iv) Identify those areas developing potential delays or cost overruns in time to permit corrective action.
Following are some of the tools or techniques of project management :
1. Bar charts and Milestones charts.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4108
2. Network diagrams.
1. Bar Charts and Milestone Charts
Bar charts were introduced by Henery Gannt around 1900 AD. Bar charts represent pictorial representation in two
dimensions of a project by breaking it down into a number of manageable units or activities for planning and control shown on
one dimension or axis and the durations assigned to these activities on the other dimensions or axes. Bar charts were later
modified to yield the milestone charts. While the bar chart represents the activities a milestone chart represents the events
which mark either the beginning or the end of an activity. The bars of the bar chart are broken into a number of pieces, each
one of which represents an identifiable major event. It should be noted that each event is a point in time which the
management has identified as important reference point during the completion of the project.
2. Network methods
Network diagram is an outcome of the improvements in the milestone charts. The network technique is a major advance in
management science. This technique is based on the basic characteristics of all projects, that all work must be done in well-
defined steps. For example, for completing a foundation, the various steps are, i) layout, ii)digging, iii)placing side boards and
iv)concreting. The network technique exploits this characteristics by representing the steps of the project objective
graphically in the form of a network or arrow diagram. It would be difficult to find in the history of management methods any
technique which has received such widespread attention as that accorded to network methods for planning, scheduling and
controlling.
The network techniques are called by various names such as PERT, CPM,UNETICS,LESS, TOPS and SCANS. However these and
other systems have emerged from the following two major network systems;
1. PERT
2. CPM.
The other systems, by and large, differ from their parents only in non-essentials.
CONCLUSION
An increasing number of organisations are currently project oriented or use projects, and their success is dependent on the
success of their projects. The study of relevant literature has revealed that each success is a complex category and that the
project success and the project management success are related in that the project management success contributes to project
success. The project success is defined as a cross-section of empirical facts and perceptions of interested groups and, at that,
the approach is different in case of public and private projects and, depending on the evaluator or project environment
influences, the evaluation can vary over time. Project manager and his team are responsible for the success of project
management, and they have to regard success of management activities as a function of the project success, which is a higher
level objective. In order to enhance success of project management, and hence to improve overall project results, it is highly
significant to continuously develop competencies and improve management methods. In the study of a framework for
enhancing success of management activities, the focus is placed on project management documents and three hierarchical
levels in the organisational structure of the project, and on their connection with the project management success, i.e. with the
success of the project. In the proposed project management success enhancement model, the key role is attributed to
management of project risks, changes and constraints, which define the style of management under variable conditions
dictated by the interests of project participants, and by influences of project environment. If there were no risks, changes, and
constraints, the project management would be very simple, but such projects do not exist. That is why these three elements
directly influence the style of management giving higher priority either to forcing – acceleration of implementation, or to
control – slowing down of implementation, which directly influences the project management success based on the criteria
defined through the overview of research focusing on this issue. The project management success can be improved, and hence
project results can get better, through development of management frameworks and management models that link key
organisational components of management activities.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4109
REFERENCES
1. Stewart, T.: Project Manager No. 1 Career of the Future, Fortune Magazine (1999) 8.
2. McKinsey Global Institute analysis, http://www.mckinsey.com.
3. Ika, L.A.: Project success as a topic in project management journals, Project Management Journal, 40 (2009) 4, pp. 6-19.
4. Jari, A.J., Bhangale, P.P.: To study critical factors necessary for a successful construction project, International Journal
of Innovative Technology and Exploring Engineering, 2 (2013) 5, pp. 331-335.
5. Park, Y., Park, H.: Weights for Construction Performance Impact Factors of Public Construction Project, The Journal of
the Korea Contents Association, 12 (2012) 8, pp. 373-379.

Mais conteúdo relacionado

Mais procurados

Project Management Notes 1
Project Management Notes 1Project Management Notes 1
Project Management Notes 1Golam Bitonsir
 
Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012CPA Australia
 
Introduction to Management & Project Management By Pravin Minde
Introduction to Management & Project Management By Pravin MindeIntroduction to Management & Project Management By Pravin Minde
Introduction to Management & Project Management By Pravin MindePravin Minde
 
Resource capacity planning guide - best practice, hints, tips
Resource capacity planning guide - best practice, hints, tipsResource capacity planning guide - best practice, hints, tips
Resource capacity planning guide - best practice, hints, tipsian jones
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project ResourcesToyin Osunlaja
 
Project management book for mba
Project management book for mbaProject management book for mba
Project management book for mbaBikramjit Singh
 
PMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_ManagementPMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_ManagementBob Zoller
 
5 benefits of project management trends emerging in 2021
5 benefits of project management trends emerging in 20215 benefits of project management trends emerging in 2021
5 benefits of project management trends emerging in 2021Orangescrum
 
Project management lecture 1
Project management lecture 1Project management lecture 1
Project management lecture 1Abeera Malik
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies Capterra
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Jeremy Jay Lim
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12Dreams Design
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.sanjeeev bahadur, m.tech,mba
 
Project management for engineers and architects
Project management for engineers and architectsProject management for engineers and architects
Project management for engineers and architectsCarla Fair-Wright
 
Pmbok 4th edition chapter 2 - Project Life cycle and Organization
Pmbok 4th edition   chapter 2 - Project Life cycle and OrganizationPmbok 4th edition   chapter 2 - Project Life cycle and Organization
Pmbok 4th edition chapter 2 - Project Life cycle and OrganizationAhmad Maharma, PMP,RMP
 
Concept of project and classification – an overview prentation
Concept of project and classification – an overview prentation Concept of project and classification – an overview prentation
Concept of project and classification – an overview prentation RAHUL ZAMBARE
 

Mais procurados (20)

Project Management Notes 1
Project Management Notes 1Project Management Notes 1
Project Management Notes 1
 
PMP_Project Human Resources Management
PMP_Project Human Resources ManagementPMP_Project Human Resources Management
PMP_Project Human Resources Management
 
Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012
 
Strategic Performance Plan
Strategic Performance PlanStrategic Performance Plan
Strategic Performance Plan
 
Introduction to Management & Project Management By Pravin Minde
Introduction to Management & Project Management By Pravin MindeIntroduction to Management & Project Management By Pravin Minde
Introduction to Management & Project Management By Pravin Minde
 
Resource capacity planning guide - best practice, hints, tips
Resource capacity planning guide - best practice, hints, tipsResource capacity planning guide - best practice, hints, tips
Resource capacity planning guide - best practice, hints, tips
 
Managing Project Resources
Managing Project ResourcesManaging Project Resources
Managing Project Resources
 
Project management book for mba
Project management book for mbaProject management book for mba
Project management book for mba
 
PMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_ManagementPMINEO_2010_03_Resource_Management
PMINEO_2010_03_Resource_Management
 
5 benefits of project management trends emerging in 2021
5 benefits of project management trends emerging in 20215 benefits of project management trends emerging in 2021
5 benefits of project management trends emerging in 2021
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Project management lecture 1
Project management lecture 1Project management lecture 1
Project management lecture 1
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies The Ultimate Review of Construction Project Management Methodologies
The Ultimate Review of Construction Project Management Methodologies
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.
 
Project management for engineers and architects
Project management for engineers and architectsProject management for engineers and architects
Project management for engineers and architects
 
Pmbok 4th edition chapter 2 - Project Life cycle and Organization
Pmbok 4th edition   chapter 2 - Project Life cycle and OrganizationPmbok 4th edition   chapter 2 - Project Life cycle and Organization
Pmbok 4th edition chapter 2 - Project Life cycle and Organization
 
Concept of project and classification – an overview prentation
Concept of project and classification – an overview prentation Concept of project and classification – an overview prentation
Concept of project and classification – an overview prentation
 

Semelhante a IRJET- An Overview on Project Management

IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility studyMars Mfyam
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmuhammadyasirsaeedqa
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project managementIRJET Journal
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project managementPMlynda17
 
What are the 6 elements of a project
What are the 6 elements of a projectWhat are the 6 elements of a project
What are the 6 elements of a projectRichardPierce28
 
Project Management: A Critical Examination of the PPARS Project
Project Management: A Critical Examination of the PPARS ProjectProject Management: A Critical Examination of the PPARS Project
Project Management: A Critical Examination of the PPARS ProjectOlivia Moran
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3POOJA UDAYAN
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 
Project Organizational Responsibility Model - ORM
Project Organizational Responsibility Model -  ORMProject Organizational Responsibility Model -  ORM
Project Organizational Responsibility Model - ORMGuttenberg Ferreira Passos
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptxGermelynPea1
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementLuis Cabrera
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxStanleyChabata1
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...eSAT Publishing House
 
Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)  Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD) jo bitonio
 

Semelhante a IRJET- An Overview on Project Management (20)

IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
Project planning and feasibility study
Project planning and feasibility studyProject planning and feasibility study
Project planning and feasibility study
 
Project Management U 1.pptx
Project Management U 1.pptxProject Management U 1.pptx
Project Management U 1.pptx
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
The role of time, cost and quality in project management
The role of time, cost and quality in project managementThe role of time, cost and quality in project management
The role of time, cost and quality in project management
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project management
 
What are the 6 elements of a project
What are the 6 elements of a projectWhat are the 6 elements of a project
What are the 6 elements of a project
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
 
Project Management: A Critical Examination of the PPARS Project
Project Management: A Critical Examination of the PPARS ProjectProject Management: A Critical Examination of the PPARS Project
Project Management: A Critical Examination of the PPARS Project
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
Project Organizational Responsibility Model - ORM
Project Organizational Responsibility Model -  ORMProject Organizational Responsibility Model -  ORM
Project Organizational Responsibility Model - ORM
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
 
Project and process engineering management industrial engineering management
Project and process engineering management industrial engineering managementProject and process engineering management industrial engineering management
Project and process engineering management industrial engineering management
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
Project handling
Project handlingProject handling
Project handling
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...
 
Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)  Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)
 

Mais de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Mais de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Último

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 

Último (20)

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 

IRJET- An Overview on Project Management

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4103 An Overview on Project Management Ku. Shuhashree P. Deshmukh1, Prof. Dr. Manish M. Bais2 PG Studen, PRMCEAM, Badnera, Amravati Dean of Civil Department, PRMCEAM, Badnera, Amravati --------------------------------------------------------------------------***---------------------------------------------------------------------------- Abstract - Project Planning and Management is key framework for successful completion of any project. Planning is a procedural step in project management, where appropriate and standard documents are required to create an intact and comprehensive project. Knowledge, skills, tools and techniques are applied to various project activities to meet the project requirements. Planning without management is of no use. In order to develop a successful project, different project management techniques have been widely established in the areas such as planning and control. In this, various project management methodologies, success and failure, planning activity etc have been proposed. Keywords: Project Management, Controlling, Scheduling. 1. INTRODUCTION A project is composed of jobs, activities, functions or tasks that related one to the other in some manner, and all of these should e completed in order to complete the project. Every project has one specific purpose: it starts at some specific moment and it is finished when its objectives have been fulfilled. For completion of a project two basic things are required: i) Material Resources ii) Manpower Resources Many countries, rich in material resources are exceedingly poor in terms of level of production or plan achievement, while there are other countries which have very limited natural resources but have achieved higher level of productivity mainly because of talents, skills experience and know-how of their people. Availability, quality and use of human resources is a single determinant factor in accomplishing project objectives. Rapid accumulation of scientific technique in the recent past has not been matched by a corresponding improvement in the sphere of human group relations. In other words sociology has not kept pace with technology. We are not in position to utilize fully our technology advancement unless we are also ale to advance in social sphere. Here comes the role of management. While technology deals with material things, management deals with both material things as well as human-beings. 2. SUCCESS AND FAILURE OF PROJECT MANAGEMENT The meaning of undertaking administration proposes a shorter term and more particular connection for achievement. For the fulfillment of the plan, the evident markers are incorporated, thereby fulfilling the undertaking timetable, satisfactory quality principles, and hence meeting the task objective. The various elements which cause’s the venture administration to neglect to accomplish this task include the following: 1. insufficient premise for venture; 2. wrong individual as task chief; 3. top administration unsupportive; 4. deficiently characterized undertakings; 5. absence of task administration systems; 6. administration procedures miss-utilized; 7. venture closedown not arranged; 8. Absence of responsibility to extend.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4104 These components would propose that effective venture administration obliges arranging with a pledge to finish the task; watchful arrangement of a talented undertaking supervisor; investing time to characterize the undertaking enough; accurately arranging the exercises in the venture; guaranteeing right and satisfactory data streams; changing exercises to oblige successive changes on dynamic; obliging representatives' close to home objectives with execution and prizes; furthermore committing a new beginning when errors in execution have been distinguished. Management increases the productivity through technological innovation taking into account human factors involved in these advances. Each project, whether big or small has three objectives: i) The project should be completed with a minimum of elapsed time. ii) It should use available manpower and other resources as sparingly as possible without delay. iii) It should be completed with a minimum of capital investment, without delay. iv) Project management is a highly specified job, to achieve the above objectives. Project management involves, the following three phases: 1. Project Planning 2. Project Scheduling 3. Project Controlling Out of the above three phases of project management the first two phases are accomplished before the actual project start. The third phase is operative during the execution of the project, and its aim is to recognize the difficulties during the execution and to apply measures to deal with these difficulties. 3. PROJECT PLANNING Planning is the most important phase of project management. Planning involves defining objectives of the project, listing of tasks or jobs that must be performed, determining gross requirements for material, equipment and manpower and preparing estimates of costs and durations for the various jobs or activities to bring about the satisfactory completion of the project. Planning is important because: i) It provides direction ii) It provides unifying framework iii) It helps to reveal future opportunities and threats iv) It provide performance standards In the planning phase, plan is made and strategies are set, taking into consideration the company’s policies, procedures and rules. Plan It is a statement of intent, i.e., what is to e done. It is interpreted in terms of what has to be done to resources achieve the intent. The resource to be used may be : office staff, tradesmen, labor, materials, plant and machinery, space and funds. Plans are detailed methods, formulated before hand for doing or making something. Plans simply list the goals (targets) and define the means of achieving them. These listed goals are called events and means of achieving these goals are known as operations or activities in attaining final target set aside by the plan. The size of the activities depends on the nature and scale of project ; however, each activity should be sufficiently well defined, for work on them to proceed without interruption from other tasks. Activities are those operations of the plan which take time to carry out and on which resources are expended.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4105 Strategies Strategy is one of the important type of plan. It specifies the central concept or purpose of the enterprise as well as the means by which it intend to carry that purpose. Policies, Procedures and rules Policies, procedures and rules differ from each other in degree of specificity. Policies usually set broad guide-lines for the enterprise. For example, it might be the policy of a departmental store that if a customer is dissatisfied with any of its sale article, his/her money will be refunded. Procedure specify how to proceed in some situation. For example, ‘before refunding the money of the customer, the salesman should carefully inspect the article to be returned and then obtain approval from the manager for the refund.’ A rule is even more specific guide for action. For example, the departmental store may have a rule that ‘under no conditions will the money be refunded to the costumer if he/she brings the defective article after 15 days of purchase.’ Thus, plans should e finalized and strategies should be set only after taking into considerations the company’s policies, procedures and rules. 3.1 Steps in Project Planning Following eight steps are generally recognized in the planning process of project : 1. DEFINE : the objectives of the project in definite words. 2. ESTABLISH : goals and stages intermediate to attain the final target. 3. DEVELOP : forecast and means of achieving goals, i.e. , activities. 4. EVALUATE : organizations resources-financial, managerial And operational- to carry out activities and to determine what is feasible and what is not. 5. DETERMINE : alternatives-individual courses of action that will allow to accomplish goals. 6. TEST : for consistency with companies policy. 7. CHOOSE : an alternative which is not only consistent with its goals and concept but also one that can be accomplished with the evaluated resources 8. DECIDE : on a plan. During the planning phase, the information needed is about all those operations or activities, which have to be carried out before the project is completed, their sequence and their logical interrelationship. Resources In running a project, there is a basic need of resources. These resources classified as under: i) Material resources ii) Equipment resources iii) Space resources iv) Effort or man power resources v) Time resources Resources are the starting point of many problems that have to be solved by the manager in the planning phase, before proceeding for scheduling phase of the project
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4106 4. SCHEDULING Scheduling is the allocation of resources. These resources, in conceptual sense, are time and energy, but in practical sense are time, space, equipment and effort applied to material. More specifically, scheduling is the mechanical process of formalizing the planned functions assigning the starting and completion dates to each part( or activity) of the working such a manner that the whole work( or project) proceeds in a logical sequence and in an orderly and systematic manner. In other words, scheduling is the laying out of the actual activities of the project in time order in which they are to be performed, and calculating the manpower and material requirements ( or resources requirements,, in general) needed at each stage of production, along with the expected completion time of each of the activity. Steps in Project Scheduling Phase 4.1 Scheduling done in the following steps: 1. CALCULATE : detailed control information. 2. ASSIGN : timings to event and activities. 3. GIVE : consideration to the resources. The manager is generally concerned with those resources whose availability is limited and which thereby impose a constraint on the project. The important ones are usually skilled, technical and supervisory manpower and capital investment. 4. ALLOCATE : the resources. In traditional techniques, the term scheduling a project is somewhat is leading because actually some attempt at planning and scheduling are performed as one step. 5. CONTROLLING As stated earlier, the planning and scheduling phases of a project are undertaken before the actual project starts while the controlling phase is undertaken during the actual project operations. Controlling consists of reviewing the difference between the schedule and actual performance once the project has begun. Project control is the formal mechanism establish to determine deviations from the basic plan, to determine the precise effect of these deviations on the plan, and to replan and reschedule to compensate for the deviations. Steps in Control Process 5.1 Controlling is accomplished in the following well recognized steps: 1.ESTABLISH : standards or targets. These targets are generally expressed in terms of time. 2. MEASURE : performance against the standards set down in the first step. 3.IDENTITY : the deviations from the standards. 4. SUGGEST AND SELECT : correcting measures. This will involve all the problems-identifying, decision-
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4107 making and organizing and leadership skill of the decision-maker. 6. Role of Decision in Project Management While planning organizing, staffing, leading, scheduling and controlling are the basic functions of management, each of these clearly involve decisions-decision as to which plan to implement, what goals to achieve, what ways to use, and so forth. The success or failure of management is judged from the decisions it takes at various stages. A poor or erroneous decision may lead to the failure of a project. If a poor decision is made and a wrong road is choosen none but luckiest survive. Steps in Decision-making Following are steps for a better decision-making: 1. IDENTITY: the central problem. 2. DEVELOP : alternatives. 3. ANALYSE: the alternatives. 4. MAKE: final decision. Techniques for analyzing alternatives: Operation Research Generally, we have several alternatives, and it is essential to evaluate the before we can choose the best out of these. This can be successfully done through operation research. The term ‘operation research’ usually refers to asset of mathematical techniques through which a variety of organizational problems can be analyzed and solved. 6.1 Steps in Operational Research Techniques: 1. FORMULATE : the problem. 2. CONSTRUCT: a mathematical model to represent the system under study. 3. DERIVE: a solution for the model. 4. TEST: the model and solution derived from it. 5. ESTABLISH: controls over the solution. 6. PUT: the solution to work and Implementation. 7. METHODS OF PLANNING As stated earlier, complex research and development projects can be managed effectively if project managers have the means to plan and control the schedules and costs of the work required to achieve their technical performance objectives. When the planning of a project is undertaken a host of questions arise : How should the work be accomplished ? What resources will be needed ? How long will it take ? How much will it cost ? The answer to all these questions can be found by following the modern techniques of project management. Managers at all levels need improved techniques at all stages in a project to : i) Define the work to be performed. ii) Develop more realistic schedule and cost estimates based or resources planned to perform the work. iii) Determine where resources should be applied to best achieve the time, cost and technical performance objectives. iv) Identify those areas developing potential delays or cost overruns in time to permit corrective action. Following are some of the tools or techniques of project management : 1. Bar charts and Milestones charts.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4108 2. Network diagrams. 1. Bar Charts and Milestone Charts Bar charts were introduced by Henery Gannt around 1900 AD. Bar charts represent pictorial representation in two dimensions of a project by breaking it down into a number of manageable units or activities for planning and control shown on one dimension or axis and the durations assigned to these activities on the other dimensions or axes. Bar charts were later modified to yield the milestone charts. While the bar chart represents the activities a milestone chart represents the events which mark either the beginning or the end of an activity. The bars of the bar chart are broken into a number of pieces, each one of which represents an identifiable major event. It should be noted that each event is a point in time which the management has identified as important reference point during the completion of the project. 2. Network methods Network diagram is an outcome of the improvements in the milestone charts. The network technique is a major advance in management science. This technique is based on the basic characteristics of all projects, that all work must be done in well- defined steps. For example, for completing a foundation, the various steps are, i) layout, ii)digging, iii)placing side boards and iv)concreting. The network technique exploits this characteristics by representing the steps of the project objective graphically in the form of a network or arrow diagram. It would be difficult to find in the history of management methods any technique which has received such widespread attention as that accorded to network methods for planning, scheduling and controlling. The network techniques are called by various names such as PERT, CPM,UNETICS,LESS, TOPS and SCANS. However these and other systems have emerged from the following two major network systems; 1. PERT 2. CPM. The other systems, by and large, differ from their parents only in non-essentials. CONCLUSION An increasing number of organisations are currently project oriented or use projects, and their success is dependent on the success of their projects. The study of relevant literature has revealed that each success is a complex category and that the project success and the project management success are related in that the project management success contributes to project success. The project success is defined as a cross-section of empirical facts and perceptions of interested groups and, at that, the approach is different in case of public and private projects and, depending on the evaluator or project environment influences, the evaluation can vary over time. Project manager and his team are responsible for the success of project management, and they have to regard success of management activities as a function of the project success, which is a higher level objective. In order to enhance success of project management, and hence to improve overall project results, it is highly significant to continuously develop competencies and improve management methods. In the study of a framework for enhancing success of management activities, the focus is placed on project management documents and three hierarchical levels in the organisational structure of the project, and on their connection with the project management success, i.e. with the success of the project. In the proposed project management success enhancement model, the key role is attributed to management of project risks, changes and constraints, which define the style of management under variable conditions dictated by the interests of project participants, and by influences of project environment. If there were no risks, changes, and constraints, the project management would be very simple, but such projects do not exist. That is why these three elements directly influence the style of management giving higher priority either to forcing – acceleration of implementation, or to control – slowing down of implementation, which directly influences the project management success based on the criteria defined through the overview of research focusing on this issue. The project management success can be improved, and hence project results can get better, through development of management frameworks and management models that link key organisational components of management activities.
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4109 REFERENCES 1. Stewart, T.: Project Manager No. 1 Career of the Future, Fortune Magazine (1999) 8. 2. McKinsey Global Institute analysis, http://www.mckinsey.com. 3. Ika, L.A.: Project success as a topic in project management journals, Project Management Journal, 40 (2009) 4, pp. 6-19. 4. Jari, A.J., Bhangale, P.P.: To study critical factors necessary for a successful construction project, International Journal of Innovative Technology and Exploring Engineering, 2 (2013) 5, pp. 331-335. 5. Park, Y., Park, H.: Weights for Construction Performance Impact Factors of Public Construction Project, The Journal of the Korea Contents Association, 12 (2012) 8, pp. 373-379.