SlideShare uma empresa Scribd logo
1 de 26
Baixar para ler offline
Bajaj Auto Limited
            (Aurangabad Division)
                       Waluj

GC-
GC-1000                                 XCD-
                                        XCD-125




                   You All
           Passenger      Platina-
                          Platina-125
                                                  1



                                                      1
CONTENTS

ØCompany profile
ØManufacturing process
ØWater Conservation Target
ØWater Conservation Approach
Øwater Conservation Methodology
ØInnovative projects
ØOther Projects
ØResults
ØSustenance
ØAchievements
ØFuture Projects
                                  2



                                      2
COMPANY PROFILE
• World class Manufacturing Plant at Waluj, Pant nagar &
 state of art plant at Chakan

• Wide Range of Two wheelers & Three wheelers

• ISO 9001( Quality system), ISO 14001 (Environment system)
  & OHSAS 18001-1999(Occupational Health & Safety Assessment
            18001-
  Series) certifications

• Total Productive Maintenance(TPM) Philosophy in the organization
                                                      organization

• Largest Exporter of Two & Three wheelers

• Sales – 24.51 Lacs Vehicle during FY 2007 –2008

• Turnover of Rs. 91688 Million
                                                                     3



                                                                         3
COMPANY DATA

    Strength - Workmen              -        3265 Nos.

    Strength - Staff/ Managers -             744 Nos.

    Total Plant Area                 -       600 Acres.

    Total Connected Load             -       40 MW.

    Machines/ Equipments             -       3200 Nos.

    Modern Machines/ Equipments include:

Ø   NTC/ Mazak/ Nigatta/ Fortuna/ AMS/Schaudt/HMT
    Fanuc Robot drill
Ø   ABB Sweden Robot for Resistance Welding

Ø   SAMES Bell Applicator/ Kawasaki Paint Robot.
    SMG/ Heilbronn Press.
                                                          4



                                                              4
MANUFACTURING PROCESS
            Engine         Heat      Gears          Aluminium
           Assembly     treatment                 / Steel Parts




                 Vehicle
                Assembly




Dispatch
                                    Fabrication
                      Paint Shop                   Press Shop
                                      Shop                        5



                                                                      5
TARGET


YEAR       TARGET        ACHIEVED
          M3 / Vehicle   M3 / Vehicle

2004-
2004-05      0.71           0.65
2005-
2005-06      0.61           0.62
2006-
2006-07      0.60           0.58
2007-
2007-08      0.55           0.54
2008-
2008-09      0.52


                                        6



                                            6
WATER CONSERVATION APPROACH

EARLIER            +   ADDITIONAL
                          (3 R)

Conserve           +        Reduce

Preserve           +        Reuse

Reserve            +        Recycle


LESS …        WATER CONVERSATION
MORE ..       WATER CONSERVATION
                                        7



                                            7
WATER CONSERVATION METHODOLOGY
Sr.
         Activity            Methodology                   Tools used
No.
                      To identify areas of water    Weekly / Monthly data
 1    Audit           conservation potential        through Pie charts &
                                                    brainstorming


                      To identify equipments        Daily/weekly water
 2    Analysis        where water conservation is   consumption recording
                      possible                      through bar charts,graphs

                      Identify activities for       Resource planning &
 3    Action Plan     individual equipments with    activity charts
                      time frame
                     Action for procurement &       6W2H Way Activity Charts
 4    Implementation implementation

                      To analyze plan V/S Actual    Gap Analysis &
 5    Evaluation                                    countermeasures
                                                                                8



                                                                                    8
Innovative Project No.1
            Automation of localized Water storage system




Before :       Additional 40 HP Pump running for 1.5 Hrs/Day
After   :      PLC Controlled auto system Provided

                Benefits – Saving of 140 Cub. Meters/Year
                                                               9



                                                                   9
Innovative Project No.2
Elimination of water wastage by providing timer for water supply
    Before                                After
  Continuous                                                      Solenoid
                                                                   valve
water available
during non use
 time also for
  hand wash
     area.
                    Hand Wash Area

                    Provided Timer circuit & solenoid valve to make water
                      available only during Lunch/ Dinner/Breakfast time

                  Total Qty : 80 No.s of Taps
           Benefit: Saving of 730 Cub. Mtr / Year
                                                                             10



                                                                                  10
Innovative Project No.3




Pump set




Before :    Fresh Water/ TTP Water Used for Process & Horticulture

After   :   Rain water Pond of Capacity 7000 Cub.mtr. Constructed

             Benefits – Saving of 45000 Cub. Meters/Year
                                                                     11



                                                                          11
Optimisation of Paint Sludge Pit Cleaning in MCD Paint Shop
          Before                               After


       Manual Paint
      Sludge Removal



  Sludge pit cleaning Frequency:            Sludge pit cleaning Frequency:
             Quarterly.                                 Yearly.
                                                  10 00      800




Benefit: Water saving - 600 Cubic Mtr / year.      5 00
                                                                    200




                                                     0                       12
                                                          BEFORE   AFTER




                                                                                  12
Installation of Screw compressors- Without Cooling Towers
                       compressors-
            Befor                                  After
              e

                           Add
                         Cooling
                          tower
                          photo



                                         Provided Atlas Copco screw
Reciprocating Compressor – Needs         Compressor. This being air
      Cooling Tower 24 Hrs               cooled, cooling tower is not
                                         required

              Investment           : Rs. 18 Lacs
              Water Saving         : 6000 Cub.Mtr / Yr                  13



                                                                             13
Installation of Spot cooling System to replace Old type ARP system
                                                            system

        Before                                    After




                                                  Localised storage tank


 ARP was used for shop                 Modular spot coolers used
       cooling
                                          for shop cooling

                  Benefit: Saving of 1500 Cub. Mtr

                                                                           14



                                                                                14
Orificing to Tap water of all basins
             Before                                 After




                                                    Or ifice washer



 Total Qty : 120 Nos. of Taps

Benefit: Saving of 1200 Cub. Mtr/ Year                                15



                                                                           15
Reuse of DM water for Ind. Dip Water Tank of PTAED Line

         Before                                     After
DM Water          Industrial        DM Water            Industrial
                  Water                                 Water




                                    M           P

       Drain              Drain                               Drain

DM water & Industrial water       DM Water transferred to Industrial
tanks drained per week.Total      Water Tank.after making pipe line
water requirement                 modification
                                  Hence only DM Water required
140000 ltrs /week
                                  70,000 Ltrs. Per week

         Investment – Rs. 0.3 Lacs
         Water Saving -3640 M 3 / Annum                                16



                                                                            16
Installation of Drip Irrigation system


 Before                                After




Investment ---- Rs 40 lacs
Saving TTP water ---- 150 m 3 /day

                                                    17



                                                         17
LEGAL COMPLIANCE




•WE ARE A ZERO DISCHARGE COMPANY.


•WE MEET LEGAL REQUIREMENTS AS PER
 FOLLOWING ACTS :
•The water(Prevention & control of pollution) Act – 1974


•The water (Prevention & control of pollution) Cess act- 1977


•The Environment(Protection ) Act- 1986& Amendment rules 2000


                                                                18



                                                                     18
WASTE WATER TREATMENT
             At Source
             Paint Seperation




                                  Sludge
At Source                        Dewatering
 Ni – Cr.                          Plant
Separation
  Plant

                                 Effluent
 Tertiary                       Treatment
Treatment                         Plant
  Plant
                                              19



                                                   19
Installation of TTP plant

    Before                                   After

ETP water was
   used for
 horticulture
 activity only
                                TTP Plant       TTP Water storage
                                                      Tank
                         Use of TTP water for paint shop
                    Sedimentation tank top up & tank cleaning


  Fresh water Saving – 46,000 m 3 /annum
                                                                20



                                                                     20
MAJOR ENVIRONMENTAL IMPROVEMENTS 2004– 2008


ØNo water discharged outside the company.

ØTree & shrub Plantation- More than One Million

ØWind Mill Installation – 65 MW (138 Nos.)

ØUpgradation of Effluent treatment Plant (ETP)

ØInstallation of tertiary treatment plant

ØInstallation of Nickel/Chrome heavy metal
separation plant



                                                      21



                                                           21
MONITORING AND REPORTING SYSTEM

ØCell cost meetings are conducted Monthly to
monitor cell wise expenses like Tools,Energy & water
consumption

ØWater consumption reviewed Monthly for
 planning further improvements and monitoring
 existing plans.

ØConducting Audit for Water leakage and
Immediate Preventive actions.

ØAnnual reports of water saving generated to set
 goals for next year.


                                                   22



                                                        22
Training and Awareness
           Programs
• Training through Class Room programs.
• Awareness through Poster Display.
• Social Awareness through Company
  Bulletins.
• Organising various Poster
  Competitions, Kaizen Competitions .
• Suggestion Box.
                                          23



                                               23
Reduction in Specific Water Consumption



Year         Water       %
          Consumption Reduction
            Cub. Mtr/ over Base
              Veh.      Year
2004-
2004-05      0.65     Base Year

2005-
2005-06      0.62         5

2006-
2006-07      0.58        11

2007-
2007-08      0.54        17




                                                        24



                                                             24
Water Usage Distribution in Plant




                                    25



                                         25
Future Water conservation Projects – 2007- 08
                                                 2007-

 Total Identified Projects               - 8 Nos.
 Expected Saving                         - 100 m 3 /day
 Total Investment (Estimated)            - Rs 50 lacs

Sr. No.                     Projects in hand

  1       Replacement of old underground main water line
          ( @ 600 mtrs )
  2       Installation of RO Plant for Paint shop 3 Wh.
  3       Rain Water Harvesting for Individual Shops
  4       Installation of VFD for main water supply pumps

  5       Installation of Fanless cooling towers
                                                            26



                                                                 26

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Benefits of GT
Benefits of GTBenefits of GT
Benefits of GT
 
Chapter 2 constructional feature of cnc machine
Chapter 2 constructional feature of cnc machineChapter 2 constructional feature of cnc machine
Chapter 2 constructional feature of cnc machine
 
MT-II UNIT V CNC MACHINING
MT-II UNIT V CNC MACHININGMT-II UNIT V CNC MACHINING
MT-II UNIT V CNC MACHINING
 
Unit 4
Unit 4Unit 4
Unit 4
 
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDVOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
 
Digital manufacturing
Digital manufacturingDigital manufacturing
Digital manufacturing
 
Bearing
BearingBearing
Bearing
 
Cylinder liner ppt Presentation
Cylinder liner ppt PresentationCylinder liner ppt Presentation
Cylinder liner ppt Presentation
 
Water jet machining
Water jet machiningWater jet machining
Water jet machining
 
Linear motion guideways
Linear motion guidewaysLinear motion guideways
Linear motion guideways
 
FMEA - Electrical Motor
FMEA - Electrical MotorFMEA - Electrical Motor
FMEA - Electrical Motor
 
Assembly and Disassembly Procedure of Screw type Compressor
Assembly and Disassembly Procedure of Screw type Compressor Assembly and Disassembly Procedure of Screw type Compressor
Assembly and Disassembly Procedure of Screw type Compressor
 
Robot Configuration - 2
Robot Configuration - 2Robot Configuration - 2
Robot Configuration - 2
 
Robot Configuration - 1
Robot Configuration - 1Robot Configuration - 1
Robot Configuration - 1
 
BAJA Presentation (1)-1.pptx
BAJA Presentation (1)-1.pptxBAJA Presentation (1)-1.pptx
BAJA Presentation (1)-1.pptx
 
BAJA SAE INDIA 2015
BAJA SAE INDIA 2015BAJA SAE INDIA 2015
BAJA SAE INDIA 2015
 
NC, CNC & DNC Machine
NC, CNC & DNC Machine NC, CNC & DNC Machine
NC, CNC & DNC Machine
 
Materials for automotive body and chassis structure by sandeep mangukiya
Materials for automotive body and chassis structure by sandeep mangukiyaMaterials for automotive body and chassis structure by sandeep mangukiya
Materials for automotive body and chassis structure by sandeep mangukiya
 
Applications of Additive Manufacturing Technology
Applications of Additive Manufacturing TechnologyApplications of Additive Manufacturing Technology
Applications of Additive Manufacturing Technology
 
Rolling contact bearing (1)
Rolling contact bearing (1)Rolling contact bearing (1)
Rolling contact bearing (1)
 

Destaque (14)

Project on bajaj Auto Ltd
Project on bajaj Auto LtdProject on bajaj Auto Ltd
Project on bajaj Auto Ltd
 
OPERATION MANAGEMENT OF BAJAJ AUTO LTD.
OPERATION MANAGEMENT OF BAJAJ AUTO LTD.OPERATION MANAGEMENT OF BAJAJ AUTO LTD.
OPERATION MANAGEMENT OF BAJAJ AUTO LTD.
 
BAJAJ AUTO LTD
BAJAJ AUTO LTDBAJAJ AUTO LTD
BAJAJ AUTO LTD
 
Bajaj operation
Bajaj operationBajaj operation
Bajaj operation
 
Bajaj Auto Presentation
Bajaj Auto Presentation Bajaj Auto Presentation
Bajaj Auto Presentation
 
Bajaj
BajajBajaj
Bajaj
 
fundamental analysis Bajaj auto ltd
fundamental analysis Bajaj auto ltdfundamental analysis Bajaj auto ltd
fundamental analysis Bajaj auto ltd
 
Bajaj Auto
Bajaj AutoBajaj Auto
Bajaj Auto
 
chamba rumal
chamba rumalchamba rumal
chamba rumal
 
50035324 study-on-consumer-buying-behaviour-amp-satisfaction-level-of-two-whe...
50035324 study-on-consumer-buying-behaviour-amp-satisfaction-level-of-two-whe...50035324 study-on-consumer-buying-behaviour-amp-satisfaction-level-of-two-whe...
50035324 study-on-consumer-buying-behaviour-amp-satisfaction-level-of-two-whe...
 
Consumer behaviour-regarding-two-wheeler-(automobiles-industry)
Consumer behaviour-regarding-two-wheeler-(automobiles-industry)Consumer behaviour-regarding-two-wheeler-(automobiles-industry)
Consumer behaviour-regarding-two-wheeler-(automobiles-industry)
 
Bajaj Auto
Bajaj AutoBajaj Auto
Bajaj Auto
 
36421489 bajaj-auto-ltd-business-strategy-case-study-ppt
36421489 bajaj-auto-ltd-business-strategy-case-study-ppt36421489 bajaj-auto-ltd-business-strategy-case-study-ppt
36421489 bajaj-auto-ltd-business-strategy-case-study-ppt
 
Bajaj Auto Limited
Bajaj Auto LimitedBajaj Auto Limited
Bajaj Auto Limited
 

Semelhante a Bajaj Auto Limited(Aurangabad division) Waluj

Ace 10 conference green plumbersusa - 2 tips from each of the 5 core courses
Ace 10 conference green plumbersusa - 2 tips from each of the 5 core coursesAce 10 conference green plumbersusa - 2 tips from each of the 5 core courses
Ace 10 conference green plumbersusa - 2 tips from each of the 5 core courses
Troy Aichele
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
ggurudev
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
Raja Ratnam
 
STM Environment
STM EnvironmentSTM Environment
STM Environment
Joe Riley
 

Semelhante a Bajaj Auto Limited(Aurangabad division) Waluj (20)

Conserve Water Need of the Hour presented by Ashok Leyland
Conserve Water Need of the Hour presented by Ashok LeylandConserve Water Need of the Hour presented by Ashok Leyland
Conserve Water Need of the Hour presented by Ashok Leyland
 
Tata Chemicals Ltd, Babrala
Tata Chemicals Ltd, BabralaTata Chemicals Ltd, Babrala
Tata Chemicals Ltd, Babrala
 
Clearwater Controls - DERAGGER
Clearwater Controls - DERAGGERClearwater Controls - DERAGGER
Clearwater Controls - DERAGGER
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Hydrofinity UAE Hospitality Brochure
Hydrofinity UAE Hospitality BrochureHydrofinity UAE Hospitality Brochure
Hydrofinity UAE Hospitality Brochure
 
Town hall factory may 12
Town hall factory may 12Town hall factory may 12
Town hall factory may 12
 
Ace 10 conference green plumbersusa - 2 tips from each of the 5 core courses
Ace 10 conference green plumbersusa - 2 tips from each of the 5 core coursesAce 10 conference green plumbersusa - 2 tips from each of the 5 core courses
Ace 10 conference green plumbersusa - 2 tips from each of the 5 core courses
 
Optimizing Conveyor Technologies
Optimizing Conveyor TechnologiesOptimizing Conveyor Technologies
Optimizing Conveyor Technologies
 
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
 
Manufacturing Conference Workshop 3 - OEE and Energy
Manufacturing Conference Workshop 3 -  OEE and EnergyManufacturing Conference Workshop 3 -  OEE and Energy
Manufacturing Conference Workshop 3 - OEE and Energy
 
Enduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedEnduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc Limited
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatment
 
Fuji tu dong hoa catalog frenic-aqua-fuji-dienhathe.org
Fuji tu dong hoa catalog frenic-aqua-fuji-dienhathe.orgFuji tu dong hoa catalog frenic-aqua-fuji-dienhathe.org
Fuji tu dong hoa catalog frenic-aqua-fuji-dienhathe.org
 
ICE PLANT
ICE PLANTICE PLANT
ICE PLANT
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Notes
 
Computational fluid dynamics in water waste treatment plants
 Computational fluid dynamics in water waste treatment plants Computational fluid dynamics in water waste treatment plants
Computational fluid dynamics in water waste treatment plants
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
STM Environment
STM EnvironmentSTM Environment
STM Environment
 

Mais de India Water Portal

Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
India Water Portal
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
India Water Portal
 
Water quality
Water qualityWater quality
Water quality
India Water Portal
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
India Water Portal
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
India Water Portal
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
India Water Portal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
India Water Portal
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
India Water Portal
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
India Water Portal
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
India Water Portal
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
India Water Portal
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
India Water Portal
 

Mais de India Water Portal (20)

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedure
 
Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
 
Water quality
Water qualityWater quality
Water quality
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity building
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Bajaj Auto Limited(Aurangabad division) Waluj

  • 1. Bajaj Auto Limited (Aurangabad Division) Waluj GC- GC-1000 XCD- XCD-125 You All Passenger Platina- Platina-125 1 1
  • 2. CONTENTS ØCompany profile ØManufacturing process ØWater Conservation Target ØWater Conservation Approach Øwater Conservation Methodology ØInnovative projects ØOther Projects ØResults ØSustenance ØAchievements ØFuture Projects 2 2
  • 3. COMPANY PROFILE • World class Manufacturing Plant at Waluj, Pant nagar & state of art plant at Chakan • Wide Range of Two wheelers & Three wheelers • ISO 9001( Quality system), ISO 14001 (Environment system) & OHSAS 18001-1999(Occupational Health & Safety Assessment 18001- Series) certifications • Total Productive Maintenance(TPM) Philosophy in the organization organization • Largest Exporter of Two & Three wheelers • Sales – 24.51 Lacs Vehicle during FY 2007 –2008 • Turnover of Rs. 91688 Million 3 3
  • 4. COMPANY DATA Strength - Workmen - 3265 Nos. Strength - Staff/ Managers - 744 Nos. Total Plant Area - 600 Acres. Total Connected Load - 40 MW. Machines/ Equipments - 3200 Nos. Modern Machines/ Equipments include: Ø NTC/ Mazak/ Nigatta/ Fortuna/ AMS/Schaudt/HMT Fanuc Robot drill Ø ABB Sweden Robot for Resistance Welding Ø SAMES Bell Applicator/ Kawasaki Paint Robot. SMG/ Heilbronn Press. 4 4
  • 5. MANUFACTURING PROCESS Engine Heat Gears Aluminium Assembly treatment / Steel Parts Vehicle Assembly Dispatch Fabrication Paint Shop Press Shop Shop 5 5
  • 6. TARGET YEAR TARGET ACHIEVED M3 / Vehicle M3 / Vehicle 2004- 2004-05 0.71 0.65 2005- 2005-06 0.61 0.62 2006- 2006-07 0.60 0.58 2007- 2007-08 0.55 0.54 2008- 2008-09 0.52 6 6
  • 7. WATER CONSERVATION APPROACH EARLIER + ADDITIONAL (3 R) Conserve + Reduce Preserve + Reuse Reserve + Recycle LESS … WATER CONVERSATION MORE .. WATER CONSERVATION 7 7
  • 8. WATER CONSERVATION METHODOLOGY Sr. Activity Methodology Tools used No. To identify areas of water Weekly / Monthly data 1 Audit conservation potential through Pie charts & brainstorming To identify equipments Daily/weekly water 2 Analysis where water conservation is consumption recording possible through bar charts,graphs Identify activities for Resource planning & 3 Action Plan individual equipments with activity charts time frame Action for procurement & 6W2H Way Activity Charts 4 Implementation implementation To analyze plan V/S Actual Gap Analysis & 5 Evaluation countermeasures 8 8
  • 9. Innovative Project No.1 Automation of localized Water storage system Before : Additional 40 HP Pump running for 1.5 Hrs/Day After : PLC Controlled auto system Provided Benefits – Saving of 140 Cub. Meters/Year 9 9
  • 10. Innovative Project No.2 Elimination of water wastage by providing timer for water supply Before After Continuous Solenoid valve water available during non use time also for hand wash area. Hand Wash Area Provided Timer circuit & solenoid valve to make water available only during Lunch/ Dinner/Breakfast time Total Qty : 80 No.s of Taps Benefit: Saving of 730 Cub. Mtr / Year 10 10
  • 11. Innovative Project No.3 Pump set Before : Fresh Water/ TTP Water Used for Process & Horticulture After : Rain water Pond of Capacity 7000 Cub.mtr. Constructed Benefits – Saving of 45000 Cub. Meters/Year 11 11
  • 12. Optimisation of Paint Sludge Pit Cleaning in MCD Paint Shop Before After Manual Paint Sludge Removal Sludge pit cleaning Frequency: Sludge pit cleaning Frequency: Quarterly. Yearly. 10 00 800 Benefit: Water saving - 600 Cubic Mtr / year. 5 00 200 0 12 BEFORE AFTER 12
  • 13. Installation of Screw compressors- Without Cooling Towers compressors- Befor After e Add Cooling tower photo Provided Atlas Copco screw Reciprocating Compressor – Needs Compressor. This being air Cooling Tower 24 Hrs cooled, cooling tower is not required Investment : Rs. 18 Lacs Water Saving : 6000 Cub.Mtr / Yr 13 13
  • 14. Installation of Spot cooling System to replace Old type ARP system system Before After Localised storage tank ARP was used for shop Modular spot coolers used cooling for shop cooling Benefit: Saving of 1500 Cub. Mtr 14 14
  • 15. Orificing to Tap water of all basins Before After Or ifice washer Total Qty : 120 Nos. of Taps Benefit: Saving of 1200 Cub. Mtr/ Year 15 15
  • 16. Reuse of DM water for Ind. Dip Water Tank of PTAED Line Before After DM Water Industrial DM Water Industrial Water Water M P Drain Drain Drain DM water & Industrial water DM Water transferred to Industrial tanks drained per week.Total Water Tank.after making pipe line water requirement modification Hence only DM Water required 140000 ltrs /week 70,000 Ltrs. Per week Investment – Rs. 0.3 Lacs Water Saving -3640 M 3 / Annum 16 16
  • 17. Installation of Drip Irrigation system Before After Investment ---- Rs 40 lacs Saving TTP water ---- 150 m 3 /day 17 17
  • 18. LEGAL COMPLIANCE •WE ARE A ZERO DISCHARGE COMPANY. •WE MEET LEGAL REQUIREMENTS AS PER FOLLOWING ACTS : •The water(Prevention & control of pollution) Act – 1974 •The water (Prevention & control of pollution) Cess act- 1977 •The Environment(Protection ) Act- 1986& Amendment rules 2000 18 18
  • 19. WASTE WATER TREATMENT At Source Paint Seperation Sludge At Source Dewatering Ni – Cr. Plant Separation Plant Effluent Tertiary Treatment Treatment Plant Plant 19 19
  • 20. Installation of TTP plant Before After ETP water was used for horticulture activity only TTP Plant TTP Water storage Tank Use of TTP water for paint shop Sedimentation tank top up & tank cleaning Fresh water Saving – 46,000 m 3 /annum 20 20
  • 21. MAJOR ENVIRONMENTAL IMPROVEMENTS 2004– 2008 ØNo water discharged outside the company. ØTree & shrub Plantation- More than One Million ØWind Mill Installation – 65 MW (138 Nos.) ØUpgradation of Effluent treatment Plant (ETP) ØInstallation of tertiary treatment plant ØInstallation of Nickel/Chrome heavy metal separation plant 21 21
  • 22. MONITORING AND REPORTING SYSTEM ØCell cost meetings are conducted Monthly to monitor cell wise expenses like Tools,Energy & water consumption ØWater consumption reviewed Monthly for planning further improvements and monitoring existing plans. ØConducting Audit for Water leakage and Immediate Preventive actions. ØAnnual reports of water saving generated to set goals for next year. 22 22
  • 23. Training and Awareness Programs • Training through Class Room programs. • Awareness through Poster Display. • Social Awareness through Company Bulletins. • Organising various Poster Competitions, Kaizen Competitions . • Suggestion Box. 23 23
  • 24. Reduction in Specific Water Consumption Year Water % Consumption Reduction Cub. Mtr/ over Base Veh. Year 2004- 2004-05 0.65 Base Year 2005- 2005-06 0.62 5 2006- 2006-07 0.58 11 2007- 2007-08 0.54 17 24 24
  • 25. Water Usage Distribution in Plant 25 25
  • 26. Future Water conservation Projects – 2007- 08 2007- Total Identified Projects - 8 Nos. Expected Saving - 100 m 3 /day Total Investment (Estimated) - Rs 50 lacs Sr. No. Projects in hand 1 Replacement of old underground main water line ( @ 600 mtrs ) 2 Installation of RO Plant for Paint shop 3 Wh. 3 Rain Water Harvesting for Individual Shops 4 Installation of VFD for main water supply pumps 5 Installation of Fanless cooling towers 26 26