Construction Site Inspection checklist
Project Details
Project Name
Area/Building Date
Person doing site inspection: (Print name)
Person doing site inspection: (Signature)
Items for inspection
Item X
or N/A
Item X or
N/A
Work area has been isolated from
local traffic – barricades/tape, etc
All steps & stairways have non slip
treads & damage free
All personnel are inducted and have
signed in
All ladders are industrial grade and
appropriate to job (eg non metal
ladder for electrical work)
All relevant Job documents are
displayed– Work Notice, Out of order
signs, shutdown notice
Electrical equipment and leads are
free of damage
All relevant Job documents are
available, Safe Work Method
Statements (SWMS), High Risk
Permits, Job Docket, MSDS, etc
Electrical equipment has been tested
and tag date is within service period
Emergency access/egress is clear
and free from obstructions
Portable Residual Current
Devices/Earth Leakage Breakers are
used on portable electrical equipment
& leads
All entrances, exits & walkways are
clear and identifiable
No burn marks are on power
switches/outlets
There is a Material Safety Data
Sheet for each product
Adequate appropriate fire fighting
equipment is available, visible &
readily accessible
Material Safety Data Sheets have
not expired their 5 year life
Fire equipment is clean and has been
checked in last 6 months
Chemical containers are clearly
labelled and stored correctly (eg not
near food, in appropriate container)
Adequate first aid kits with
appropriate contents are available
Personnel are aware of the contents
of the SWMS and are complying with
its requirements for risk control
Workers are aware of local
emergency procedures.
All employees are working safely
and according to SWMS
Emergency contact (security)
numbers are displayed near kits
All personnel are wearing correct
safety clothing and PPE as specified
by SWMS
Workers are aware of nearest
evacuation exit and assembly point
All guards are in place – where
applicable
All machinery & equipment is in a
safe and clean condition
= yes
X = no
N/A = not applicable

Mais conteúdo relacionado

Mais procurados

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
Chris Morris
 
Method statement for transmission line (lanco)
Method statement for transmission line (lanco)Method statement for transmission line (lanco)
Method statement for transmission line (lanco)
Praveen Kumar
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Gary Hayes
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
DusanJankovic8
 

Mais procurados (20)

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
 
Permit to work training
Permit to work training Permit to work training
Permit to work training
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
Method statement for transmission line (lanco)
Method statement for transmission line (lanco)Method statement for transmission line (lanco)
Method statement for transmission line (lanco)
 
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-...
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and MachineryOSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
OSHA Construction Safety for Vehicles, Mobile Equipment, and Machinery
 
Confined Space Training by Colby College
Confined Space Training by Colby CollegeConfined Space Training by Colby College
Confined Space Training by Colby College
 
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
27 Hydrostatic Pressure Testing inside buildings Risk Assessment Templates.docx
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Methodstatement welding
Methodstatement weldingMethodstatement welding
Methodstatement welding
 
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)252113184 method-statement-for-office-container-and-equipment-mobilization (1)
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
 
Electrical inspection-checklists
Electrical inspection-checklistsElectrical inspection-checklists
Electrical inspection-checklists
 
Confined space entry
Confined space entryConfined space entry
Confined space entry
 
Road Construction Work Zone Safety
Road Construction Work Zone SafetyRoad Construction Work Zone Safety
Road Construction Work Zone Safety
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
Mounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump SafetyMounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump Safety
 

Semelhante a Chk construction site_inspection-checklist

AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AhmadNadzir4
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
Jahanzeb Khan
 
BrandNewResume2016
BrandNewResume2016BrandNewResume2016
BrandNewResume2016
Chad Bingham
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE Presentation
Ishtiaq Hashmi
 
RICHARD ERIC BALMORES-NGrid
RICHARD ERIC BALMORES-NGridRICHARD ERIC BALMORES-NGrid
RICHARD ERIC BALMORES-NGrid
Richard Balmores
 

Semelhante a Chk construction site_inspection-checklist (20)

electricity-safety-checklist-for-small-sites.pdf
electricity-safety-checklist-for-small-sites.pdfelectricity-safety-checklist-for-small-sites.pdf
electricity-safety-checklist-for-small-sites.pdf
 
mintu updated cv
mintu updated cvmintu updated cv
mintu updated cv
 
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.pptAIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
AIGA TP 06_06 Work Permit System_reformated Jan 12.ppt
 
RESUME CV
RESUME CVRESUME CV
RESUME CV
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
Mfd fieldwork planning_form
Mfd fieldwork planning_formMfd fieldwork planning_form
Mfd fieldwork planning_form
 
BrandNewResume2016
BrandNewResume2016BrandNewResume2016
BrandNewResume2016
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
CV PRAKASH MECHANICAL
CV PRAKASH MECHANICALCV PRAKASH MECHANICAL
CV PRAKASH MECHANICAL
 
Saeed Aslam
Saeed AslamSaeed Aslam
Saeed Aslam
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
C.v Muhammad Moaviah. M
C.v Muhammad Moaviah. MC.v Muhammad Moaviah. M
C.v Muhammad Moaviah. M
 
Vuong Tatthang
Vuong TatthangVuong Tatthang
Vuong Tatthang
 
Tower Project HSE Presentation
Tower Project HSE PresentationTower Project HSE Presentation
Tower Project HSE Presentation
 
RICHARD ERIC BALMORES-NGrid
RICHARD ERIC BALMORES-NGridRICHARD ERIC BALMORES-NGrid
RICHARD ERIC BALMORES-NGrid
 
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION  INSTRUMENT - TECHNICIAN  – PROCESS CONTROL & INSTRUMENTATION
INSTRUMENT - TECHNICIAN – PROCESS CONTROL & INSTRUMENTATION
 
safety officer cv.DOC
safety officer cv.DOCsafety officer cv.DOC
safety officer cv.DOC
 
Karthikeyan. ex insp cv
Karthikeyan.  ex insp cvKarthikeyan.  ex insp cv
Karthikeyan. ex insp cv
 

Mais de imaduddin91

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
imaduddin91
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplications
imaduddin91
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineering
imaduddin91
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural design
imaduddin91
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
imaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
imaduddin91
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplications
imaduddin91
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineering
imaduddin91
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
imaduddin91
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural design
imaduddin91
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign
imaduddin91
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
imaduddin91
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
imaduddin91
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications
imaduddin91
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement
imaduddin91
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
imaduddin91
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
imaduddin91
 
Statistical metods
Statistical metodsStatistical metods
Statistical metods
imaduddin91
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference concepts
imaduddin91
 

Mais de imaduddin91 (20)

07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
Remotesensingandgisapplications
RemotesensingandgisapplicationsRemotesensingandgisapplications
Remotesensingandgisapplications
 
R05410107 advancedfoundationengineering
R05410107 advancedfoundationengineeringR05410107 advancedfoundationengineering
R05410107 advancedfoundationengineering
 
07 a80101 advanced structural design
07 a80101 advanced structural design07 a80101 advanced structural design
07 a80101 advanced structural design
 
07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications07 a70401 remotesensingandgisapplications
07 a70401 remotesensingandgisapplications
 
07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering07 a70102 finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
R05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplicationsR05410103 remotesensingandgisapplications
R05410103 remotesensingandgisapplications
 
R05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineeringR05410102 finiteelementmethodsincivilengineering
R05410102 finiteelementmethodsincivilengineering
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
 
07 a82101 advanced structural design
07 a82101  advanced structural design07 a82101  advanced structural design
07 a82101 advanced structural design
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign
 
07 a80104 watershedmanagement
07 a80104 watershedmanagement07 a80104 watershedmanagement
07 a80104 watershedmanagement
 
07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement07 a80102 groundwaterdevelopmentandmanagement
07 a80102 groundwaterdevelopmentandmanagement
 
07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications07 a70110 remotesensingandgisapplications
07 a70110 remotesensingandgisapplications
 
07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement07 a70107 waterresourcessystemplanningandmanagement
07 a70107 waterresourcessystemplanningandmanagement
 
07 a70102 finite element methods in civil engineering
07 a70102  finite element methods in civil engineering07 a70102  finite element methods in civil engineering
07 a70102 finite element methods in civil engineering
 
07 a60105 estimatingandcosting
07 a60105 estimatingandcosting07 a60105 estimatingandcosting
07 a60105 estimatingandcosting
 
Statistical metods
Statistical metodsStatistical metods
Statistical metods
 
Sas cheat
Sas cheatSas cheat
Sas cheat
 
Sas language reference concepts
Sas language reference  conceptsSas language reference  concepts
Sas language reference concepts
 

Chk construction site_inspection-checklist

  • 1. Construction Site Inspection checklist Project Details Project Name Area/Building Date Person doing site inspection: (Print name) Person doing site inspection: (Signature) Items for inspection Item X or N/A Item X or N/A Work area has been isolated from local traffic – barricades/tape, etc All steps & stairways have non slip treads & damage free All personnel are inducted and have signed in All ladders are industrial grade and appropriate to job (eg non metal ladder for electrical work) All relevant Job documents are displayed– Work Notice, Out of order signs, shutdown notice Electrical equipment and leads are free of damage All relevant Job documents are available, Safe Work Method Statements (SWMS), High Risk Permits, Job Docket, MSDS, etc Electrical equipment has been tested and tag date is within service period Emergency access/egress is clear and free from obstructions Portable Residual Current Devices/Earth Leakage Breakers are used on portable electrical equipment & leads All entrances, exits & walkways are clear and identifiable No burn marks are on power switches/outlets There is a Material Safety Data Sheet for each product Adequate appropriate fire fighting equipment is available, visible & readily accessible Material Safety Data Sheets have not expired their 5 year life Fire equipment is clean and has been checked in last 6 months Chemical containers are clearly labelled and stored correctly (eg not near food, in appropriate container) Adequate first aid kits with appropriate contents are available Personnel are aware of the contents of the SWMS and are complying with its requirements for risk control Workers are aware of local emergency procedures. All employees are working safely and according to SWMS Emergency contact (security) numbers are displayed near kits All personnel are wearing correct safety clothing and PPE as specified by SWMS Workers are aware of nearest evacuation exit and assembly point All guards are in place – where applicable All machinery & equipment is in a safe and clean condition = yes X = no N/A = not applicable