MANG6311 Stakeholder Management
Dr. Ian Cammack
i.j.cammack@soton.ac.uk
MSc Project Management
Sources:
http://www.antonioolmos.com/index.php#mi=2&pt=1&pi=10000&s=13&p=7&a=0&at=0
http://mayrsom.com/2013/07/10/stakeholder-orientation/
Introduction
• Relatively new concept :
– “70% of people not consulted” (Hutton 1995)
• Successful projects more than ‘time, cost & quality’
– Quantitative and Qualitative success criteria
Definition(s)
• “those groups who without whose support the organisation would
cease to exist” (Freeman 1984)
• “the people who have a real interest in the outcomes of the project”
(Lockwood 1996)
• “individuals or groups who can effect, or are affected by the
(project) you are (managing)” (Ryan 1996)
• “a person or group of people who have a vested interest in the
success of an organisation [project] and the environment within
which the organisation [project] exists” (BS6079 1996)
A stakeholder management process
Identify project
success criteria
Identify
resource
requirements
Identify
stakeholders
Conduct
stakeholder
analysis
Implement
stakeholder
management
strategy
Monitor
external and
internal change
Monitor
stakeholder
satisfactionSuccessful
project
completion
Source: after McElroy B. & Mills C. (2000) Managing Stakeholders
Stakeholder Management
• Satisfaction = perception – expectation
• Hard Metrics:
– Time, Cost & Quality
• Perceived Quality:
– Responsiveness
– Communication
– Competence / Professionalism
– Courtesy
– Accessibility
Different perspectives on success
Client
Have the goals been achieved to
a satisfactory degree
Project leader
Has the result been achieved with
respect to the aspects of Time,
Money, Quality, Information &
Organisation
Project employee Is their contribution appreciated?
Financier Is it profitable?
End User Is it usable?
Person with problem Are we any closer to finding a solution
Source: van Well-Stam et al p.31
Types of Stakeholder
“Internal”
• Project Manager
• Project Team
• Senior Management
• Project Client
• Competitors (for Project
Resources)
• Suppliers (internal)
• Customers (internal)
• Unions / Staff Associations
“External”
• Government (UK, EU)
• Regulators
• Competitors
• Neighbours
• Suppliers (ext. Supply Chain)
• Customers
• Opinion Formers (Media,
Commentators, Unions)
NB: Not all Stakeholders want the project to succeed
A Stakeholder Schematic
Internal
Internal
Internal
INTERNAL
LOCAL
NATIONAL
INTERNATIONAL
Industrial
Customers
Multilateral
investors
National
Media
Customers
International
Media
Local
Media
Think tanks/
research
groups
Academic
institutes Local Interest
groups
Customers
CustomersEmployees
Trade
unions
Contractors
Local
government
Local
NGO’s
Suppliers
Neighbours/
local community
National
NGO’s
Investors
National
Government /
regulators
International
NGO’s
Industry &
business asoc
Hund (2002)
What Resources Can Stakeholders
Deploy?
Project
Internal
support Political
attention
Planning
Public
support
Regulatory
Discretion
External
contacts
Knowledge
Emotion
Skills
Project
materials
Finance
Bureaucratic
inertia
Source: McElroy B. & Mills C. (2000) Managing Stakeholders
Exercise 1
• Working in a small group
• Consider a project to bring a new
mobile phone to market
• Identify a range of stakeholders and
stakeholder groups
• What resources do they bring to the
project?
Stakeholder Analysis:
Factors
• Knowledge
• Power/ influence
• Interest
• Intent
• Trust
Stakeholder Analysis
• What is the person or group’s stake in the project?
– Are they needed to resource it?
– Are they directly affected by it?
– Are they indirectly affected by it?
– Are they unaffected, but still have the power to affect it
should they choose?
Don’t take for granted
Assure that project
meets their objectives
Difficult to manage
Basing their opposition on
knowledge
Vulnerable;
could easily be lost
Protect and
reinforce support
Key target area
Fill gaps in knowledge
with positive messages
Stakeholder Analysis & Mapping #1
Knowledge
Attitude/ Intent
Source: McElroy B. & Mills C. (2000) Managing Stakeholders
Support
Aware
Oppose
Ignorant
Minimal effort
direction
Low
Low
Keep informed
education/ communication
High
Keep satisfied
intervention
High
Key players
participation
Stakeholder Analysis:
Stakeholder mapping #2
Source: Mendelow, A,(1991) Proceedings of 2nd International Conference on Information Systems, Cambridge, Mass.
Interest
A B
C D
Power
Assessing power/ influence
Internal stakeholders
• Status
– position in hierarchy
– Salary/ grade indicators
• Claim on resources
– Number of staff
– Budget as % of total
• Representation
– Number/ influence of
directors
• Symbols
– Quality of accommodation
– Support services
External stakeholders
• Status
– Speed of your reaction
– Level of influence
• Resource dependence
– Degree of involvement in
strategy implementation
– Degree of control over
strategic resources
• Negotiating arrangements
– Standard prices versus
individual negotiations
• Symbols
– Access and invitations
If I were to pursue this project…would/could they stop me?
Stakeholder Mapping: Stage 2
Active
Opposition
Passive
Opposition
No
Commitment
Passive
Support
Active
Support
A B
A B
A B
A B
A B
A B
Managing
Director
Users
Regulator
Media
Suppliers
Key Customers
Finance
Director
AB
Key
A= Current
B = Required
Role of
Stakeholder
Decision
Maker
Consent
Influencer
Influencer
Player
Consent
Influencer
Attitude of Stakeholder
Stakeholder Mapping: Step 3
Engineers
Key
Customer
Staff
Assoc.
Users
Sales
Director
Line
Manager
PR
Agency
MediaMarket-
ing
Training
Suppliers
Agents
Regulator
Venture
CapitalMD
Finance
Director
PM
DM +ve?
P -ve?
I ?
I +ve?
C –ve?
C -ve
I +ve
Key:
DM = decision maker
I = influencer
P = player
C = consult
–ve / -ve? / ? / +ve? / +ve
Example of Stakeholder Mapping 1 (part A)
Football
Association
LeagueFederation of Stadium
Communities
PFA
Football Foundation
Media
Local Authority
Football in the Community
Local Businesses
Supporters Trust
Supporters Groups
The Co-operative Group
Supports Direct
Football Supporters
Federation
Independent Football
Commission
Shareholders
Sponsors
Source: Holt et al 2005 p.70
Football Club
Example of Stakeholder Mapping 1 (part B)
Football Club
Football Association
League
Federation of Stadium
Communities
PFA
Football Foundation
Media
Local Authority
Football in the Community
Local BusinessesSupporters TrustSupporters Groups
The Co-operative Group
Supports Direct
Football Supporters
Federation
Independent Football
Commission
Shareholders
Sponsors
Source: Holt et al 2005 p.71
Example of Stakeholder Mapping 2
Euro2000
(Executor)
UEFA
(principal) KBVB,
KNVB
Sponsors
ISL
Stadiums
FORTO
2000
EBU
Media
The public
Government Bodies:
•Local
•Regional
•National
•International
Contract
Informal
Obligation (delivery)
Approval
KEY:
Source: van Well-Stam et al p.31
Example of Stakeholder Mapping 3
Stages to Committment
Ignorance : Do Nothing Awareness : Newsletters
Memos
Briefing Papers
Understanding : Discussions
Team Meetings
Roadshows
Support : Consultation
Debate
Feedback
Involvement : Early Incorporation
Show Compromise
Share Confidences
Collective Problem Solving
Stakeholder Mapping: Stage 4
Managing
Director
Users
Regulator
Media
Suppliers
Key Customers
Finance
Director
Decision
Maker
Consent
Influencer
Influencer
Player
Consent
Influencer
Stakeholder Category Influencing Strategy Information Required
Comms
Medium
Resp.A B
Reading
Essential Reading:
• Karlsen J.T. “Project Stakeholder Management” Engineering Management Journal Vol. 14
No. 4 December 2002
• McElroy B. & Mills C. (2000) “Managing Stakeholders” in Turner J.R. & Simister S.J.
Handbook of Project Management 3rd Edition
Additional Reading:
• Malvey D. Fottler M.D. & Slovensky D.J. “Evaluating Stakeholder Management Performance
Using a Stakeholder Report Card” Health Care Management Review 2002, 27(2), 66-79
• Kumar K. & Subramanian R. (1998) Meeting the Expectations of Key Stakeholders:
Stakeholder Management in the Health Care Industry
• Useful proforma for stakeholder management
http://www.adams12.org/Quality/documents/ProjectStakeholderAnalysis.pdf

Mais conteúdo relacionado

Mais procurados

Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management Workshop
Nadun De Silva
 
Pm prompt ver1
Pm prompt ver1Pm prompt ver1
Pm prompt ver1
proctra
 

Mais procurados (20)

Human aspect of project
Human aspect of projectHuman aspect of project
Human aspect of project
 
Project Stakeholder Engagement
Project Stakeholder EngagementProject Stakeholder Engagement
Project Stakeholder Engagement
 
Scope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization SuccessScope or: How to Manage Projects for Organization Success
Scope or: How to Manage Projects for Organization Success
 
Top Five Ideas for Project Management
Top Five Ideas for Project ManagementTop Five Ideas for Project Management
Top Five Ideas for Project Management
 
Kepner and Fourie Complex problem solving intro
Kepner and Fourie Complex problem solving introKepner and Fourie Complex problem solving intro
Kepner and Fourie Complex problem solving intro
 
Project Manager Competences And Selection
Project Manager Competences And SelectionProject Manager Competences And Selection
Project Manager Competences And Selection
 
AICD Presentation - Project Management for Directors
AICD Presentation - Project Management for DirectorsAICD Presentation - Project Management for Directors
AICD Presentation - Project Management for Directors
 
Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management Workshop
 
Project management ppt
Project management pptProject management ppt
Project management ppt
 
Managing stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellenceManaging stakeholders as critical success factor in operational excellence
Managing stakeholders as critical success factor in operational excellence
 
Human Factor in Project Management
Human Factor in Project Management Human Factor in Project Management
Human Factor in Project Management
 
PMSI Session 1
PMSI Session 1PMSI Session 1
PMSI Session 1
 
Pm prompt ver1
Pm prompt ver1Pm prompt ver1
Pm prompt ver1
 
Scheduling & Budgeting
Scheduling & Budgeting Scheduling & Budgeting
Scheduling & Budgeting
 
Session 4: Implementing & Closing out
Session 4: Implementing & Closing outSession 4: Implementing & Closing out
Session 4: Implementing & Closing out
 
Project Management Workshop
Project Management WorkshopProject Management Workshop
Project Management Workshop
 
Project Management for non Project Managers
Project Management for non Project ManagersProject Management for non Project Managers
Project Management for non Project Managers
 
Governance Rochester 2021
Governance Rochester 2021Governance Rochester 2021
Governance Rochester 2021
 
Recent evolution and future trend of project management - Prof. Soderlund
Recent evolution and future trend of project management - Prof. SoderlundRecent evolution and future trend of project management - Prof. Soderlund
Recent evolution and future trend of project management - Prof. Soderlund
 
Nine best practices of project management
Nine best practices of project managementNine best practices of project management
Nine best practices of project management
 

Destaque

Resturant stakeholders
Resturant stakeholdersResturant stakeholders
Resturant stakeholders
mazin mohamed
 

Destaque (9)

Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Four Fictional Faces of Scaled Stakeholder Management by Drew Jemilo (Agile2016)
Four Fictional Faces of Scaled Stakeholder Management by Drew Jemilo (Agile2016)Four Fictional Faces of Scaled Stakeholder Management by Drew Jemilo (Agile2016)
Four Fictional Faces of Scaled Stakeholder Management by Drew Jemilo (Agile2016)
 
Driving Collaboration Between IT and Procurement
Driving Collaboration Between IT and ProcurementDriving Collaboration Between IT and Procurement
Driving Collaboration Between IT and Procurement
 
Software Project Management Training
Software Project Management TrainingSoftware Project Management Training
Software Project Management Training
 
Competence framework 2nd edition and new project professional qualification, ...
Competence framework 2nd edition and new project professional qualification, ...Competence framework 2nd edition and new project professional qualification, ...
Competence framework 2nd edition and new project professional qualification, ...
 
Stakeholder Management for Product Managers - ProductTank Paris
Stakeholder Management for Product Managers - ProductTank ParisStakeholder Management for Product Managers - ProductTank Paris
Stakeholder Management for Product Managers - ProductTank Paris
 
CSR for HR
CSR for HRCSR for HR
CSR for HR
 
Resturant stakeholders
Resturant stakeholdersResturant stakeholders
Resturant stakeholders
 
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
 

Semelhante a Human Factors in Project Management: Stakeholder Management

Relationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And StakeholdersRelationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And Stakeholders
Amanda Reed
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]
Saddan Juhari
 
Best_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsBest_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_Expectations
Patricia J. Williams, PMP
 
Introduction to Implementing the Balanced Value Impact Model - Workshop for N...
Introduction to Implementing the Balanced Value Impact Model - Workshop for N...Introduction to Implementing the Balanced Value Impact Model - Workshop for N...
Introduction to Implementing the Balanced Value Impact Model - Workshop for N...
Simon Tanner
 
Discussion -1 100 Words   A project is successful when it reac.docx
Discussion -1 100 Words   A project is successful when it reac.docxDiscussion -1 100 Words   A project is successful when it reac.docx
Discussion -1 100 Words   A project is successful when it reac.docx
cuddietheresa
 
Fundraising training andreas beckmann
Fundraising training andreas beckmannFundraising training andreas beckmann
Fundraising training andreas beckmann
climateclimate
 
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docxDPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
jacksnathalie
 

Semelhante a Human Factors in Project Management: Stakeholder Management (20)

Relationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And StakeholdersRelationship Between Stakeholders And Stakeholders
Relationship Between Stakeholders And Stakeholders
 
STAKEHOLDER-IDENTIFICATION.pptx
STAKEHOLDER-IDENTIFICATION.pptxSTAKEHOLDER-IDENTIFICATION.pptx
STAKEHOLDER-IDENTIFICATION.pptx
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptx
 
Best_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_ExpectationsBest_Practices_Managing_Stakeholder_Expectations
Best_Practices_Managing_Stakeholder_Expectations
 
Introduction to Implementing the Balanced Value Impact Model - Workshop for N...
Introduction to Implementing the Balanced Value Impact Model - Workshop for N...Introduction to Implementing the Balanced Value Impact Model - Workshop for N...
Introduction to Implementing the Balanced Value Impact Model - Workshop for N...
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
Stakholder Mapping_Power Analysys_SU_v0.2.pptx
Stakholder Mapping_Power Analysys_SU_v0.2.pptxStakholder Mapping_Power Analysys_SU_v0.2.pptx
Stakholder Mapping_Power Analysys_SU_v0.2.pptx
 
Discussion -1 100 Words   A project is successful when it reac.docx
Discussion -1 100 Words   A project is successful when it reac.docxDiscussion -1 100 Words   A project is successful when it reac.docx
Discussion -1 100 Words   A project is successful when it reac.docx
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
Project PC Lecture-7 Project Stakeholder Planning.pptx
Project PC Lecture-7   Project Stakeholder Planning.pptxProject PC Lecture-7   Project Stakeholder Planning.pptx
Project PC Lecture-7 Project Stakeholder Planning.pptx
 
Project Management Essentials: Stakeholder Management
Project Management Essentials: Stakeholder ManagementProject Management Essentials: Stakeholder Management
Project Management Essentials: Stakeholder Management
 
Institutional Investing in the 21st Century
Institutional Investing in the 21st Century Institutional Investing in the 21st Century
Institutional Investing in the 21st Century
 
Fundraising training andreas beckmann
Fundraising training andreas beckmannFundraising training andreas beckmann
Fundraising training andreas beckmann
 
Stakeholders and sponsors: Key ingredients for project success
Stakeholders and sponsors: Key ingredients for project successStakeholders and sponsors: Key ingredients for project success
Stakeholders and sponsors: Key ingredients for project success
 
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
HHL 360 stakeholder analysis - systematic process in identifying strategic bl...
 
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docxDPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
DPA 8400 Unit 9 AssignmentPolicy Implementation GridIn thi.docx
 
Ldt300x week5-storyboard-phil charles
Ldt300x week5-storyboard-phil charlesLdt300x week5-storyboard-phil charles
Ldt300x week5-storyboard-phil charles
 
2023-01-30-Finance-for-Non-financial-Managers.pptx
2023-01-30-Finance-for-Non-financial-Managers.pptx2023-01-30-Finance-for-Non-financial-Managers.pptx
2023-01-30-Finance-for-Non-financial-Managers.pptx
 

Mais de Ian Cammack

Mais de Ian Cammack (17)

Human Factors in Project Management Session 6 leadership issue 1
Human Factors in Project Management Session 6 leadership issue 1Human Factors in Project Management Session 6 leadership issue 1
Human Factors in Project Management Session 6 leadership issue 1
 
Human Factors in Project Management Session 5 team working issue 1
Human Factors in Project Management Session 5 team working issue 1 Human Factors in Project Management Session 5 team working issue 1
Human Factors in Project Management Session 5 team working issue 1
 
Human Factors in Project Management Session 4 motivation issue 1
Human Factors in Project Management Session 4 motivation issue 1Human Factors in Project Management Session 4 motivation issue 1
Human Factors in Project Management Session 4 motivation issue 1
 
Human factors in project Management Session 3 communications issue 1
Human factors in project Management Session 3 communications issue 1Human factors in project Management Session 3 communications issue 1
Human factors in project Management Session 3 communications issue 1
 
Bj research session 10 presenting your findings
Bj research session 10 presenting your findingsBj research session 10 presenting your findings
Bj research session 10 presenting your findings
 
Bj research session 9 analysing quantitative
Bj research session 9 analysing quantitativeBj research session 9 analysing quantitative
Bj research session 9 analysing quantitative
 
Bj research session 8 gathering quantitative data
Bj research session 8 gathering quantitative dataBj research session 8 gathering quantitative data
Bj research session 8 gathering quantitative data
 
Business research Methods session 7 qualitative techniques
Business research Methods session 7 qualitative techniquesBusiness research Methods session 7 qualitative techniques
Business research Methods session 7 qualitative techniques
 
Business Research Methods session 6 research design
Business Research Methods session 6 research designBusiness Research Methods session 6 research design
Business Research Methods session 6 research design
 
Business Research Methods session 3
Business Research Methods session 3Business Research Methods session 3
Business Research Methods session 3
 
Business Research Methods session 2
Business Research Methods session 2Business Research Methods session 2
Business Research Methods session 2
 
Research Methods for Business Students
Research Methods for Business StudentsResearch Methods for Business Students
Research Methods for Business Students
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Product based planning
Product based planning Product based planning
Product based planning
 
Project Selection
Project SelectionProject Selection
Project Selection
 
Project requirements management
Project requirements managementProject requirements management
Project requirements management
 
Goal directed project management
Goal directed project managementGoal directed project management
Goal directed project management
 

Último

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 

Último (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Human Factors in Project Management: Stakeholder Management

  • 1. MANG6311 Stakeholder Management Dr. Ian Cammack i.j.cammack@soton.ac.uk MSc Project Management Sources: http://www.antonioolmos.com/index.php#mi=2&pt=1&pi=10000&s=13&p=7&a=0&at=0 http://mayrsom.com/2013/07/10/stakeholder-orientation/
  • 2.
  • 3. Introduction • Relatively new concept : – “70% of people not consulted” (Hutton 1995) • Successful projects more than ‘time, cost & quality’ – Quantitative and Qualitative success criteria
  • 4. Definition(s) • “those groups who without whose support the organisation would cease to exist” (Freeman 1984) • “the people who have a real interest in the outcomes of the project” (Lockwood 1996) • “individuals or groups who can effect, or are affected by the (project) you are (managing)” (Ryan 1996) • “a person or group of people who have a vested interest in the success of an organisation [project] and the environment within which the organisation [project] exists” (BS6079 1996)
  • 5. A stakeholder management process Identify project success criteria Identify resource requirements Identify stakeholders Conduct stakeholder analysis Implement stakeholder management strategy Monitor external and internal change Monitor stakeholder satisfactionSuccessful project completion Source: after McElroy B. & Mills C. (2000) Managing Stakeholders
  • 6. Stakeholder Management • Satisfaction = perception – expectation • Hard Metrics: – Time, Cost & Quality • Perceived Quality: – Responsiveness – Communication – Competence / Professionalism – Courtesy – Accessibility
  • 7. Different perspectives on success Client Have the goals been achieved to a satisfactory degree Project leader Has the result been achieved with respect to the aspects of Time, Money, Quality, Information & Organisation Project employee Is their contribution appreciated? Financier Is it profitable? End User Is it usable? Person with problem Are we any closer to finding a solution Source: van Well-Stam et al p.31
  • 8. Types of Stakeholder “Internal” • Project Manager • Project Team • Senior Management • Project Client • Competitors (for Project Resources) • Suppliers (internal) • Customers (internal) • Unions / Staff Associations “External” • Government (UK, EU) • Regulators • Competitors • Neighbours • Suppliers (ext. Supply Chain) • Customers • Opinion Formers (Media, Commentators, Unions) NB: Not all Stakeholders want the project to succeed
  • 9. A Stakeholder Schematic Internal Internal Internal INTERNAL LOCAL NATIONAL INTERNATIONAL Industrial Customers Multilateral investors National Media Customers International Media Local Media Think tanks/ research groups Academic institutes Local Interest groups Customers CustomersEmployees Trade unions Contractors Local government Local NGO’s Suppliers Neighbours/ local community National NGO’s Investors National Government / regulators International NGO’s Industry & business asoc Hund (2002)
  • 10. What Resources Can Stakeholders Deploy? Project Internal support Political attention Planning Public support Regulatory Discretion External contacts Knowledge Emotion Skills Project materials Finance Bureaucratic inertia Source: McElroy B. & Mills C. (2000) Managing Stakeholders
  • 11. Exercise 1 • Working in a small group • Consider a project to bring a new mobile phone to market • Identify a range of stakeholders and stakeholder groups • What resources do they bring to the project?
  • 12. Stakeholder Analysis: Factors • Knowledge • Power/ influence • Interest • Intent • Trust
  • 13. Stakeholder Analysis • What is the person or group’s stake in the project? – Are they needed to resource it? – Are they directly affected by it? – Are they indirectly affected by it? – Are they unaffected, but still have the power to affect it should they choose?
  • 14. Don’t take for granted Assure that project meets their objectives Difficult to manage Basing their opposition on knowledge Vulnerable; could easily be lost Protect and reinforce support Key target area Fill gaps in knowledge with positive messages Stakeholder Analysis & Mapping #1 Knowledge Attitude/ Intent Source: McElroy B. & Mills C. (2000) Managing Stakeholders Support Aware Oppose Ignorant
  • 15. Minimal effort direction Low Low Keep informed education/ communication High Keep satisfied intervention High Key players participation Stakeholder Analysis: Stakeholder mapping #2 Source: Mendelow, A,(1991) Proceedings of 2nd International Conference on Information Systems, Cambridge, Mass. Interest A B C D Power
  • 16. Assessing power/ influence Internal stakeholders • Status – position in hierarchy – Salary/ grade indicators • Claim on resources – Number of staff – Budget as % of total • Representation – Number/ influence of directors • Symbols – Quality of accommodation – Support services External stakeholders • Status – Speed of your reaction – Level of influence • Resource dependence – Degree of involvement in strategy implementation – Degree of control over strategic resources • Negotiating arrangements – Standard prices versus individual negotiations • Symbols – Access and invitations If I were to pursue this project…would/could they stop me?
  • 17. Stakeholder Mapping: Stage 2 Active Opposition Passive Opposition No Commitment Passive Support Active Support A B A B A B A B A B A B Managing Director Users Regulator Media Suppliers Key Customers Finance Director AB Key A= Current B = Required Role of Stakeholder Decision Maker Consent Influencer Influencer Player Consent Influencer Attitude of Stakeholder
  • 18. Stakeholder Mapping: Step 3 Engineers Key Customer Staff Assoc. Users Sales Director Line Manager PR Agency MediaMarket- ing Training Suppliers Agents Regulator Venture CapitalMD Finance Director PM DM +ve? P -ve? I ? I +ve? C –ve? C -ve I +ve Key: DM = decision maker I = influencer P = player C = consult –ve / -ve? / ? / +ve? / +ve
  • 19. Example of Stakeholder Mapping 1 (part A) Football Association LeagueFederation of Stadium Communities PFA Football Foundation Media Local Authority Football in the Community Local Businesses Supporters Trust Supporters Groups The Co-operative Group Supports Direct Football Supporters Federation Independent Football Commission Shareholders Sponsors Source: Holt et al 2005 p.70 Football Club
  • 20. Example of Stakeholder Mapping 1 (part B) Football Club Football Association League Federation of Stadium Communities PFA Football Foundation Media Local Authority Football in the Community Local BusinessesSupporters TrustSupporters Groups The Co-operative Group Supports Direct Football Supporters Federation Independent Football Commission Shareholders Sponsors Source: Holt et al 2005 p.71
  • 21. Example of Stakeholder Mapping 2 Euro2000 (Executor) UEFA (principal) KBVB, KNVB Sponsors ISL Stadiums FORTO 2000 EBU Media The public Government Bodies: •Local •Regional •National •International Contract Informal Obligation (delivery) Approval KEY: Source: van Well-Stam et al p.31
  • 23. Stages to Committment Ignorance : Do Nothing Awareness : Newsletters Memos Briefing Papers Understanding : Discussions Team Meetings Roadshows Support : Consultation Debate Feedback Involvement : Early Incorporation Show Compromise Share Confidences Collective Problem Solving
  • 24. Stakeholder Mapping: Stage 4 Managing Director Users Regulator Media Suppliers Key Customers Finance Director Decision Maker Consent Influencer Influencer Player Consent Influencer Stakeholder Category Influencing Strategy Information Required Comms Medium Resp.A B
  • 25. Reading Essential Reading: • Karlsen J.T. “Project Stakeholder Management” Engineering Management Journal Vol. 14 No. 4 December 2002 • McElroy B. & Mills C. (2000) “Managing Stakeholders” in Turner J.R. & Simister S.J. Handbook of Project Management 3rd Edition Additional Reading: • Malvey D. Fottler M.D. & Slovensky D.J. “Evaluating Stakeholder Management Performance Using a Stakeholder Report Card” Health Care Management Review 2002, 27(2), 66-79 • Kumar K. & Subramanian R. (1998) Meeting the Expectations of Key Stakeholders: Stakeholder Management in the Health Care Industry • Useful proforma for stakeholder management http://www.adams12.org/Quality/documents/ProjectStakeholderAnalysis.pdf