Review of Hydrology Project
(Andhra Pradesh Surface Water)
World Bank's Final Supervision and Completion mission
7 to 8 May 2014
Hydrology Project - APSW
Brief
Introduction
Implementation Agency :Irrigation & CAD Dept, Govt. of A.P.
Date of Loan Agreement(Loan No.
4749-IN)
:19/01/2006
Date of Commencement :05/04/2006
Loan Closing Date :31/05/2014
Project Cost :
Rs.700.32 Lakhs
(at the time of commencement )
Revised Project Cost :Rs 892.08 Lakhs(As per RCT-2013)
Lender Share :78%
State Share :22%
Name of the Agency : Andhra Pradesh Surface Water Component
Web Site Address : hp-apsw-cgg.gov.in
Financial
Targets
&
Achievements
Transaction
Amount INR
( in Crores)
Cumulative Claims made up to March -2014 4.1366
Cumulative Reimbursement received up to March -2014 4.0558
KEY POINTS
World bank
communicated Aide
memoire vide E-mail
dt.18.11.2013
advised to drop RTTS
activity
In Crores
Physical
Achievements
 Procured and created the environment with DSS planning Server -1,
DSS Web Publishing Server-1, DSS Work station -2 with LAN and
internet connectivity.
 Civil works executed for 25 ARGs/SRGs and 4 F.C stations for data
collection network through Local Shopping in Hydrology Project
Phase-II.
 Procured 36nos computers, 7 Laptops and peripherals under up
gradation of IT infrastructure.
 Procured GIS and Image processing software.
 Procured 5 LCD projectors and information Brochures got printed.
 Website for HP was developed.
 The Hydrology data is being disseminated to the users on demand.
 Out of Four Reservoirs Hydrographic Survey for 1 project was
completed and report was submitted The remaining three Projects
Hydrographic Survey work was completed and reports are under
preparation and the reports will be submitted before closure of HP-II
i.e.31-05-2014.
Institutional Strengthening
Trainings
&
Competency
Building
Category of
Training Program
No Of Training
Programs
Domain 8
Procurement
Procedures 6
Software / GIS 12
Study Tour 2
Grand Total 28
In House Training Programs
Category of
Training Program
No Of Training
Programs
Domain 63
Procurement
Procedures 2
Soft skills 1
Software / GIS 34
Grand Total 100
External Training Programs
KEY POINTS
 Officers Trained – 474
Institutional Strengthening
Network
Stations
Station Type HP - I HP -II
Total
Stations
AWLR 8 0 8
DWLR 32 0 32
GD Station 77 0 77
ARG & SRG 80 25 105
Upgraded SRG 203 0 203
FCS 8 4 12
Institutional Strengthening
Awareness
Raising
&
Knowledge
Sharing
 Developed HP Website & procured books related
to HP
 Procured Infrastructure for trainings like LCD
projectors, Audio systems etc
 Printed 1400 brochures and necessary training
material for circulation
 Conducted 7 State level HDUG Meetings & 21
District level HDUG meeting
 Conducted 23 Awareness Raising Work shops
Data Dissemination
The data pertaining to Hydrology, Hydro-meteorological and
Climatic station is available from July 1999 to January 2014 in
Hydrology Project circle Data storage center.
After implementation of pricing structure (in 2007) the data
Disseminated to various government, N.G.O. and private
organization covering university scholars and P.G. Students,
Irrigation, A.P Genco, WAPCOS and other private
organizations for utilization for different purposes
(Irrigation/Industry/consultancy).
The total number of purchasers till date are 170nos and the
amount collected so far is Rs.1,36,794/-
Application of
HIS Data
Vertical Extension
Purpose
Driven
Studies
 Reservoir sedimentation studies are identified under PDS
 Rs.60.50 lakhs allotted for Reservoir Sedimentation Studies of
four reservoirs i.e Jurala, SRSP, Kadam and Nizam sagar.
 Hydro graphic survey of Priyadarshini Jurala project was
completed and report submitted
 Other reservoirs Hydro graphic survey completed and report
preparation is being under progress
Key Observations:-
Priyadarshini Jurala Project constructed across the river Krisha
Storage capacity of project is 338.10 M.cum (11.94 TMC)
The first survey was conducted during the Mar-Apr 2012
Capacity of reservoir found is 273.440 M.Cum (9.657 TMC) at FRL
+318.516 m
Loss in capacity is 19.125%
The rate of sedimentation was worked out to 0.49
Ha.m/100Sq.Km/year
It is observed that % loss in capacity is in the order of high
Suggestions made :-
Take catchment area treatment as per guidelines
Construct check dams and plantation to arrest soil erosion
Conduct Hydrographic surveys at least once in 5Years when it
attains FRL
KEY POINTS
Hydrographic Survey
for SRSP, Kadam and
Nizam Sagar
completed and
report preparation
under progress
Vertical Extension
Decision
Support
System (P)
Development of Software model for Decision Support system planning (DSS-
P) is one of the components of Hydrology Project Phase-II. Middle Godavari
Basin(G-5), Sriram Sagar Project (SRSP) System was selected for model
development. The following scenarios tested
A.Crop selection and corresponding water requirements:
This scenario tested for multiple cropping pattern in command
area. Different combinations of crops are selected for optimum utilization of
"available water level" in the reservoir during 1st October to 1st June. to
assess the deficit of water under various cropping patterns.
B. Providing Water for all sectors based on Increasing Demands:
Effective allotment of water for various sectors (Drinking ,
Irrigation and industry ) based on Increased demands has been tested to
analyze the impact of increased demands of a particular sector on the
remaining sectors
C. Combined Management of reservoirs and Water Transfers:
Integrated reservoir operation model setup completed and
working on various possible test cases and results are yet to be analyzed.
D. Balancing Head-end and tail-end abstraction along irrigation canal:
Conjunctive use of water has been tested in this scenario.
Distributory-83(D-83) of SRSP catchment is selected as part of pilot study.
Extending the scenario for more area in association with Ground Water
Post Project Plan HP-II
Continuation
of HP-II
Activities
 Post Project Training for updating Knowledge.
 Operation and maintenance of the network stations,
Water Quality lab equipment, Hydrometry and
Hydrometeorology equipment, Computers etc.,
 Awareness raising by conducting HDUG meetings.
 Publication of Meta data year book and monthly bulletins
like Aquadat.
 Dissemination of data to users on demand.
 Completing left over activities of DSS(P) pilot study and
blending with Decision making and Awareness raising.
 Dissemination of PDS results.
 Application of HDA software's as per necessity after
receipt of the same.
Moving Towards HP-III
Exploring the
possibility of
Hydrology
Project - III
 Different applications under different river basins/projects can be
taken up using DSS(P)
 Scale up applications from Hydrology to water resources
 Carry out the information to applications from data related to
Water resources and Hydrology
 Upgrading of existing Hydro meteorological network to Real time
data acquisition system
 Data processing reservoir management, flood management can
be done by real time monitoring (RTDSS)
 The reservoir sedimentation studies of Nagarjun Sagar project and
Srisailam project can be taken up under HP-III through APERL /
APSRAC
 Introduction of E-Swiss in Andhra Pradesh
 Application of Hydrological design Aids developed by CWC
(Consultant CES) in Andhra Pradesh water resources sector
AP Reorganisation Act (2014)
Appointed
Day 2 June
2014.
KEY POINTS
Request for IT
Infrastructure Assets
Description Purpose
Existing
Number
s
Approxi
mate
Cost (in
INR)
Proposals
Software - DSS Software
provided by DHI along with
dongle
DSS (P)
1
Need to procure the same for
Andhra Pradesh (1 Nos)
Computers - Servers and
systems along with LAN
connection, Racks, routers
and UPS etc
1 set
25-30
Lakhs
Need to procure the same for
Andhra Pradesh (1 Set)
Laptop 1
0.75
Lakhs
Need to procure the same for
Andhra Pradesh (1 Nos)
Infrastructure – DSS room
setup
1 Room
+ 1
Server
Room
3 Lakhs
Need to procure the same for
Andhra Pradesh
Computers - Data Backup
Systems State
Data
Storage
Center
Nil
1.50
Lakhs
Need to procure for both the
states (2 Nos)
Computers – Data Storage
systems with SWDES
1
0.75
Lakhs
Need to procure for Andhra
Pradesh state (1 Nos)
Computers Data Backup
Systems
Nil
1.50
Lakhs
Need to procure for both the
states (2 Nos)
Andhra pradesh surface water

Mais conteúdo relacionado

Mais procurados

Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
hydrologyproject001
 
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
 Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
hydrologyproject001
 
2007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_1082007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_108
SM Tanvir Hassan
 

Mais procurados (18)

Final gw handbook 180514
Final gw handbook 180514Final gw handbook 180514
Final gw handbook 180514
 
Day 3 sudip pradhan, icimod, arrcc-carissa workshop
Day 3 sudip pradhan, icimod, arrcc-carissa workshopDay 3 sudip pradhan, icimod, arrcc-carissa workshop
Day 3 sudip pradhan, icimod, arrcc-carissa workshop
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
 
Background Material
Background MaterialBackground Material
Background Material
 
F04423441
F04423441F04423441
F04423441
 
2013 01 24
2013 01 242013 01 24
2013 01 24
 
Ijrdtvlis31 1502
Ijrdtvlis31 1502Ijrdtvlis31 1502
Ijrdtvlis31 1502
 
Wp [final]master plan may 16 workshop summary
Wp   [final]master plan may 16 workshop summaryWp   [final]master plan may 16 workshop summary
Wp [final]master plan may 16 workshop summary
 
Solar Irrigation and Groundwater Management
Solar Irrigation and Groundwater ManagementSolar Irrigation and Groundwater Management
Solar Irrigation and Groundwater Management
 
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
 Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
 
2007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_1082007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_108
 
hc-eeac-jun09
hc-eeac-jun09hc-eeac-jun09
hc-eeac-jun09
 
TGS GPS - APPA Project Brochure
TGS GPS - APPA Project Brochure TGS GPS - APPA Project Brochure
TGS GPS - APPA Project Brochure
 
Wp special master-plan[071113]
Wp special master-plan[071113]Wp special master-plan[071113]
Wp special master-plan[071113]
 
Final master plan - wp workshop 5-16-13
Final   master plan - wp workshop 5-16-13Final   master plan - wp workshop 5-16-13
Final master plan - wp workshop 5-16-13
 
Climate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board MtgClimate Action Plan Update Sept 12 2013 Special Board Mtg
Climate Action Plan Update Sept 12 2013 Special Board Mtg
 
Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014
 
Wp final climate action plan oct 24 2013
Wp   final climate action plan oct 24 2013Wp   final climate action plan oct 24 2013
Wp final climate action plan oct 24 2013
 

Semelhante a Andhra pradesh surface water

Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
hydrologyproject0
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
hydrologywebsite1
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
hydrologyproject0
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhis
hydrologyproject001
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
eSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
eSAT Journals
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
hydrologywebsite1
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
hydrologyproject001
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
hydrologywebsite1
 
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
 Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
hydrologyproject001
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
hydrologywebsite1
 

Semelhante a Andhra pradesh surface water (20)

Cwc
CwcCwc
Cwc
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
 
Nih
NihNih
Nih
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhis
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
Haii 2017
Haii 2017 Haii 2017
Haii 2017
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
 
Final sw handbook 180514
Final sw handbook 180514Final sw handbook 180514
Final sw handbook 180514
 
Gujarat surface water
Gujarat surface waterGujarat surface water
Gujarat surface water
 
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEDESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
 
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
 Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
Download-manuals-hydrometeorology-data processing-13howtoreportonrainfalldata
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
 
Puducherry
Puducherry Puducherry
Puducherry
 

Mais de hydrologywebsite1

Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
hydrologywebsite1
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
hydrologywebsite1
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
hydrologywebsite1
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
hydrologywebsite1
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
hydrologywebsite1
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
hydrologywebsite1
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
hydrologywebsite1
 

Mais de hydrologywebsite1 (20)

Punjab 8.4.14 edt
Punjab 8.4.14 edtPunjab 8.4.14 edt
Punjab 8.4.14 edt
 
Pcs 070514
Pcs 070514Pcs 070514
Pcs 070514
 
Mp surface water
Mp surface waterMp surface water
Mp surface water
 
Maharashtra sw_ce_050514
Maharashtra  sw_ce_050514Maharashtra  sw_ce_050514
Maharashtra sw_ce_050514
 
Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Goa
GoaGoa
Goa
 
Cwprs
CwprsCwprs
Cwprs
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Bbmb
BbmbBbmb
Bbmb
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

Andhra pradesh surface water

  • 1. Review of Hydrology Project (Andhra Pradesh Surface Water) World Bank's Final Supervision and Completion mission 7 to 8 May 2014
  • 2. Hydrology Project - APSW Brief Introduction Implementation Agency :Irrigation & CAD Dept, Govt. of A.P. Date of Loan Agreement(Loan No. 4749-IN) :19/01/2006 Date of Commencement :05/04/2006 Loan Closing Date :31/05/2014 Project Cost : Rs.700.32 Lakhs (at the time of commencement ) Revised Project Cost :Rs 892.08 Lakhs(As per RCT-2013) Lender Share :78% State Share :22% Name of the Agency : Andhra Pradesh Surface Water Component Web Site Address : hp-apsw-cgg.gov.in
  • 3. Financial Targets & Achievements Transaction Amount INR ( in Crores) Cumulative Claims made up to March -2014 4.1366 Cumulative Reimbursement received up to March -2014 4.0558 KEY POINTS World bank communicated Aide memoire vide E-mail dt.18.11.2013 advised to drop RTTS activity In Crores
  • 4. Physical Achievements  Procured and created the environment with DSS planning Server -1, DSS Web Publishing Server-1, DSS Work station -2 with LAN and internet connectivity.  Civil works executed for 25 ARGs/SRGs and 4 F.C stations for data collection network through Local Shopping in Hydrology Project Phase-II.  Procured 36nos computers, 7 Laptops and peripherals under up gradation of IT infrastructure.  Procured GIS and Image processing software.  Procured 5 LCD projectors and information Brochures got printed.  Website for HP was developed.  The Hydrology data is being disseminated to the users on demand.  Out of Four Reservoirs Hydrographic Survey for 1 project was completed and report was submitted The remaining three Projects Hydrographic Survey work was completed and reports are under preparation and the reports will be submitted before closure of HP-II i.e.31-05-2014.
  • 5. Institutional Strengthening Trainings & Competency Building Category of Training Program No Of Training Programs Domain 8 Procurement Procedures 6 Software / GIS 12 Study Tour 2 Grand Total 28 In House Training Programs Category of Training Program No Of Training Programs Domain 63 Procurement Procedures 2 Soft skills 1 Software / GIS 34 Grand Total 100 External Training Programs KEY POINTS  Officers Trained – 474
  • 6. Institutional Strengthening Network Stations Station Type HP - I HP -II Total Stations AWLR 8 0 8 DWLR 32 0 32 GD Station 77 0 77 ARG & SRG 80 25 105 Upgraded SRG 203 0 203 FCS 8 4 12
  • 7. Institutional Strengthening Awareness Raising & Knowledge Sharing  Developed HP Website & procured books related to HP  Procured Infrastructure for trainings like LCD projectors, Audio systems etc  Printed 1400 brochures and necessary training material for circulation  Conducted 7 State level HDUG Meetings & 21 District level HDUG meeting  Conducted 23 Awareness Raising Work shops
  • 8. Data Dissemination The data pertaining to Hydrology, Hydro-meteorological and Climatic station is available from July 1999 to January 2014 in Hydrology Project circle Data storage center. After implementation of pricing structure (in 2007) the data Disseminated to various government, N.G.O. and private organization covering university scholars and P.G. Students, Irrigation, A.P Genco, WAPCOS and other private organizations for utilization for different purposes (Irrigation/Industry/consultancy). The total number of purchasers till date are 170nos and the amount collected so far is Rs.1,36,794/- Application of HIS Data
  • 9. Vertical Extension Purpose Driven Studies  Reservoir sedimentation studies are identified under PDS  Rs.60.50 lakhs allotted for Reservoir Sedimentation Studies of four reservoirs i.e Jurala, SRSP, Kadam and Nizam sagar.  Hydro graphic survey of Priyadarshini Jurala project was completed and report submitted  Other reservoirs Hydro graphic survey completed and report preparation is being under progress Key Observations:- Priyadarshini Jurala Project constructed across the river Krisha Storage capacity of project is 338.10 M.cum (11.94 TMC) The first survey was conducted during the Mar-Apr 2012 Capacity of reservoir found is 273.440 M.Cum (9.657 TMC) at FRL +318.516 m Loss in capacity is 19.125% The rate of sedimentation was worked out to 0.49 Ha.m/100Sq.Km/year It is observed that % loss in capacity is in the order of high Suggestions made :- Take catchment area treatment as per guidelines Construct check dams and plantation to arrest soil erosion Conduct Hydrographic surveys at least once in 5Years when it attains FRL KEY POINTS Hydrographic Survey for SRSP, Kadam and Nizam Sagar completed and report preparation under progress
  • 10. Vertical Extension Decision Support System (P) Development of Software model for Decision Support system planning (DSS- P) is one of the components of Hydrology Project Phase-II. Middle Godavari Basin(G-5), Sriram Sagar Project (SRSP) System was selected for model development. The following scenarios tested A.Crop selection and corresponding water requirements: This scenario tested for multiple cropping pattern in command area. Different combinations of crops are selected for optimum utilization of "available water level" in the reservoir during 1st October to 1st June. to assess the deficit of water under various cropping patterns. B. Providing Water for all sectors based on Increasing Demands: Effective allotment of water for various sectors (Drinking , Irrigation and industry ) based on Increased demands has been tested to analyze the impact of increased demands of a particular sector on the remaining sectors C. Combined Management of reservoirs and Water Transfers: Integrated reservoir operation model setup completed and working on various possible test cases and results are yet to be analyzed. D. Balancing Head-end and tail-end abstraction along irrigation canal: Conjunctive use of water has been tested in this scenario. Distributory-83(D-83) of SRSP catchment is selected as part of pilot study. Extending the scenario for more area in association with Ground Water
  • 11. Post Project Plan HP-II Continuation of HP-II Activities  Post Project Training for updating Knowledge.  Operation and maintenance of the network stations, Water Quality lab equipment, Hydrometry and Hydrometeorology equipment, Computers etc.,  Awareness raising by conducting HDUG meetings.  Publication of Meta data year book and monthly bulletins like Aquadat.  Dissemination of data to users on demand.  Completing left over activities of DSS(P) pilot study and blending with Decision making and Awareness raising.  Dissemination of PDS results.  Application of HDA software's as per necessity after receipt of the same.
  • 12. Moving Towards HP-III Exploring the possibility of Hydrology Project - III  Different applications under different river basins/projects can be taken up using DSS(P)  Scale up applications from Hydrology to water resources  Carry out the information to applications from data related to Water resources and Hydrology  Upgrading of existing Hydro meteorological network to Real time data acquisition system  Data processing reservoir management, flood management can be done by real time monitoring (RTDSS)  The reservoir sedimentation studies of Nagarjun Sagar project and Srisailam project can be taken up under HP-III through APERL / APSRAC  Introduction of E-Swiss in Andhra Pradesh  Application of Hydrological design Aids developed by CWC (Consultant CES) in Andhra Pradesh water resources sector
  • 13. AP Reorganisation Act (2014) Appointed Day 2 June 2014. KEY POINTS Request for IT Infrastructure Assets Description Purpose Existing Number s Approxi mate Cost (in INR) Proposals Software - DSS Software provided by DHI along with dongle DSS (P) 1 Need to procure the same for Andhra Pradesh (1 Nos) Computers - Servers and systems along with LAN connection, Racks, routers and UPS etc 1 set 25-30 Lakhs Need to procure the same for Andhra Pradesh (1 Set) Laptop 1 0.75 Lakhs Need to procure the same for Andhra Pradesh (1 Nos) Infrastructure – DSS room setup 1 Room + 1 Server Room 3 Lakhs Need to procure the same for Andhra Pradesh Computers - Data Backup Systems State Data Storage Center Nil 1.50 Lakhs Need to procure for both the states (2 Nos) Computers – Data Storage systems with SWDES 1 0.75 Lakhs Need to procure for Andhra Pradesh state (1 Nos) Computers Data Backup Systems Nil 1.50 Lakhs Need to procure for both the states (2 Nos)