WATER AND POWER DEVELOPMENT AUTHORITY
PRESENTATION FOR FIRST GENERAL MANAGERS / PDS
CONFERENCE
128 MW KEYAL KHWAR HPP
08TH FEB, 2023
INTRODUCTION TO PROJECT
Location: Project is located at right tributary of Indus, in Kohistan(L) KPK,
at a distance of 310 Km from Islamabad.
Cost: Project Cost (approved 2nd Rev. PC-I), is Rs. 26,084.178 M. 3rd Rev.
(Rs. 49,648.67 M) under process.
Salient Features:
Gross Head 732 m.
Plant Factor 38 %
Capacity 128 MW
Consultants: JV of Tractebel Engg. (former Lahmeyer), NDC & EASE-Pak.
Financer: KfW (Germany) Euro 97 Million (Intact)
AFD (France) Euro 120 Million (signed on 16.01.2023).
Timeline: Expected commencement of Civil Works Contract is Aug 2023.
Discharge 20 Cumecs
Mean Annual Energy 418 GWh
Construction Time 04 Years
PROJECT LAYOUT
PROJECT COMPONENTS
Concrete Gravity Dam
Power Conduit System
Headrace Tunnels and Shafts
Pressure Shaft
Main Access Tunnel
Underground Powerhouse
Mini Hydropower Station
132 KV Switch Yard
Interconnection to Grid.
Power Intake
 Desander
 Surge Tunnel
Pressure Tunnel
 Cable Ventilation Tunnel
 Tailrace System
 E&M Components
Computerized Control
System
ACHIEVEMENTS
Land: Required Land 940 Kanal & 06 Marla acquired at cost Rs. 568.9 M.
Flood 2022 completely washed-out some patches of existing access
road, which require acquisition of additional Land.
O&M Colony: WAPDA Colony at Pattan has almost been completed.
Financial Status: Loan agreement of Euro 120 Million has been signed
between EAD (GoP) & AFD (France) on 16.01.2023. Hence, the financial
close has been carried out.
Contract-01(Ventilation Tunnel): The Contract for Exploratory Adit was
completed in May 2014 at a cost of Rs.112.88 Million.
Expenditure: Rs. 4,509.11 Million have been spent till Dec 2022, on
account of land acquisition, Ventilation tunnel, O&M Colony,
Consultant’s fee, Supervisory charges & Admin expenditure.
PROJECT PROGRESS
(Overall Physical Progress 11 % & Financial Progress 18 %)
Civil & Hydraulic Steel Works Contract:
KfW issued NOL for Pre-Qualification (PQ) Evaluation on 23.09.2022.
Wapda Authority accorded approval for Qualified firms on 19.10.2022
Notification of pre-qualified companies issued to all applicants, and
published in GTAI and PPRA / WAPDA website.
Bidding Documents submitted to the lead sponsor M/s KfW on
16.12.2022, for review and issuance of NOL.
Electrical and Mechanical (E&M) EQUIPMENT Contract:
Project Consultants submitted Final Evaluation Report on 09.01.2023.
Pre-qualification Report submitted to KfW on 13.01.2023 for NOL.
Technical Challenges & Major Issues.
Termination of Civil Works Contract in Dec 2017, due to Contractor’s
non-performance (Retendering in process).
Financial gap of Euro 100 Million arose after expiry / exit of loan of
Euro 100 Million from EIB (Loan signed with AFD on 16.01.2023).
Revision of PC-I is envisaged due to inflation, devaluation of Pak Rs. &
escalation. {Energy Wing (Planning Commission) returned 3rd Rev. PC-I,
to resubmit it after getting Bid prices of Civil & E&M Contracts}.
Destruction of existing access road to Dam site due to Floods-2022,
requires update in the design of this road. (Topographic Survey Report
prepared by M/s SPATIO, funded by AFD, has been provided to KHC in
Jan 2023, for re-alignment/re-designing of the access road).
Colony and Damaged Road’s Pictures
Lessons Learnt and Recommendation
Land Acquisition: Land required for the Project (atleast the priority
areas) must be acquired prior to award of Contract to avoid delays.
Financial Closure: Financing of the Project must be secured in ICB
Contracts, prior to start of the Project.
PC-I: Project PC-I with accuracy of the Cost needs to be carried out to
avoid further revisions.
Local Contractor: For Joint Venture with International bidders, the
local contractor must be qualified, eligible and experienced in such
hydropower Projects.
Cooperation of related government departments for land acquisition,
Loan approval and other necessary matters is always required on
expedited pace to avoid unnecessary delays and future complications.
THANK YOU

Mais conteúdo relacionado

Semelhante a Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx

STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYShabaz Khan
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxsheikhInayat5
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review ReportRamuSekar4
 
Digital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment PlantDigital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment PlantStephen Au
 
Annexure - Projects
Annexure - ProjectsAnnexure - Projects
Annexure - ProjectsMohit Verma
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxMayankGandhi51
 
Jr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioJr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioMahmoud Abubkr
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxArshadMahmood155695
 
Government recognized new advance material for sustainable construction of ro...
Government recognized new advance material for sustainable construction of ro...Government recognized new advance material for sustainable construction of ro...
Government recognized new advance material for sustainable construction of ro...Jogani Reinforcement
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Exergy
 

Semelhante a Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx (20)

STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
PPT to BPC.pptx
PPT to BPC.pptxPPT to BPC.pptx
PPT to BPC.pptx
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
Performance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptxPerformance Audit of GBPWD.pptx
Performance Audit of GBPWD.pptx
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review Report
 
Digital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment PlantDigital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment Plant
 
Annexure - Projects
Annexure - ProjectsAnnexure - Projects
Annexure - Projects
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 
MCV
MCVMCV
MCV
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Review of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptxReview of PH-16 With CRB.pptx
Review of PH-16 With CRB.pptx
 
Jr. Civil Engineer Portfolio
Jr. Civil Engineer PortfolioJr. Civil Engineer Portfolio
Jr. Civil Engineer Portfolio
 
Draft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docxDraft Bid Evaluation Report-2.docx
Draft Bid Evaluation Report-2.docx
 
CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3CURRICULUM VITAE World Bank Format V3
CURRICULUM VITAE World Bank Format V3
 
Ashraf Suleiman.
Ashraf Suleiman.Ashraf Suleiman.
Ashraf Suleiman.
 
Government recognized new advance material for sustainable construction of ro...
Government recognized new advance material for sustainable construction of ro...Government recognized new advance material for sustainable construction of ro...
Government recognized new advance material for sustainable construction of ro...
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 

Último

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Último (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx

  • 1. WATER AND POWER DEVELOPMENT AUTHORITY PRESENTATION FOR FIRST GENERAL MANAGERS / PDS CONFERENCE 128 MW KEYAL KHWAR HPP 08TH FEB, 2023
  • 2. INTRODUCTION TO PROJECT Location: Project is located at right tributary of Indus, in Kohistan(L) KPK, at a distance of 310 Km from Islamabad. Cost: Project Cost (approved 2nd Rev. PC-I), is Rs. 26,084.178 M. 3rd Rev. (Rs. 49,648.67 M) under process. Salient Features: Gross Head 732 m. Plant Factor 38 % Capacity 128 MW Consultants: JV of Tractebel Engg. (former Lahmeyer), NDC & EASE-Pak. Financer: KfW (Germany) Euro 97 Million (Intact) AFD (France) Euro 120 Million (signed on 16.01.2023). Timeline: Expected commencement of Civil Works Contract is Aug 2023. Discharge 20 Cumecs Mean Annual Energy 418 GWh Construction Time 04 Years
  • 4. PROJECT COMPONENTS Concrete Gravity Dam Power Conduit System Headrace Tunnels and Shafts Pressure Shaft Main Access Tunnel Underground Powerhouse Mini Hydropower Station 132 KV Switch Yard Interconnection to Grid. Power Intake  Desander  Surge Tunnel Pressure Tunnel  Cable Ventilation Tunnel  Tailrace System  E&M Components Computerized Control System
  • 5. ACHIEVEMENTS Land: Required Land 940 Kanal & 06 Marla acquired at cost Rs. 568.9 M. Flood 2022 completely washed-out some patches of existing access road, which require acquisition of additional Land. O&M Colony: WAPDA Colony at Pattan has almost been completed. Financial Status: Loan agreement of Euro 120 Million has been signed between EAD (GoP) & AFD (France) on 16.01.2023. Hence, the financial close has been carried out. Contract-01(Ventilation Tunnel): The Contract for Exploratory Adit was completed in May 2014 at a cost of Rs.112.88 Million. Expenditure: Rs. 4,509.11 Million have been spent till Dec 2022, on account of land acquisition, Ventilation tunnel, O&M Colony, Consultant’s fee, Supervisory charges & Admin expenditure.
  • 6. PROJECT PROGRESS (Overall Physical Progress 11 % & Financial Progress 18 %) Civil & Hydraulic Steel Works Contract: KfW issued NOL for Pre-Qualification (PQ) Evaluation on 23.09.2022. Wapda Authority accorded approval for Qualified firms on 19.10.2022 Notification of pre-qualified companies issued to all applicants, and published in GTAI and PPRA / WAPDA website. Bidding Documents submitted to the lead sponsor M/s KfW on 16.12.2022, for review and issuance of NOL. Electrical and Mechanical (E&M) EQUIPMENT Contract: Project Consultants submitted Final Evaluation Report on 09.01.2023. Pre-qualification Report submitted to KfW on 13.01.2023 for NOL.
  • 7. Technical Challenges & Major Issues. Termination of Civil Works Contract in Dec 2017, due to Contractor’s non-performance (Retendering in process). Financial gap of Euro 100 Million arose after expiry / exit of loan of Euro 100 Million from EIB (Loan signed with AFD on 16.01.2023). Revision of PC-I is envisaged due to inflation, devaluation of Pak Rs. & escalation. {Energy Wing (Planning Commission) returned 3rd Rev. PC-I, to resubmit it after getting Bid prices of Civil & E&M Contracts}. Destruction of existing access road to Dam site due to Floods-2022, requires update in the design of this road. (Topographic Survey Report prepared by M/s SPATIO, funded by AFD, has been provided to KHC in Jan 2023, for re-alignment/re-designing of the access road).
  • 8. Colony and Damaged Road’s Pictures
  • 9. Lessons Learnt and Recommendation Land Acquisition: Land required for the Project (atleast the priority areas) must be acquired prior to award of Contract to avoid delays. Financial Closure: Financing of the Project must be secured in ICB Contracts, prior to start of the Project. PC-I: Project PC-I with accuracy of the Cost needs to be carried out to avoid further revisions. Local Contractor: For Joint Venture with International bidders, the local contractor must be qualified, eligible and experienced in such hydropower Projects. Cooperation of related government departments for land acquisition, Loan approval and other necessary matters is always required on expedited pace to avoid unnecessary delays and future complications.