SlideShare uma empresa Scribd logo
1 de 10
VIDHYADEEP INSTITUTE OF ENGINEERING
AND TECHNOLOGY
SUBJECT: Industrial Safety and Maintenance Engineering
TOPIC : Boiler Act, 1923
NAME: Patel Hiten P.
DEPARTMENT : Mechanical Engg.
GUIDE BY: Mr. Bipin.R.Godhani
INTRODUCTION
 Boiler act contain the law related to registration and inspection of
steam boiler.
 This Act may be called the Indian Boilers Act, 1923.
 It extends to the whole of India except the State of Jammu and
Kashmir.
 This act is applicable to all boiler (water tube and fire tube boilers).
 Section 2 defines various definitions related to boiler and its
accessories. Here, are some major definitions of the Act are as
following.
BOILER
 Boiler means any closed vessel exceeding 22.75 liters in capacity
which is used expressly for
generating steam under pressure
and includes any mounting or
other fitting attached to such
vessel, which is wholly or partly
under pressure when is shut off.
ACCIDENT
 "Accident" means an explosion of a boiler or steam-pipe or any
damage to a boiler or steam-pipe which is calculated to weaken the
strength therefore so as to render it liable to explode.
ECONOMIZER
"economizer" means any part of a feed-pipe that is wholly or
partially exposed to the action of flue gases for the purpose of recovery
of waste heat.
FEED PIPE AND STEAM PIPE
 "feed-pipe" means any pipe or connected fitting wholly or
partly under pressure through which feed water passes
directly to a boiler and which does not form an integral part.
 "steam-pipe" means any pipe through which steam passes
from a boiler to a prime mover or other user or both.
 Section 5 denotes the authority of state Government in order to
installation and inspection of boiler.
 Section 7 provides the rules regarding the registration of boiler for
utilization
• Every boiler must be resisted. If the boiler is not registered , than the
owner has to apply for the registration along with prescribed fees.
• After getting the application, the inspector fix the date, within 30 days
of receipt of the application.
• After that period, the certificate of boiler is required to be renewed.
 Section 11 provides the rules regarding the revocation certificate of
boiler:
• If the person in charge of boiler, does not hold competent certificate,
then the boiler cannot be used.
DUTIES OF PERSON IN-CHARGE
 To check whether all boilers are registered or not.
 To check all the boilers are according to the provision of the
act.
 To check boilers and its mounting and accessories periodically.
 Advise the owner regarding the maintenance and inspection of
boiler.
DUTIES OF CHIEF INSPECTION OFFICER
 Decide whether the certificate is to be given or not.
 Maintain the record of all the boiler.
 Supervise and control the work of officer in-charge.
Isme ( boiler act ,1923 )

Mais conteúdo relacionado

Mais procurados

Factories act, 1948 with related attachments
Factories act, 1948 with related attachmentsFactories act, 1948 with related attachments
Factories act, 1948 with related attachments
ACS Shalu Saraf
 
Factories act 1948.ppt
Factories act 1948.pptFactories act 1948.ppt
Factories act 1948.ppt
2459478
 
The factories act, 1948
The factories act, 1948The factories act, 1948
The factories act, 1948
Ranjeet Yadav
 
Gas cylinder rule_2004
Gas cylinder rule_2004Gas cylinder rule_2004
Gas cylinder rule_2004
GirishBarve
 
Employees compensation act 1923
Employees compensation act 1923Employees compensation act 1923
Employees compensation act 1923
DrPadma Nabhan
 
Boilers and Thermic Fluidheaters
Boilers and Thermic FluidheatersBoilers and Thermic Fluidheaters
Boilers and Thermic Fluidheaters
Musa Sabri
 

Mais procurados (20)

factories act 1948
factories act 1948factories act 1948
factories act 1948
 
Factories act, 1948 with related attachments
Factories act, 1948 with related attachmentsFactories act, 1948 with related attachments
Factories act, 1948 with related attachments
 
Factories act 1948
Factories act 1948Factories act 1948
Factories act 1948
 
Presentation on bocw act.
Presentation on bocw act.Presentation on bocw act.
Presentation on bocw act.
 
Factories act 1948
Factories act 1948Factories act 1948
Factories act 1948
 
Regulatory regime
Regulatory regimeRegulatory regime
Regulatory regime
 
Factories act, 1948
Factories act, 1948Factories act, 1948
Factories act, 1948
 
Factories act-1948
Factories act-1948Factories act-1948
Factories act-1948
 
Dock workers
Dock workersDock workers
Dock workers
 
Factories act 1948.ppt
Factories act 1948.pptFactories act 1948.ppt
Factories act 1948.ppt
 
The factories act, 1948
The factories act, 1948The factories act, 1948
The factories act, 1948
 
Gas cylinder rule_2004
Gas cylinder rule_2004Gas cylinder rule_2004
Gas cylinder rule_2004
 
Smpv(u) rules 2016-18
Smpv(u) rules  2016-18Smpv(u) rules  2016-18
Smpv(u) rules 2016-18
 
Factory act 1948
Factory act 1948Factory act 1948
Factory act 1948
 
The factories act 1948
The factories act 1948 The factories act 1948
The factories act 1948
 
Occupational safety, health and working conditions code, 2020
Occupational safety, health and working conditions code, 2020Occupational safety, health and working conditions code, 2020
Occupational safety, health and working conditions code, 2020
 
Factories act, 1948
Factories act, 1948Factories act, 1948
Factories act, 1948
 
Employees compensation act 1923
Employees compensation act 1923Employees compensation act 1923
Employees compensation act 1923
 
Factory act(1948)
Factory act(1948)Factory act(1948)
Factory act(1948)
 
Boilers and Thermic Fluidheaters
Boilers and Thermic FluidheatersBoilers and Thermic Fluidheaters
Boilers and Thermic Fluidheaters
 

Semelhante a Isme ( boiler act ,1923 )

BR08 Proposed Section B - B
BR08 Proposed Section B - BBR08 Proposed Section B - B
BR08 Proposed Section B - B
sarah ralphs
 

Semelhante a Isme ( boiler act ,1923 ) (20)

Indian_Boiler_regulation_act_by_Hemant_Thakare.pptx
Indian_Boiler_regulation_act_by_Hemant_Thakare.pptxIndian_Boiler_regulation_act_by_Hemant_Thakare.pptx
Indian_Boiler_regulation_act_by_Hemant_Thakare.pptx
 
THERMAL ENGINEERING
THERMAL ENGINEERINGTHERMAL ENGINEERING
THERMAL ENGINEERING
 
Boiler operation engineers_rules_20111
Boiler operation engineers_rules_20111Boiler operation engineers_rules_20111
Boiler operation engineers_rules_20111
 
A guide for firetube boiler testes
A guide for firetube boiler   testesA guide for firetube boiler   testes
A guide for firetube boiler testes
 
Cheema
CheemaCheema
Cheema
 
EPCB 1Ton/h Coal Fired Steam Boiler Installation & Operation Instruction
EPCB 1Ton/h Coal Fired Steam Boiler Installation & Operation InstructionEPCB 1Ton/h Coal Fired Steam Boiler Installation & Operation Instruction
EPCB 1Ton/h Coal Fired Steam Boiler Installation & Operation Instruction
 
Applicability of IBR in a Process Plant Equipment.pdf
Applicability of IBR in a Process Plant Equipment.pdfApplicability of IBR in a Process Plant Equipment.pdf
Applicability of IBR in a Process Plant Equipment.pdf
 
Boiler condition survey
Boiler condition surveyBoiler condition survey
Boiler condition survey
 
Boiler water quality requirements abma
Boiler water quality requirements abmaBoiler water quality requirements abma
Boiler water quality requirements abma
 
NYC Apartment Management Checklist: Boiler/Burner Certification
NYC Apartment Management Checklist:  Boiler/Burner CertificationNYC Apartment Management Checklist:  Boiler/Burner Certification
NYC Apartment Management Checklist: Boiler/Burner Certification
 
Hand book onplumbing installation for building
Hand book onplumbing installation for buildingHand book onplumbing installation for building
Hand book onplumbing installation for building
 
Boiler | Boiler In Textile Industry | Overview Of Boiler
Boiler | Boiler In Textile Industry | Overview Of BoilerBoiler | Boiler In Textile Industry | Overview Of Boiler
Boiler | Boiler In Textile Industry | Overview Of Boiler
 
Amended rule in_boiler_1160
Amended rule in_boiler_1160Amended rule in_boiler_1160
Amended rule in_boiler_1160
 
Different Acts Used in Safety Management
Different Acts Used in Safety ManagementDifferent Acts Used in Safety Management
Different Acts Used in Safety Management
 
Api 650 & 653 questions closed book with answers
Api 650 & 653 questions closed book with answersApi 650 & 653 questions closed book with answers
Api 650 & 653 questions closed book with answers
 
DraftLPG12012018.pdf
DraftLPG12012018.pdfDraftLPG12012018.pdf
DraftLPG12012018.pdf
 
Standard Inspection Method
Standard Inspection Method Standard Inspection Method
Standard Inspection Method
 
Air Conditioning Inspections For Buildings Cibse Belfast
Air Conditioning Inspections For Buildings  Cibse BelfastAir Conditioning Inspections For Buildings  Cibse Belfast
Air Conditioning Inspections For Buildings Cibse Belfast
 
Insurance
InsuranceInsurance
Insurance
 
BR08 Proposed Section B - B
BR08 Proposed Section B - BBR08 Proposed Section B - B
BR08 Proposed Section B - B
 

Último

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Último (20)

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 

Isme ( boiler act ,1923 )

  • 1. VIDHYADEEP INSTITUTE OF ENGINEERING AND TECHNOLOGY SUBJECT: Industrial Safety and Maintenance Engineering TOPIC : Boiler Act, 1923 NAME: Patel Hiten P. DEPARTMENT : Mechanical Engg. GUIDE BY: Mr. Bipin.R.Godhani
  • 2. INTRODUCTION  Boiler act contain the law related to registration and inspection of steam boiler.  This Act may be called the Indian Boilers Act, 1923.  It extends to the whole of India except the State of Jammu and Kashmir.  This act is applicable to all boiler (water tube and fire tube boilers).  Section 2 defines various definitions related to boiler and its accessories. Here, are some major definitions of the Act are as following.
  • 3. BOILER  Boiler means any closed vessel exceeding 22.75 liters in capacity which is used expressly for generating steam under pressure and includes any mounting or other fitting attached to such vessel, which is wholly or partly under pressure when is shut off.
  • 4. ACCIDENT  "Accident" means an explosion of a boiler or steam-pipe or any damage to a boiler or steam-pipe which is calculated to weaken the strength therefore so as to render it liable to explode.
  • 5. ECONOMIZER "economizer" means any part of a feed-pipe that is wholly or partially exposed to the action of flue gases for the purpose of recovery of waste heat.
  • 6. FEED PIPE AND STEAM PIPE  "feed-pipe" means any pipe or connected fitting wholly or partly under pressure through which feed water passes directly to a boiler and which does not form an integral part.  "steam-pipe" means any pipe through which steam passes from a boiler to a prime mover or other user or both.
  • 7.  Section 5 denotes the authority of state Government in order to installation and inspection of boiler.  Section 7 provides the rules regarding the registration of boiler for utilization • Every boiler must be resisted. If the boiler is not registered , than the owner has to apply for the registration along with prescribed fees. • After getting the application, the inspector fix the date, within 30 days of receipt of the application. • After that period, the certificate of boiler is required to be renewed.  Section 11 provides the rules regarding the revocation certificate of boiler: • If the person in charge of boiler, does not hold competent certificate, then the boiler cannot be used.
  • 8. DUTIES OF PERSON IN-CHARGE  To check whether all boilers are registered or not.  To check all the boilers are according to the provision of the act.  To check boilers and its mounting and accessories periodically.  Advise the owner regarding the maintenance and inspection of boiler.
  • 9. DUTIES OF CHIEF INSPECTION OFFICER  Decide whether the certificate is to be given or not.  Maintain the record of all the boiler.  Supervise and control the work of officer in-charge.