RAPPORT ANNUEL 2008 
Sommaire
INTRODUCTION ....................................................................................................................................... 5 

1.          FICHE DU PROGRAMME .................................................................................................................. 6 

2.          DONNEES DE BASE .......................................................................................................................... 6 

3.          RAPPEL DES OBJECTIFS DU PROGRAMME A COURT TERME 2006 –2008 ....................................... 6 

4.          DESCRIPTION DU PROGRAMME ...................................................................................................... 7 

      Composante A : Appui institutionnel et renforcement des capacités ................................................ 7 

      Composante B : Réhabilitation et développement des infrastructures d’eau potable et 
      d’assainissement ................................................................................................................................. 8 

      Composante C : Gestion du programme ............................................................................................. 9 

5.          QUELQUES CHANGEMENTS INSTITUTIONNELS en 2008  .............................................................. 10 
                                                        .

6.          REALISATIONS 2008 ....................................................................................................................... 11 

      Composante A : Appui institutionnel et renforcement des capacités .............................................. 13 

            A1. : Appui institutionnel des institutions et agences nationales œuvrant dans le domaine de 
            l’eau et l’assainissement : ANDEA, DEPA, Direction de Promotion du Genre .............................. 13 

            A2. Activités IEC ............................................................................................................................. 13 

      Composante B : REHABILITATION ET DEVELOPPEMENT DES INFRASTRUCTURES ............................ 18 

      Composante C : Gestion du programme ........................................................................................... 22 

      Réunion du CCP ................................................................................................................................. 23 

      SITUATION FINANCIERE ............................................................................... Erreur ! Signet non défini. 

PERSPECTIVE 2009  ................................................................................................................................ 24 
                .

ANNEXES  ............................................................................................................................................... 25 
       .

      1.       LISTE DES FORAGES REALISES .................................................................................................... 25 

      2.       LISTE DES SITES DES GRANDS CENTRES ETUDIES ...................................................................... 27 

      3.       LISTE DES POINTS D’EAU A REHABILITES ETUDIES .................................................................... 28 

 

Rapport  Annuel 2008                                                                                                                                        2 
LISTE DES ABREVIATIONS 

   AAFC            Agent Administratif et Financier Central 
   AAFR            Agent Administratif et Financier Régional 
   AEP             Alimentation  en Eau Potable 
   AEPA            Alimentation en Eau Potable et Assainissement 
   ALT             Andrew Lees Trust (Station Radio locale dans le Sud) 
   ANDEA           Autorité Nationale De l’Eau et de l’Assainissement 
   BAD             Banque Africaine de Développement 
   BEN             Bénéficiaire 
   BLU             Bande Latérale Unique 
   BOA             Bank Of Africa 
   CCP             Comité Consultatif de Pilotage 
   CDE             Contrôle des Dépenses Engagées 
   CDMT            Cadre des Dépenses à Moyen Terme 
   CEP             Cellule d’Exécution du Programme  
   CPE             Comité de point d’eau 
   CFN             Consultation des Fournisseurs à échelon National 
   CNM             Commission Nationale des Marchés 
   CV              Curriculum Vitae 
   DAO             Dossier d’Appel d’Offres 
   DAOI            Dossier d’Appel d’Offres International 
   DEPA            Direction de l’Eau Potable et de l’Assainissement 
   DIRP            Direction Inter Régionale de la Population 
                   Direction Régionale de Santé pour la Planification Familiale et Protection 
   DRSPFPS 
                   Sociale 
   ECAR            Eglise Catholique Apostolique Romaine 
   FAD             Fonds Africain de Développement 
   UNFPA           Fons des Nations Unies pour la Population 
   GVT             Gouvernement 
   IEC             Information Education Communication  
                   Information, Education, Communication/Communication pour le Changement 
   IEC/CCC 
                   de Comportement 
   MAEP            Ministère de l’Agriculture, de l’Elevage et de la Pêche 
   MEM             Ministère de l’Energie et des Mines 
   MJ/DE           Ministère de la Justice /Direction des Etudes  
   OCB             Organisation Communautaire de Base 
   OMD             Objectif du Millénaire pour le Développement 
   ONG             Organisation Non Gouvernementale 
   ONE             Office National de l’Environnement 
   PAEAR           Programme d’Alimentation en Eau Potable et Assainissement en milieu Rural  
   PANAGED         Plan National Genre et Développement 
   PGSE            Planification, Gestion, Suivi et Evaluation 
   PRMP            Personne Responsable des Marchés Publics 

Rapport  Annuel 2008                                                                             3 
PTA             Programme de Travail Annuel 
   PTT             Programme de Travail Trimestriel 
   TDR             Termes de référence 
   UC              Unité de Compte 
   UNDB            United Nations Development Business 
   UNICEF          Fonds des Nations Unies Pour l’Enfance 




Rapport  Annuel 2008                                         4 
INTRODUCTION 
 


                                          Le  démarrage  effectif  du  programme  PAEAR  date  de  mai 
                                       2006.  Ce  démarrage,  conduit  par  une  première  équipe  de 
                                       Cellule  d’Exécution  du  Programme  (CEP)  s’étendant  jusqu’au 
                                       mois de novembre 2006, a surtout été marqué par la mise en 
                                       place  et  l’organisation  du  Programme  suivant  le  rapport 
                                       d’évaluation  ainsi  que  la  mise  en  place  administrative  suivant 
                                       les  conditionnalités  de  l’Accord  de  prêt,  notamment 
                                       l’ouverture  de  compte.  Une  deuxième  équipe  de  CEP  était 
                                       fonctionnelle  pendant  le  premier  semestre  de  l’année  2007. 
Cette équipe a réalisé des formations et une familiarisation avec les procédures de la BAD, elle s’est 
chargée  également  de  la  préparation  de  la  procédure  de  lancement  d’appel  d’offres  en  vue  de 
l’acquisition des matériels, des mobiliers et des équipements du Programme.  

A partir du mois de juin 2007, une troisième équipe de la CEP a été mise en place et opérationnelle 
jusqu’à ce jour. Les activités du Programme pendant l’année 2007 ont été axées sur l’acquisition des 
Biens, achevée à 100% et les procédures de passation des marchés pour les services et les travaux. 

L’année  2008  est  surtout  consacrée  au  démarrage  des  prestations  de  services  relatives  aux  études 
techniques d’alimentation en eau potable ainsi que des travaux de forages. Considérant que 82% du 
budget du PAEAR est consacré aux travaux, il est logique qu’en cette phase de démarrage, le taux de 
décaissement est encore assez faible. 

S’ajoutent  à  ces  activités,  l’appui  institutionnel  de  l’ANDEA,  de  la  DEPA  et  de  la  Direction  de  la 
Promotion  du  Genre.  Par  ailleurs,  les  activités  IEC  menées  par  les  partenaires  du  Programme, 
notamment l’IEC radio par l’UNICEF et l’IEC Santé/Population par l’UNFPA ont connu un avancement 
considérable. En effet, l’acquisition des matériels pour renforcer les radios partenaires et les radios 
manivelles  pour  les  bénéficiaires,  la  formation  des  animateurs  radios,  la  convention  de  partenariat 
avec  les  radios  locales  sont  réalisées  à  100%.  De  même,  la  formation  des  pools  de  formateurs,  la 
formation  en  mobilisation  sociale  et  en  IEC/CCC  ainsi  qu’en  technique  de  communication  des 
DRSPFPS et des SDSPS jusqu’au niveau des formations sanitaires ont atteint leurs objectifs. De plus, 
malgré le retard du recrutement de l’ONG chargée des activités d’IEC, les membres de la CEP ont fait 
un effort pour réaliser l’identification des sites de forages pour que les travaux puissent démarrer à 
temps. 

L’année 2009 va être consacrée à l’exécution des travaux de forages et des systèmes d’alimentation 
en eau. 

 

 




Rapport  Annuel 2008                                                                                             5 
1. FICHE DU PROGRAMME 
 
PAYS  :   MADAGASCAR 
TITRE   : Programme d’Alimentation en Eau potable et d’Assainissement en milieu Rural (PAEAR) 
                      • Programme n° : P‐MG‐E‐00‐005 
                      • Crédit n° : 2100150011344 
LIEU D’INTERVENTION : 
8 (huit) Régions :          Diana – Sava – Sofia – Betsiboka – Melaky (dans la zone NORD) 
                           Atsimo Andrefana – Anosy ‐ Androy d’Antsiranana (dans la zone SUD) 
EMPRUNTEUR : Gouvernement malgache 
ORGANE D’EXECUTION : Cellule d’Exécution du Programme PAEAR  
                                Direction Générale du Ministère de l’Eau ‐ Ministère de l’Eau 
                                

2. DONNEES DE BASE 
 
COUT TOTAL :                                         60,00 millions d’UC 
FINANCEMENT DU GROUPE DE LA BANQUE :   51,00 millions d’UC 
AUTRES SOURCES DE FINANCEMENT : 
     •   Gouvernement Malgache :                     8,40 millions d’UC 
     •   Bénéficiaires :                             0,60 millions d’UC 
DATE D’APPROBATION :                                 Décembre 2005 
DATE DE DEMARRAGE ET DUREE :                         Mai 2006, pour 3 ans 
 
LE TAUX DE REPARTITION DE FINANCEMENT PAR CATEGORIES DE DEPENSES : 
 

             CATEGORIES DE DEPENSES                         FAD              GVT                 BEN 

    TRAVAUX                                            84,50%               14,29%           1,21% 

    BIENS                                              77,01%               22,99%               0% 

    SERVICES                                           93,79%               6,21%                0% 

    FONCTIONNEMENT                                     56,67%               43,33%               0% 
 

3. RAPPEL DES OBJECTIFS DU PROGRAMME A COURT TERME 2006 –2008 
L’objectif  sectoriel  du  programme  est  de  contribuer  à  l’amélioration  des  conditions  socio‐
économiques et sanitaires des populations rurales. 

Rapport  Annuel 2008                                                                                    6 
Le  programme  a  pour  objectif  spécifique  d’assurer  durablement  l’approvisionnement  des 
populations rurales en eau potable et en services d’assainissement. 

4. DESCRIPTION DU PROGRAMME 

Composante A : Appui institutionnel et renforcement des capacités
A1 : Appui institutionnel des institutions et agences nationales œuvrant dans le domaine de l’eau et 
l’assainissement  telles  que  la  DEPA,  ANDEA,  les  directions  régionales  du  Ministère  chargé  de  l’eau, 
Direction de la Promotion du Genre, l’unité de gestion du PANAGED 

A2 : Activités IEC 

    •   Des activités d’Information, Education et Communication (IEC) par des ONG expérimentées 

    •   L’UNFPA    travaille  avec  le  programme  pour  le  renforcement  des  capacités  des  régions  et 
        districts sanitaires à appuyer les centres de santé de base dans le suivi de la mise en œuvre 
        des activités d’IEC portant sur la santé et l’AEPA en milieu rural ; et l’encadrement des ONG 
        dans  la  mise  en  œuvre  d’activités  appropriées  d’IEC  axées  sur  la  santé  en  général,  l’eau  et 
        l’assainissement en particulier. 

    •   La convention avec l’UNICEF  fournit un appui technique aux radios locales partenaires dans 
        les huit régions d’intervention du Programme. 




Rapport  Annuel 2008                                                                                             7 
 

Composante B : Réhabilitation et développement des infrastructures d’eau potable et d’assainissement
         

         
                                                          LES DIFFERENTES ETAPES DES ACTIVITES 
                                                   DU PROGRAMME D’ALIMENTATION EN EAU POTABLE ET  
                                                      ASSAINISSEMENT EN MILIEU RURAL (PAEAR)
         

         
                           Information Education                     Animation et 
                                                                                                   Sensibilisation de 
                          Communication (IEC) et                    constitution des 

 
             1           identification des villages 
                                bénéficiaires 
                                                                   comités de points 
                                                                         d’eau 
                                                                                                       maintien 




 

                                                               2
                                                                        ETUDES               3
                                                                      TECHNIQUES 
 

                                                                                 
                                                                                                       TRAVAUX


Rapport  Annuel 2008                                                                    8 
Réhabilitation de 230 points d’eau existants, 
             Construction de 180 systèmes d’AEP dans les petites localités rurales, 
             Construction de 30 systèmes d’AEP dans les grands centres ruraux, 
             Réalisation de 1.000 forages avec pompes à motricité humaine et 250 autres équipés de 
             pompes à énergie solaire, 
             Construction du deuxième tronçon de 87km de  pipe line du Grand Sud, 
             Construction de 3.700 blocs sanitaires et 6.460 latrines. 
             Acquisition  et  installation  de  quatre  (04)  stations  éoliennes  pour  renforcer  la  capacité 
             énergétique du 1er tronçon de la pipe line du Grand Sud. 
             Etudes techniques complémentaires de l’AEP des Grands Centres Ruraux et des forages 
             avec pompes à motricité humaine ou équipés de pompes à énergie solaire  
             Elaboration de l’étude stratégique environnementale et du suivi environnemental :  
             Assistance technique et supervision des travaux. 
              

Composante C : Gestion du programme
 

             Réhabilitation des locaux de la DEPA à Antananarivo, à Antsiranana et  à Tuléar. 
             Acquisition  des  mobiliers,  des  équipements  de  communication,  des  matériels 
             informatiques et des fournitures de bureau, 
             Equipements hydrogéologiques et matériels de terrain ainsi que des moyens  roulants. 
             Formation des agents de la DEPA chargés de la gestion du programme, 
             Voyage de familiarisation des cadres de la DEPA au siège de la Banque, 
             Recrutement  d’un  cabinet  spécialisé  pour  l’audit  financier  pour  les  3  exercices  (2006  – 
             2007 – 2008) du Programme. 


Dans  le  cadre  de  la  mise  en  œuvre  du  Programme,  il  est  prévu  que  la  coordination  et  le  suivi  des 
activités seront assurés par un Comité Consultatif de Pilotage (CCP) formé par les membres du CCP 
du  projet  AEPA  dans  le  grand  sud  élargis  aux  représentants  des  administrations  des  régions 
concernées par le programme et un représentant de la Direction de la Promotion du Genre. Le CCP a 
pour objectif d’harmoniser les approches des différents acteurs et parties prenantes et d’assurer  le 
suivi des réalisations ainsi que l’évaluation à plus long terme des acquis du programme. 




Rapport  Annuel 2008                                                                                              9 
5. QUELQUES CHANGEMENTS INSTITUTIONNELS en 2008 
 

La Direction générale du genre et l’unité de gestion du PANAGED  de la Direction interrégionale de la 
population  sont  devenus  Direction  de  Promotion  du  genre  au  sein  du  Ministère  de  la  Santé,  du 
Planning Familial et de la Protection Sociale. 

Le Ministère chargé de l’Eau est le Ministère de l’Eau, le Programme PAEAR est directement rattaché 
à la Direction Générale  

 




Rapport  Annuel 2008                                                                                     10 
6. REALISATIONS 2008 
             CATEGORIES ET TITRES DES ACTIVITES                       TITULAIRE                      % DE REALISATION          CUMUL DE  % DE 
                                                                                                        avant 2008        REALISATION AU 31/12/2008 

    I‐   TRAVAUX 
Travaux de réhabilitation du local du programme PAEAR                   MIALY                               0%                      100% 
Travaux de réhabilitation du local  du programme à Antsiranana                                              0%
                                                                        ALSON                                                       50% 

Travaux de réhabilitation du local  du programme à Toliara                                                  0%
                                                                    FITARIKANDRO                                                    50% 

Travaux de 600 forages positifs équipés  de PMH dans la région                                              0% 
                                                                         CGC                                                        3,5% 
d'Androy, Anosy, Atsimo Andrefana 
Travaux de 300 forages positifs équipés de PMH dans la région                                               0%                      12% 
                                                                         CGC            
de Melaky, Betsiboka Sofia, Diana, Sava 
Travaux de 350 forages positifs dont 100 équipés de PMH et 250 
                                                                                                            0%                      10% 
pompes solaires dans la région de Melaky, Betsiboka, Sofia,          REVA FORAGE        
Diana, Sava 
Travaux de construction de 3700 blocs sanitaires                                                                                       
    II‐  BIENS 
Fournitures des matériels informatiques  Lot I                        ALPHATEK                             100%                     100% 
Fourniture et installation des équipements  de communication      LANDIS MADAGASCAR                        100%                     100% 

Fourniture des 20 motos tout terrain                                 HENRI FRAISE                          100%                     100% 

Fournitures des matériels de bureau                                     LUXOR                              100%                     100% 

Fournitures des matériels informatiques  Lot II                          CBL                               100%                     100% 

Fourniture des trois véhicules double cabine                         OCEAN TRADE                           100%                     100% 

Fourniture des trois véhicules station wagon                        AUTO DIFFUSION                         100%                     100% 

Fourniture des matériels  hydrogéologiques                             SOMECA                                                       100% 


Rapport  Annuel 2008                                                                       11 
 

          CATEGORIES ET TITRES DES ACTIVITES                     TITULAIRE       MONTANT HT          % DE REALISATION       % DE REALISATION AU 
                                                                                                        avant 2008               31/12/2008 

    I‐   SERVICE 
Audit de compte pour l'exercice 2ème trimestre 2006 et                                                      0% 
                                                                DELTA AUDIT                                                          100% 
2007 du PAEAR 
Etudes, contrôle et surveillance de30 système d'AEP grand     ANTEA/CNEAGR/                                                      Etude = 40% 
                                                                                                            0% 
centres; diagnostic230 points d'eau                               ACTION               
                                                              DEVELOPPEMENT                                                     Contrôle = 0% 

Etudes d'implantation  et supervision1250 forages; études                                                                 Etude d’implantation  = 20% 
et contrôle 180 AEPG                                         TECSULT/SGDM/TECM                              0% 
                                                                                                                           Contrôle de forage = 10% 
                                                                     AD 
                                                                                                                              Etude AEPG =  20% 
Etude stratégique environnementale du PAEAR                                                                 0%
                                                                    BRL                                                          Etude = 30% 

Suivi environnementale du PAEAR                                                                             0%
                                                                  BIODEV                                                         Etude = 10% 

Etudes des connaissances, Attitudes et Pratiques(CAP) et 
mise en œuvre des Activités d'IEC en matière d'eau 
                                                                                                                                        
potable, hygiène et assainissement, contrôle des travaux 
de construction des infrastructures d'assainissement 
 

 




Rapport  Annuel 2008                                                                           12 
Composante A : Appui institutionnel et renforcement des capacités

A1. : Appui institutionnel des institutions et agences nationales œuvrant dans le domaine de l’eau 
et l’assainissement : ANDEA, DEPA, Direction de Promotion du Genre 
Travaux 

     •    Travaux de réhabilitation des locaux de la Direction de la Promotion du Genre (DPG) :  

La DPG élabore les devis estimatifs pour la réhabilitation de ses locaux et le transmettra à la CEP afin 
de finaliser les dossiers d’appel d’offres y afférents. 

     •    Travaux de réhabilitation des locaux de l’ANDEA 

L’ANDEA  a  transmis  à  la  CEP  une  demande  relative  à  son  souhait  de  réhabiliter  les  locaux 
d’Antananarivo à la place de ceux des agences de bassin dans le nord et dans le sud. La CEP a sollicité 
l’avis  de  la  BAD  qui  lui  donne  le  pouvoir  de  décision.  Suite  à  la  restructuration  de  l’ANDEA,  la 
situation reste en stand by. 

Formation des agents 

36  %  des  cadres  de  l’ANDEA  sont  formés  dans  le  domaine  de  la  concertation  et  résolution  de  conflits 
dans  l'appui  aux  développements  et  la  gestion  des  ressources  en  eau,  et  visite  d'information  et  d'échange 
d'expérience auprès de l'Agence de Bassins TENSIFT MARAKECH MAROC  

 25  %  des  cadres  de  la  DEPA  sont  formés  dans  le  domaine  d’Audit  interne :  outil  de  performance  du 
secteur public  

70 % des cadres de la Direction de Promotion du genre sont formés dans le domaine de  programmes 
et  projets  de  lutte  contre  la  pauvreté,  outils  du  chef  de  projet  pour  améliorer  son  efficacité  et  l’état  et  les 
organisations paysannes. 

Fourniture de matériels informatiques, équipements techniques et trousseaux d’analyse chimique et 
bactériologique aux administrations concernées 

100% des biens et équipements prévus pour l’appui de l’ANDEA sont livrés : matériels informatiques, 
équipements techniques, équipement hydrogéologique. 

100%  des  mobiliers,  équipements  de  communication,  équipements  informatiques  prévus  pour 
l’appui de la DEPA sont livrés. 

A2. Activités IEC 
Recrutement de l’ONG chargée des activités CAP/IEC : 

La demande de propositions sur la base d’une liste restreinte approuvée par la BAD a été lancée le 01 
septembre  2008.  La  remise  des  propositions  a  été  prévue  en  date  du  16  octobre  2008  et  les 
procédures de passation des marchés sont en cours. 

Jusqu’à ce que l’ONG soit opérationnelle, les membres de la CEP PAEAR sont descendus sur le terrain 
pour  effectuer  les  prestations  d’IEC  en  vue  de  l’identification  des  sites  de  forages  afin  de  pouvoir 
démarrer les travaux de forages à temps.  



Rapport  Annuel 2008                                                                                                           13 
Ainsi, 360 sites sont identifiés dans les Régions Anosy,  Sofia,  Diana et  Sava. Pour les régions SAVA et 
DIANA, la CEP PAEAR a également mis en place une cinquantaine de Comités de Point d’Eau (CPE). 




                             
 Activités d’IEC réalisées par les membres de la CEP        Formation théorique des membres des CPE dans la 
                                                                                  
    dans la Commune de Tsivory, Région Anosy                     commune Antsahanoro, Région Sava 
                                                                                  




                                                                                    
                  Formation pratique des CPE dans la commune de Farahalana, Région Sava 
                  Formation pratique des CPE dans la commune de Farahalana, Région Sava 




                                                                                   
                   Formation pratique des CPE dans le village d’Antanandronono, la commune de 
                                                        
                         Farahalana, Région Sava par l’équipe de la CEP PAEAR et UNFPA 
                                                        



Rapport  Annuel 2008                                                                                     14 
IEC Santé et Population dans le cadre de la convention avec l’UNFPA 

Le  Projet  IEC/CCC  Santé  et  Population  PAEAR_UNFPA  a  terminé  la  stratégie  formation  pour  le 
renforcement de capacité des DRSPFPS et des SDSPS jusqu’au niveau des formations sanitaires.  

Les activités suivantes ont été entreprises : 

Activité  1:  Mise  en  place  d’une  équipe  au  sein  du  Bureau  régional  UNFPA    avec  les  matériels  et 
équipements nécessaires pour la réalisation des activités du Projet d’IEC/CCC en santé et population 
dans les huit régions.  

Activité 2 : Evaluation de la capacité des Direction Régionale de Santé, du Planning Familial et de la 
Protection Sociale (DRSPFPS) et des Services de District Sanitaire et de la Protection Sociale (SDSPS), 
en  matière  d’IEC  CCC  et  de    communication  de  proximité  dans  le  domaine  de  la  santé  et  de  la 
population jusqu’au niveau des CSB (Centres de Santé de Base). 

Activité 3 : Renforcement des capacités des SP‐UNFPA : 

Création  de  Pool  de  formateurs  /  encadreurs  en  matière  d’IEC/CCC  au  niveau  de  chaque  région  et 
district (8 régions et 40 Districts) : 167 agents formés, soit une réalisation à 100%. 

Formation en Mobilisation Sociale et en Technique d’IEC de proximité : 153 agents formés, soit une 
réalisation à 100% 

Formation  des  agents  de  Santé  en  technique  d’IEC  de  proximité :  850  agents  formés,  soit  une 
réalisation à 95%. 




                                                                                                                
                                                       
    Formation des formateurs à Maintirano dans la             Formation des formateurs à Amboasary Sud dans 
                                                                                      
                 région du MELAKY                                            la région d’ ANOSY 
 

 

 

 

 




Rapport  Annuel 2008                                                                                        15 
IEC Radios locales dans le cadre de la convention avec  l’UNICEF 

1. Renforcement des radios locales

• Validation des recommandations de l’étude technique réalisée par le cabinet ALT/ Globe Com en 
  vue d’identifier les radios existantes dans les zones d’intervention du PAEAR 

• Extension  de  la  zone  de  couverture  pour  10  stations  au  lieu  de  6  initialement  prévues  et 
  amélioration  de  la  qualité  de  production  par  acquisition  des  matériels  de  diffusion  et  de 
  production. La totalité des matériels prévus sont acquis comprenant :  

    -   05 unités centre de production (comportant chacun un studio de production, des matériels de
        duplication, d’impression)
    -   18 unités de studio de production (ordinateur, logiciel…)
    -   06 unités de studio de diffusion (ordinateur, logiciel …)
    -   10 unités d’émetteur complet de 500 watts (émetteur et antenne)
    -   04 unités d’émetteur seul de 500 watts
    -   50 unités de matériel de reportage (dictaphone)
    -   25 unités de kit de maintenance
    -   30 unités de lecteur CD
    -   08 unités de table de mixage 
    -   2000 radios manivelle 


• Renforcement de compétence des animateurs‐ producteurs radios et des écrivains 

Formation sur « l’élaboration et la production de pièce théâtrale radiophonique » et organisation de
l’audience :

Chaque station de Niveau 2 et Niveau 3, totalisant 29 stations pour les 8 régions, a reçu une
formation sur « l’élaboration de pièce théâtrale radiophonique : méthodologie et processus de
production ». Trois (03) vagues de formations sont tenues sur 03 sites (01 site à Antsiranana pour les
stations partenaires de DIANA et SAVA, 01 site à Antsohihy pour Sofia, Betsiboka , Melaky et 01 site
à Tuléar pour Anosy , Androy et Atsimo Andrefana.

La plupart des participants sont des DelCom (Délégué de la Communication) et des journalistes.
Toutes ces compétences serviront à la mise en œuvre des activités de communication de masse du
volet IEC radio PAEAR /UNICEF

Le volet IEC radio PAEAR a formé 150 animateurs / producteurs et 58 d’entre eux sont issus des
partenaires publics du niveau décentralisé de l’éducation, de la santé tels que des instituteurs et/ou
des employés de la santé.




                                                         Participants à la formation à Tuléar




Rapport  Annuel 2008                                                                                   16 
2. Partenariat avec les radios locales des 8 régions PAEAR

63 conventions de partenariat relatif à l’ « Echange de service » sont signées entre le volet IEC radio
PAEAR UNICEF et les radios locales. La convention s’étend jusqu’en fin 2011. En effet, le volet IEC
radio PAEAR dote les radios partenaires, de matériels de diffusion et de production, offre des
renforcements de compétence pour les animateurs /producteurs et en contre partie, les radios locales
produisent, diffusent et archivent les productions conçues dans le cadre du programme.

Les stations partenaires sont regroupés en 3 catégories dont :

    -    34 stations dans la catégorie Niveau 1 qui diffusera seulement les émissions
    -    24 stations dans la catégorie Niveau 2 qui devra produire et diffuser des émissions
    -    05 stations dans la catégorie Niveau 3            qui devra produire, diffuser et tenir une
         documentation sonore des émissions produites dans le cadre du projet .

Les premières émissions sont diffusées dans la zone Nord (Sava, Diana, Sofia, Betsiboka, Melaky) à
partir du mois de Décembre 2008. Pour la Zone Sud (Androy, Anosy, Atsimo Andrefana) les
émissions débuteront en Janvier 2009.

3. Mise en place des Groupes d’Ecoute

Les 2000 postes radios à manivelle sont acquis et sont dans l’entrepôt en attendant la mise en place
de la collaboration avec les OCB qui vont assurer la mise en œuvre du volet communautaire du projet
à travers les groupes d’écoute.




                                           Les postes radios acquises par le
                                                        PAEAR


Collaboration avec les OCB
 
Initialement  32  OCB  (4  par  régions)  devront  être  recrutées,  formées  pour  assurer  le  prolongement  
communautaire  de  l’approche  (Mise  en  place  et  encadrement  de  Groupes  d’écoutes,  réception, 
distribution  et  suivi  de  l’utilisation  des  matériels  d’écoute).  Par  suite  de  la  diminution  des  postes 
radios à manivelle, l’UNICEF a proposé une initiation de nouveaux groupes d’écoute à partir des 2000 
nouveaux postes  et une redynamisation des groupes d’écoute existants  dans chaque région. 

Identification des OCB pour mettre en œuvre les activités de Groupes d’écoute  
 
47  OCB  et/ou  ONG  sont  évalués.  Certaines  de  ces  OCB  et  ONG    deviendraient  les  partenaires  du 
Projet IEC RADIO PAEAR dans la mise en œuvre de l’organisation de l’audience, à l’issue de l’examen 
de leur offre technique et financière respective.  



Rapport  Annuel 2008                                                                                            17 
Composante B : REHABILITATION ET DEVELOPPEMENT DES
              INFRASTRUCTURES
 

        TRAVAUX  
TRAVAUX DE 1250 FORAGES 

Les travaux sont repartis en trois lots : un lot 350 forages, et un lot de 300 forages dans le nord et un 
autre lot de 600 forages dans le Sud.  Le lot de  350 forages est confié à REVA FORAGE et les deux 
autres lots sont confiés à l’Entreprise Chinoise CHINA GEO ENGINNERRING CORPORATION – CGC. 

Le  31  juillet  2008,  dans  la  région  de  la  SAVA,  localité  d’Ambia,  CR  de  Farahalana  dans  le 
district  de  Sambava  a  eu  lieu    le  lancement  officiel  des  travaux  de  1250  forages.  Cette 
localité fait partie du lot des 300 forages. 

 

 

 

 

 

 
                                    Lancement des travaux de forages dans 
                                                  
                                             la Région de SAVA                                                        
 

                                              Ci‐après la situation de chaque lot 

                                              1.   300 FORAGES DANS LE NORD
                                               
                                                   •       Lancement  travaux  :  le  31  juillet  2008  dans  la 
                                                           région de SAVA 
                                                   •       Situation actuel des travaux 
                                              59 forages effectués dont 44 positifs et 9 équipés, soit 
                                              un avancement de 12%.  

                                              Les travaux de forage ont arrêté depuis le 10 décembre à 
Forage équipé de PMH dans le village 
                                            cause de la période des pluies. Les travaux de l’entreprise 
   Antanandronono, Région SAVA              sont  actuellement  consacrés  à  la  construction  des 
                                            margelles et des aires d’assainissement et l’installation des 
pompes. 

Les pompes destinées aux 300 forages sont déjà livrées et sont prêts à la pose.  




Rapport  Annuel 2008                                                                                          18 
 

2.   350 FORAGES DANS LE NORD

     • Lancement des travaux du lot de 350 forages : 

Le 26 septembre 2008, a eu lieu à Antsohihy le lancement officiel des travaux de 350 forages pour les  
régions du Nord. C’est ainsi la date de démarrage des travaux pour ce lot de forages. 

 

 

 

 

 

  

 

                                                           

          Lancement des travaux de forages à               
               Antsohihy, Région SOFIA                                                                                  
                                                           

     • Situation actuelle des travaux 

A la fin de l’année 2008, 33 forages  dont 26 positifs sont réalisés et sont entrain d’être équipés de 
pompes, ce qui représente un avancement de 10%. 

Avec les 5 ateliers de forage de l’entreprise qui seront fonctionnels dès le début de cette année, on 
envisage de pouvoir respecter le délai d’exécution qui est prévu à 18 mois 

3.    600 FORAGES DANS LE SUD

     • Lancement des  travaux du lot de 600 forages : 

Le  lancement  officiel  des  travaux  a  eu  lieu  le  05  octobre  2008  dans  la  région  d’ANOSY,  localité  de 
Soaserana, commune rurale de Tsivory, District Amboasary Atsimo  

 

 

 

 

 


                              Lancement des travaux de forages dans le 
                                                                                                                 19 
Rapport  Annuel 2008  
                                village de Soaserana, Région ANOSY 
• Situation actuelle des travaux 

33 forages ont été réalisés dans le Sud dont  22 positifs, soit un avancement de 3,5%. Les travaux de 
foration ont été arrêtés depuis le 10 décembre dernier à cause de la période des pluies.  

4  ateliers  de  forages  seront  opérationnels  dès  la  reprise  de  chantier  pour  respecter  le  délai 
d’exécution. 

TRAVAUX DE CONSTRUCTION DE 3700 BLOCS SANITAIRES 

Conformément  aux  recommandations  de  la  mission  de  supervision  de  la  BAD  en  date  18  février 
2008,  les  travaux  de  construction  des  3700  blocs  sanitaires  repartis  en  6  lots  sont  confiés  à  des 
entreprises de travaux. 

L’appel  d’offres  international  a  été  lancé  le  29  septembre  2008  pour  être  remises  le  01  décembre 
2008.  Les  procédures  de  passation  des  marchés  sont  activées  et  les  travaux  commenceront  cette 
année 2009. 

PIPELINE DU GRAND SUD 

Suite à la mission de supervision du 18 au 29 février 2008, l’option initialement prévu consistant au 
prolongement du 1er tronçon de pipeline, la réalisation du 2ème tronçon a été abandonnée du fait que 
le 1er tronçon n’est même pas fonctionnel et que le débit de la ressource n’est pas suffisante la ville 
d’Ambovombe. 

La CEP a chargé le Groupement ANTEA / CNEAGR / ACTION et DEVELOPPEMENT, titulaire du marché 
des  études  techniques  du  lot  1  pour  effectuer  une  étude  approfondie  de  l’alimentation  en  eau  de 
l’extrême  sud.  Il  en  résulte  que  les  ressources  identifiées  par  les  japonais  n’est  pas  suffisante  pour 
alimenter la ville d’Ambovombe. 

Ainsi,  La  CEP  proposera  une  autre  alternative  pour  l’alimentation  en  eau  potable  de  la  ville 
d’Ambovombe  et  ses  communes  environnantes.  Cette  proposition  dépendra  surtout  des  résultats 
d’études effectuées par le groupement lors de la présentation du rapport d’APD. 

 

         BIENS 
ACQUISITION ET INSTALLATION DE 4 STATIONS EOLIENNES

Faisant  suite  à  la  décision  prise  concernant  le  pipeline  écartant  la  réalisation  du  2ème  tronçon,  la 
tenue ou non de l’acquisition des stations éoliennes dépendra de l’étude technique effectuée par le 
groupement ANTEA / CNEAGR / ACTION et DEVELOPPEMENT  




Rapport  Annuel 2008                                                                                              20 
SERVICES 
La phase de recrutement de consultants pour effectuer les tâches prévues pour le volet « services » 
est  effectuée  à  100%  et  les  consultants  sélectionnés  sont  à  pied  d’œuvre  pour  d’accomplir  leur 
engagement au programme PAEAR et réaliser à temps et dans les normes leurs prestations. 

ETUDES TECHNIQUES D’AEP 

    • Situation  de  l’avancement  du  LOT  1 : « Etudes  et  contrôle  des  travaux  pour  l’AEP 
      des 30 grands centres et la réhabilitation de 230 points d’eau » 

Le  lot  1  a  été  attribué  au  groupement  ANTEA  /  CNEAGR  /  ACTION  ET  DEVELOPPEMENT.  Leurs 
prestations ont commencé en octobre 2008. Leur situation d’avancement se présente comme suit :  

                 30 Grands Centres 

Fin de l’année 2008, les  études d’avant projet sommaire (APS) des 14 centres ont été validés par la 
CEP,  soit  un  avancement  de  46%.  Le  lancement  des  travaux  est  prévu  pour  le  début  du  mois  de 
février 2009 après la validation des APD.  

                 230 Points D’eau 

L’étude de 48 localités sur les 164 prévus est réalisée, soit un avancement de 30%. 
Les travaux vont être lancés le plus rapidement possible dès la réception des APD des sites étudiés. 
La liste des sites étudiés sont portés en annexe. 

    • Situation  de  l’avancement  du  LOT  2 :  « études  d’implantation  et  supervision  des 
      travaux  de  1250  forages  et  études  et  contrôle  des  travaux  d’adduction  d’eau 
      potable gravitaire de 180 petits centres ». 

Le  lot  2  quant  à  lui,  est  attribué  au  Groupement  TECSULT  /  TECMAD  /  SGDM  qui  est  notifié  le  21 
octobre 2008. Initialement, la durée de leur contrat était de 24 mois, mais comme le Programme se 
doit  de  réaliser  toutes  les  activités  prévues  avant  Juillet  2010,  alors,  le  groupement  sera  dans 
l’obligation de revoir son planning et tous ses moyens. 

                 1250 forages 

A  la  date  de  22  décembre  2008,  le  consultant  a  effectué  306  implantations  dans  les  8  régions 
d’intervention du PAEAR et pour les trois lots de travaux de forage, soit un avancement de 16%. 

                 180 petits centres 

Pour ce volet, le consultant a déjà effectué les études sur terrain de 44 localités sur les 180 prévus ; 
soit 24% par rapport à l’objectif en vue de finaliser les études d’avant projet sommaire. Le lancement 
des appels d’offres pour les travaux vont se réaliser en 2009. 

 

 



Rapport  Annuel 2008                                                                                          21 
ELABORATION DE L’ETUDE STRATEGIQUE ENVIRONNEMENTALE 

Le  groupement  BRL  Ingénierie/BRL  Madagascar,  adjudicataire  du  marché  est  notifié  le  03  octobre 
2008.  

Conformément au contrat, les prestations ont commencé et le rapport provisoire de la phase 1 de 
l’étude est remis au Programme le 16 décembre 2008 pour approbation. 

SUIVI ENVIRONNEMENTAL  

Le marché est attribué au cabinet d’études BIODEV Madagascar Consulting. Le Titulaire est notifié le 
11 décembre 2008 pour démarrer les prestations.  

Selon  le  calendrier  de  remise  de  rapport,  le  titulaire  a  remis  le  document  de  suivi  provisoire  le  29 
décembre 2008 pour approbation. 

 
Composante C : Gestion du programme
 

TRAVAUX  
    Attribuée à l’Entreprise « MIALY » en date du 10/01/2008 
         •    Travaux réalisés à 100% 
         •    Situation actuelle : en attente de la réception définitive   
    Réhabilitation des locaux de la DEPA à Antsiranana 
         •    Attribuée à l’Entreprise « ALSON » en date du 04/12/2008 
         •    Avancement des travaux à 50%.  
    Réhabilitation des locaux de la DEPA à Tuléar 
         •    Attribuée à l’Entreprise « FITARIKANDRO » en date du 08/12/2008 
         •    Avancement des travaux à 50%.  

BIENS 
Acquisition des mobiliers réalisée en 2007 

SERVICES 
    •    Formation des agents de la CEP chargés de la gestion du Programme 
75% des agents de la CEP ont été formés dans le domaine du suivi‐évaluation, passation des 
marchés, comptabilité de projet. 
    •    Recrutement d’un cabinet d’audit financier du programme pendant les 3 exercices concernés 

Pour l’audit de l’exercice 2008 et de l’exercice 2009, il a été convenu de retenir la liste restreinte des 
cabinets pour l’exercice précédente. Actuellement la CEP est en attente de leur confirmation pour la 
participation à la consultation. 



Rapport  Annuel 2008                                                                                              22 
Réunion du CCP
La première réunion du CCP a eu lieu à Mahajanga le 15 février 2008. Cette réunion a eu pour 
objectif le rapport d’activités de l’année 2007 et la validation du PTA de l’année 2008 du programme 
PAEAR et ceux du projet AEPA dans le Grand Sud. 

Après la présentation des deux programmes, il y a eu des questions/réponses qui ont pu apporter 
des éclaircissements aux membres du CCP. Des remarques, recommandations et souhaits du CCP ont 
également été adressées aux deux programmes respectifs. Quelques éléments de réponses ont été 
apportés par les programmes qui ont pris bonne note. 

 




                                                                                                          

 

                           Réunion du CCP le 15 février 2008 à Mahajanga 




Rapport  Annuel 2008                                                                               23 
 


PERSPECTIVE 2009 
 

La  CEP  PAEAR  a  établi  un  plan  d’action  accélérée  afin  de  terminer  le  Programme    dans  le  délai 
imparti. Ainsi, au fur et à mesure de l’achèvement des études techniques, les travaux seront lancés ;  
tous  les  travaux  de  système  d’alimentation  en  eau,  les  travaux  de  forages  et  les  travaux  de 
construction de blocs sanitaires et latrines vont être entrepris pendant l’année 2009 et s’étendraient 
jusqu’en juin 2010. 




Rapport  Annuel 2008                                                                                       24 
ANNEXES 

    1. LISTE DES FORAGES REALISES 
       RÉGION               DISTRICT        COMMUNE                  VILLAGE
    SAVA                 Sambava       Farahalana          Ambia
    SAVA                 Sambava       Farahalana          Ambia
    SAVA                 Sambava       Farahalana          Ambia
    SAVA                 Sambava       Farahalana          Ambia
    SAVA                 Sambava       Farahalana          Ambodi-pont
    SAVA                 Sambava       Farahalana          Antanandronono
    SAVA                 Sambava       Farahalana          Antanandronono
    SAVA                 Antalaha      Antalaha            Antsahanoro
    SAVA                 Antalaha      Antalaha            Antsahanoro
    SAVA                 Antalaha      Antalaha            Antsahanoro
    SAVA                 Antalaha      Antalaha            Antsahanoro
    SAVA                 Antalaha      Antanmbao-Ampano    Antanambao-Ampano
    SAVA                 Antalaha      Antanmbao-Ampano    Antanambao-ampano
    SAVA                 Antalaha      Antanambao-Ampano   Andritika
    SAVA                 Antalaha      Antampolo           Antampolo
    SAVA                 Antalaha      Antampolo           Antampolo
    SAVA                 Antalaha      Antampolo           Antampolo
    SAVA                 Antalaha      Antampolo           Antampolo
    SAVA                 Antalaha      Antampolo           Antampolo
    SAVA                 Antalaha      Ampahana            Ampombobe
    SAVA                 Antalaha      Ampahana            Andranotsara
    SAVA                 Antalaha      Ampahana            Andranotsara
    SAVA                 Sambava       ambinanifaho        Antambaovao
    SAVA                 Antalaha      Antsahanoro         Androranga
    SAVA                 Antalaha      Antsahanoro         Androranga
    SAVA                 Antalaha      Antalaha            Anjiamangotraka
    SAVA                 Andapa        Analambe            Analanambe
    SAVA                 Andapa        Analambe            Analanambe
    SAVA                 Andapa        Bealampona          Andratamarina
    SAVA                 Andapa        Bealampona          Andratamarina
    SAVA                 Andapa        Bealampona          Andratamarina
    SAVA                 Andapa        Anjavibe            Anjavibe
    SAVA                 Andapa        Anjavibe            Anjavibe
    SAVA                 Andapa        Anjavibe            Anjavibe
    SAVA                 Andapa        Tanandava           Andapankova
    SAVA                 Andapa        Ambodimanga I       Antsahanongo
    SAVA                 Vohemar       Ampondra            Ampondra
    SAVA                 Vohemar       Ampondra            Ampondra
    SAVA                 Vohemar       Ampondra            Antsahambovo
    SAVA                 Vohemar       Nosy be             Mahasoa
    SAVA                 Vohemar       Nosy be             Morafeno est
    SAVA                 Vohemar       Nosy be             Bobatsirevo
    SAVA                 Vohemar       Nosy be             Mafokovo
    SAVA                 Vohemar       Madirobe            Madirobe
    SAVA                 Vohemar       Nosy be             Morafeno oest
    SAVA                 Vohemar       Nosy be             Morafeno oest




Rapport  Annuel 2008                                                           25 
 

       RÉGION                DISTRICT         COMMUNE                VILLAGE
    SOFIA                 Antsohihy      Ampandrakilandy   Ankazobetsiahy
    SOFIA                 Antsohihy      Ampandrakilandy   Ankazobetsiahy
    SOFIA                 Antsohihy      Ampandrakilandy   Antanalabe
    SOFIA                 Antsohihy      Ampandrakilandy   Andrafia
    SOFIA                 Antsohihy      Ampandrakilandy   Andrafia
    SOFIA                 Antsohihy      Ampandrakilandy   Andrafia
    SOFIA                 Antsohihy      Ampandrakilandy   Andrafia
    SOFIA                 Antsohihy      Ampandrakilandy   Andilambe
    SOFIA                 Antsohihy      Ampandrakilandy   Andilambe
    SOFIA                 Antsohihy      Ampandrakilandy   Mahialambo
    SOFIA                 Antsohihy      Ampandrakilandy   Matsaboribe
    SOFIA                 Antsohihy      Ampandrakilandy   Matsaboribe
    SOFIA                 Antsohihy      Antsohihy         Bekitrobaka
    SOFIA                 Antsohihy      Ambodimandresy    Antambohitra
    SOFIA                 Antsohihy      Ambodimandresy    Antambohitra
    SOFIA                 Antsohihy      Antsohihy         Tsimananila
    SOFIA                 Antsohihy      Ambodimandresy    Ambohimanandririna
    SOFIA                 Antsohihy      Ambodimandresy    Ambohimanandririna
    SOFIA                 Antsohihy      Ankerika          Anjiajia
    SOFIA                 Antsohihy      Anjiamangirana    Anjiamangirana II
    SOFIA                 Antsohihy      Ankerika          Anjiamangirana II
    SOFIA                 Antsohihy      Anahidrano        Antanimora haut
    SOFIA                 Antsohihy      Ankerika          Antafiandakana
    SOFIA                 Antsohihy      Ankerika          Antafiandakana
    SOFIA                 Antsohihy      Ampandrakilandy   Marovato
    SOFIA                 Antsohihy      Anahidrano        Antanimora bas
    SOFIA                 Antsohihy      Ankerika          Antanambao Ankerika
    SOFIA                 Antsohihy      Ampandrakilandy   Ambinanindranomena
    SOFIA                 Antsohihy      Ambodimandresy    Ambalahonko
    SOFIA                 Antsohihy      Ankerika          Anjiajia
    SOFIA                 Antsohihy      Anjiamangirana    Andalirano Sud
    SOFIA                 Antsohihy      Anjiamangirana    Andalirano Nord
    SOFIA                 Antsohihy      Anjiamangirana    Ambalarano Doroa
 

     RÉGION                DISTRICT           COMMUNE                  VILLAGE
     ANOSY               Amboasary sud         Tsivory                Soaserana
     ANOSY               Amboasary sud         Tsivory               Antaninareny
     ANOSY               Amboasary sud         Tsivory               Antaninareny
     ANOSY               Amboasary sud         Tsivory               Ampasimaiky
     ANOSY               Amboasary sud         Tsivory              Amparakininy
     ANOSY               Amboasary sud         Tsivory             Amboangitokana
     ANOSY               Amboasary sud         Tsivory                Sarondrano
     ANOSY               Amboasary sud         Tsivory                Ankilimary
     ANOSY               Amboasary sud         Tsivory             Tanambao centre
     ANOSY               Amboasary sud         Tsivory                Ankilimamy
     ANOSY               Amboasary sud         Tsivory                  Ambia
     ANOSY               Amboasary sud         Tsivory                  Agnara
     ANOSY               Amboasary sud         Tsivory                 Ankiliabo




Rapport  Annuel 2008                                                                 26 
ANOSY           Amboasary sud        Tsivory           Ampiriky
         ANOSY           Amboasary sud        Tsivory         Belenalena
         ANOSY           Amboasary sud        Tsivory      Antsambalahy sud
         ANOSY           Amboasary sud        Tsivory           Tsapa be
         ANOSY           Amboasary sud        Tsivory        Amboropotsy
         ANOSY           Amboasary sud        Tsivory             Ankily
         ANOSY           Amboasary sud        Tsivory           Besakoa
         ANOSY           Amboasary sud        Tsivory        Fandranarivo
         ANOSY           Amboasary sud        Tsivory            Betania
         ANOSY           Amboasary sud      Tomboarivo     Mandavenoka ouest
         ANOSY           Amboasary sud      Tomboarivo     Miheba Tanambao
         ANOSY           Amboasary sud      Tomboarivo          Soarano
         ANOSY           Amboasary sud        Tsivory           Ankotika
         ANOSY           Amboasary sud        Tsivory          Ampitroara
         ANOSY           Amboasary sud        Elonty          Bemandresy
 

         RÉGION            DISTRICT         COMMUNE            VILLAGE
          DIANA            Ambilobe          Mantaly       Tanambao Mantaly
          DIANA            Ambilobe          Mantaly       Tanambao Mantaly
          DIANA            Ambilobe          Mantaly      Ampanakana Mantaly
          DIANA            Ambilobe          Mantaly      Ampanakana Mantaly
          DIANA            Ambilobe          Mantaly      Ampanakana Mantaly
          DIANA            Ambilobe          Mantaly      Ampanakana Mantaly
          DIANA            Ambilobe          Mantaly      Ampanakana Mantaly
          DIANA            Ambilobe          Mantaly         Antanatanana
          DIANA            Ambilobe          Mantaly         Antanatanana
          DIANA            Ambilobe          Mantaly         Antanatanana
          DIANA            Ambilobe        Ampondralava        Bekolahy
          DIANA            Ambilobe        Ampondralava        Bekolahy

     2. LISTE DES SITES DES GRANDS CENTRES ETUDIES 
    N°     Région            Districts    Communes          Localités
    2      DIANA              Ambilobe      Ambilobe        Ambilobe
    9      SOFIA             Antsohihy      Ankerika        Ankerika
    10     SOFIA             Analalava     Analalava        Analalava
    11     SOFIA             Bealanana     Bealanana        Bealanana
    12     SOFIA            Mandritsara    Mandritsara     Mandritsara
    13     SOFIA             Port Bergé    Port Bergé       Port Bergé
    14     MELAKY            Maintirano    Maintirano       Maintirano
    15     MELAKY           Morafenobe    Morafenobe       Morafenobe
    16     MELAKY            Besalampy     Besalampy       Besalampy
    17     MELAKY            Antsalova     Antsalova        Antsalova
    18     MELAKY          Ambatomainty   Ambatomainty    Ambatomainty
    19     BETSIBOKA        Maevatanana   Maevatanana     Maevatanana
    29     ANDROY           Ambovombe     Ambovombe        Ambovombe
    30     ANOSY             Amboasary     Amboasary      Amboasary Sud




Rapport  Annuel 2008                                                           27 
3. LISTE DES POINTS D’EAU A REHABILITES ETUDIES 
              Localités             Commune              District        Région
             Andriamena             Andriamena        Tsaratanàna      BETSIBOKA
               Anjiakely            Bemokotra        Maevatanana       BETSIBOKA
              Bemokotra             Bemokotra        Maevatanana       BETSIBOKA
               Mahasoa              Bemokotra        Maevatanana       BETSIBOKA
             Maevarano              Bemokotra        Maevatanana       BETSIBOKA
            Ankijatsivazay          Mahazoma         Maevatanana       BETSIBOKA
               Ambaky               Ambohisoa         Mandritsara        SOFIA
             Ambanjabe             Ambanjabe           Port Bergé        SOFIA
                Ambato           Tsarahonenana      Befandriana Nord     SOFIA
             Ambatoriha            Ambatoriha          Bealanana         SOFIA
           Ambodisakoana         Ambodisakoana         Port Bergé        SOFIA
          Ampandriakilandy      Ampandriakilandy       Antsohihy         SOFIA
          Ampandroangisa          Ambohitoaka         Mampikony          SOFIA
              Amparihy               Amparihy          Port Bergé        SOFIA
            Andrafiatsara        Tsarahonenana      Befandriana Nord     SOFIA
               Anjiabory            Ankaramy           Analalava         SOFIA
              Ankaramy              Ankaramy           Analalava         SOFIA
           Beandrarezona         Beandrarezona         Bealanana         SOFIA
               Befotaka              Befotaka          Analalava         SOFIA
               Maroala               Maroala           Antsohihy         SOFIA
             Maromandia            Maromandia          Analalava         SOFIA
            Mevaranohely          Mevaranohely         Port Bergé        SOFIA
             Tsarahasina           Tsarahasina         Port Bergé        SOFIA
             Tsaratanana           Tsaratanàna         Port Bergé        SOFIA
          Tsinjomitondraka      Tsinjomitondraka       Port Bergé        SOFIA
             Anjiabe - haut        Anjiabe - haut       Ambilobe         DIANA
               Anketrabe          Antsahampano       Antsiranana II      DIANA
                Ivovona               Ramena         Antsiranana II      DIANA
               Mananara              Mangaoka        Antsiranana II      DIANA
           Ramena village            Ramena          Antsiranana II      DIANA
             Andrapengy             Ampahana            Antalaha         SAVA
             Andamasina             Ampahana            Antalaha         SAVA
              Ampahana              Ampahana            Antalaha         SAVA
            Ambinanifaho          Ambinanifaho          Antalaha         SAVA
           Ampanatsovana          Ambinanifaho          Antalaha         SAVA
         Ambodipont-Isahana       Ambinanifaho          Antalaha         SAVA
            Valambanina            Antsahanoro          Antalaha         SAVA
           Malotrandrohely         Antsahanoro          Antalaha         SAVA
              Marokosa             Antsahanoro          Antalaha         SAVA
            Ampombolava            Antsahanoro          Antalaha         SAVA
             Ambosikidy            Antsahanoro          Antalaha         SAVA
              Ankitsaka            Antsahanoro          Antalaha         SAVA
             Antsorolava           Antsahanoro          Antalaha         SAVA
            Maromokotra             Ampahana            Antalaha         SAVA
            Ambodimadiro            Ampondra            Vohémar          SAVA
           Antsahampano               Nosibe            Vohémar          SAVA
              Analovana            Fanambana            Vohémar          SAVA
            Amparihirano              Daraina           Vohémar          SAVA
 




Rapport  Annuel 2008                                                               28 

Mais conteúdo relacionado

Destaque

Prueba5 10megas2
Prueba5 10megas2Prueba5 10megas2
Prueba5 10megas2tallera
 
Bruits (Pp Tminimizer)
Bruits (Pp Tminimizer)Bruits (Pp Tminimizer)
Bruits (Pp Tminimizer)guestc5bc529
 
Aquaplex + panneaux thermiques
Aquaplex + panneaux thermiquesAquaplex + panneaux thermiques
Aquaplex + panneaux thermiquesEuropages2
 
Ironía Del Destino Israel
Ironía Del Destino IsraelIronía Del Destino Israel
Ironía Del Destino IsraelTSBlog
 
DiagnóStico Multifeedback
DiagnóStico MultifeedbackDiagnóStico Multifeedback
DiagnóStico Multifeedbackjorgebungu
 
Temps ~ aujourd'hui
Temps ~ aujourd'huiTemps ~ aujourd'hui
Temps ~ aujourd'huibruntess99
 
Compte-rendu de la réunion du 30 03 10
Compte-rendu de la réunion du 30 03 10Compte-rendu de la réunion du 30 03 10
Compte-rendu de la réunion du 30 03 10Convergences Yvelines
 
Guerra Avisada No Mata Soldado
Guerra Avisada No Mata SoldadoGuerra Avisada No Mata Soldado
Guerra Avisada No Mata Soldadorefranes
 
Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...
Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...
Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...Antoine Mercier-ame
 
Vic 2009, Els 10 Errors Més Comuns en la Comunicació a Internet
Vic 2009, Els 10 Errors Més Comuns en la Comunicació a InternetVic 2009, Els 10 Errors Més Comuns en la Comunicació a Internet
Vic 2009, Els 10 Errors Més Comuns en la Comunicació a InternetMontserrat Peñarroya
 
Himno a medellin
Himno a medellinHimno a medellin
Himno a medellinsolvasquez
 
Tema iii (cont2)
Tema iii (cont2)Tema iii (cont2)
Tema iii (cont2)Luz García
 

Destaque (20)

Prueba5 10megas2
Prueba5 10megas2Prueba5 10megas2
Prueba5 10megas2
 
Bruits (Pp Tminimizer)
Bruits (Pp Tminimizer)Bruits (Pp Tminimizer)
Bruits (Pp Tminimizer)
 
Aquaplex + panneaux thermiques
Aquaplex + panneaux thermiquesAquaplex + panneaux thermiques
Aquaplex + panneaux thermiques
 
Ironía Del Destino Israel
Ironía Del Destino IsraelIronía Del Destino Israel
Ironía Del Destino Israel
 
DiagnóStico Multifeedback
DiagnóStico MultifeedbackDiagnóStico Multifeedback
DiagnóStico Multifeedback
 
Aud_Mod_3
Aud_Mod_3Aud_Mod_3
Aud_Mod_3
 
Temps ~ aujourd'hui
Temps ~ aujourd'huiTemps ~ aujourd'hui
Temps ~ aujourd'hui
 
Value In Project Management Services
Value In Project Management ServicesValue In Project Management Services
Value In Project Management Services
 
Compte-rendu de la réunion du 30 03 10
Compte-rendu de la réunion du 30 03 10Compte-rendu de la réunion du 30 03 10
Compte-rendu de la réunion du 30 03 10
 
Perrenoud. construir competencias entrevista
Perrenoud. construir competencias entrevistaPerrenoud. construir competencias entrevista
Perrenoud. construir competencias entrevista
 
Guerra Avisada No Mata Soldado
Guerra Avisada No Mata SoldadoGuerra Avisada No Mata Soldado
Guerra Avisada No Mata Soldado
 
Mod2pre
Mod2preMod2pre
Mod2pre
 
Arenay Cafe
Arenay CafeArenay Cafe
Arenay Cafe
 
Guia int de_linea_teo_de_green_01_15
Guia int de_linea_teo_de_green_01_15Guia int de_linea_teo_de_green_01_15
Guia int de_linea_teo_de_green_01_15
 
Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...
Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...
Ame gallery dans la série le monde de l'art selon e.t., 26 avril 2014 bordeau...
 
Cinco+por+ciento
Cinco+por+cientoCinco+por+ciento
Cinco+por+ciento
 
Vic 2009, Els 10 Errors Més Comuns en la Comunicació a Internet
Vic 2009, Els 10 Errors Més Comuns en la Comunicació a InternetVic 2009, Els 10 Errors Més Comuns en la Comunicació a Internet
Vic 2009, Els 10 Errors Més Comuns en la Comunicació a Internet
 
Himno a medellin
Himno a medellinHimno a medellin
Himno a medellin
 
Magazines du mois de mars 2015
Magazines du mois de mars 2015Magazines du mois de mars 2015
Magazines du mois de mars 2015
 
Tema iii (cont2)
Tema iii (cont2)Tema iii (cont2)
Tema iii (cont2)
 

Semelhante a Rapport annuel 2008

Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...
Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...
Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...NAP Global Network
 
Presentation technique du PNAAFA - Guinée
Presentation technique du PNAAFA - GuinéePresentation technique du PNAAFA - Guinée
Presentation technique du PNAAFA - GuinéeFIDAfrique-IFADAfrica
 
Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...
Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...
Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...ILRI
 
Revue Echos Finances #13
Revue Echos Finances #13Revue Echos Finances #13
Revue Echos Finances #13senmfb
 
Processus pna présentation de la feuille de route atelier points focaux
Processus pna présentation de la feuille de route atelier points focauxProcessus pna présentation de la feuille de route atelier points focaux
Processus pna présentation de la feuille de route atelier points focauxUNDP Climate
 
Le bilan des 100 premiers jours avril juillet 2017 guito edouard
Le bilan des 100 premiers jours  avril   juillet 2017 guito edouardLe bilan des 100 premiers jours  avril   juillet 2017 guito edouard
Le bilan des 100 premiers jours avril juillet 2017 guito edouarddinepacom
 
Le processus PNA en Côte d’Ivoire
Le processus PNA en Côte d’IvoireLe processus PNA en Côte d’Ivoire
Le processus PNA en Côte d’IvoireNAP Global Network
 
Processus PNA – Expérience du Togo dans l’intégration de l'adaptation dans l...
Processus PNA – Expérience du Togo  dans l’intégration de l'adaptation dans l...Processus PNA – Expérience du Togo  dans l’intégration de l'adaptation dans l...
Processus PNA – Expérience du Togo dans l’intégration de l'adaptation dans l...NAP Global Network
 
2012 stratégie bénin 2012 2016 bad
2012 stratégie bénin 2012 2016   bad2012 stratégie bénin 2012 2016   bad
2012 stratégie bénin 2012 2016 badWilliams Paolo Bella
 
Madagascar-segs-ifad rome 2007
Madagascar-segs-ifad rome 2007Madagascar-segs-ifad rome 2007
Madagascar-segs-ifad rome 2007Benoît THIERRY
 
Guide du programme fr 2012
Guide du programme fr 2012Guide du programme fr 2012
Guide du programme fr 2012Gabriel BREZOIU
 
Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...
Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...
Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...ExternalEvents
 
Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...
Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...
Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...ExternalEvents
 
5341 55014 manuel du budget participatif en afrique - volume 2
5341 55014 manuel du budget participatif en afrique - volume 25341 55014 manuel du budget participatif en afrique - volume 2
5341 55014 manuel du budget participatif en afrique - volume 2Mamadou Barry
 
Rapport général de synthèse atelier PAOPA
Rapport général de synthèse  atelier PAOPARapport général de synthèse  atelier PAOPA
Rapport général de synthèse atelier PAOPAFatimata Kone
 

Semelhante a Rapport annuel 2008 (20)

2011 burkina faso pascacaf bad
2011 burkina faso pascacaf   bad2011 burkina faso pascacaf   bad
2011 burkina faso pascacaf bad
 
Expérience du Mali en matière de renforcement de la résilience
Expérience du Mali en matière de renforcement de la résilienceExpérience du Mali en matière de renforcement de la résilience
Expérience du Mali en matière de renforcement de la résilience
 
Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...
Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...
Accès aux fonds pour l’adaptation aux changements climatiques à travers le bu...
 
Presentation technique du PNAAFA - Guinée
Presentation technique du PNAAFA - GuinéePresentation technique du PNAAFA - Guinée
Presentation technique du PNAAFA - Guinée
 
Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...
Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...
Le projet régional d’appui au pastoralisme au Sahel (PRAPS): Burkina Faso, Ma...
 
Revue Echos Finances #13
Revue Echos Finances #13Revue Echos Finances #13
Revue Echos Finances #13
 
Processus pna présentation de la feuille de route atelier points focaux
Processus pna présentation de la feuille de route atelier points focauxProcessus pna présentation de la feuille de route atelier points focaux
Processus pna présentation de la feuille de route atelier points focaux
 
Le bilan des 100 premiers jours avril juillet 2017 guito edouard
Le bilan des 100 premiers jours  avril   juillet 2017 guito edouardLe bilan des 100 premiers jours  avril   juillet 2017 guito edouard
Le bilan des 100 premiers jours avril juillet 2017 guito edouard
 
Le processus PNA en Côte d’Ivoire
Le processus PNA en Côte d’IvoireLe processus PNA en Côte d’Ivoire
Le processus PNA en Côte d’Ivoire
 
DSCE - Cameroun
DSCE - CamerounDSCE - Cameroun
DSCE - Cameroun
 
Processus PNA – Expérience du Togo dans l’intégration de l'adaptation dans l...
Processus PNA – Expérience du Togo  dans l’intégration de l'adaptation dans l...Processus PNA – Expérience du Togo  dans l’intégration de l'adaptation dans l...
Processus PNA – Expérience du Togo dans l’intégration de l'adaptation dans l...
 
2012 stratégie bénin 2012 2016 bad
2012 stratégie bénin 2012 2016   bad2012 stratégie bénin 2012 2016   bad
2012 stratégie bénin 2012 2016 bad
 
2015 ReSAKSS Conference – Day 1 - Yacouba SANON
2015 ReSAKSS Conference – Day 1 - Yacouba SANON�2015 ReSAKSS Conference – Day 1 - Yacouba SANON�
2015 ReSAKSS Conference – Day 1 - Yacouba SANON
 
Madagascar-segs-ifad rome 2007
Madagascar-segs-ifad rome 2007Madagascar-segs-ifad rome 2007
Madagascar-segs-ifad rome 2007
 
Guide du programme fr 2012
Guide du programme fr 2012Guide du programme fr 2012
Guide du programme fr 2012
 
Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...
Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...
Newsletter, janvier 2009 _ Appui au developpement des produits de qualite lie...
 
31715 annexe8igadeac
31715 annexe8igadeac31715 annexe8igadeac
31715 annexe8igadeac
 
Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...
Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...
Mise en œuvre de la stratégie mondiale pour l’amélioration des statistiques a...
 
5341 55014 manuel du budget participatif en afrique - volume 2
5341 55014 manuel du budget participatif en afrique - volume 25341 55014 manuel du budget participatif en afrique - volume 2
5341 55014 manuel du budget participatif en afrique - volume 2
 
Rapport général de synthèse atelier PAOPA
Rapport général de synthèse  atelier PAOPARapport général de synthèse  atelier PAOPA
Rapport général de synthèse atelier PAOPA
 

Rapport annuel 2008

  • 1. RAPPORT ANNUEL 2008  Sommaire INTRODUCTION ....................................................................................................................................... 5  1.  FICHE DU PROGRAMME .................................................................................................................. 6  2.  DONNEES DE BASE .......................................................................................................................... 6  3.  RAPPEL DES OBJECTIFS DU PROGRAMME A COURT TERME 2006 –2008 ....................................... 6  4.  DESCRIPTION DU PROGRAMME ...................................................................................................... 7  Composante A : Appui institutionnel et renforcement des capacités ................................................ 7  Composante B : Réhabilitation et développement des infrastructures d’eau potable et  d’assainissement ................................................................................................................................. 8  Composante C : Gestion du programme ............................................................................................. 9  5.  QUELQUES CHANGEMENTS INSTITUTIONNELS en 2008  .............................................................. 10  . 6.  REALISATIONS 2008 ....................................................................................................................... 11  Composante A : Appui institutionnel et renforcement des capacités .............................................. 13  A1. : Appui institutionnel des institutions et agences nationales œuvrant dans le domaine de  l’eau et l’assainissement : ANDEA, DEPA, Direction de Promotion du Genre .............................. 13  A2. Activités IEC ............................................................................................................................. 13  Composante B : REHABILITATION ET DEVELOPPEMENT DES INFRASTRUCTURES ............................ 18  Composante C : Gestion du programme ........................................................................................... 22  Réunion du CCP ................................................................................................................................. 23  SITUATION FINANCIERE ............................................................................... Erreur ! Signet non défini.  PERSPECTIVE 2009  ................................................................................................................................ 24  . ANNEXES  ............................................................................................................................................... 25  . 1.  LISTE DES FORAGES REALISES .................................................................................................... 25  2.  LISTE DES SITES DES GRANDS CENTRES ETUDIES ...................................................................... 27  3.  LISTE DES POINTS D’EAU A REHABILITES ETUDIES .................................................................... 28    Rapport  Annuel 2008     2 
  • 2. LISTE DES ABREVIATIONS  AAFC  Agent Administratif et Financier Central  AAFR  Agent Administratif et Financier Régional  AEP  Alimentation  en Eau Potable  AEPA  Alimentation en Eau Potable et Assainissement  ALT  Andrew Lees Trust (Station Radio locale dans le Sud)  ANDEA  Autorité Nationale De l’Eau et de l’Assainissement  BAD  Banque Africaine de Développement  BEN  Bénéficiaire  BLU  Bande Latérale Unique  BOA  Bank Of Africa  CCP  Comité Consultatif de Pilotage  CDE  Contrôle des Dépenses Engagées  CDMT  Cadre des Dépenses à Moyen Terme  CEP  Cellule d’Exécution du Programme   CPE  Comité de point d’eau  CFN  Consultation des Fournisseurs à échelon National  CNM  Commission Nationale des Marchés  CV  Curriculum Vitae  DAO  Dossier d’Appel d’Offres  DAOI  Dossier d’Appel d’Offres International  DEPA  Direction de l’Eau Potable et de l’Assainissement  DIRP  Direction Inter Régionale de la Population  Direction Régionale de Santé pour la Planification Familiale et Protection  DRSPFPS  Sociale  ECAR  Eglise Catholique Apostolique Romaine  FAD  Fonds Africain de Développement  UNFPA  Fons des Nations Unies pour la Population  GVT  Gouvernement  IEC  Information Education Communication   Information, Education, Communication/Communication pour le Changement  IEC/CCC  de Comportement  MAEP  Ministère de l’Agriculture, de l’Elevage et de la Pêche  MEM  Ministère de l’Energie et des Mines  MJ/DE  Ministère de la Justice /Direction des Etudes   OCB  Organisation Communautaire de Base  OMD  Objectif du Millénaire pour le Développement  ONG  Organisation Non Gouvernementale  ONE  Office National de l’Environnement  PAEAR  Programme d’Alimentation en Eau Potable et Assainissement en milieu Rural   PANAGED  Plan National Genre et Développement  PGSE  Planification, Gestion, Suivi et Evaluation  PRMP  Personne Responsable des Marchés Publics  Rapport  Annuel 2008     3 
  • 3. PTA  Programme de Travail Annuel  PTT  Programme de Travail Trimestriel  TDR  Termes de référence  UC  Unité de Compte  UNDB  United Nations Development Business  UNICEF  Fonds des Nations Unies Pour l’Enfance  Rapport  Annuel 2008     4 
  • 4. INTRODUCTION    Le  démarrage  effectif  du  programme  PAEAR  date  de  mai  2006.  Ce  démarrage,  conduit  par  une  première  équipe  de  Cellule  d’Exécution  du  Programme  (CEP)  s’étendant  jusqu’au  mois de novembre 2006, a surtout été marqué par la mise en  place  et  l’organisation  du  Programme  suivant  le  rapport  d’évaluation  ainsi  que  la  mise  en  place  administrative  suivant  les  conditionnalités  de  l’Accord  de  prêt,  notamment  l’ouverture  de  compte.  Une  deuxième  équipe  de  CEP  était  fonctionnelle  pendant  le  premier  semestre  de  l’année  2007.  Cette équipe a réalisé des formations et une familiarisation avec les procédures de la BAD, elle s’est  chargée  également  de  la  préparation  de  la  procédure  de  lancement  d’appel  d’offres  en  vue  de  l’acquisition des matériels, des mobiliers et des équipements du Programme.   A partir du mois de juin 2007, une troisième équipe de la CEP a été mise en place et opérationnelle  jusqu’à ce jour. Les activités du Programme pendant l’année 2007 ont été axées sur l’acquisition des  Biens, achevée à 100% et les procédures de passation des marchés pour les services et les travaux.  L’année  2008  est  surtout  consacrée  au  démarrage  des  prestations  de  services  relatives  aux  études  techniques d’alimentation en eau potable ainsi que des travaux de forages. Considérant que 82% du  budget du PAEAR est consacré aux travaux, il est logique qu’en cette phase de démarrage, le taux de  décaissement est encore assez faible.  S’ajoutent  à  ces  activités,  l’appui  institutionnel  de  l’ANDEA,  de  la  DEPA  et  de  la  Direction  de  la  Promotion  du  Genre.  Par  ailleurs,  les  activités  IEC  menées  par  les  partenaires  du  Programme,  notamment l’IEC radio par l’UNICEF et l’IEC Santé/Population par l’UNFPA ont connu un avancement  considérable. En effet, l’acquisition des matériels pour renforcer les radios partenaires et les radios  manivelles  pour  les  bénéficiaires,  la  formation  des  animateurs  radios,  la  convention  de  partenariat  avec  les  radios  locales  sont  réalisées  à  100%.  De  même,  la  formation  des  pools  de  formateurs,  la  formation  en  mobilisation  sociale  et  en  IEC/CCC  ainsi  qu’en  technique  de  communication  des  DRSPFPS et des SDSPS jusqu’au niveau des formations sanitaires ont atteint leurs objectifs. De plus,  malgré le retard du recrutement de l’ONG chargée des activités d’IEC, les membres de la CEP ont fait  un effort pour réaliser l’identification des sites de forages pour que les travaux puissent démarrer à  temps.  L’année 2009 va être consacrée à l’exécution des travaux de forages et des systèmes d’alimentation  en eau.      Rapport  Annuel 2008     5 
  • 5. 1. FICHE DU PROGRAMME    PAYS  :   MADAGASCAR  TITRE   : Programme d’Alimentation en Eau potable et d’Assainissement en milieu Rural (PAEAR)  • Programme n° : P‐MG‐E‐00‐005  • Crédit n° : 2100150011344  LIEU D’INTERVENTION :  8 (huit) Régions :   Diana – Sava – Sofia – Betsiboka – Melaky (dans la zone NORD)  Atsimo Andrefana – Anosy ‐ Androy d’Antsiranana (dans la zone SUD)  EMPRUNTEUR : Gouvernement malgache  ORGANE D’EXECUTION : Cellule d’Exécution du Programme PAEAR    Direction Générale du Ministère de l’Eau ‐ Ministère de l’Eau    2. DONNEES DE BASE    COUT TOTAL :           60,00 millions d’UC  FINANCEMENT DU GROUPE DE LA BANQUE :   51,00 millions d’UC  AUTRES SOURCES DE FINANCEMENT :  • Gouvernement Malgache :     8,40 millions d’UC  • Bénéficiaires :         0,60 millions d’UC  DATE D’APPROBATION :       Décembre 2005  DATE DE DEMARRAGE ET DUREE :     Mai 2006, pour 3 ans    LE TAUX DE REPARTITION DE FINANCEMENT PAR CATEGORIES DE DEPENSES :    CATEGORIES DE DEPENSES  FAD  GVT  BEN  TRAVAUX  84,50%  14,29%  1,21%  BIENS  77,01%  22,99%  0%  SERVICES  93,79%  6,21%  0%  FONCTIONNEMENT  56,67%  43,33%  0%    3. RAPPEL DES OBJECTIFS DU PROGRAMME A COURT TERME 2006 –2008  L’objectif  sectoriel  du  programme  est  de  contribuer  à  l’amélioration  des  conditions  socio‐ économiques et sanitaires des populations rurales.  Rapport  Annuel 2008     6 
  • 6. Le  programme  a  pour  objectif  spécifique  d’assurer  durablement  l’approvisionnement  des  populations rurales en eau potable et en services d’assainissement.  4. DESCRIPTION DU PROGRAMME  Composante A : Appui institutionnel et renforcement des capacités A1 : Appui institutionnel des institutions et agences nationales œuvrant dans le domaine de l’eau et  l’assainissement  telles  que  la  DEPA,  ANDEA,  les  directions  régionales  du  Ministère  chargé  de  l’eau,  Direction de la Promotion du Genre, l’unité de gestion du PANAGED  A2 : Activités IEC  • Des activités d’Information, Education et Communication (IEC) par des ONG expérimentées  • L’UNFPA    travaille  avec  le  programme  pour  le  renforcement  des  capacités  des  régions  et  districts sanitaires à appuyer les centres de santé de base dans le suivi de la mise en œuvre  des activités d’IEC portant sur la santé et l’AEPA en milieu rural ; et l’encadrement des ONG  dans  la  mise  en  œuvre  d’activités  appropriées  d’IEC  axées  sur  la  santé  en  général,  l’eau  et  l’assainissement en particulier.  • La convention avec l’UNICEF  fournit un appui technique aux radios locales partenaires dans  les huit régions d’intervention du Programme.  Rapport  Annuel 2008     7 
  • 7.   Composante B : Réhabilitation et développement des infrastructures d’eau potable et d’assainissement     LES DIFFERENTES ETAPES DES ACTIVITES    DU PROGRAMME D’ALIMENTATION EN EAU POTABLE ET   ASSAINISSEMENT EN MILIEU RURAL (PAEAR)     Information Education  Animation et    Sensibilisation de  Communication (IEC) et  constitution des    1 identification des villages  bénéficiaires  comités de points  d’eau  maintien      2   ETUDES  3 TECHNIQUES      TRAVAUX Rapport  Annuel 2008     8 
  • 8. Réhabilitation de 230 points d’eau existants,  Construction de 180 systèmes d’AEP dans les petites localités rurales,  Construction de 30 systèmes d’AEP dans les grands centres ruraux,  Réalisation de 1.000 forages avec pompes à motricité humaine et 250 autres équipés de  pompes à énergie solaire,  Construction du deuxième tronçon de 87km de  pipe line du Grand Sud,  Construction de 3.700 blocs sanitaires et 6.460 latrines.  Acquisition  et  installation  de  quatre  (04)  stations  éoliennes  pour  renforcer  la  capacité  énergétique du 1er tronçon de la pipe line du Grand Sud.  Etudes techniques complémentaires de l’AEP des Grands Centres Ruraux et des forages  avec pompes à motricité humaine ou équipés de pompes à énergie solaire   Elaboration de l’étude stratégique environnementale et du suivi environnemental :   Assistance technique et supervision des travaux.    Composante C : Gestion du programme   Réhabilitation des locaux de la DEPA à Antananarivo, à Antsiranana et  à Tuléar.  Acquisition  des  mobiliers,  des  équipements  de  communication,  des  matériels  informatiques et des fournitures de bureau,  Equipements hydrogéologiques et matériels de terrain ainsi que des moyens  roulants.  Formation des agents de la DEPA chargés de la gestion du programme,  Voyage de familiarisation des cadres de la DEPA au siège de la Banque,  Recrutement  d’un  cabinet  spécialisé  pour  l’audit  financier  pour  les  3  exercices  (2006  –  2007 – 2008) du Programme.  Dans  le  cadre  de  la  mise  en  œuvre  du  Programme,  il  est  prévu  que  la  coordination  et  le  suivi  des  activités seront assurés par un Comité Consultatif de Pilotage (CCP) formé par les membres du CCP  du  projet  AEPA  dans  le  grand  sud  élargis  aux  représentants  des  administrations  des  régions  concernées par le programme et un représentant de la Direction de la Promotion du Genre. Le CCP a  pour objectif d’harmoniser les approches des différents acteurs et parties prenantes et d’assurer  le  suivi des réalisations ainsi que l’évaluation à plus long terme des acquis du programme.  Rapport  Annuel 2008     9 
  • 9. 5. QUELQUES CHANGEMENTS INSTITUTIONNELS en 2008    La Direction générale du genre et l’unité de gestion du PANAGED  de la Direction interrégionale de la  population  sont  devenus  Direction  de  Promotion  du  genre  au  sein  du  Ministère  de  la  Santé,  du  Planning Familial et de la Protection Sociale.  Le Ministère chargé de l’Eau est le Ministère de l’Eau, le Programme PAEAR est directement rattaché  à la Direction Générale     Rapport  Annuel 2008     10 
  • 10. 6. REALISATIONS 2008  CATEGORIES ET TITRES DES ACTIVITES  TITULAIRE    % DE REALISATION   CUMUL DE  % DE  avant 2008  REALISATION AU 31/12/2008  I‐ TRAVAUX  Travaux de réhabilitation du local du programme PAEAR  MIALY    0%  100%  Travaux de réhabilitation du local  du programme à Antsiranana  0% ALSON    50%  Travaux de réhabilitation du local  du programme à Toliara  0% FITARIKANDRO    50%  Travaux de 600 forages positifs équipés  de PMH dans la région  0%  CGC    3,5%  d'Androy, Anosy, Atsimo Andrefana  Travaux de 300 forages positifs équipés de PMH dans la région  0%  12%  CGC    de Melaky, Betsiboka Sofia, Diana, Sava  Travaux de 350 forages positifs dont 100 équipés de PMH et 250  0%  10%  pompes solaires dans la région de Melaky, Betsiboka, Sofia,  REVA FORAGE    Diana, Sava  Travaux de construction de 3700 blocs sanitaires          II‐  BIENS  Fournitures des matériels informatiques  Lot I  ALPHATEK    100%  100%  Fourniture et installation des équipements  de communication  LANDIS MADAGASCAR    100%  100%  Fourniture des 20 motos tout terrain  HENRI FRAISE    100%  100%  Fournitures des matériels de bureau  LUXOR    100%  100%  Fournitures des matériels informatiques  Lot II  CBL    100%  100%  Fourniture des trois véhicules double cabine  OCEAN TRADE    100%  100%  Fourniture des trois véhicules station wagon  AUTO DIFFUSION    100%  100%  Fourniture des matériels  hydrogéologiques  SOMECA      100%  Rapport  Annuel 2008     11 
  • 11.   CATEGORIES ET TITRES DES ACTIVITES  TITULAIRE  MONTANT HT  % DE REALISATION   % DE REALISATION AU  avant 2008  31/12/2008  I‐ SERVICE  Audit de compte pour l'exercice 2ème trimestre 2006 et  0%  DELTA AUDIT    100%  2007 du PAEAR  Etudes, contrôle et surveillance de30 système d'AEP grand  ANTEA/CNEAGR/  Etude = 40%  0%  centres; diagnostic230 points d'eau  ACTION    DEVELOPPEMENT  Contrôle = 0%  Etudes d'implantation  et supervision1250 forages; études  Etude d’implantation  = 20%  et contrôle 180 AEPG  TECSULT/SGDM/TECM 0%    Contrôle de forage = 10%  AD  Etude AEPG =  20%  Etude stratégique environnementale du PAEAR  0% BRL    Etude = 30%  Suivi environnementale du PAEAR  0% BIODEV    Etude = 10%  Etudes des connaissances, Attitudes et Pratiques(CAP) et  mise en œuvre des Activités d'IEC en matière d'eau          potable, hygiène et assainissement, contrôle des travaux  de construction des infrastructures d'assainissement      Rapport  Annuel 2008     12 
  • 12. Composante A : Appui institutionnel et renforcement des capacités A1. : Appui institutionnel des institutions et agences nationales œuvrant dans le domaine de l’eau  et l’assainissement : ANDEA, DEPA, Direction de Promotion du Genre  Travaux  • Travaux de réhabilitation des locaux de la Direction de la Promotion du Genre (DPG) :   La DPG élabore les devis estimatifs pour la réhabilitation de ses locaux et le transmettra à la CEP afin  de finaliser les dossiers d’appel d’offres y afférents.  • Travaux de réhabilitation des locaux de l’ANDEA  L’ANDEA  a  transmis  à  la  CEP  une  demande  relative  à  son  souhait  de  réhabiliter  les  locaux  d’Antananarivo à la place de ceux des agences de bassin dans le nord et dans le sud. La CEP a sollicité  l’avis  de  la  BAD  qui  lui  donne  le  pouvoir  de  décision.  Suite  à  la  restructuration  de  l’ANDEA,  la  situation reste en stand by.  Formation des agents  36  %  des  cadres  de  l’ANDEA  sont  formés  dans  le  domaine  de  la  concertation  et  résolution  de  conflits  dans  l'appui  aux  développements  et  la  gestion  des  ressources  en  eau,  et  visite  d'information  et  d'échange  d'expérience auprès de l'Agence de Bassins TENSIFT MARAKECH MAROC    25  %  des  cadres  de  la  DEPA  sont  formés  dans  le  domaine  d’Audit  interne :  outil  de  performance  du  secteur public   70 % des cadres de la Direction de Promotion du genre sont formés dans le domaine de  programmes  et  projets  de  lutte  contre  la  pauvreté,  outils  du  chef  de  projet  pour  améliorer  son  efficacité  et  l’état  et  les  organisations paysannes.  Fourniture de matériels informatiques, équipements techniques et trousseaux d’analyse chimique et  bactériologique aux administrations concernées  100% des biens et équipements prévus pour l’appui de l’ANDEA sont livrés : matériels informatiques,  équipements techniques, équipement hydrogéologique.  100%  des  mobiliers,  équipements  de  communication,  équipements  informatiques  prévus  pour  l’appui de la DEPA sont livrés.  A2. Activités IEC  Recrutement de l’ONG chargée des activités CAP/IEC :  La demande de propositions sur la base d’une liste restreinte approuvée par la BAD a été lancée le 01  septembre  2008.  La  remise  des  propositions  a  été  prévue  en  date  du  16  octobre  2008  et  les  procédures de passation des marchés sont en cours.  Jusqu’à ce que l’ONG soit opérationnelle, les membres de la CEP PAEAR sont descendus sur le terrain  pour  effectuer  les  prestations  d’IEC  en  vue  de  l’identification  des  sites  de  forages  afin  de  pouvoir  démarrer les travaux de forages à temps.   Rapport  Annuel 2008     13 
  • 13. Ainsi, 360 sites sont identifiés dans les Régions Anosy,  Sofia,  Diana et  Sava. Pour les régions SAVA et  DIANA, la CEP PAEAR a également mis en place une cinquantaine de Comités de Point d’Eau (CPE).    Activités d’IEC réalisées par les membres de la CEP  Formation théorique des membres des CPE dans la    dans la Commune de Tsivory, Région Anosy  commune Antsahanoro, Région Sava      Formation pratique des CPE dans la commune de Farahalana, Région Sava  Formation pratique des CPE dans la commune de Farahalana, Région Sava    Formation pratique des CPE dans le village d’Antanandronono, la commune de    Farahalana, Région Sava par l’équipe de la CEP PAEAR et UNFPA    Rapport  Annuel 2008     14 
  • 14. IEC Santé et Population dans le cadre de la convention avec l’UNFPA  Le  Projet  IEC/CCC  Santé  et  Population  PAEAR_UNFPA  a  terminé  la  stratégie  formation  pour  le  renforcement de capacité des DRSPFPS et des SDSPS jusqu’au niveau des formations sanitaires.   Les activités suivantes ont été entreprises :  Activité  1:  Mise  en  place  d’une  équipe  au  sein  du  Bureau  régional  UNFPA    avec  les  matériels  et  équipements nécessaires pour la réalisation des activités du Projet d’IEC/CCC en santé et population  dans les huit régions.   Activité 2 : Evaluation de la capacité des Direction Régionale de Santé, du Planning Familial et de la  Protection Sociale (DRSPFPS) et des Services de District Sanitaire et de la Protection Sociale (SDSPS),  en  matière  d’IEC  CCC  et  de    communication  de  proximité  dans  le  domaine  de  la  santé  et  de  la  population jusqu’au niveau des CSB (Centres de Santé de Base).  Activité 3 : Renforcement des capacités des SP‐UNFPA :  Création  de  Pool  de  formateurs  /  encadreurs  en  matière  d’IEC/CCC  au  niveau  de  chaque  région  et  district (8 régions et 40 Districts) : 167 agents formés, soit une réalisation à 100%.  Formation en Mobilisation Sociale et en Technique d’IEC de proximité : 153 agents formés, soit une  réalisation à 100%  Formation  des  agents  de  Santé  en  technique  d’IEC  de  proximité :  850  agents  formés,  soit  une  réalisation à 95%.      Formation des formateurs à Maintirano dans la  Formation des formateurs à Amboasary Sud dans      région du MELAKY  la région d’ ANOSY            Rapport  Annuel 2008     15 
  • 15. IEC Radios locales dans le cadre de la convention avec  l’UNICEF  1. Renforcement des radios locales • Validation des recommandations de l’étude technique réalisée par le cabinet ALT/ Globe Com en  vue d’identifier les radios existantes dans les zones d’intervention du PAEAR  • Extension  de  la  zone  de  couverture  pour  10  stations  au  lieu  de  6  initialement  prévues  et  amélioration  de  la  qualité  de  production  par  acquisition  des  matériels  de  diffusion  et  de  production. La totalité des matériels prévus sont acquis comprenant :   - 05 unités centre de production (comportant chacun un studio de production, des matériels de duplication, d’impression) - 18 unités de studio de production (ordinateur, logiciel…) - 06 unités de studio de diffusion (ordinateur, logiciel …) - 10 unités d’émetteur complet de 500 watts (émetteur et antenne) - 04 unités d’émetteur seul de 500 watts - 50 unités de matériel de reportage (dictaphone) - 25 unités de kit de maintenance - 30 unités de lecteur CD - 08 unités de table de mixage  - 2000 radios manivelle  • Renforcement de compétence des animateurs‐ producteurs radios et des écrivains  Formation sur « l’élaboration et la production de pièce théâtrale radiophonique » et organisation de l’audience : Chaque station de Niveau 2 et Niveau 3, totalisant 29 stations pour les 8 régions, a reçu une formation sur « l’élaboration de pièce théâtrale radiophonique : méthodologie et processus de production ». Trois (03) vagues de formations sont tenues sur 03 sites (01 site à Antsiranana pour les stations partenaires de DIANA et SAVA, 01 site à Antsohihy pour Sofia, Betsiboka , Melaky et 01 site à Tuléar pour Anosy , Androy et Atsimo Andrefana. La plupart des participants sont des DelCom (Délégué de la Communication) et des journalistes. Toutes ces compétences serviront à la mise en œuvre des activités de communication de masse du volet IEC radio PAEAR /UNICEF Le volet IEC radio PAEAR a formé 150 animateurs / producteurs et 58 d’entre eux sont issus des partenaires publics du niveau décentralisé de l’éducation, de la santé tels que des instituteurs et/ou des employés de la santé. Participants à la formation à Tuléar Rapport  Annuel 2008     16 
  • 16. 2. Partenariat avec les radios locales des 8 régions PAEAR 63 conventions de partenariat relatif à l’ « Echange de service » sont signées entre le volet IEC radio PAEAR UNICEF et les radios locales. La convention s’étend jusqu’en fin 2011. En effet, le volet IEC radio PAEAR dote les radios partenaires, de matériels de diffusion et de production, offre des renforcements de compétence pour les animateurs /producteurs et en contre partie, les radios locales produisent, diffusent et archivent les productions conçues dans le cadre du programme. Les stations partenaires sont regroupés en 3 catégories dont : - 34 stations dans la catégorie Niveau 1 qui diffusera seulement les émissions - 24 stations dans la catégorie Niveau 2 qui devra produire et diffuser des émissions - 05 stations dans la catégorie Niveau 3 qui devra produire, diffuser et tenir une documentation sonore des émissions produites dans le cadre du projet . Les premières émissions sont diffusées dans la zone Nord (Sava, Diana, Sofia, Betsiboka, Melaky) à partir du mois de Décembre 2008. Pour la Zone Sud (Androy, Anosy, Atsimo Andrefana) les émissions débuteront en Janvier 2009. 3. Mise en place des Groupes d’Ecoute Les 2000 postes radios à manivelle sont acquis et sont dans l’entrepôt en attendant la mise en place de la collaboration avec les OCB qui vont assurer la mise en œuvre du volet communautaire du projet à travers les groupes d’écoute. Les postes radios acquises par le PAEAR Collaboration avec les OCB   Initialement  32  OCB  (4  par  régions)  devront  être  recrutées,  formées  pour  assurer  le  prolongement   communautaire  de  l’approche  (Mise  en  place  et  encadrement  de  Groupes  d’écoutes,  réception,  distribution  et  suivi  de  l’utilisation  des  matériels  d’écoute).  Par  suite  de  la  diminution  des  postes  radios à manivelle, l’UNICEF a proposé une initiation de nouveaux groupes d’écoute à partir des 2000  nouveaux postes  et une redynamisation des groupes d’écoute existants  dans chaque région.  Identification des OCB pour mettre en œuvre les activités de Groupes d’écoute     47  OCB  et/ou  ONG  sont  évalués.  Certaines  de  ces  OCB  et  ONG    deviendraient  les  partenaires  du  Projet IEC RADIO PAEAR dans la mise en œuvre de l’organisation de l’audience, à l’issue de l’examen  de leur offre technique et financière respective.   Rapport  Annuel 2008     17 
  • 17. Composante B : REHABILITATION ET DEVELOPPEMENT DES INFRASTRUCTURES   TRAVAUX   TRAVAUX DE 1250 FORAGES  Les travaux sont repartis en trois lots : un lot 350 forages, et un lot de 300 forages dans le nord et un  autre lot de 600 forages dans le Sud.  Le lot de  350 forages est confié à REVA FORAGE et les deux  autres lots sont confiés à l’Entreprise Chinoise CHINA GEO ENGINNERRING CORPORATION – CGC.  Le  31  juillet  2008,  dans  la  région  de  la  SAVA,  localité  d’Ambia,  CR  de  Farahalana  dans  le  district  de  Sambava  a  eu  lieu    le  lancement  officiel  des  travaux  de  1250  forages.  Cette  localité fait partie du lot des 300 forages.              Lancement des travaux de forages dans    la Région de SAVA      Ci‐après la situation de chaque lot  1. 300 FORAGES DANS LE NORD   • Lancement  travaux  :  le  31  juillet  2008  dans  la  région de SAVA  • Situation actuel des travaux  59 forages effectués dont 44 positifs et 9 équipés, soit  un avancement de 12%.   Les travaux de forage ont arrêté depuis le 10 décembre à  Forage équipé de PMH dans le village  cause de la période des pluies. Les travaux de l’entreprise  Antanandronono, Région SAVA  sont  actuellement  consacrés  à  la  construction  des  margelles et des aires d’assainissement et l’installation des  pompes.  Les pompes destinées aux 300 forages sont déjà livrées et sont prêts à la pose.   Rapport  Annuel 2008     18 
  • 18.   2. 350 FORAGES DANS LE NORD • Lancement des travaux du lot de 350 forages :  Le 26 septembre 2008, a eu lieu à Antsohihy le lancement officiel des travaux de 350 forages pour les   régions du Nord. C’est ainsi la date de démarrage des travaux pour ce lot de forages.                     Lancement des travaux de forages à    Antsohihy, Région SOFIA      • Situation actuelle des travaux  A la fin de l’année 2008, 33 forages  dont 26 positifs sont réalisés et sont entrain d’être équipés de  pompes, ce qui représente un avancement de 10%.  Avec les 5 ateliers de forage de l’entreprise qui seront fonctionnels dès le début de cette année, on  envisage de pouvoir respecter le délai d’exécution qui est prévu à 18 mois  3. 600 FORAGES DANS LE SUD • Lancement des  travaux du lot de 600 forages :  Le  lancement  officiel  des  travaux  a  eu  lieu  le  05  octobre  2008  dans  la  région  d’ANOSY,  localité  de  Soaserana, commune rurale de Tsivory, District Amboasary Atsimo             Lancement des travaux de forages dans le        19  Rapport  Annuel 2008   village de Soaserana, Région ANOSY 
  • 19. • Situation actuelle des travaux  33 forages ont été réalisés dans le Sud dont  22 positifs, soit un avancement de 3,5%. Les travaux de  foration ont été arrêtés depuis le 10 décembre dernier à cause de la période des pluies.   4  ateliers  de  forages  seront  opérationnels  dès  la  reprise  de  chantier  pour  respecter  le  délai  d’exécution.  TRAVAUX DE CONSTRUCTION DE 3700 BLOCS SANITAIRES  Conformément  aux  recommandations  de  la  mission  de  supervision  de  la  BAD  en  date  18  février  2008,  les  travaux  de  construction  des  3700  blocs  sanitaires  repartis  en  6  lots  sont  confiés  à  des  entreprises de travaux.  L’appel  d’offres  international  a  été  lancé  le  29  septembre  2008  pour  être  remises  le  01  décembre  2008.  Les  procédures  de  passation  des  marchés  sont  activées  et  les  travaux  commenceront  cette  année 2009.  PIPELINE DU GRAND SUD  Suite à la mission de supervision du 18 au 29 février 2008, l’option initialement prévu consistant au  prolongement du 1er tronçon de pipeline, la réalisation du 2ème tronçon a été abandonnée du fait que  le 1er tronçon n’est même pas fonctionnel et que le débit de la ressource n’est pas suffisante la ville  d’Ambovombe.  La CEP a chargé le Groupement ANTEA / CNEAGR / ACTION et DEVELOPPEMENT, titulaire du marché  des  études  techniques  du  lot  1  pour  effectuer  une  étude  approfondie  de  l’alimentation  en  eau  de  l’extrême  sud.  Il  en  résulte  que  les  ressources  identifiées  par  les  japonais  n’est  pas  suffisante  pour  alimenter la ville d’Ambovombe.  Ainsi,  La  CEP  proposera  une  autre  alternative  pour  l’alimentation  en  eau  potable  de  la  ville  d’Ambovombe  et  ses  communes  environnantes.  Cette  proposition  dépendra  surtout  des  résultats  d’études effectuées par le groupement lors de la présentation du rapport d’APD.    BIENS  ACQUISITION ET INSTALLATION DE 4 STATIONS EOLIENNES Faisant  suite  à  la  décision  prise  concernant  le  pipeline  écartant  la  réalisation  du  2ème  tronçon,  la  tenue ou non de l’acquisition des stations éoliennes dépendra de l’étude technique effectuée par le  groupement ANTEA / CNEAGR / ACTION et DEVELOPPEMENT   Rapport  Annuel 2008     20 
  • 20. SERVICES  La phase de recrutement de consultants pour effectuer les tâches prévues pour le volet « services »  est  effectuée  à  100%  et  les  consultants  sélectionnés  sont  à  pied  d’œuvre  pour  d’accomplir  leur  engagement au programme PAEAR et réaliser à temps et dans les normes leurs prestations.  ETUDES TECHNIQUES D’AEP  • Situation  de  l’avancement  du  LOT  1 : « Etudes  et  contrôle  des  travaux  pour  l’AEP  des 30 grands centres et la réhabilitation de 230 points d’eau »  Le  lot  1  a  été  attribué  au  groupement  ANTEA  /  CNEAGR  /  ACTION  ET  DEVELOPPEMENT.  Leurs  prestations ont commencé en octobre 2008. Leur situation d’avancement se présente comme suit :   30 Grands Centres  Fin de l’année 2008, les  études d’avant projet sommaire (APS) des 14 centres ont été validés par la  CEP,  soit  un  avancement  de  46%.  Le  lancement  des  travaux  est  prévu  pour  le  début  du  mois  de  février 2009 après la validation des APD.   230 Points D’eau  L’étude de 48 localités sur les 164 prévus est réalisée, soit un avancement de 30%.  Les travaux vont être lancés le plus rapidement possible dès la réception des APD des sites étudiés.  La liste des sites étudiés sont portés en annexe.  • Situation  de  l’avancement  du  LOT  2 :  « études  d’implantation  et  supervision  des  travaux  de  1250  forages  et  études  et  contrôle  des  travaux  d’adduction  d’eau  potable gravitaire de 180 petits centres ».  Le  lot  2  quant  à  lui,  est  attribué  au  Groupement  TECSULT  /  TECMAD  /  SGDM  qui  est  notifié  le  21  octobre 2008. Initialement, la durée de leur contrat était de 24 mois, mais comme le Programme se  doit  de  réaliser  toutes  les  activités  prévues  avant  Juillet  2010,  alors,  le  groupement  sera  dans  l’obligation de revoir son planning et tous ses moyens.  1250 forages  A  la  date  de  22  décembre  2008,  le  consultant  a  effectué  306  implantations  dans  les  8  régions  d’intervention du PAEAR et pour les trois lots de travaux de forage, soit un avancement de 16%.  180 petits centres  Pour ce volet, le consultant a déjà effectué les études sur terrain de 44 localités sur les 180 prévus ;  soit 24% par rapport à l’objectif en vue de finaliser les études d’avant projet sommaire. Le lancement  des appels d’offres pour les travaux vont se réaliser en 2009.      Rapport  Annuel 2008     21 
  • 21. ELABORATION DE L’ETUDE STRATEGIQUE ENVIRONNEMENTALE  Le  groupement  BRL  Ingénierie/BRL  Madagascar,  adjudicataire  du  marché  est  notifié  le  03  octobre  2008.   Conformément au contrat, les prestations ont commencé et le rapport provisoire de la phase 1 de  l’étude est remis au Programme le 16 décembre 2008 pour approbation.  SUIVI ENVIRONNEMENTAL   Le marché est attribué au cabinet d’études BIODEV Madagascar Consulting. Le Titulaire est notifié le  11 décembre 2008 pour démarrer les prestations.   Selon  le  calendrier  de  remise  de  rapport,  le  titulaire  a  remis  le  document  de  suivi  provisoire  le  29  décembre 2008 pour approbation.    Composante C : Gestion du programme   TRAVAUX   Attribuée à l’Entreprise « MIALY » en date du 10/01/2008  • Travaux réalisés à 100%  • Situation actuelle : en attente de la réception définitive    Réhabilitation des locaux de la DEPA à Antsiranana  • Attribuée à l’Entreprise « ALSON » en date du 04/12/2008  • Avancement des travaux à 50%.   Réhabilitation des locaux de la DEPA à Tuléar  • Attribuée à l’Entreprise « FITARIKANDRO » en date du 08/12/2008  • Avancement des travaux à 50%.   BIENS  Acquisition des mobiliers réalisée en 2007  SERVICES  • Formation des agents de la CEP chargés de la gestion du Programme  75% des agents de la CEP ont été formés dans le domaine du suivi‐évaluation, passation des  marchés, comptabilité de projet.  • Recrutement d’un cabinet d’audit financier du programme pendant les 3 exercices concernés  Pour l’audit de l’exercice 2008 et de l’exercice 2009, il a été convenu de retenir la liste restreinte des  cabinets pour l’exercice précédente. Actuellement la CEP est en attente de leur confirmation pour la  participation à la consultation.  Rapport  Annuel 2008     22 
  • 22. Réunion du CCP La première réunion du CCP a eu lieu à Mahajanga le 15 février 2008. Cette réunion a eu pour  objectif le rapport d’activités de l’année 2007 et la validation du PTA de l’année 2008 du programme  PAEAR et ceux du projet AEPA dans le Grand Sud.  Après la présentation des deux programmes, il y a eu des questions/réponses qui ont pu apporter  des éclaircissements aux membres du CCP. Des remarques, recommandations et souhaits du CCP ont  également été adressées aux deux programmes respectifs. Quelques éléments de réponses ont été  apportés par les programmes qui ont pris bonne note.          Réunion du CCP le 15 février 2008 à Mahajanga  Rapport  Annuel 2008     23 
  • 23.   PERSPECTIVE 2009    La  CEP  PAEAR  a  établi  un  plan  d’action  accélérée  afin  de  terminer  le  Programme    dans  le  délai  imparti. Ainsi, au fur et à mesure de l’achèvement des études techniques, les travaux seront lancés ;   tous  les  travaux  de  système  d’alimentation  en  eau,  les  travaux  de  forages  et  les  travaux  de  construction de blocs sanitaires et latrines vont être entrepris pendant l’année 2009 et s’étendraient  jusqu’en juin 2010.  Rapport  Annuel 2008     24 
  • 24. ANNEXES  1. LISTE DES FORAGES REALISES  RÉGION DISTRICT COMMUNE VILLAGE SAVA Sambava Farahalana Ambia SAVA Sambava Farahalana Ambia SAVA Sambava Farahalana Ambia SAVA Sambava Farahalana Ambia SAVA Sambava Farahalana Ambodi-pont SAVA Sambava Farahalana Antanandronono SAVA Sambava Farahalana Antanandronono SAVA Antalaha Antalaha Antsahanoro SAVA Antalaha Antalaha Antsahanoro SAVA Antalaha Antalaha Antsahanoro SAVA Antalaha Antalaha Antsahanoro SAVA Antalaha Antanmbao-Ampano Antanambao-Ampano SAVA Antalaha Antanmbao-Ampano Antanambao-ampano SAVA Antalaha Antanambao-Ampano Andritika SAVA Antalaha Antampolo Antampolo SAVA Antalaha Antampolo Antampolo SAVA Antalaha Antampolo Antampolo SAVA Antalaha Antampolo Antampolo SAVA Antalaha Antampolo Antampolo SAVA Antalaha Ampahana Ampombobe SAVA Antalaha Ampahana Andranotsara SAVA Antalaha Ampahana Andranotsara SAVA Sambava ambinanifaho Antambaovao SAVA Antalaha Antsahanoro Androranga SAVA Antalaha Antsahanoro Androranga SAVA Antalaha Antalaha Anjiamangotraka SAVA Andapa Analambe Analanambe SAVA Andapa Analambe Analanambe SAVA Andapa Bealampona Andratamarina SAVA Andapa Bealampona Andratamarina SAVA Andapa Bealampona Andratamarina SAVA Andapa Anjavibe Anjavibe SAVA Andapa Anjavibe Anjavibe SAVA Andapa Anjavibe Anjavibe SAVA Andapa Tanandava Andapankova SAVA Andapa Ambodimanga I Antsahanongo SAVA Vohemar Ampondra Ampondra SAVA Vohemar Ampondra Ampondra SAVA Vohemar Ampondra Antsahambovo SAVA Vohemar Nosy be Mahasoa SAVA Vohemar Nosy be Morafeno est SAVA Vohemar Nosy be Bobatsirevo SAVA Vohemar Nosy be Mafokovo SAVA Vohemar Madirobe Madirobe SAVA Vohemar Nosy be Morafeno oest SAVA Vohemar Nosy be Morafeno oest Rapport  Annuel 2008     25 
  • 25.   RÉGION DISTRICT COMMUNE VILLAGE SOFIA Antsohihy Ampandrakilandy Ankazobetsiahy SOFIA Antsohihy Ampandrakilandy Ankazobetsiahy SOFIA Antsohihy Ampandrakilandy Antanalabe SOFIA Antsohihy Ampandrakilandy Andrafia SOFIA Antsohihy Ampandrakilandy Andrafia SOFIA Antsohihy Ampandrakilandy Andrafia SOFIA Antsohihy Ampandrakilandy Andrafia SOFIA Antsohihy Ampandrakilandy Andilambe SOFIA Antsohihy Ampandrakilandy Andilambe SOFIA Antsohihy Ampandrakilandy Mahialambo SOFIA Antsohihy Ampandrakilandy Matsaboribe SOFIA Antsohihy Ampandrakilandy Matsaboribe SOFIA Antsohihy Antsohihy Bekitrobaka SOFIA Antsohihy Ambodimandresy Antambohitra SOFIA Antsohihy Ambodimandresy Antambohitra SOFIA Antsohihy Antsohihy Tsimananila SOFIA Antsohihy Ambodimandresy Ambohimanandririna SOFIA Antsohihy Ambodimandresy Ambohimanandririna SOFIA Antsohihy Ankerika Anjiajia SOFIA Antsohihy Anjiamangirana Anjiamangirana II SOFIA Antsohihy Ankerika Anjiamangirana II SOFIA Antsohihy Anahidrano Antanimora haut SOFIA Antsohihy Ankerika Antafiandakana SOFIA Antsohihy Ankerika Antafiandakana SOFIA Antsohihy Ampandrakilandy Marovato SOFIA Antsohihy Anahidrano Antanimora bas SOFIA Antsohihy Ankerika Antanambao Ankerika SOFIA Antsohihy Ampandrakilandy Ambinanindranomena SOFIA Antsohihy Ambodimandresy Ambalahonko SOFIA Antsohihy Ankerika Anjiajia SOFIA Antsohihy Anjiamangirana Andalirano Sud SOFIA Antsohihy Anjiamangirana Andalirano Nord SOFIA Antsohihy Anjiamangirana Ambalarano Doroa   RÉGION DISTRICT COMMUNE VILLAGE ANOSY Amboasary sud Tsivory Soaserana ANOSY Amboasary sud Tsivory Antaninareny ANOSY Amboasary sud Tsivory Antaninareny ANOSY Amboasary sud Tsivory Ampasimaiky ANOSY Amboasary sud Tsivory Amparakininy ANOSY Amboasary sud Tsivory Amboangitokana ANOSY Amboasary sud Tsivory Sarondrano ANOSY Amboasary sud Tsivory Ankilimary ANOSY Amboasary sud Tsivory Tanambao centre ANOSY Amboasary sud Tsivory Ankilimamy ANOSY Amboasary sud Tsivory Ambia ANOSY Amboasary sud Tsivory Agnara ANOSY Amboasary sud Tsivory Ankiliabo Rapport  Annuel 2008     26 
  • 26. ANOSY Amboasary sud Tsivory Ampiriky ANOSY Amboasary sud Tsivory Belenalena ANOSY Amboasary sud Tsivory Antsambalahy sud ANOSY Amboasary sud Tsivory Tsapa be ANOSY Amboasary sud Tsivory Amboropotsy ANOSY Amboasary sud Tsivory Ankily ANOSY Amboasary sud Tsivory Besakoa ANOSY Amboasary sud Tsivory Fandranarivo ANOSY Amboasary sud Tsivory Betania ANOSY Amboasary sud Tomboarivo Mandavenoka ouest ANOSY Amboasary sud Tomboarivo Miheba Tanambao ANOSY Amboasary sud Tomboarivo Soarano ANOSY Amboasary sud Tsivory Ankotika ANOSY Amboasary sud Tsivory Ampitroara ANOSY Amboasary sud Elonty Bemandresy   RÉGION DISTRICT COMMUNE VILLAGE DIANA Ambilobe Mantaly Tanambao Mantaly DIANA Ambilobe Mantaly Tanambao Mantaly DIANA Ambilobe Mantaly Ampanakana Mantaly DIANA Ambilobe Mantaly Ampanakana Mantaly DIANA Ambilobe Mantaly Ampanakana Mantaly DIANA Ambilobe Mantaly Ampanakana Mantaly DIANA Ambilobe Mantaly Ampanakana Mantaly DIANA Ambilobe Mantaly Antanatanana DIANA Ambilobe Mantaly Antanatanana DIANA Ambilobe Mantaly Antanatanana DIANA Ambilobe Ampondralava Bekolahy DIANA Ambilobe Ampondralava Bekolahy 2. LISTE DES SITES DES GRANDS CENTRES ETUDIES  N°  Région Districts Communes Localités 2  DIANA Ambilobe Ambilobe Ambilobe 9  SOFIA Antsohihy Ankerika Ankerika 10  SOFIA Analalava Analalava Analalava 11  SOFIA Bealanana Bealanana Bealanana 12  SOFIA Mandritsara Mandritsara Mandritsara 13  SOFIA Port Bergé Port Bergé Port Bergé 14  MELAKY Maintirano Maintirano Maintirano 15  MELAKY Morafenobe Morafenobe Morafenobe 16  MELAKY Besalampy Besalampy Besalampy 17  MELAKY Antsalova Antsalova Antsalova 18  MELAKY Ambatomainty Ambatomainty Ambatomainty 19  BETSIBOKA Maevatanana Maevatanana Maevatanana 29  ANDROY Ambovombe Ambovombe Ambovombe 30  ANOSY Amboasary Amboasary Amboasary Sud Rapport  Annuel 2008     27 
  • 27. 3. LISTE DES POINTS D’EAU A REHABILITES ETUDIES  Localités Commune District Région Andriamena Andriamena Tsaratanàna BETSIBOKA Anjiakely Bemokotra Maevatanana BETSIBOKA Bemokotra Bemokotra Maevatanana BETSIBOKA Mahasoa Bemokotra Maevatanana BETSIBOKA Maevarano Bemokotra Maevatanana BETSIBOKA Ankijatsivazay Mahazoma Maevatanana BETSIBOKA Ambaky Ambohisoa Mandritsara SOFIA Ambanjabe Ambanjabe Port Bergé SOFIA Ambato Tsarahonenana Befandriana Nord SOFIA Ambatoriha Ambatoriha Bealanana SOFIA Ambodisakoana Ambodisakoana Port Bergé SOFIA Ampandriakilandy Ampandriakilandy Antsohihy SOFIA Ampandroangisa Ambohitoaka Mampikony SOFIA Amparihy Amparihy Port Bergé SOFIA Andrafiatsara Tsarahonenana Befandriana Nord SOFIA Anjiabory Ankaramy Analalava SOFIA Ankaramy Ankaramy Analalava SOFIA Beandrarezona Beandrarezona Bealanana SOFIA Befotaka Befotaka Analalava SOFIA Maroala Maroala Antsohihy SOFIA Maromandia Maromandia Analalava SOFIA Mevaranohely Mevaranohely Port Bergé SOFIA Tsarahasina Tsarahasina Port Bergé SOFIA Tsaratanana Tsaratanàna Port Bergé SOFIA Tsinjomitondraka Tsinjomitondraka Port Bergé SOFIA Anjiabe - haut Anjiabe - haut Ambilobe DIANA Anketrabe Antsahampano Antsiranana II DIANA Ivovona Ramena Antsiranana II DIANA Mananara Mangaoka Antsiranana II DIANA Ramena village Ramena Antsiranana II DIANA Andrapengy Ampahana Antalaha SAVA Andamasina Ampahana Antalaha SAVA Ampahana Ampahana Antalaha SAVA Ambinanifaho Ambinanifaho Antalaha SAVA Ampanatsovana Ambinanifaho Antalaha SAVA Ambodipont-Isahana Ambinanifaho Antalaha SAVA Valambanina Antsahanoro Antalaha SAVA Malotrandrohely Antsahanoro Antalaha SAVA Marokosa Antsahanoro Antalaha SAVA Ampombolava Antsahanoro Antalaha SAVA Ambosikidy Antsahanoro Antalaha SAVA Ankitsaka Antsahanoro Antalaha SAVA Antsorolava Antsahanoro Antalaha SAVA Maromokotra Ampahana Antalaha SAVA Ambodimadiro Ampondra Vohémar SAVA Antsahampano Nosibe Vohémar SAVA Analovana Fanambana Vohémar SAVA Amparihirano Daraina Vohémar SAVA   Rapport  Annuel 2008     28