Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler. All rights reserved.For academic use only. 1
MGT610
Lecture 6
Project Stakeholder Management
Dr. Thomas Lechler Phone: (201) 216-8174
Morton Room 636 FAX: (201) 216-5385
email: tlechler@stevens.edu
22
Project Stakeholders & Roles
• An individual, group, or organization who may affect,
be affected by, or perceive itself to be affected by
a decision, activity or outcome of a project (PMBOK,
2013)
• Examples
– Project manager
– Project sponsor: provide resources and support
for the project
– Project owner: initiates a project, finances
it, contracts it out, and benefits from its output(s)
Thomas Lechler, Ting Gao
33
Project Stakeholders & Roles
– Client/customer: approve and use the project’s
product, service or results
– Vendors: provide components or services
necessary for the project also called contractors
– Functional managers: provide SME or services to
the project
– Organizational groups: internal stakeholders
affected by the activities of the project team
– Other stakeholders: financial institutions,
government regulators, consultants and others
Thomas Lechler, Ting Gao
44
N=42
• Stakeholder capabilities and dynamics are the most
frequent source of uncertainties!
Stakeholder Uncertainties
Uncertainty Categories Uncertainty Sources Frequencies
Stakeholder uncertainty Inexperience, change, contracts 20
Organizational uncertainty M&A, politics, unknown legacy system 10
Technological uncertainty Tech. issues, tight specs 8
Contextual turbulences Legal, market 6
Project characteristics Unknown complexity 3
Malpractice Self induced uncertainty 2
55
Stakeholders Related Sources of Uncertainties
Uncertainty sources Frequencies
Customer induced changes/Contracts/Diverse
needs
3
Rejection from clients 1
Requirements changed by project owner 1
Opposition from external stakeholders 1
Inability of contractor or vendor 3
Inexperienced project manager 2
Inexperienced subcontractor 1
Contractor-client Relations 2
Change of key stakeholders 2
Unknown project ownership 1
Thomas Lechler, Ting Gao
66
Project Owner Goals: Defined by Project
Contract
Fixed Price (without incentives and penalties): 21%
Fixed Price (with Incentives and penalties): 18%
Cost reimbursement (with and without incentives): 13 %
In House Work Order or Budget Allocation: 45%
Other: 3%
N=242 projects
77
Managing Project Owner Perspective: Project
Mission
Project Mission:
Represents the project owner expectations and is expressed in the
business need and the project justification.
Business Need:
Expressed as a goal or as a problem derived from the corporate
strategy.
Project Justification:
States the reason for undertaking the project.
Explains why business need should be solved.
The justification should influence future decisions about what to do
in the project.
Problem:
Need and justification are often ill defined. The ultimate goal is to
maximize wealth.
8
Explaining Project Success with Client
Expectation Alignment: An Empirical Study
Thomas Lechler Ting Gao
Stevens Institute of Technology
99
Agenda
• Motivation
• Literature Review
• Model Development and Hypotheses
• Methodology
• Results
• Implications and Outlook
Thomas Lechler, Ting Gao
1010
Motivation
• Challenge for project managers to satisfy their clients
• Not unusual for clients to change their expectations
during project implementation
• Gap: Managing client expectations is recognized by
practitioners, but research lags behind practice
• Research Question: What are the effects
of managing client expectations?
Thomas Lechler, Ting Gao
1111
Literature Review
• Reasons for Dynamic Client Expectations
– Information asymmetry
• Creating potential mistrust (Turner &
Müller, 2004)
– Motivation to maximize value
• Self-perception theory (Bem,1972)
• Dissatisfaction with past choices (Huber,
1997)
Thomas Lechler, Ting Gao
1212
Literature Review
• Influence of Dynamic Client Expectations
– Project changes, especially goal changes
(Kreiner, 1995)
– Loss of client support
Thomas Lechler, Ting Gao
1313
Literature Review
• Client Expectation Alignment
– The processes to align client expectations
with project objectives
• Following relationship marketing literature
(Morgan & Hunt, 1994; Buttle, 2001)
– The processes reducing goal changes
– The processes increasing client support
Thomas Lechler, Ting Gao
1414
Model Development and
Hypotheses
• Conceptual Framework
Client
Competence
Team
Competence
Project
Manager
Authority
Client
Expectation
Alignment
Client
Support
Goal
Changes
Project
Success
H5a (+)
H5b(+)
H5c (+)
H3a (-)
H3b (+)
H3c (+)
H1 (-)
H2 (+)
H4a
H4b
Thomas Lechler, Ting Gao
1515
Methodology
• Data Collection
– From project manager, two project team members,
and one senior manager
– 600 surveys from 249 projects in the USA
• Research Sample
– 39% NPD
– 34% IT/IS projects
– 8% Construction projects
– 11% Others
Thomas Lechler, Ting Gao
1616
Methodology
• Research Measures
– Applying multiple items
– 7-point rating scales from “strongly
disagree” to “strongly agree”
– Cronbach’s alpha from 0.83 to 0.95 for the
five constructs
Thomas Lechler, Ting Gao
1717
Methodology
Scale Alpha Number of items
Project success 0.85 – 0.95 13
Client expectation
alignment
0.89 9
Goal changes 0.85 2
Team competence 0.83 3
Project manager
authority
0.84 4
Client support N/A 1
Client competence N/A 1
• Research Measures
Thomas Lechler, Ting Gao
1818
Variable Measurements
Scale Measures
Efficiency 1. The project was completed on schedule
2. The project was completed within budget
Effectiveness 1. The project met all technical specifications.
2. The project does what it is supposed to do.
3. The results of this project represent an improvement in client
performance.
4. The project is used by its intended clients.
5. The project has a positive impact on those who make use of it.
6. Important clients, directly affected by the project, make use of it.
7. Clients using this project will experience more effective decision
making and / or improved performance.
Customer
satisfaction
1. The clients were satisfied with the process by which this project was
completed
2. The clients are satisfied with the results of the project
Economic
success
1. The project was an economic success for the organization that
completed it.
2. All things considered, the project is a success.
1919
Variable Measurements
Scale Measures
Client expectation
alignment
1. Potential clients had been contacted about the usefulness of the
project output.
2. The clients had been given the opportunity to provide input early in
the project development stage.
3. The limitations of the project had been discussed with the client.
4. The clients were told whether or not their input was adopted into the
project plan.
5. Clients know whom to contact when problems or questions arose.
6. The clients were kept informed about the project’s progress.
7. Adequate advanced preparation had been done to determine how
best to “sell” the project to the clients.
8. There was adequate documentation of the project to permit easy use
by the clients (instructions, manuals, etc).
9. An adequate presentation of the project had been developed for the
clients.
Client support 1.In case of difficulties, the clients supported the project team.
Goal changes 1. Project goals were often changed.
2. At least one major project goal was changed considerably.
2020
Variable Measurements
Scale Measures
Client competence 1. During the negotiation process, the client appeared knowledgeable
regarding the technical aspects of the project.
Team competence 1. The project team was sufficiently trained.
2. The project team was technically competent.
3. The people implementing the project understood it.
Project manager’s
authority
1. The authority allocated to the position of project manager was
sufficient.
2. The project manager had enough authority to negotiate agreements
with project clients (internal or external) regarding the terms, conditions,
and or deliverables of the project.
3. The project manager had sufficient authority to make all the
necessary decisions to achieve the project goals.
4. The project manager had the authority to change objectives in order
to achieve the project goal.
2121
Methodology
• Data Analysis
– Within unit agreement index (rwg) to justify
aggregation: deleted 43 projects
– Structural Equation Modeling: LISREL
– Stepwise Regression Model
Thomas Lechler, Ting Gao
2222
Results
• Influence of Client Expectation Alignment (SEM)
Direct Indirect Total
Client expectation alignment +0.24 +0.38 +0.62
Goal changes -0.14 -- -0.14
Client support +0.59 -- +0.59
+0.24
Client
Expectation
Alignment
Client
Support
Goal
Changes
Project
Success
-0.32
+0.56
-0.14
+0.59
Thomas Lechler, Ting Gao
2323
Model Development and
Hypotheses
• Conceptual Framework
Client
Competence
Team
Competence
Project
Manager
Authority
Client
Expectation
Alignment
Client
Support
Goal
Changes
Project
Success
H5a (+)
H5b(+)
H5c (+)
H3a (-)
H3b (+)
H3c (+)
H1 (-)
H2 (+)
H4a
H4b
Thomas Lechler, Ting Gao
2424
Results
• Determinants of Client Expectation Alignment
(Stepwise Regression Model)
** p<0.01
• All hypotheses are supported
Variables Final Step
Project team competence 0.43**
Client competence 0.32**
PM authority 0.17**
F value 64.30**
R2 0.50
Thomas Lechler, Ting Gao
2525
Implications and Outlook
• For Stakeholder Theory
– Significance of stakeholder expectations
– The influence path of changing expectations on
project performance
• For Practice
– Communicating to adjust clients’ expectations
– Managing project changes by managing
stakeholder expectations
Thomas Lechler, Ting Gao
2626
Implications and Outlook
• Outlook
– Alternative measurement model for client
expectation alignment
– Internal and external stakeholder expectations
– Project uncertainty as a moderator
– More mediators to explain the effect of client
expectation alignment on project success
Thomas Lechler, Ting Gao

Mais conteúdo relacionado

Mais procurados

Atifa Capstone Final Report First Draft. (1)
Atifa Capstone Final Report First Draft. (1)Atifa Capstone Final Report First Draft. (1)
Atifa Capstone Final Report First Draft. (1)
Atifa Mahmoodi
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
PMI_IREP_TP
 
Work breakdown structure google day.
Work breakdown structure google day.Work breakdown structure google day.
Work breakdown structure google day.
Abhijeet Athipet
 

Mais procurados (20)

3 Questions PM needs to ask for Stakeholder Management
3 Questions PM needs to ask for Stakeholder Management3 Questions PM needs to ask for Stakeholder Management
3 Questions PM needs to ask for Stakeholder Management
 
Guid to implement initiating and planning processes
Guid to implement initiating and planning processesGuid to implement initiating and planning processes
Guid to implement initiating and planning processes
 
Balanced scorecard for effective project selection process
Balanced scorecard for effective project selection processBalanced scorecard for effective project selection process
Balanced scorecard for effective project selection process
 
Babok v3 chp 10 techniques
Babok v3 chp 10 techniquesBabok v3 chp 10 techniques
Babok v3 chp 10 techniques
 
Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
Prince 2: project managment Document Lessons learned report
Prince 2: project managment Document Lessons learned reportPrince 2: project managment Document Lessons learned report
Prince 2: project managment Document Lessons learned report
 
Project stakeholder management
Project stakeholder managementProject stakeholder management
Project stakeholder management
 
Mobile Marketing Project Charter
Mobile Marketing Project CharterMobile Marketing Project Charter
Mobile Marketing Project Charter
 
DPPM2
DPPM2DPPM2
DPPM2
 
DPPM6
DPPM6DPPM6
DPPM6
 
Project management
Project managementProject management
Project management
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2
 
Atifa Capstone Final Report First Draft. (1)
Atifa Capstone Final Report First Draft. (1)Atifa Capstone Final Report First Draft. (1)
Atifa Capstone Final Report First Draft. (1)
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
 
Project Charter in 45 mins or less for IACET #pm #training
Project Charter in 45 mins or less for IACET  #pm #trainingProject Charter in 45 mins or less for IACET  #pm #training
Project Charter in 45 mins or less for IACET #pm #training
 
Project initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder managementProject initiation topic 2.8_stakeholder management
Project initiation topic 2.8_stakeholder management
 
Work breakdown structure google day.
Work breakdown structure google day.Work breakdown structure google day.
Work breakdown structure google day.
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARY
 
Implementing a project delivery framework
Implementing a project delivery frameworkImplementing a project delivery framework
Implementing a project delivery framework
 
Chap002
Chap002Chap002
Chap002
 

Destaque

Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_s
henry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
henry KKK
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
henry KKK
 
Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cc
henry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
henry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
henry KKK
 
Reading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionReading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_prediction
henry KKK
 
Proyecto Facebook Dimension Material Presentacion Isla Echague
Proyecto Facebook Dimension Material Presentacion Isla EchagueProyecto Facebook Dimension Material Presentacion Isla Echague
Proyecto Facebook Dimension Material Presentacion Isla Echague
Estela Dominguez Halpern
 

Destaque (8)

Syllabus mgt610 2013_s
Syllabus mgt610 2013_sSyllabus mgt610 2013_s
Syllabus mgt610 2013_s
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
 
Reading week09 lechler_cc
Reading week09 lechler_ccReading week09 lechler_cc
Reading week09 lechler_cc
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Reading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_predictionReading week08 saaty_ahp_prediction
Reading week08 saaty_ahp_prediction
 
Proyecto Facebook Dimension Material Presentacion Isla Echague
Proyecto Facebook Dimension Material Presentacion Isla EchagueProyecto Facebook Dimension Material Presentacion Isla Echague
Proyecto Facebook Dimension Material Presentacion Isla Echague
 

Semelhante a Week06 slides

Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
apoorvaguptaspn27
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
Pavan Kumar
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
chikuverma1
 

Semelhante a Week06 slides (20)

Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Mega project not mega problems session 1
Mega project not mega problems session 1Mega project not mega problems session 1
Mega project not mega problems session 1
 
Strategy And Project Alignment V1.0
Strategy And Project Alignment V1.0Strategy And Project Alignment V1.0
Strategy And Project Alignment V1.0
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
Project governance
Project governanceProject governance
Project governance
 
Episode 21 : Project Scope Management
Episode 21 :  Project Scope ManagementEpisode 21 :  Project Scope Management
Episode 21 : Project Scope Management
 
ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
Project Management Presentation Template.pdf
Project Management Presentation Template.pdfProject Management Presentation Template.pdf
Project Management Presentation Template.pdf
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_management
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Lec#1
Lec#1Lec#1
Lec#1
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project Standards
 
PROJECT MANAGEMENT.pptx
PROJECT MANAGEMENT.pptxPROJECT MANAGEMENT.pptx
PROJECT MANAGEMENT.pptx
 
Impact of eLearning Scope Creep_ A Project Manager's Guide.pdf
Impact of eLearning Scope Creep_ A Project Manager's Guide.pdfImpact of eLearning Scope Creep_ A Project Manager's Guide.pdf
Impact of eLearning Scope Creep_ A Project Manager's Guide.pdf
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
3) PSTM & PSCM.pptx
3) PSTM & PSCM.pptx3) PSTM & PSCM.pptx
3) PSTM & PSCM.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
 
Lecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptxLecture 27 Projects (03-11-20).pptx
Lecture 27 Projects (03-11-20).pptx
 

Mais de henry KKK

Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3
henry KKK
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2
henry KKK
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1
henry KKK
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributes
henry KKK
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
henry KKK
 
Week11 slides
Week11 slidesWeek11 slides
Week11 slides
henry KKK
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slides
henry KKK
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
henry KKK
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slides
henry KKK
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_s
henry KKK
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_case
henry KKK
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
henry KKK
 
Week05 reading
Week05 readingWeek05 reading
Week05 reading
henry KKK
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercise
henry KKK
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013
henry KKK
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindset
henry KKK
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
henry KKK
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013
henry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
henry KKK
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
henry KKK
 

Mais de henry KKK (20)

Yiheng deng hw3
Yiheng deng hw3Yiheng deng hw3
Yiheng deng hw3
 
Yiheng deng hw2
Yiheng deng hw2Yiheng deng hw2
Yiheng deng hw2
 
Yiheng deng hw1
Yiheng deng hw1Yiheng deng hw1
Yiheng deng hw1
 
Examples of smart_objective_attributes
Examples of smart_objective_attributesExamples of smart_objective_attributes
Examples of smart_objective_attributes
 
Week10 slides
Week10 slidesWeek10 slides
Week10 slides
 
Week11 slides
Week11 slidesWeek11 slides
Week11 slides
 
Week12 slides
Week12 slidesWeek12 slides
Week12 slides
 
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
 
Week08 slides
Week08 slidesWeek08 slides
Week08 slides
 
Week07 slides 2013_s
Week07 slides 2013_sWeek07 slides 2013_s
Week07 slides 2013_s
 
Week05 spc single_case
Week05 spc single_caseWeek05 spc single_case
Week05 spc single_case
 
Week05 slides
Week05 slidesWeek05 slides
Week05 slides
 
Week05 reading
Week05 readingWeek05 reading
Week05 reading
 
Week05 exercise
Week05 exerciseWeek05 exercise
Week05 exercise
 
Week03 slides spring_2013
Week03 slides spring_2013Week03 slides spring_2013
Week03 slides spring_2013
 
Week03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindsetWeek03 reading lechler_pm_mindset
Week03 reading lechler_pm_mindset
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Week01 slides spring_2013
Week01 slides spring_2013Week01 slides spring_2013
Week01 slides spring_2013
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 
Toc evaporating cloud
Toc evaporating cloudToc evaporating cloud
Toc evaporating cloud
 

Último

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 

Último (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Week06 slides

  • 1. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler. All rights reserved.For academic use only. 1 MGT610 Lecture 6 Project Stakeholder Management Dr. Thomas Lechler Phone: (201) 216-8174 Morton Room 636 FAX: (201) 216-5385 email: tlechler@stevens.edu
  • 2. 22 Project Stakeholders & Roles • An individual, group, or organization who may affect, be affected by, or perceive itself to be affected by a decision, activity or outcome of a project (PMBOK, 2013) • Examples – Project manager – Project sponsor: provide resources and support for the project – Project owner: initiates a project, finances it, contracts it out, and benefits from its output(s) Thomas Lechler, Ting Gao
  • 3. 33 Project Stakeholders & Roles – Client/customer: approve and use the project’s product, service or results – Vendors: provide components or services necessary for the project also called contractors – Functional managers: provide SME or services to the project – Organizational groups: internal stakeholders affected by the activities of the project team – Other stakeholders: financial institutions, government regulators, consultants and others Thomas Lechler, Ting Gao
  • 4. 44 N=42 • Stakeholder capabilities and dynamics are the most frequent source of uncertainties! Stakeholder Uncertainties Uncertainty Categories Uncertainty Sources Frequencies Stakeholder uncertainty Inexperience, change, contracts 20 Organizational uncertainty M&A, politics, unknown legacy system 10 Technological uncertainty Tech. issues, tight specs 8 Contextual turbulences Legal, market 6 Project characteristics Unknown complexity 3 Malpractice Self induced uncertainty 2
  • 5. 55 Stakeholders Related Sources of Uncertainties Uncertainty sources Frequencies Customer induced changes/Contracts/Diverse needs 3 Rejection from clients 1 Requirements changed by project owner 1 Opposition from external stakeholders 1 Inability of contractor or vendor 3 Inexperienced project manager 2 Inexperienced subcontractor 1 Contractor-client Relations 2 Change of key stakeholders 2 Unknown project ownership 1 Thomas Lechler, Ting Gao
  • 6. 66 Project Owner Goals: Defined by Project Contract Fixed Price (without incentives and penalties): 21% Fixed Price (with Incentives and penalties): 18% Cost reimbursement (with and without incentives): 13 % In House Work Order or Budget Allocation: 45% Other: 3% N=242 projects
  • 7. 77 Managing Project Owner Perspective: Project Mission Project Mission: Represents the project owner expectations and is expressed in the business need and the project justification. Business Need: Expressed as a goal or as a problem derived from the corporate strategy. Project Justification: States the reason for undertaking the project. Explains why business need should be solved. The justification should influence future decisions about what to do in the project. Problem: Need and justification are often ill defined. The ultimate goal is to maximize wealth.
  • 8. 8 Explaining Project Success with Client Expectation Alignment: An Empirical Study Thomas Lechler Ting Gao Stevens Institute of Technology
  • 9. 99 Agenda • Motivation • Literature Review • Model Development and Hypotheses • Methodology • Results • Implications and Outlook Thomas Lechler, Ting Gao
  • 10. 1010 Motivation • Challenge for project managers to satisfy their clients • Not unusual for clients to change their expectations during project implementation • Gap: Managing client expectations is recognized by practitioners, but research lags behind practice • Research Question: What are the effects of managing client expectations? Thomas Lechler, Ting Gao
  • 11. 1111 Literature Review • Reasons for Dynamic Client Expectations – Information asymmetry • Creating potential mistrust (Turner & Müller, 2004) – Motivation to maximize value • Self-perception theory (Bem,1972) • Dissatisfaction with past choices (Huber, 1997) Thomas Lechler, Ting Gao
  • 12. 1212 Literature Review • Influence of Dynamic Client Expectations – Project changes, especially goal changes (Kreiner, 1995) – Loss of client support Thomas Lechler, Ting Gao
  • 13. 1313 Literature Review • Client Expectation Alignment – The processes to align client expectations with project objectives • Following relationship marketing literature (Morgan & Hunt, 1994; Buttle, 2001) – The processes reducing goal changes – The processes increasing client support Thomas Lechler, Ting Gao
  • 14. 1414 Model Development and Hypotheses • Conceptual Framework Client Competence Team Competence Project Manager Authority Client Expectation Alignment Client Support Goal Changes Project Success H5a (+) H5b(+) H5c (+) H3a (-) H3b (+) H3c (+) H1 (-) H2 (+) H4a H4b Thomas Lechler, Ting Gao
  • 15. 1515 Methodology • Data Collection – From project manager, two project team members, and one senior manager – 600 surveys from 249 projects in the USA • Research Sample – 39% NPD – 34% IT/IS projects – 8% Construction projects – 11% Others Thomas Lechler, Ting Gao
  • 16. 1616 Methodology • Research Measures – Applying multiple items – 7-point rating scales from “strongly disagree” to “strongly agree” – Cronbach’s alpha from 0.83 to 0.95 for the five constructs Thomas Lechler, Ting Gao
  • 17. 1717 Methodology Scale Alpha Number of items Project success 0.85 – 0.95 13 Client expectation alignment 0.89 9 Goal changes 0.85 2 Team competence 0.83 3 Project manager authority 0.84 4 Client support N/A 1 Client competence N/A 1 • Research Measures Thomas Lechler, Ting Gao
  • 18. 1818 Variable Measurements Scale Measures Efficiency 1. The project was completed on schedule 2. The project was completed within budget Effectiveness 1. The project met all technical specifications. 2. The project does what it is supposed to do. 3. The results of this project represent an improvement in client performance. 4. The project is used by its intended clients. 5. The project has a positive impact on those who make use of it. 6. Important clients, directly affected by the project, make use of it. 7. Clients using this project will experience more effective decision making and / or improved performance. Customer satisfaction 1. The clients were satisfied with the process by which this project was completed 2. The clients are satisfied with the results of the project Economic success 1. The project was an economic success for the organization that completed it. 2. All things considered, the project is a success.
  • 19. 1919 Variable Measurements Scale Measures Client expectation alignment 1. Potential clients had been contacted about the usefulness of the project output. 2. The clients had been given the opportunity to provide input early in the project development stage. 3. The limitations of the project had been discussed with the client. 4. The clients were told whether or not their input was adopted into the project plan. 5. Clients know whom to contact when problems or questions arose. 6. The clients were kept informed about the project’s progress. 7. Adequate advanced preparation had been done to determine how best to “sell” the project to the clients. 8. There was adequate documentation of the project to permit easy use by the clients (instructions, manuals, etc). 9. An adequate presentation of the project had been developed for the clients. Client support 1.In case of difficulties, the clients supported the project team. Goal changes 1. Project goals were often changed. 2. At least one major project goal was changed considerably.
  • 20. 2020 Variable Measurements Scale Measures Client competence 1. During the negotiation process, the client appeared knowledgeable regarding the technical aspects of the project. Team competence 1. The project team was sufficiently trained. 2. The project team was technically competent. 3. The people implementing the project understood it. Project manager’s authority 1. The authority allocated to the position of project manager was sufficient. 2. The project manager had enough authority to negotiate agreements with project clients (internal or external) regarding the terms, conditions, and or deliverables of the project. 3. The project manager had sufficient authority to make all the necessary decisions to achieve the project goals. 4. The project manager had the authority to change objectives in order to achieve the project goal.
  • 21. 2121 Methodology • Data Analysis – Within unit agreement index (rwg) to justify aggregation: deleted 43 projects – Structural Equation Modeling: LISREL – Stepwise Regression Model Thomas Lechler, Ting Gao
  • 22. 2222 Results • Influence of Client Expectation Alignment (SEM) Direct Indirect Total Client expectation alignment +0.24 +0.38 +0.62 Goal changes -0.14 -- -0.14 Client support +0.59 -- +0.59 +0.24 Client Expectation Alignment Client Support Goal Changes Project Success -0.32 +0.56 -0.14 +0.59 Thomas Lechler, Ting Gao
  • 23. 2323 Model Development and Hypotheses • Conceptual Framework Client Competence Team Competence Project Manager Authority Client Expectation Alignment Client Support Goal Changes Project Success H5a (+) H5b(+) H5c (+) H3a (-) H3b (+) H3c (+) H1 (-) H2 (+) H4a H4b Thomas Lechler, Ting Gao
  • 24. 2424 Results • Determinants of Client Expectation Alignment (Stepwise Regression Model) ** p<0.01 • All hypotheses are supported Variables Final Step Project team competence 0.43** Client competence 0.32** PM authority 0.17** F value 64.30** R2 0.50 Thomas Lechler, Ting Gao
  • 25. 2525 Implications and Outlook • For Stakeholder Theory – Significance of stakeholder expectations – The influence path of changing expectations on project performance • For Practice – Communicating to adjust clients’ expectations – Managing project changes by managing stakeholder expectations Thomas Lechler, Ting Gao
  • 26. 2626 Implications and Outlook • Outlook – Alternative measurement model for client expectation alignment – Internal and external stakeholder expectations – Project uncertainty as a moderator – More mediators to explain the effect of client expectation alignment on project success Thomas Lechler, Ting Gao