Project Research Proposal Design of 4.5km road
1. Project Research Proposal
Project Research Proposal
Design of 4.5km Nawakilli to Balili check post
link Road
Submitted by
(FALL-2010)
• AMJAD PERVEZ: 13380 (Group Leader)
• ASSADULLAH: 12816
• HAZOOR ALI SHAH: 12699
• RIAZ KHAN: 15265
• BILAWAL IBRAHIM: 15628
• SHARAF UD DIN: 12562
Supervised by
ENGR. NAWAZ ALI
Lecturer
Department of Civil Engineering
Faculty of Engineering
Supervised by Nawaz Ali Kakar Page 1 of 6
2. Project Research Proposal
Table of Content
PROJECT RESEARCH PROPOSAL...............................................................1
TABLE OF CONTENT.......................................................................................2
1.TITLE:.............................................................................................................3
3.CHECKED BY................................................................................................3
4.APPROVED BY .............................................................................................3
5.SCOPE:..........................................................................................................4
6.COPYRIGHTS:...............................................................................................4
7.ABSTRACT: ..................................................................................................5
8.OBJECTIVES.................................................................................................5
9.REFERENCES...............................................................................................5
10.RESEARCH METHODOLOGY:...................................................................6
11.POTENTIAL BENEFITS...............................................................................6
Supervised by Nawaz Ali Kakar Page 2 of 6
3. Project Research Proposal
1. Title:
Design of 4.5km Nawakilli to Balili ceck post link Road
2. Prepared by:
• AMJAD PERVEZ: 13380 (Group Leader)
• ASSADULLAH: 12816
• HAZOOR ALI SHAH: 12699
• RIAZ KHAN: 15265
• BILAWAL IBRAHIM: 15628
• SHARAF UD DIN: 12562
3. Checked by
NAWAZ ALI KAKAR
Project Supervisor
Lecturer
Department of Civil Engineering
4. Approved by
Dr. Gul Ahmed Jokhio
Assistant Professor
Chairman Department of Civil Engineering
Supervised by Nawaz Ali Kakar Page 3 of 6
4. Project Research Proposal
5. Scope:
This research project covers the following:
5.1. Survey (preliminary & secondary) and levelling of the road.
5.2. Geometrical designs (Long Sections & cross Sections).
5.3. Different types of Soil Tests:
5.3.1. Moisture Content test.
5.3.2. Liquid Limit test.
5.3.3. Plastic Limit test.
5.3.4. Shrinkage Limit test.
5.3.5. Proctor Test.
5.3.6. California Bearing Ratio (CBR) Test.
5.4. Design of culverts (pipe, box).
5.5. Design of causeway.
5.6. Design of curve.
5.7. Road Finishing (Alignment).
5.8. Estimation and Costing.
6. Copyrights:
The copyrights of the project will remain with Department of Civil
Engineering, Faculty of Engineering, Baluchistan University of
Information Technology, Engineering and Management Sciences Quetta.
Supervised by Nawaz Ali Kakar Page 4 of 6
5. Project Research Proposal
7. Abstract:
A road is a thoroughfare route, or way on the land between two places
which has been paved or otherwise improved to allow travel by some
conveyance, including a horse, cart, or motorcycle vehicle. Designing of
our road is based upon the AASHTO specifications under the following
standards, Geometric design: AASHTO 2001 and Pavement design:
AASHTO 1986-Road note 31-1993.
By carrying out survey & levelling collected the road data which is
further required to draw the long-sections & cross-sections. By gathering
the soil samples from the road site we then performed specified tests. All
the above information will be used to design the road.
8. Objectives
The prime objective of this project is to connect the rural area (Shah
wali) with Nawakilli and Saraghurgai.
The aim of this project work is to fulfil the demand of the road for the
sake of increasing population, for which we will have to plan and design
the road. In this project we will work on the Softwares related to
Transportation engineering e.g. GPS for finding the coordinates of the
proposed road. AutoCAD for drawing L-sections & Cross sections.
9. References
9.1. AASHTO standards.
9.1.1.1. Geometric design: AASHTO 2001
9.1.1.2. Pavement design: AASHTO 1986-Road note
31-1993.
9.2 Fundamentals of Transportation Engineering book
Supervised by Nawaz Ali Kakar Page 5 of 6
6. Project Research Proposal
10. Research Methodology:
The project will include following methodology for completion
10.1. Planning to Carrey the project.
10.2. Weather forecasting to Carrey the survey.
10.3. Collection of data through preliminary & secondary survey &
levelling
10.4. Tests for checking the characteristics of the soil (moisture
content Test, liquid limit test, plastic limit test, CBR test, proctor
test.)
10.5. Analysis of the data obtained by survey & tests.
10.6. Implementation of the data.
10.7. Use of Softwares (GPS for finding coordinates, & AutoCAD for
Drawing the L & cross sections).
10.8. Designing of culverts, curve, cause way.
10.9. Estimation and costing.
10.10. Road finishing (Alignments).
11. Potential Benefits
11.1. The Potential benefit of the project is to develop the Linking road
between the villages nearby.
11.2. Economic way of approach for the local people.
_______ THE END______
Supervised by Nawaz Ali Kakar Page 6 of 6
7. Project Research Proposal
10. Research Methodology:
The project will include following methodology for completion
10.1. Planning to Carrey the project.
10.2. Weather forecasting to Carrey the survey.
10.3. Collection of data through preliminary & secondary survey &
levelling
10.4. Tests for checking the characteristics of the soil (moisture
content Test, liquid limit test, plastic limit test, CBR test, proctor
test.)
10.5. Analysis of the data obtained by survey & tests.
10.6. Implementation of the data.
10.7. Use of Softwares (GPS for finding coordinates, & AutoCAD for
Drawing the L & cross sections).
10.8. Designing of culverts, curve, cause way.
10.9. Estimation and costing.
10.10. Road finishing (Alignments).
11. Potential Benefits
11.1. The Potential benefit of the project is to develop the Linking road
between the villages nearby.
11.2. Economic way of approach for the local people.
_______ THE END______
Supervised by Nawaz Ali Kakar Page 6 of 6