Project Research Proposal
Project Research Proposal
Design of 4.5km Nawakilli to Balili check post
link Road
Submitted by
(FALL-2010)
• AMJAD PERVEZ: 13380 (Group Leader)
• ASSADULLAH: 12816
• HAZOOR ALI SHAH: 12699
• RIAZ KHAN: 15265
• BILAWAL IBRAHIM: 15628
• SHARAF UD DIN: 12562
Supervised by
ENGR. NAWAZ ALI
Lecturer
Department of Civil Engineering
Faculty of Engineering
Supervised by Nawaz Ali Kakar Page 1 of 6
Project Research Proposal
Table of Content
PROJECT RESEARCH PROPOSAL...............................................................1
TABLE OF CONTENT.......................................................................................2
1.TITLE:.............................................................................................................3
3.CHECKED BY................................................................................................3
4.APPROVED BY .............................................................................................3
5.SCOPE:..........................................................................................................4
6.COPYRIGHTS:...............................................................................................4
7.ABSTRACT: ..................................................................................................5
8.OBJECTIVES.................................................................................................5
9.REFERENCES...............................................................................................5
10.RESEARCH METHODOLOGY:...................................................................6
11.POTENTIAL BENEFITS...............................................................................6
Supervised by Nawaz Ali Kakar Page 2 of 6
Project Research Proposal
1. Title:
Design of 4.5km Nawakilli to Balili ceck post link Road
2. Prepared by:
• AMJAD PERVEZ: 13380 (Group Leader)
• ASSADULLAH: 12816
• HAZOOR ALI SHAH: 12699
• RIAZ KHAN: 15265
• BILAWAL IBRAHIM: 15628
• SHARAF UD DIN: 12562
3. Checked by
NAWAZ ALI KAKAR
Project Supervisor
Lecturer
Department of Civil Engineering
4. Approved by
Dr. Gul Ahmed Jokhio
Assistant Professor
Chairman Department of Civil Engineering
Supervised by Nawaz Ali Kakar Page 3 of 6
Project Research Proposal
5. Scope:
This research project covers the following:
5.1. Survey (preliminary & secondary) and levelling of the road.
5.2. Geometrical designs (Long Sections & cross Sections).
5.3. Different types of Soil Tests:
5.3.1. Moisture Content test.
5.3.2. Liquid Limit test.
5.3.3. Plastic Limit test.
5.3.4. Shrinkage Limit test.
5.3.5. Proctor Test.
5.3.6. California Bearing Ratio (CBR) Test.
5.4. Design of culverts (pipe, box).
5.5. Design of causeway.
5.6. Design of curve.
5.7. Road Finishing (Alignment).
5.8. Estimation and Costing.
6. Copyrights:
The copyrights of the project will remain with Department of Civil
Engineering, Faculty of Engineering, Baluchistan University of
Information Technology, Engineering and Management Sciences Quetta.
Supervised by Nawaz Ali Kakar Page 4 of 6
Project Research Proposal
7. Abstract:
A road is a thoroughfare route, or way on the land between two places
which has been paved or otherwise improved to allow travel by some
conveyance, including a horse, cart, or motorcycle vehicle. Designing of
our road is based upon the AASHTO specifications under the following
standards, Geometric design: AASHTO 2001 and Pavement design:
AASHTO 1986-Road note 31-1993.
By carrying out survey & levelling collected the road data which is
further required to draw the long-sections & cross-sections. By gathering
the soil samples from the road site we then performed specified tests. All
the above information will be used to design the road.
8. Objectives
The prime objective of this project is to connect the rural area (Shah
wali) with Nawakilli and Saraghurgai.
The aim of this project work is to fulfil the demand of the road for the
sake of increasing population, for which we will have to plan and design
the road. In this project we will work on the Softwares related to
Transportation engineering e.g. GPS for finding the coordinates of the
proposed road. AutoCAD for drawing L-sections & Cross sections.
9. References
9.1. AASHTO standards.
9.1.1.1. Geometric design: AASHTO 2001
9.1.1.2. Pavement design: AASHTO 1986-Road note
31-1993.
9.2 Fundamentals of Transportation Engineering book
Supervised by Nawaz Ali Kakar Page 5 of 6
Project Research Proposal
10. Research Methodology:
The project will include following methodology for completion
10.1. Planning to Carrey the project.
10.2. Weather forecasting to Carrey the survey.
10.3. Collection of data through preliminary & secondary survey &
levelling
10.4. Tests for checking the characteristics of the soil (moisture
content Test, liquid limit test, plastic limit test, CBR test, proctor
test.)
10.5. Analysis of the data obtained by survey & tests.
10.6. Implementation of the data.
10.7. Use of Softwares (GPS for finding coordinates, & AutoCAD for
Drawing the L & cross sections).
10.8. Designing of culverts, curve, cause way.
10.9. Estimation and costing.
10.10. Road finishing (Alignments).
11. Potential Benefits
11.1. The Potential benefit of the project is to develop the Linking road
between the villages nearby.
11.2. Economic way of approach for the local people.
_______ THE END______
Supervised by Nawaz Ali Kakar Page 6 of 6
Project Research Proposal
10. Research Methodology:
The project will include following methodology for completion
10.1. Planning to Carrey the project.
10.2. Weather forecasting to Carrey the survey.
10.3. Collection of data through preliminary & secondary survey &
levelling
10.4. Tests for checking the characteristics of the soil (moisture
content Test, liquid limit test, plastic limit test, CBR test, proctor
test.)
10.5. Analysis of the data obtained by survey & tests.
10.6. Implementation of the data.
10.7. Use of Softwares (GPS for finding coordinates, & AutoCAD for
Drawing the L & cross sections).
10.8. Designing of culverts, curve, cause way.
10.9. Estimation and costing.
10.10. Road finishing (Alignments).
11. Potential Benefits
11.1. The Potential benefit of the project is to develop the Linking road
between the villages nearby.
11.2. Economic way of approach for the local people.
_______ THE END______
Supervised by Nawaz Ali Kakar Page 6 of 6

Mais conteúdo relacionado

Mais procurados

Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - ISachin Kulkarni
 
Study of causes of failures and remedies on road
Study of causes of failures and remedies on roadStudy of causes of failures and remedies on road
Study of causes of failures and remedies on roadShantanu Patil
 
Study of design of the flexible pavements
Study of design of the flexible pavementsStudy of design of the flexible pavements
Study of design of the flexible pavementsShaik Asif Ahmed
 
Marshall Mix Design
Marshall Mix Design Marshall Mix Design
Marshall Mix Design Akhil Ahuja
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planningPiter Biswas
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for BitumenShweta Sagar
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss Sudhir Gayake
 
project final year civil
project final year civilproject final year civil
project final year civilAlankar jaiswal
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile FoundationSubham Kundu
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume StudiesMd Tanvir Alam
 
Highway And traffic Engineering
Highway And traffic EngineeringHighway And traffic Engineering
Highway And traffic EngineeringLatif Hyder Wadho
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavementUTU Dehradun
 
Design & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD ProDesign & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD ProPARAS TANEJA
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of RoadsSanjeev B
 

Mais procurados (20)

Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - I
 
Study of causes of failures and remedies on road
Study of causes of failures and remedies on roadStudy of causes of failures and remedies on road
Study of causes of failures and remedies on road
 
Study of design of the flexible pavements
Study of design of the flexible pavementsStudy of design of the flexible pavements
Study of design of the flexible pavements
 
Marshall Mix Design
Marshall Mix Design Marshall Mix Design
Marshall Mix Design
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planning
 
Penetration Test for Bitumen
Penetration Test for BitumenPenetration Test for Bitumen
Penetration Test for Bitumen
 
Design of industrial roof truss
Design of industrial roof truss Design of industrial roof truss
Design of industrial roof truss
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 
Highway And traffic Engineering
Highway And traffic EngineeringHighway And traffic Engineering
Highway And traffic Engineering
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavement
 
Design & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD ProDesign & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD Pro
 
Report on Widening and Construction of Roads
Report on Widening and Construction of RoadsReport on Widening and Construction of Roads
Report on Widening and Construction of Roads
 
Cbr test
Cbr testCbr test
Cbr test
 

Semelhante a Project Research Proposal Design of 4.5km road

Semelhante a Project Research Proposal Design of 4.5km road (20)

UNDERPASS DESIGN
UNDERPASS DESIGNUNDERPASS DESIGN
UNDERPASS DESIGN
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
" Design of Flexible Pavement "
" Design of Flexible Pavement "" Design of Flexible Pavement "
" Design of Flexible Pavement "
 
Design of rigit pavement
Design of rigit pavementDesign of rigit pavement
Design of rigit pavement
 
2014 IRF GRAA Winners
2014 IRF GRAA Winners2014 IRF GRAA Winners
2014 IRF GRAA Winners
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
CV_Anil Malagi
CV_Anil MalagiCV_Anil Malagi
CV_Anil Malagi
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
20320130406022 2
20320130406022 220320130406022 2
20320130406022 2
 
20320130406022 2
20320130406022 220320130406022 2
20320130406022 2
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
 
Bridge report
Bridge reportBridge report
Bridge report
 
Design of expressway
Design of expresswayDesign of expressway
Design of expressway
 
Senior surveyor ragab atta c.v
Senior surveyor ragab atta c.vSenior surveyor ragab atta c.v
Senior surveyor ragab atta c.v
 
ToR
ToRToR
ToR
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in Kazakhstan
 
A Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement ExpertA Meganathan - Traffic cum Pavement Expert
A Meganathan - Traffic cum Pavement Expert
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
PROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDUPROJECT-REPORT-SUBHENDU
PROJECT-REPORT-SUBHENDU
 

Último

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Último (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Project Research Proposal Design of 4.5km road

  • 1. Project Research Proposal Project Research Proposal Design of 4.5km Nawakilli to Balili check post link Road Submitted by (FALL-2010) • AMJAD PERVEZ: 13380 (Group Leader) • ASSADULLAH: 12816 • HAZOOR ALI SHAH: 12699 • RIAZ KHAN: 15265 • BILAWAL IBRAHIM: 15628 • SHARAF UD DIN: 12562 Supervised by ENGR. NAWAZ ALI Lecturer Department of Civil Engineering Faculty of Engineering Supervised by Nawaz Ali Kakar Page 1 of 6
  • 2. Project Research Proposal Table of Content PROJECT RESEARCH PROPOSAL...............................................................1 TABLE OF CONTENT.......................................................................................2 1.TITLE:.............................................................................................................3 3.CHECKED BY................................................................................................3 4.APPROVED BY .............................................................................................3 5.SCOPE:..........................................................................................................4 6.COPYRIGHTS:...............................................................................................4 7.ABSTRACT: ..................................................................................................5 8.OBJECTIVES.................................................................................................5 9.REFERENCES...............................................................................................5 10.RESEARCH METHODOLOGY:...................................................................6 11.POTENTIAL BENEFITS...............................................................................6 Supervised by Nawaz Ali Kakar Page 2 of 6
  • 3. Project Research Proposal 1. Title: Design of 4.5km Nawakilli to Balili ceck post link Road 2. Prepared by: • AMJAD PERVEZ: 13380 (Group Leader) • ASSADULLAH: 12816 • HAZOOR ALI SHAH: 12699 • RIAZ KHAN: 15265 • BILAWAL IBRAHIM: 15628 • SHARAF UD DIN: 12562 3. Checked by NAWAZ ALI KAKAR Project Supervisor Lecturer Department of Civil Engineering 4. Approved by Dr. Gul Ahmed Jokhio Assistant Professor Chairman Department of Civil Engineering Supervised by Nawaz Ali Kakar Page 3 of 6
  • 4. Project Research Proposal 5. Scope: This research project covers the following: 5.1. Survey (preliminary & secondary) and levelling of the road. 5.2. Geometrical designs (Long Sections & cross Sections). 5.3. Different types of Soil Tests: 5.3.1. Moisture Content test. 5.3.2. Liquid Limit test. 5.3.3. Plastic Limit test. 5.3.4. Shrinkage Limit test. 5.3.5. Proctor Test. 5.3.6. California Bearing Ratio (CBR) Test. 5.4. Design of culverts (pipe, box). 5.5. Design of causeway. 5.6. Design of curve. 5.7. Road Finishing (Alignment). 5.8. Estimation and Costing. 6. Copyrights: The copyrights of the project will remain with Department of Civil Engineering, Faculty of Engineering, Baluchistan University of Information Technology, Engineering and Management Sciences Quetta. Supervised by Nawaz Ali Kakar Page 4 of 6
  • 5. Project Research Proposal 7. Abstract: A road is a thoroughfare route, or way on the land between two places which has been paved or otherwise improved to allow travel by some conveyance, including a horse, cart, or motorcycle vehicle. Designing of our road is based upon the AASHTO specifications under the following standards, Geometric design: AASHTO 2001 and Pavement design: AASHTO 1986-Road note 31-1993. By carrying out survey & levelling collected the road data which is further required to draw the long-sections & cross-sections. By gathering the soil samples from the road site we then performed specified tests. All the above information will be used to design the road. 8. Objectives The prime objective of this project is to connect the rural area (Shah wali) with Nawakilli and Saraghurgai. The aim of this project work is to fulfil the demand of the road for the sake of increasing population, for which we will have to plan and design the road. In this project we will work on the Softwares related to Transportation engineering e.g. GPS for finding the coordinates of the proposed road. AutoCAD for drawing L-sections & Cross sections. 9. References 9.1. AASHTO standards. 9.1.1.1. Geometric design: AASHTO 2001 9.1.1.2. Pavement design: AASHTO 1986-Road note 31-1993. 9.2 Fundamentals of Transportation Engineering book Supervised by Nawaz Ali Kakar Page 5 of 6
  • 6. Project Research Proposal 10. Research Methodology: The project will include following methodology for completion 10.1. Planning to Carrey the project. 10.2. Weather forecasting to Carrey the survey. 10.3. Collection of data through preliminary & secondary survey & levelling 10.4. Tests for checking the characteristics of the soil (moisture content Test, liquid limit test, plastic limit test, CBR test, proctor test.) 10.5. Analysis of the data obtained by survey & tests. 10.6. Implementation of the data. 10.7. Use of Softwares (GPS for finding coordinates, & AutoCAD for Drawing the L & cross sections). 10.8. Designing of culverts, curve, cause way. 10.9. Estimation and costing. 10.10. Road finishing (Alignments). 11. Potential Benefits 11.1. The Potential benefit of the project is to develop the Linking road between the villages nearby. 11.2. Economic way of approach for the local people. _______ THE END______ Supervised by Nawaz Ali Kakar Page 6 of 6
  • 7. Project Research Proposal 10. Research Methodology: The project will include following methodology for completion 10.1. Planning to Carrey the project. 10.2. Weather forecasting to Carrey the survey. 10.3. Collection of data through preliminary & secondary survey & levelling 10.4. Tests for checking the characteristics of the soil (moisture content Test, liquid limit test, plastic limit test, CBR test, proctor test.) 10.5. Analysis of the data obtained by survey & tests. 10.6. Implementation of the data. 10.7. Use of Softwares (GPS for finding coordinates, & AutoCAD for Drawing the L & cross sections). 10.8. Designing of culverts, curve, cause way. 10.9. Estimation and costing. 10.10. Road finishing (Alignments). 11. Potential Benefits 11.1. The Potential benefit of the project is to develop the Linking road between the villages nearby. 11.2. Economic way of approach for the local people. _______ THE END______ Supervised by Nawaz Ali Kakar Page 6 of 6