2. The Trains
Trains will be built by AnsaldoBreda and Ansaldo STS
Automated driverless trains
Length: 20m
Width: 3m
Height: 4.1m
Top Speed: 65mph
3. The Trains
System will be considered a Heavy Rail
and not a Light Rail
A heavy rail train A light rail train
4. The Trains
Trains will be powered from a third electrified rail
instead of overhead wires
Third rail Overhead wires
5. The Trains
Trains will use a “Shoe” to collect electricity from
the third rail
Pantograph used for overhead wires Shoe used for third rail
6. The Trains
Maximum capacity of 159 standing
passengers per car
36 seats per car
2 spaces for wheel chairs per car
6 doors per car – 3 on each side
7. The Trains
Expected to be powered by four 170hp
motors – Total of around 680hp
Expected to be fed by Insulated Gate
Bipolar Transistor (IGBT) semi conductor
8. Keikyu Series 600 Train
Similar in Size and layout to planned trains
for HART