Manufacturing Of Transformer
&
It’s Accessories

Harshit Srivastava
Department Of Electrical And Electronics
Engineering
Fall Semester 2010
Roll No. 0705621028
29-08-2010

1
INTRODUCTION
This presentation is an overview of some of the
ideas and techniques used by Areva T&D Ltd. In
developing transformers.
In Areva the transformer development
department is mainly divided into 3 categories:
1. Power Transformer ( P.T)
2. Medium Power Transformer (M.P.T)
3. Distributed Transformer (D.T)
29-08-2010

2
Topics
1. Introduction of Areva
2. Steps for manufacturing of
transformer
I. Overview of steps
II. Relationships between them

3. Uses of transformer
4. Accessories of Transformer
5. Steps done to solve issues in
industries
29-08-2010

3
AREVA T&D WITHIN THE GROUP

T&D: 1/3 of AREVA’s energy business
29-08-2010

Source: 2010 AREVA annual report

4
COMPLETE PORTFOLIO
OF ELECTRICITY TRANSMISSION & DISTRIBUTION
Products

Power
Transformers

Generator Circuit
Breakers

Disconnectors

Instrument
Transformers

Primary Distribution

Gas-Insulated

Secondary Distribution

Substations

Circuit Breakers

Distribution
Transformers

Systems

Substations

Power Electronics

Distributed Energy

Power Distribution

Automation

Automation Products

Automation Systems

Automation Support

Service

Maintenance &
Repair

29-08-2010

Erection &
Commissioning

Retrofit

Spare Parts

Total Asset Care

Training & Network
Consulting

5
PRODUCT LINE - POWER TRANSFORMER

29-08-2010

6
PTI - Technology

Worldwide Manufacturing Facilities
Stafford
United-Kingdom
Mönchengladbach
Germany

Jakarta
Indonesia

Le Petit-Quevilly
France
Saint-Ouen
France

Shanghai
China

Naini
India
Gebze
Turkey

Brisbane
Australia

Canoas
Brazil

29-08-2010

7

Power Transformer

March 2002- 7
Manufacturing Process
Of Transformer

RAW
MATERIAL

• Raw material basically used is CRGO(cold
rolled grained oriented)silicon steel.
• The purpose of using CRGO is to reduce
the Hysteresis Losses.

CORE
CUTTING

• It is in the form of thin sheets & cut to size
as per design.
• Generally three different shapes of core
laminations are used in one assembly.

COIL
WINDING

• Coil Winding is of two types:• R-S COIL
• HELICAL COIL
• SPIRAL COIL

CORE
FITTING

ASSEMBLY

29-08-2010

• The core assembly is vertically placed with the foot
plate touching the ground. the top yoke of the core
is removed. The limbs of the core are tightly
wrapped with cotton tape and then varnished.

• The coils as specified in the design may be
of following types:
• L.V COIL
• H.V COIL

8
TESTING

TANKING

• COIL WINDING
• CONNECTION

• Tanking is a procedure of embracement of complete
unit (active unit) in a mild steel tank, the unit being
enclosed includes (core entrapped with windings).

• ROUTINE TEST
• RATIO METER METHOD
• DIELECTRIC TESTS
TESTING AT • IMPULSE TEST LEVELS
POWER LEVEL • TEMPERATURE RISE TEST

DISMANTLIN
G&
DISPATCH

29-08-2010

• After testing is completed and before dispatch from the factory
all necessary work, e.g. removal of bushings etc. shall be
performed.
• A shipping list is made concerning the General arrangement
drawing which list out the external attachments of a power
transformer to be send to customers .

9
RAW MATERIAL USED
 MATERIAL- CRGO SILLICON STEEL
 DIFFERENT GRADES OF CRGO
 CTC-Continuous transposed material
 TYPICAL LOSS VALUE (W/Kg) AT 50 Hz & B (Tesla)
GRADE

LOSS VALUE

CRGO

B (Telsa)

 27M-4

0.83

1.22

 MOH

0.72

0.99

 ZH100

0.70

0.96

 ZDKH90

0.60

0.83

29-08-2010

CTC (Continuous Transposed
Conductors) 10
CORE CUTTING

E shape

I shape

V shape

29-08-2010

11
COIL WINDING

HELICAL WINDING

29-08-2010

CONTINUOUS DISC WINDING

SPIRAL WINDING

INTERLEAVED DISC WINDING

12
CORE FITTING
 CONSTRUCTION
1.THREE LEG (NORMAL)
2.FIVE LEG (TO REDUCE HEIGHT)
 CLAMPING ARRANGEMENT
1.END FRAME & INSULATION
2.CLAMPING PLATES
3.YOKE BOLTS
OR
YOKE STEEL BAND
(NO HOLE PUNCHING REQ )
 PROPER TIGHTENING TO REDUCE NOISE
LEVEL
29-08-2010

 VARNISH AT EXPOSED SURFACES

13
The steps are being continued..

29-08-2010

14
ASSEMBLY(BEFORE TERMINAL
GEAR STAGE)
 TOP YOKE REMOVAL
 LEVELING OF BOTTOM SUPPORT BLOCK
 LEG PREPARATION
VISUAL CHECKING OF COIL
 LOWERING OF COIL IN PROPER
ORIENTATION
 TOP INSULATION & CLAMPING RINGS
 MOUNTING OF ENDFRAMES

 SHRINKAGE IN HEATER
 TOP YOKE FITTING
 BTG TEST FOR CHECKING CORRECTNESS
29-08-2010

15
TESTING
CORE ASSEMBLY

COIL MANUFACTURING

TYPES OF TESTS
 STAGE TESTING ( DURING
MANUFACTURING STAGE)
 ROUTINE TEST

AFTER TG STAGE
DRYING & PROCESSING

 TYPE TEST
FINAL SERVICING

 SPECIAL TEST

29-08-2010

FINAL TANKING,OIL FILLING
16
TANKING

Oil filling station where tanking is done
29-08-2010

17
DISMANTLING & DISPATCH
Shipping list

Commissioning

Physical inspection of tank before placing it
Onto trailor

Final inspection for traveling point of view
29-08-2010

18
PRECAUTION & GENERAL PRACTICES
IN COIL
ADOPTED
• PRECAUTION
Conductors with rounded of
edge
Strip & spacers shouldn't
have sharp edges
Clean winding & insulation
shop
• STABILISATION OF
WINDINGS
Alignment
2 to 3 heating cycle &
pressing under hydraulic
press
HYDRAULIC PRESS FOR COIL
29-08-2010

19
POWER MARKET
Estimated capacity shortfall in GW

5-10 x Scale-up REQUIRED IN RATE OF
CAPACITY ADDITION

Annual Capacity Addition in GW / year

Source: Powering India – Road to 2017, McKinsey 2008

29-08-2010

If business as usual
continues…India is likely to
face a capacity shortfall of 95140 GW by 2017

Source: Powering India – Road to 2017, McKinsey 2008

20
TECHNOLOGY REQUIREMENTS

 ULTRA MEGA POWER PROJECTS- LARGE GENERATOR
TRANSFORMER -936 MVA

 POWERGRID AS MAIN NODAL AGENCY
 FORMATION OF CENTERAL GRID

 INTERCONNECTION OF GRIDS
29-08-2010

21
TECHNOLOGY CHALLENGES

 765kV System & Network

 800kV HVDC Transmission
 1200kV Development System

29-08-2010

22
USES
Uses
Power Transformers are used for a variety of
reasons, but they all have one thing in common;
namely that the power being received must be
tailored for the specific use.

29-08-2010

23
29-08-2010

24

Mais conteúdo relacionado

Mais procurados

Transformer testing
Transformer testingTransformer testing
Transformer testing
ajayknows
 
Dissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilDissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oil
SHIVAJI CHOUDHURY
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
Ishank Ranjan
 

Mais procurados (20)

Industrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing companyIndustrial training in Transformer manufacturing company
Industrial training in Transformer manufacturing company
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Presentation of Manufacturing Of Distribution Transformer (Prodip)
Presentation of Manufacturing Of Distribution Transformer (Prodip)Presentation of Manufacturing Of Distribution Transformer (Prodip)
Presentation of Manufacturing Of Distribution Transformer (Prodip)
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Dissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilDissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oil
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protection
 
Testing of Transformer (AREVA)
Testing of Transformer (AREVA)Testing of Transformer (AREVA)
Testing of Transformer (AREVA)
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Power transformer manufacturing process and testing
Power transformer manufacturing process and testingPower transformer manufacturing process and testing
Power transformer manufacturing process and testing
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
Manufaturing transformer
Manufaturing transformerManufaturing transformer
Manufaturing transformer
 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
 
Single line diagram
Single line diagramSingle line diagram
Single line diagram
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Protection Relays Numbering (ANSI)
Protection Relays Numbering (ANSI)Protection Relays Numbering (ANSI)
Protection Relays Numbering (ANSI)
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functions
 

Destaque

Destaque (20)

Transformer
TransformerTransformer
Transformer
 
Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 
Summer traning on Power Transformer Construction
Summer traning on Power Transformer ConstructionSummer traning on Power Transformer Construction
Summer traning on Power Transformer Construction
 
Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )Power Transformer ( Summer Training presentation BHEL )
Power Transformer ( Summer Training presentation BHEL )
 
Oil filled transformer accessories - copy
Oil  filled  transformer   accessories - copyOil  filled  transformer   accessories - copy
Oil filled transformer accessories - copy
 
Transformers stdm
Transformers stdmTransformers stdm
Transformers stdm
 
the substation components study
the substation components study the substation components study
the substation components study
 
Transformer manufacturing and Internship Report
Transformer manufacturing and Internship ReportTransformer manufacturing and Internship Report
Transformer manufacturing and Internship Report
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 
instrument transformer
instrument transformerinstrument transformer
instrument transformer
 
Transformer
TransformerTransformer
Transformer
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Transformer
TransformerTransformer
Transformer
 
Power Transformer Parts And Functions
Power Transformer Parts And FunctionsPower Transformer Parts And Functions
Power Transformer Parts And Functions
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
Areva 2005
Areva 2005Areva 2005
Areva 2005
 
Transformers for Electric Arc-Melting Furnaces with Direct Voltage Regulation
Transformers for Electric Arc-Melting Furnaces with Direct Voltage RegulationTransformers for Electric Arc-Melting Furnaces with Direct Voltage Regulation
Transformers for Electric Arc-Melting Furnaces with Direct Voltage Regulation
 
POWER TRANSFORMER WINDINGS WITHOUT PAPER INSULATION
POWER TRANSFORMER WINDINGS WITHOUT PAPER INSULATIONPOWER TRANSFORMER WINDINGS WITHOUT PAPER INSULATION
POWER TRANSFORMER WINDINGS WITHOUT PAPER INSULATION
 
0 Presentation1
0 Presentation10 Presentation1
0 Presentation1
 
3.pmbt m 3
3.pmbt m 33.pmbt m 3
3.pmbt m 3
 

Semelhante a Areva "Manufacturing of transformer, uses & it’s accessories"

Toyota 30-5FBC18 Battery Forklift Service Repair Manual
Toyota 30-5FBC18 Battery Forklift Service Repair ManualToyota 30-5FBC18 Battery Forklift Service Repair Manual
Toyota 30-5FBC18 Battery Forklift Service Repair Manual
ufdjjsjejfkkekm
 
Toyota 5FBC13 Battery Forklift Service Repair Manual
Toyota 5FBC13 Battery Forklift Service Repair ManualToyota 5FBC13 Battery Forklift Service Repair Manual
Toyota 5FBC13 Battery Forklift Service Repair Manual
ufujjsejfkkemme
 
Toyota 30-5FBC28 Battery Forklift Service Repair Manual
Toyota 30-5FBC28 Battery Forklift Service Repair ManualToyota 30-5FBC28 Battery Forklift Service Repair Manual
Toyota 30-5FBC28 Battery Forklift Service Repair Manual
fujjsjejkekmmd
 
Toyota 30-5FBC30 Battery Forklift Service Repair Manual
Toyota 30-5FBC30 Battery Forklift Service Repair ManualToyota 30-5FBC30 Battery Forklift Service Repair Manual
Toyota 30-5FBC30 Battery Forklift Service Repair Manual
ufdjjsjejfkkekm
 
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair ManualToyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
ufdjjsjejfkkekm
 
Toyota 30-5FBC15 Battery Forklift Service Repair Manual
Toyota 30-5FBC15 Battery Forklift Service Repair ManualToyota 30-5FBC15 Battery Forklift Service Repair Manual
Toyota 30-5FBC15 Battery Forklift Service Repair Manual
ufjjsjejkksemmd
 
Toyota 5FBC20 Battery Forklift Service Repair Manual
Toyota 5FBC20 Battery Forklift Service Repair ManualToyota 5FBC20 Battery Forklift Service Repair Manual
Toyota 5FBC20 Battery Forklift Service Repair Manual
ufujjsejfkkemme
 
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair ManualToyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
fujjsjejkekmmd
 
Toyota 30-5FBC13 Battery Forklift Service Repair Manual
Toyota 30-5FBC13 Battery Forklift Service Repair ManualToyota 30-5FBC13 Battery Forklift Service Repair Manual
Toyota 30-5FBC13 Battery Forklift Service Repair Manual
ufjjsjejkksemmd
 

Semelhante a Areva "Manufacturing of transformer, uses & it’s accessories" (20)

Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
Bhel report block 4
Bhel report block 4Bhel report block 4
Bhel report block 4
 
TGS PIPE, Carbon Steel Precision Tube Professional
TGS PIPE, Carbon Steel Precision Tube ProfessionalTGS PIPE, Carbon Steel Precision Tube Professional
TGS PIPE, Carbon Steel Precision Tube Professional
 
Toyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manualToyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manual
 
Toyota 30-5FBC18 Battery Forklift Service Repair Manual
Toyota 30-5FBC18 Battery Forklift Service Repair ManualToyota 30-5FBC18 Battery Forklift Service Repair Manual
Toyota 30-5FBC18 Battery Forklift Service Repair Manual
 
Toyota 30 5 fbc28 battery forklift service repair manual
Toyota 30 5 fbc28 battery forklift service repair manualToyota 30 5 fbc28 battery forklift service repair manual
Toyota 30 5 fbc28 battery forklift service repair manual
 
Toyota 5FBC13 Battery Forklift Service Repair Manual
Toyota 5FBC13 Battery Forklift Service Repair ManualToyota 5FBC13 Battery Forklift Service Repair Manual
Toyota 5FBC13 Battery Forklift Service Repair Manual
 
Toyota 30-5FBC28 Battery Forklift Service Repair Manual
Toyota 30-5FBC28 Battery Forklift Service Repair ManualToyota 30-5FBC28 Battery Forklift Service Repair Manual
Toyota 30-5FBC28 Battery Forklift Service Repair Manual
 
Toyota 30 5 fbc20 battery forklift service repair manual
Toyota 30 5 fbc20 battery forklift service repair manualToyota 30 5 fbc20 battery forklift service repair manual
Toyota 30 5 fbc20 battery forklift service repair manual
 
Toyota 30-5FBC30 Battery Forklift Service Repair Manual
Toyota 30-5FBC30 Battery Forklift Service Repair ManualToyota 30-5FBC30 Battery Forklift Service Repair Manual
Toyota 30-5FBC30 Battery Forklift Service Repair Manual
 
Toyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manualToyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manual
 
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair ManualToyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
 
Toyota 30 5 fbc25 battery forklift service repair manual
Toyota 30 5 fbc25 battery forklift service repair manualToyota 30 5 fbc25 battery forklift service repair manual
Toyota 30 5 fbc25 battery forklift service repair manual
 
Toyota 30-5FBC15 Battery Forklift Service Repair Manual
Toyota 30-5FBC15 Battery Forklift Service Repair ManualToyota 30-5FBC15 Battery Forklift Service Repair Manual
Toyota 30-5FBC15 Battery Forklift Service Repair Manual
 
Toyota 30 5 fbc15 battery forklift service repair manual
Toyota 30 5 fbc15 battery forklift service repair manualToyota 30 5 fbc15 battery forklift service repair manual
Toyota 30 5 fbc15 battery forklift service repair manual
 
Toyota 5FBC20 Battery Forklift Service Repair Manual
Toyota 5FBC20 Battery Forklift Service Repair ManualToyota 5FBC20 Battery Forklift Service Repair Manual
Toyota 5FBC20 Battery Forklift Service Repair Manual
 
Toyota 5 fbch25 battery forklift service repair manual
Toyota 5 fbch25 battery forklift service repair manualToyota 5 fbch25 battery forklift service repair manual
Toyota 5 fbch25 battery forklift service repair manual
 
Toyota 30 5 fbch25 battery forklift service repair manual
Toyota 30 5 fbch25 battery forklift service repair manualToyota 30 5 fbch25 battery forklift service repair manual
Toyota 30 5 fbch25 battery forklift service repair manual
 
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair ManualToyota 30-5FBCH20 Battery Forklift Service Repair Manual
Toyota 30-5FBCH20 Battery Forklift Service Repair Manual
 
Toyota 30-5FBC13 Battery Forklift Service Repair Manual
Toyota 30-5FBC13 Battery Forklift Service Repair ManualToyota 30-5FBC13 Battery Forklift Service Repair Manual
Toyota 30-5FBC13 Battery Forklift Service Repair Manual
 

Mais de Harshit Srivastava

Mais de Harshit Srivastava (20)

Baseband processor final rev
Baseband processor final revBaseband processor final rev
Baseband processor final rev
 
Introduction to intel galileo board gen2
Introduction to intel galileo board gen2Introduction to intel galileo board gen2
Introduction to intel galileo board gen2
 
Impromptu ideas in respect of v2 v and other
Impromptu ideas in respect of v2 v and otherImpromptu ideas in respect of v2 v and other
Impromptu ideas in respect of v2 v and other
 
Prediction approach in predicting next user choice
Prediction approach in predicting next user choicePrediction approach in predicting next user choice
Prediction approach in predicting next user choice
 
Introduction to equalization
Introduction to equalizationIntroduction to equalization
Introduction to equalization
 
Scale free network Visualiuzation
Scale free network VisualiuzationScale free network Visualiuzation
Scale free network Visualiuzation
 
TCP/ IP
TCP/ IP TCP/ IP
TCP/ IP
 
Emic Effects on controlling automobile safety
Emic Effects on controlling automobile safety Emic Effects on controlling automobile safety
Emic Effects on controlling automobile safety
 
Emic effects in radio frequency instruments
Emic effects in radio frequency instrumentsEmic effects in radio frequency instruments
Emic effects in radio frequency instruments
 
Vacuum circuit breaker
Vacuum circuit breakerVacuum circuit breaker
Vacuum circuit breaker
 
Stepper motor
Stepper motorStepper motor
Stepper motor
 
Rocket
RocketRocket
Rocket
 
Roboticsin army
Roboticsin armyRoboticsin army
Roboticsin army
 
Quark particles
Quark particlesQuark particles
Quark particles
 
Power system contingencies
Power system  contingenciesPower system  contingencies
Power system contingencies
 
Power plant technology
Power plant technologyPower plant technology
Power plant technology
 
Optical tweezers
Optical tweezersOptical tweezers
Optical tweezers
 
Nuclear technology
Nuclear technologyNuclear technology
Nuclear technology
 
E waste management in india
E  waste management in indiaE  waste management in india
E waste management in india
 
Carbon nanotubes
Carbon  nanotubesCarbon  nanotubes
Carbon nanotubes
 

Último

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 

Último (20)

Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 

Areva "Manufacturing of transformer, uses & it’s accessories"

  • 1. Manufacturing Of Transformer & It’s Accessories Harshit Srivastava Department Of Electrical And Electronics Engineering Fall Semester 2010 Roll No. 0705621028 29-08-2010 1
  • 2. INTRODUCTION This presentation is an overview of some of the ideas and techniques used by Areva T&D Ltd. In developing transformers. In Areva the transformer development department is mainly divided into 3 categories: 1. Power Transformer ( P.T) 2. Medium Power Transformer (M.P.T) 3. Distributed Transformer (D.T) 29-08-2010 2
  • 3. Topics 1. Introduction of Areva 2. Steps for manufacturing of transformer I. Overview of steps II. Relationships between them 3. Uses of transformer 4. Accessories of Transformer 5. Steps done to solve issues in industries 29-08-2010 3
  • 4. AREVA T&D WITHIN THE GROUP T&D: 1/3 of AREVA’s energy business 29-08-2010 Source: 2010 AREVA annual report 4
  • 5. COMPLETE PORTFOLIO OF ELECTRICITY TRANSMISSION & DISTRIBUTION Products Power Transformers Generator Circuit Breakers Disconnectors Instrument Transformers Primary Distribution Gas-Insulated Secondary Distribution Substations Circuit Breakers Distribution Transformers Systems Substations Power Electronics Distributed Energy Power Distribution Automation Automation Products Automation Systems Automation Support Service Maintenance & Repair 29-08-2010 Erection & Commissioning Retrofit Spare Parts Total Asset Care Training & Network Consulting 5
  • 6. PRODUCT LINE - POWER TRANSFORMER 29-08-2010 6
  • 7. PTI - Technology Worldwide Manufacturing Facilities Stafford United-Kingdom Mönchengladbach Germany Jakarta Indonesia Le Petit-Quevilly France Saint-Ouen France Shanghai China Naini India Gebze Turkey Brisbane Australia Canoas Brazil 29-08-2010 7 Power Transformer March 2002- 7
  • 8. Manufacturing Process Of Transformer RAW MATERIAL • Raw material basically used is CRGO(cold rolled grained oriented)silicon steel. • The purpose of using CRGO is to reduce the Hysteresis Losses. CORE CUTTING • It is in the form of thin sheets & cut to size as per design. • Generally three different shapes of core laminations are used in one assembly. COIL WINDING • Coil Winding is of two types:• R-S COIL • HELICAL COIL • SPIRAL COIL CORE FITTING ASSEMBLY 29-08-2010 • The core assembly is vertically placed with the foot plate touching the ground. the top yoke of the core is removed. The limbs of the core are tightly wrapped with cotton tape and then varnished. • The coils as specified in the design may be of following types: • L.V COIL • H.V COIL 8
  • 9. TESTING TANKING • COIL WINDING • CONNECTION • Tanking is a procedure of embracement of complete unit (active unit) in a mild steel tank, the unit being enclosed includes (core entrapped with windings). • ROUTINE TEST • RATIO METER METHOD • DIELECTRIC TESTS TESTING AT • IMPULSE TEST LEVELS POWER LEVEL • TEMPERATURE RISE TEST DISMANTLIN G& DISPATCH 29-08-2010 • After testing is completed and before dispatch from the factory all necessary work, e.g. removal of bushings etc. shall be performed. • A shipping list is made concerning the General arrangement drawing which list out the external attachments of a power transformer to be send to customers . 9
  • 10. RAW MATERIAL USED  MATERIAL- CRGO SILLICON STEEL  DIFFERENT GRADES OF CRGO  CTC-Continuous transposed material  TYPICAL LOSS VALUE (W/Kg) AT 50 Hz & B (Tesla) GRADE LOSS VALUE CRGO B (Telsa)  27M-4 0.83 1.22  MOH 0.72 0.99  ZH100 0.70 0.96  ZDKH90 0.60 0.83 29-08-2010 CTC (Continuous Transposed Conductors) 10
  • 11. CORE CUTTING E shape I shape V shape 29-08-2010 11
  • 12. COIL WINDING HELICAL WINDING 29-08-2010 CONTINUOUS DISC WINDING SPIRAL WINDING INTERLEAVED DISC WINDING 12
  • 13. CORE FITTING  CONSTRUCTION 1.THREE LEG (NORMAL) 2.FIVE LEG (TO REDUCE HEIGHT)  CLAMPING ARRANGEMENT 1.END FRAME & INSULATION 2.CLAMPING PLATES 3.YOKE BOLTS OR YOKE STEEL BAND (NO HOLE PUNCHING REQ )  PROPER TIGHTENING TO REDUCE NOISE LEVEL 29-08-2010  VARNISH AT EXPOSED SURFACES 13
  • 14. The steps are being continued.. 29-08-2010 14
  • 15. ASSEMBLY(BEFORE TERMINAL GEAR STAGE)  TOP YOKE REMOVAL  LEVELING OF BOTTOM SUPPORT BLOCK  LEG PREPARATION VISUAL CHECKING OF COIL  LOWERING OF COIL IN PROPER ORIENTATION  TOP INSULATION & CLAMPING RINGS  MOUNTING OF ENDFRAMES  SHRINKAGE IN HEATER  TOP YOKE FITTING  BTG TEST FOR CHECKING CORRECTNESS 29-08-2010 15
  • 16. TESTING CORE ASSEMBLY COIL MANUFACTURING TYPES OF TESTS  STAGE TESTING ( DURING MANUFACTURING STAGE)  ROUTINE TEST AFTER TG STAGE DRYING & PROCESSING  TYPE TEST FINAL SERVICING  SPECIAL TEST 29-08-2010 FINAL TANKING,OIL FILLING 16
  • 17. TANKING Oil filling station where tanking is done 29-08-2010 17
  • 18. DISMANTLING & DISPATCH Shipping list Commissioning Physical inspection of tank before placing it Onto trailor Final inspection for traveling point of view 29-08-2010 18
  • 19. PRECAUTION & GENERAL PRACTICES IN COIL ADOPTED • PRECAUTION Conductors with rounded of edge Strip & spacers shouldn't have sharp edges Clean winding & insulation shop • STABILISATION OF WINDINGS Alignment 2 to 3 heating cycle & pressing under hydraulic press HYDRAULIC PRESS FOR COIL 29-08-2010 19
  • 20. POWER MARKET Estimated capacity shortfall in GW 5-10 x Scale-up REQUIRED IN RATE OF CAPACITY ADDITION Annual Capacity Addition in GW / year Source: Powering India – Road to 2017, McKinsey 2008 29-08-2010 If business as usual continues…India is likely to face a capacity shortfall of 95140 GW by 2017 Source: Powering India – Road to 2017, McKinsey 2008 20
  • 21. TECHNOLOGY REQUIREMENTS  ULTRA MEGA POWER PROJECTS- LARGE GENERATOR TRANSFORMER -936 MVA  POWERGRID AS MAIN NODAL AGENCY  FORMATION OF CENTERAL GRID  INTERCONNECTION OF GRIDS 29-08-2010 21
  • 22. TECHNOLOGY CHALLENGES  765kV System & Network  800kV HVDC Transmission  1200kV Development System 29-08-2010 22
  • 23. USES Uses Power Transformers are used for a variety of reasons, but they all have one thing in common; namely that the power being received must be tailored for the specific use. 29-08-2010 23