A General Overview on
Tunnel Boring Machines
SRMEG-NCUS Seminar
31 January 2012
Professor Jian ZHAO
Rock Mechanics & Tunnelling
New Singapore MRT
are in tunnels
Conventional and TBM Tunnelling
2
Fort Canning Tunnel by
Conventional Method
MRT Tunnel by TBM
Conventional and TBM Tunnelling
Tunnelling
Excavate a tunnel using machines
and/or explosives, and support
the tunnel using concrete and
steel.
Modern methods are
conventional and
mechanised methods
Conventional tunnelling
by drill-and-blast
Mechnised tunnelling by tunnel boring machine (TBM)
Conventional and TBM Tunnelling
3
Tunnelling and
Use of TBM in
Switzerland
TBM
Singapore is the most intensive user of TBM for
tunnel construction.
Conventional and TBM Tunnelling
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
Conventional and TBM Tunnelling
4
1. Excavating the
Ground
Basic Functions of TBM
2. Supporting the
Ground
Basic Functions of TBM
5
3. Mucking the Excavated Materials
Basic Functions of TBM
ADVANTAGES
Enhanced health and safety
conditions for the workers.
Industrialization of the
tunnelling process, with
ensuing reductions in cost and
construction times.
Possibility of crossing complex
geological and hydrogeological
conditions safely and
economically.
Good quality of finished
product (surrounding ground
less altered, precast segment
lining).
RISKS
Lack of flexibility: Once the
technique has been chosen it
is virtually impossible to
change it throughout the
construction of the tunnel.
Therefore, a correct analysis of
different parameters is needed
for the choice of the correct
mechanized tunnelling
technique
Basic Functions of TBM
6
Tunnel Reaming and Enlarge Machines
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
Tunnel Bore Extender
(TBE) used at Uetliberg
Tunnel in Switzerland.
Tunnel is enlarged from a 5
m pilot tunnel to 14.4 m.
Tunnel Reaming and Enlarge Machines
7
Reaming boring machine bores the final section from an axial
pilot tunnel from which it pulls itself forward by means of a
gripper unit.
With the production of large diameter TBMs, this machine is
no longer needed.
Tunnel Reaming and Enlarge Machines
Gripper TBM
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
8
Rock excavation machine for competent and hard rocks.
Movement of machine uses the grippers.
Gripper
Cutterhead
Gripper TBM
Rock is fragmented by fracturing
and chipping between cutters.
Gripper TBM
9
Single gripper TBM
Double gripper TBM
MOVIE
Gripper TBM
ADVANTAGES
Rapid excavation rate in
hard rocks.
Capable to excavate hard
rocks of UCS up to 300
MPa.
For tunnels of diameter up
to 14 m (largest 14.4 m,
2008).
Flexible rock support
measure according to
ground conditions.
LIMITATIONS
No protection or support
given to the rock while
excavating. Limited to
stable ground.
Gripper may have difficult
in poor rock masses with
low strength.
Dedusting is needed.
Gripper TBM
10
Open Face Shield TBM
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
Open Face Shield TBM
Open Face Shield TBM
has no face support.
When needed,
compressed air pressure
can be used to support
the face.
It is used limited and
only in very consistent
firm ground requires no
face support.
11
TBM with Mechanical Face Support
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
Open face TBM can be for rock and firm soil without the
need of face pressure.
12
It usually does not have a chamber to
generate pressure support to the
excavation face. Excavated materials can
be transported directly from the
cutterhead.
It can often to be combined with
compressed air pressure when needed.Flood doors closed
Flood doors open
Compressed Air Shield
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
13
When open face shield excavating groundwater-bearing soil,
water penetration can be prevented by having the shield and
a section of the tunnel protected by a lock system using
compressed air.
The required pressure is
monitored continuously
and adjusted automatically
where necessary by a
compressed air system
consisting of two control
circuits.
The health consideration
under compressed air
pressure limits the usage.
Compressed Air Shield
Slurry / Hydro-Shield
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
14
Slurry / Hydro-Shield
Large diameter slurry shield (15.43m, 2006), used for the
Shanghai Changjiang River Tunnel Project.
TBM excavation face is supported by pressurizing bentonite
in cutterhead chamber. Circulation of the fluid flushes out
the muck. Pressure is maintained by controlling discharge
rates.
1. Cutting wheel
2. Air bubble
3. Bentonite suspension
4. Drive unit
5. Stone crusher
6. Push cylinder
7. Air lock
8. Steer cylinder/ shield tail
9. Segment erector
10. Segment conveyor
MOVIE
Slurry / Hydro-Shield
15
ADVANTAGES
Equal distribution of
pressures against mixed-
face conditions.
Good performance in sands
and gravels.
Gives better face stability
(formation of mud-cake).
Allows access to the face
with compressed air.
LIMITATIONS
Need of large separation
plants for bentonite
separation and treatment.
Not suitable for clayey-silty
grounds.
Slurry / Hydro-Shield
Earth Pressure Balance Shield
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
16
Large diameter EPB machine (15.2 m, 2006) for Madrid M-30
project.
Earth Pressure Balance Shield
TBM excavation
face is supported
by pressurizing soil
(earth) inside the
cutterhead
chamber. Earth
pressure in the
chamber is
regulated by the
rate of earth
discharge through
the screw
conveyer.
Earth Pressure Balance Shield
17
Foams and
chemical additives
are used to
conditioning soil
for better control
of pressure and
muck discharge, in
sandy grounds.
MOVIE
Earth Pressure Balance Shield
Laboratoire de Mécanique des Roches − LMR Tunnelling
ADVANTAGES
Very well adapted for
excavating silty and clayey
grounds.
No need of separation
plant.
The use of additives
(foams) enables EPB’s to be
used with sandy-gravely
soils.
LIMITATIONS
Irregular distribution of
pressure against mixed face
conditions.
Problems when boulders
are encountered: no
possibility of fitting a rock
crusher.
Wearing of the screw can
lead to bad pressure
distribution.
Earth Pressure Balance Shield
18
Selection of Shield Boring Machine
Based on Soil Grain Size Distribution
EPB
Slurry
Earth Pressure Balance Shield
Mix-Shield
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
19
Mix-Shield
The cutterhead has combined features for hard rock and soil
excavation. It enables the shield TBM to excavate through
both rocks and soils, and rock-soil mixed face. Mix-shield
can be EPB or slurry based. The largest shield is a mix-shield
of 19.25 m.
Mix-Shield Slurry Mix-Shield EPB
Laboratoire de Mécanique des Roches − LMR Tunnelling
ADVANTAGES
Flexible in excavation of
rock, soil, and mixed
ground.
Face pressure features are
maintained by either EPB
or slurry.
Other advantages of EPB or
slurry shields.
LIMITATIONS
Maintaining face pressure
may be difficult,
particularly for EPB based
machine.
Cutter wear and damage is
generally high.
Muck discharge may be
difficult due to mixing of
rock and soil.
Other limitations of EPB or
slurry shields.
Mix-Shield
20
Double Shield
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
It combines the features of gripper and shield in one TBM,
and enables fast excavation even in varying rock formations.
Gripper
Double Shield
21
In poor ground condition, it works as a single
shield machine. When in rocks, grippers are used
for forward movement, so segment can be
simultaneously installed while excavating.
MOVIE
Double Shield
ADVANTAGES
Good flexibility for varying
grounds.
High advancement rates.
The increase depends on
operation.
Possibility to have different
support measures, e.g.,
segmental lining, and bolts-
shotcrete.
Possibility of ground
treatment and/or probing
through the gap between
shields.
LIMITATIONS
Maintenance problems of
articulation between the
shields.
Long shield length: possible
drawback for squeezing
grounds.
More expensive than
conventional shields.
Double Shield
22
EPB-Slurry Convertible Shield
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds
It is a machine has both EPB and slurry system installed. It
can convert between EPB mode and slurry mode, to cope
with grounds suitable for both type of machines.
Slurry Mode EPB Mode
EPB-Slurry Convertible Shield
23
Open
Mode EPB Slurry EPB
EPB-Slurry Convertible Shield
It allow the machine to change the mode to suit the ground
condition.
Support of TBM Tunnels
For non-shield TBMs, typical rock support are applied, using
bolts, shotcrete, wire mesh or steel sets, as determined by
the ground condition.
Cutterhead
Rock
bolt
Weir
mesh Gripper
Shotcrete
24
Support of TBM Tunnels
Segments transportation
For shield TBMs, precasted concrete segments are erected
inside the shield to form a ring to support the ground.
Support of TBM Tunnels
The segments are jointed by bolts. Gap between ground and
ring is filled. Rubber gaskets are used to stop water inflow.
Gasket
25
Difference cross section shape to optimize space: double-
circle, square, rectangular etc.
New TBM Technologies
Optimizing advancement by continuing face excavation
during segment installation.
New TBM Technologies
26
Optimizing machine with variable and complex ground
condition, aiming towards Universal TBM.
New TBM Technologies
e-Tunnelling and Smart TBM
• Focus on the use of information technology in
tunnelling;
• Instrumentation and real-time monitoring of
ground condition, ground movement, TBM
reaction;
• Data and information management to guide the
best operation of TBM;
• Future toward self-learning and smart TBM.
New TBM Technologies
27
TBM Machines at a Glance
Mechanical Face Support
Earth Pressure Balance Shield
Open Face
Compressed Air Shield
Slurry / Hydro-Shield
Firm soil, soft rock
Firm soil, weathered and highly
fractured rock
Clay, clayey soil mixed with rock
Firm soil with groundwater, soil
mixed with rockShield TBM
Gripper TBM
Reaming Machine
Non-Shield TBM
Competent rock
Competent rock
Sand, sandy soil mixed with rock
Rock TBM
Soil TBM
Double Shield Rock-soil changing grounds
EPB-Slurry Convertible Clay-sand varying grounds
Hybrid Shield
Mix-Shield Soil-rock mixed grounds

Mais conteúdo relacionado

Mais procurados

Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
mohammadsalikali
 
Microtunneling presentation 2014
Microtunneling presentation 2014Microtunneling presentation 2014
Microtunneling presentation 2014
Jamal A'Bed
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design Presentation
Keith Kong
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 

Mais procurados (20)

NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Working of dragline
Working of draglineWorking of dragline
Working of dragline
 
Ripper
RipperRipper
Ripper
 
Power shovel
Power shovelPower shovel
Power shovel
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
Microtunneling presentation 2014
Microtunneling presentation 2014Microtunneling presentation 2014
Microtunneling presentation 2014
 
Tunneling in soft ground and hard rock
Tunneling in soft ground and hard rockTunneling in soft ground and hard rock
Tunneling in soft ground and hard rock
 
Drilling
DrillingDrilling
Drilling
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design Presentation
 
Presentation on Piling Machine & TMB
Presentation on Piling Machine & TMBPresentation on Piling Machine & TMB
Presentation on Piling Machine & TMB
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
 
Tunnel construction
Tunnel constructionTunnel construction
Tunnel construction
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Dragline ppt
Dragline pptDragline ppt
Dragline ppt
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 
construction equipment and agreegate production equipment
construction equipment and agreegate production equipmentconstruction equipment and agreegate production equipment
construction equipment and agreegate production equipment
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 

Destaque

The tunnel powerpoint
The tunnel powerpointThe tunnel powerpoint
The tunnel powerpoint
ishict
 
GT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBMGT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBM
Bruno Demay
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct project
rajnish singh
 
Tunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisTunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_Konstantis
ILIAS MICHALIS
 
Decision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecherDecision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecher
Junaida Wally
 

Destaque (16)

Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
The tunnel powerpoint
The tunnel powerpointThe tunnel powerpoint
The tunnel powerpoint
 
report for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machinereport for tunnelling by tunnel boring machine
report for tunnelling by tunnel boring machine
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Tunneling
Tunneling  Tunneling
Tunneling
 
Tunnel Boring Machines
Tunnel Boring Machines  Tunnel Boring Machines
Tunnel Boring Machines
 
Characterization of soil conditioning for mechanized tunnelling
Characterization of soil conditioning for mechanized tunnellingCharacterization of soil conditioning for mechanized tunnelling
Characterization of soil conditioning for mechanized tunnelling
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experience
 
GT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBMGT4R4A1 Slurry for use on slurry shield TBM
GT4R4A1 Slurry for use on slurry shield TBM
 
Kolkata metro rail via-duct project
Kolkata metro rail via-duct projectKolkata metro rail via-duct project
Kolkata metro rail via-duct project
 
Tunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_KonstantisTunnel Stability Factor Michalis_Konstantis
Tunnel Stability Factor Michalis_Konstantis
 
Decision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecherDecision analysis applied to rock tunnel exploration 1978 baecher
Decision analysis applied to rock tunnel exploration 1978 baecher
 
Tunnel Safety
Tunnel SafetyTunnel Safety
Tunnel Safety
 

Semelhante a Tunnel Boring Machines (TBM)

2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
FONDAZIONE INT.LE CENTRO STUDI E RICERCHE-ONLUS (NGO)
 
118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt
FlittiAbdelhamid
 

Semelhante a Tunnel Boring Machines (TBM) (20)

Compaction equipment
Compaction equipmentCompaction equipment
Compaction equipment
 
Ground Improvement Techniques
Ground Improvement TechniquesGround Improvement Techniques
Ground Improvement Techniques
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBM
 
Soil Stabilization, Soil Exploration, Foundation in expansive Soil.pdf
Soil Stabilization, Soil Exploration, Foundation in expansive Soil.pdfSoil Stabilization, Soil Exploration, Foundation in expansive Soil.pdf
Soil Stabilization, Soil Exploration, Foundation in expansive Soil.pdf
 
Types of compaction and equipment used for compaction
Types of compaction and equipment used for compaction Types of compaction and equipment used for compaction
Types of compaction and equipment used for compaction
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Opencast mining overview
Opencast mining overviewOpencast mining overview
Opencast mining overview
 
Ishfaq
IshfaqIshfaq
Ishfaq
 
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
2022_TEST INVESTIGATE SOIL CONDITIONING FOR EPB-compressed (1).pdf
 
118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt118039141-Soil-Improvement-Techniques.ppt
118039141-Soil-Improvement-Techniques.ppt
 
Soil Compaction: A case study of Anpara Thermal Power Plant, Uttar Pradesh
Soil Compaction: A case study of Anpara Thermal Power Plant, Uttar PradeshSoil Compaction: A case study of Anpara Thermal Power Plant, Uttar Pradesh
Soil Compaction: A case study of Anpara Thermal Power Plant, Uttar Pradesh
 
Soil compaction
Soil compactionSoil compaction
Soil compaction
 
Grouting in Soils
Grouting in SoilsGrouting in Soils
Grouting in Soils
 
Compaction of soil (for civil engineering)
Compaction of soil (for civil engineering)Compaction of soil (for civil engineering)
Compaction of soil (for civil engineering)
 
Grouting PPT by OM.ppt
Grouting PPT by OM.pptGrouting PPT by OM.ppt
Grouting PPT by OM.ppt
 
Horizontal Directional Drilling Reamer Selection Guide
Horizontal Directional Drilling Reamer Selection GuideHorizontal Directional Drilling Reamer Selection Guide
Horizontal Directional Drilling Reamer Selection Guide
 
Tunnel and Underground Excavation Presentation
Tunnel and Underground Excavation PresentationTunnel and Underground Excavation Presentation
Tunnel and Underground Excavation Presentation
 
Comparitive study-of-pile-foundations-with-foundations-on-stone-column-treate...
Comparitive study-of-pile-foundations-with-foundations-on-stone-column-treate...Comparitive study-of-pile-foundations-with-foundations-on-stone-column-treate...
Comparitive study-of-pile-foundations-with-foundations-on-stone-column-treate...
 
Dams
DamsDams
Dams
 
Dams
DamsDams
Dams
 

Mais de Hamed Zarei

دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پیدانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
Hamed Zarei
 
(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش
Hamed Zarei
 

Mais de Hamed Zarei (20)

دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پیدانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
 
Blasting rock
Blasting rockBlasting rock
Blasting rock
 
جزوه درس اصول مهندسي سد
جزوه درس اصول مهندسي سدجزوه درس اصول مهندسي سد
جزوه درس اصول مهندسي سد
 
سدهای لاستیکی
سدهای لاستیکی سدهای لاستیکی
سدهای لاستیکی
 
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلیظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
 
numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...
 
Intelligent back analysis using data from the instrument (poster)
Intelligent back analysis using data from the instrument (poster)Intelligent back analysis using data from the instrument (poster)
Intelligent back analysis using data from the instrument (poster)
 
(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش
 
(جلد اول) SPSS 19 راهنمای آموزش
(جلد اول) SPSS 19 راهنمای آموزش(جلد اول) SPSS 19 راهنمای آموزش
(جلد اول) SPSS 19 راهنمای آموزش
 
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
 
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن (روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
 
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
 
Tunnelling & underground design (Topic7-brittle failure)
Tunnelling & underground design (Topic7-brittle failure)Tunnelling & underground design (Topic7-brittle failure)
Tunnelling & underground design (Topic7-brittle failure)
 
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
Tunnelling & underground design (Topic4-soft ground tunnelling methods)
Tunnelling & underground design (Topic4-soft ground tunnelling methods)Tunnelling & underground design (Topic4-soft ground tunnelling methods)
Tunnelling & underground design (Topic4-soft ground tunnelling methods)
 
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
 
Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)
 
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
 
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبولکنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
 

Último

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 

Último (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 

Tunnel Boring Machines (TBM)

  • 1. 1 A General Overview on Tunnel Boring Machines SRMEG-NCUS Seminar 31 January 2012 Professor Jian ZHAO Rock Mechanics & Tunnelling New Singapore MRT are in tunnels Conventional and TBM Tunnelling
  • 2. 2 Fort Canning Tunnel by Conventional Method MRT Tunnel by TBM Conventional and TBM Tunnelling Tunnelling Excavate a tunnel using machines and/or explosives, and support the tunnel using concrete and steel. Modern methods are conventional and mechanised methods Conventional tunnelling by drill-and-blast Mechnised tunnelling by tunnel boring machine (TBM) Conventional and TBM Tunnelling
  • 3. 3 Tunnelling and Use of TBM in Switzerland TBM Singapore is the most intensive user of TBM for tunnel construction. Conventional and TBM Tunnelling Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds Conventional and TBM Tunnelling
  • 4. 4 1. Excavating the Ground Basic Functions of TBM 2. Supporting the Ground Basic Functions of TBM
  • 5. 5 3. Mucking the Excavated Materials Basic Functions of TBM ADVANTAGES Enhanced health and safety conditions for the workers. Industrialization of the tunnelling process, with ensuing reductions in cost and construction times. Possibility of crossing complex geological and hydrogeological conditions safely and economically. Good quality of finished product (surrounding ground less altered, precast segment lining). RISKS Lack of flexibility: Once the technique has been chosen it is virtually impossible to change it throughout the construction of the tunnel. Therefore, a correct analysis of different parameters is needed for the choice of the correct mechanized tunnelling technique Basic Functions of TBM
  • 6. 6 Tunnel Reaming and Enlarge Machines Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds Tunnel Bore Extender (TBE) used at Uetliberg Tunnel in Switzerland. Tunnel is enlarged from a 5 m pilot tunnel to 14.4 m. Tunnel Reaming and Enlarge Machines
  • 7. 7 Reaming boring machine bores the final section from an axial pilot tunnel from which it pulls itself forward by means of a gripper unit. With the production of large diameter TBMs, this machine is no longer needed. Tunnel Reaming and Enlarge Machines Gripper TBM Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds
  • 8. 8 Rock excavation machine for competent and hard rocks. Movement of machine uses the grippers. Gripper Cutterhead Gripper TBM Rock is fragmented by fracturing and chipping between cutters. Gripper TBM
  • 9. 9 Single gripper TBM Double gripper TBM MOVIE Gripper TBM ADVANTAGES Rapid excavation rate in hard rocks. Capable to excavate hard rocks of UCS up to 300 MPa. For tunnels of diameter up to 14 m (largest 14.4 m, 2008). Flexible rock support measure according to ground conditions. LIMITATIONS No protection or support given to the rock while excavating. Limited to stable ground. Gripper may have difficult in poor rock masses with low strength. Dedusting is needed. Gripper TBM
  • 10. 10 Open Face Shield TBM Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds Open Face Shield TBM Open Face Shield TBM has no face support. When needed, compressed air pressure can be used to support the face. It is used limited and only in very consistent firm ground requires no face support.
  • 11. 11 TBM with Mechanical Face Support Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds Open face TBM can be for rock and firm soil without the need of face pressure.
  • 12. 12 It usually does not have a chamber to generate pressure support to the excavation face. Excavated materials can be transported directly from the cutterhead. It can often to be combined with compressed air pressure when needed.Flood doors closed Flood doors open Compressed Air Shield Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds
  • 13. 13 When open face shield excavating groundwater-bearing soil, water penetration can be prevented by having the shield and a section of the tunnel protected by a lock system using compressed air. The required pressure is monitored continuously and adjusted automatically where necessary by a compressed air system consisting of two control circuits. The health consideration under compressed air pressure limits the usage. Compressed Air Shield Slurry / Hydro-Shield Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds
  • 14. 14 Slurry / Hydro-Shield Large diameter slurry shield (15.43m, 2006), used for the Shanghai Changjiang River Tunnel Project. TBM excavation face is supported by pressurizing bentonite in cutterhead chamber. Circulation of the fluid flushes out the muck. Pressure is maintained by controlling discharge rates. 1. Cutting wheel 2. Air bubble 3. Bentonite suspension 4. Drive unit 5. Stone crusher 6. Push cylinder 7. Air lock 8. Steer cylinder/ shield tail 9. Segment erector 10. Segment conveyor MOVIE Slurry / Hydro-Shield
  • 15. 15 ADVANTAGES Equal distribution of pressures against mixed- face conditions. Good performance in sands and gravels. Gives better face stability (formation of mud-cake). Allows access to the face with compressed air. LIMITATIONS Need of large separation plants for bentonite separation and treatment. Not suitable for clayey-silty grounds. Slurry / Hydro-Shield Earth Pressure Balance Shield Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds
  • 16. 16 Large diameter EPB machine (15.2 m, 2006) for Madrid M-30 project. Earth Pressure Balance Shield TBM excavation face is supported by pressurizing soil (earth) inside the cutterhead chamber. Earth pressure in the chamber is regulated by the rate of earth discharge through the screw conveyer. Earth Pressure Balance Shield
  • 17. 17 Foams and chemical additives are used to conditioning soil for better control of pressure and muck discharge, in sandy grounds. MOVIE Earth Pressure Balance Shield Laboratoire de Mécanique des Roches − LMR Tunnelling ADVANTAGES Very well adapted for excavating silty and clayey grounds. No need of separation plant. The use of additives (foams) enables EPB’s to be used with sandy-gravely soils. LIMITATIONS Irregular distribution of pressure against mixed face conditions. Problems when boulders are encountered: no possibility of fitting a rock crusher. Wearing of the screw can lead to bad pressure distribution. Earth Pressure Balance Shield
  • 18. 18 Selection of Shield Boring Machine Based on Soil Grain Size Distribution EPB Slurry Earth Pressure Balance Shield Mix-Shield Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds
  • 19. 19 Mix-Shield The cutterhead has combined features for hard rock and soil excavation. It enables the shield TBM to excavate through both rocks and soils, and rock-soil mixed face. Mix-shield can be EPB or slurry based. The largest shield is a mix-shield of 19.25 m. Mix-Shield Slurry Mix-Shield EPB Laboratoire de Mécanique des Roches − LMR Tunnelling ADVANTAGES Flexible in excavation of rock, soil, and mixed ground. Face pressure features are maintained by either EPB or slurry. Other advantages of EPB or slurry shields. LIMITATIONS Maintaining face pressure may be difficult, particularly for EPB based machine. Cutter wear and damage is generally high. Muck discharge may be difficult due to mixing of rock and soil. Other limitations of EPB or slurry shields. Mix-Shield
  • 20. 20 Double Shield Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds It combines the features of gripper and shield in one TBM, and enables fast excavation even in varying rock formations. Gripper Double Shield
  • 21. 21 In poor ground condition, it works as a single shield machine. When in rocks, grippers are used for forward movement, so segment can be simultaneously installed while excavating. MOVIE Double Shield ADVANTAGES Good flexibility for varying grounds. High advancement rates. The increase depends on operation. Possibility to have different support measures, e.g., segmental lining, and bolts- shotcrete. Possibility of ground treatment and/or probing through the gap between shields. LIMITATIONS Maintenance problems of articulation between the shields. Long shield length: possible drawback for squeezing grounds. More expensive than conventional shields. Double Shield
  • 22. 22 EPB-Slurry Convertible Shield Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds It is a machine has both EPB and slurry system installed. It can convert between EPB mode and slurry mode, to cope with grounds suitable for both type of machines. Slurry Mode EPB Mode EPB-Slurry Convertible Shield
  • 23. 23 Open Mode EPB Slurry EPB EPB-Slurry Convertible Shield It allow the machine to change the mode to suit the ground condition. Support of TBM Tunnels For non-shield TBMs, typical rock support are applied, using bolts, shotcrete, wire mesh or steel sets, as determined by the ground condition. Cutterhead Rock bolt Weir mesh Gripper Shotcrete
  • 24. 24 Support of TBM Tunnels Segments transportation For shield TBMs, precasted concrete segments are erected inside the shield to form a ring to support the ground. Support of TBM Tunnels The segments are jointed by bolts. Gap between ground and ring is filled. Rubber gaskets are used to stop water inflow. Gasket
  • 25. 25 Difference cross section shape to optimize space: double- circle, square, rectangular etc. New TBM Technologies Optimizing advancement by continuing face excavation during segment installation. New TBM Technologies
  • 26. 26 Optimizing machine with variable and complex ground condition, aiming towards Universal TBM. New TBM Technologies e-Tunnelling and Smart TBM • Focus on the use of information technology in tunnelling; • Instrumentation and real-time monitoring of ground condition, ground movement, TBM reaction; • Data and information management to guide the best operation of TBM; • Future toward self-learning and smart TBM. New TBM Technologies
  • 27. 27 TBM Machines at a Glance Mechanical Face Support Earth Pressure Balance Shield Open Face Compressed Air Shield Slurry / Hydro-Shield Firm soil, soft rock Firm soil, weathered and highly fractured rock Clay, clayey soil mixed with rock Firm soil with groundwater, soil mixed with rockShield TBM Gripper TBM Reaming Machine Non-Shield TBM Competent rock Competent rock Sand, sandy soil mixed with rock Rock TBM Soil TBM Double Shield Rock-soil changing grounds EPB-Slurry Convertible Clay-sand varying grounds Hybrid Shield Mix-Shield Soil-rock mixed grounds