CURING & DRYING SPECIALISTS

     WASTE HEAT RECOVERY
              AND
    HEAT UTILIZATION SYSTEM
Why recover waste heat?
 In many cases the amount of waste heat recovered from the kilns is sufficient to
satisfy the heat demands of the Product Dryers and Curing Processes as well as
providing enough energy to heat the workshops via Air Handling Units.

 The system can be used for both continuous Tunnel kilns and intermittent Shuttle
Kilns

 The system can be applied to both existing and new Kilns and then utilized into
either new or existing Dryers and equipment.

 The system can be installed with virtually no disruption to the factory process.

 The return on investment period can be as little as two years, with every Kw
(Therm) of energy saved after than being a direct contribution to profit.
What can CDS offer?
 Design, consultation and feasibility study concerning the viability of the project.

 Factory survey identifying the potential energy users.

 Report of the Investment return period.

 Flexibility of contract structure.
           Complete equipment supply from the UK or part ‘local’ content.
           Supervision of ‘local’ labour or complete installation by CDS
           Selection of control options.

 Comprehensive commissioning service.

 After sales service from the UK contribution to profit.
Q: Where can the waste heat be claimed from?




  A: Waste heat can be reclaimed from all available sources on both
  Tunnel Kilns and Shuttle Kilns. Depending on the design of Tunnel Kiln,
  waste heat can be recovered from the ‘cooling’, ‘centre’ and ‘exhaust’.
  On Shuttle Kilns, heat is recovered during the cooling part of the
  curve.
Q: What medium is used to convey the recovered energy?
     A: The heat may either be transferred in the form of ducted ‘hot air’ or
     alternatively by means of hot water via pipe work. When used to heat dryers, the
     hot water system is preferable so as not to compromise the humidity balance
     within the dryers. Also transferring a large mass of energy is usually
     uneconomical using ductwork.




          Photos show waste heat being collected from a Tunnel Kiln and
           distributed into Dryers and a pre-kiln Glaze Dryer with residual used for
           space heating the factory via Air Handling Units.
Q: How does the system work?

A: The following diagrams show:-
• How the ‘waste’ heat is recovered
• How the ‘waste’ heat is transferred
• How the ‘waste’ heat is utilized
Typical Control Architecture
Factory Network Providing            Ethernet Switch
     VPN Connection
                                                                       RSView SCADA PC
           for
     Remote Access                                                     Located ‘remote’
                                                                        from the users




                 Ethernet to PLC’s




             PLC                          PLC                  PLC                PLC




   Allen Bradley
Panel View C600 HMI

Set point and process
 variable monitoring



                                                                       Heat Recovery
 Ware Dryers                Mould Dryers               Environmental
                                                                         systems
Product Dryers
Environmental Air Handling
Continuous Product Dryers
Heat Recovery Data
                                                       YEARLY FIGURES (based on 1 x 7 day working week per month)
                                        High Temp Circuit (kw/hr's)                                    Low Temp Circuit (kw/hr's)
                                                                             Additional Heat                                                                  Additional Heat
    Month      Waste Heat Available   Total of Heat Users   Surplus Heat                       Waste Heat Available    Total of Heat Users   Surplus Heat
                                                                                Required                                                                         Required
    January          217,710               321,743             5,932             65,821              170,324                340,234             5,644            205,021
    February         217,710               311,872              7,321            54,993              172,325                310,652             5,644            165,032
     March           217,710               291,263             11,032            49,321              173,654                245,823             5,644            112,032
      April          217,710               264,924             16,832            38,112              168,554                158,773             6,435             60,145
      May            217,710               239,015             20,883            25,734              165,923                125,712             7,432             35,003
      June           217,710               227,774             22,732            24,987              167,083                105,982            12,732             20,821
      July           217,710               226,046             23,463            25,832              167,367                116,003            15,943             20,043
     August          217,710               233,821             24,632            27,635              166,943                138,664            14,843             35,773
   September         217,710               239,732             21,772            29,863              165,773                169,663             6,437             43,921
    October          217,710               262,811             17,663            36,832              168,345                200,735             5,644             77,447
   November          217,710               290,212             7,322             48,721              173,882                252,994             5,644            133,932
   December          217,710               311,084             5,232             57,021              171,992                318,643             5,644            183,032
   TOTALS =         2,612,520             3,220,297           184,816           484,872             2,032,165              2,483,878           97,686           1,092,202



                                                              YEARLY FIGURES (based on 338 days per annum)
                                        High Temp Circuit (kw/hr's)                                   Low Temp Circuit (kw/hr's)
                                                                             Additional Heat                                                                  Additional Heat
    Month      Waste Heat Available   Total of Heat Users   Surplus Heat                       Waste Heat Available    Total of Heat Users   Surplus Heat
                                                                                Required                                                                         Required
    January         876,024                1,294,633           23,869           264,851              685,351               1,369,037            22,710           824,965
    February        876,024                1,254,914           29,458           221,281              693,403               1,250,004            22,710           664,057
     March          876,024                1,171,987           44,391           198,458              698,751                989,145             22,710           450,795
      April         876,024                1,066,004           67,729           153,355              678,229                638,872             25,893           242,012
      May           876,024                 961,751            84,029           103,549              667,643                505,841             29,905           140,845
      June          876,024                 916,519            91,469           100,543              672,310                426,451             51,231            83,780
      July          876,024                 909,566            94,411           103,943              673,453                466,774             64,152            80,649
     August         876,024                 940,851            99,114            111,198             671,747                557,958             59,725           143,944
   September        876,024                 964,636            87,606           120,163              667,039                682,692             25,901           176,730
    October         876,024                1,057,501           71,073           148,205              677,388                807,719             22,710           311,632
   November         876,024                1,167,758           29,462           196,044              699,668               1,018,000            22,710           538,917
   December         876,024                1,251,743           21,053           229,442              692,063               1,282,159            22,710           736,486
   TOTALS =        10,512,283             12,957,862          743,664          1,951,033            8,177,045              9,994,652           393,070          4,394,813

                                                   Total Combined Waste Heat Available =         18,689,328           kw/hr's

                      HT Waste Heat Utilised =              9,768,618      kw/hr's                    LT Waste Heat Utilised =               7,783,975      kw/hr's
                 %age HT Waste Heat Utilised =               92.93%                              %age LT Waste Heat Utilised =                95.19%
                   HT Additional Energy Req'd =             1,951,033      kw/hr's                 LT Additional Energy Req'd =              4,394,813      kw/hr's

                            MAXIMUM AVAILABLE HEAT RECOVERY PER YEAR = 18,689,328 kw/hr's
                             COMBINED USAGE OF HEAT RECOVERY PER YEAR = 17,552,594 kw/hr's
                            %age WASTE HEAT UTLISATION IN THE DRYERS =                 93.92%
                                                  SURPLUS ENERGY PER YEAR =           1,136,734     kw/hr's
                                    ADDITIONAL ENERGY REQUIRED PER YEAR =             6,345,845     kw/hr's
               Note: The surplus 6.08% heat can be used for ancillary heating such as canteen, office space, warehouse etc...
Heat Recovery Data
                      High Temperature Circuit                                                                     Low Temperature Circuit

                                                               1,400,000                                                                                  1,400,000




                                                               1,200,000                                                                                  1,200,000




                                                               1,000,000                                                                                  1,000,000




                                                                                                                                                                      Kw/Hr's per month
                                                                           Kw/Hr's per month
                                                               800,000                                                                                    800,000




                                                               600,000                                                                                    600,000




                                                               400,000                                                                                    400,000




                                                               200,000                                                                                    200,000




                                                               0                                                                                          0
 January
      February
             March April May June July August
                                          September November
                                                October December                               January
                                                                                                   February
                                                                                                         March April May June JulyAugust
                                                                                                                                     September November
                                                                                                                                           October December


          Waste Heat Available                Total of Heat Users                                                       Waste Heat Available
                                                                                                                        Total of Heat Users
          Surplus Heat                        Additonal Heat Required                                                   Surplus Heat
Payback Period
•   Maximum available heat recovery per annum = 18,689,328 kw/hr’s
•   Combined usage of heat recovery per annum = 17,552,594 kw/hr’s
•   Percentage waste heat utilisation in the factory = 93.92%
•   The remaining 6.08% waste heat can be used in the warehouse,
    canteen, offices etc…
•   Surplus energy per annum = 1,136,734 kw/hr’s
•   Additional energy required per annum = 6,345,845 kw/hr’s
•   Assumed cost of natural gas per kw = $0.033
•   Estimated annual fuel cost saving = $579,236
•   Investment cost for waste heat system = $1,500,000
•   Return on investment period = 2.59 years
There can be NO
COMPROMISE when it
comes to QUALITY &
RELIABILITY.

Mais conteúdo relacionado

Semelhante a CDS Heat Recovery Presentation

Linled In Presentation
Linled In PresentationLinled In Presentation
Linled In PresentationEAMPHP
 
Techical Report June 29, 2010
Techical Report June 29, 2010Techical Report June 29, 2010
Techical Report June 29, 2010Angel Broking
 
Performance investigation of conventional heat pipe with hydrocarbon as worki...
Performance investigation of conventional heat pipe with hydrocarbon as worki...Performance investigation of conventional heat pipe with hydrocarbon as worki...
Performance investigation of conventional heat pipe with hydrocarbon as worki...eSAT Journals
 
Mec presentation for distribution 030111
Mec presentation for distribution 030111Mec presentation for distribution 030111
Mec presentation for distribution 030111Cathyann Burns
 
Superhomes 2.0 national construction summit
Superhomes 2.0 national construction summitSuperhomes 2.0 national construction summit
Superhomes 2.0 national construction summitSeamus Hoyne
 
Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesKum Visal
 
3 calculating condensate loads
3 calculating condensate loads3 calculating condensate loads
3 calculating condensate loadsIskandar Hasibuan
 
Power-plus 2V-PBC GEL Battery-update
Power-plus 2V-PBC GEL Battery-updatePower-plus 2V-PBC GEL Battery-update
Power-plus 2V-PBC GEL Battery-updateIgnatius Gunawan
 
Tech report 27.05.2010
Tech report 27.05.2010Tech report 27.05.2010
Tech report 27.05.2010Angel Broking
 
The Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheThe Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheJoe Miller
 
Technical Report- June 21, 2010
Technical Report- June 21, 2010Technical Report- June 21, 2010
Technical Report- June 21, 2010Angel Broking
 
Technical Report - July 1, 2010
Technical Report - July 1, 2010Technical Report - July 1, 2010
Technical Report - July 1, 2010Angel Broking
 
SACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KSACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KIndia Water Portal
 
Tech report 18 06 2010
Tech report 18 06 2010Tech report 18 06 2010
Tech report 18 06 2010Angel Broking
 
Operational Data 2015
Operational Data 2015Operational Data 2015
Operational Data 2015Bert Bell
 
Techical Report - July 9, 2010
Techical Report - July 9, 2010Techical Report - July 9, 2010
Techical Report - July 9, 2010Angel Broking
 
Winter summer design_temps_us
Winter summer design_temps_usWinter summer design_temps_us
Winter summer design_temps_usShalini Reddy
 

Semelhante a CDS Heat Recovery Presentation (20)

11 mn01 review 2
11 mn01 review 211 mn01 review 2
11 mn01 review 2
 
Linled In Presentation
Linled In PresentationLinled In Presentation
Linled In Presentation
 
Properties table
Properties tableProperties table
Properties table
 
Techical Report June 29, 2010
Techical Report June 29, 2010Techical Report June 29, 2010
Techical Report June 29, 2010
 
Performance investigation of conventional heat pipe with hydrocarbon as worki...
Performance investigation of conventional heat pipe with hydrocarbon as worki...Performance investigation of conventional heat pipe with hydrocarbon as worki...
Performance investigation of conventional heat pipe with hydrocarbon as worki...
 
Mec presentation for distribution 030111
Mec presentation for distribution 030111Mec presentation for distribution 030111
Mec presentation for distribution 030111
 
Superhomes 2.0 national construction summit
Superhomes 2.0 national construction summitSuperhomes 2.0 national construction summit
Superhomes 2.0 national construction summit
 
Ekler
EklerEkler
Ekler
 
Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units Tables
 
3 calculating condensate loads
3 calculating condensate loads3 calculating condensate loads
3 calculating condensate loads
 
Power-plus 2V-PBC GEL Battery-update
Power-plus 2V-PBC GEL Battery-updatePower-plus 2V-PBC GEL Battery-update
Power-plus 2V-PBC GEL Battery-update
 
Tech report 27.05.2010
Tech report 27.05.2010Tech report 27.05.2010
Tech report 27.05.2010
 
The Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In TheThe Current Status Of Nuclear Power In The
The Current Status Of Nuclear Power In The
 
Technical Report- June 21, 2010
Technical Report- June 21, 2010Technical Report- June 21, 2010
Technical Report- June 21, 2010
 
Technical Report - July 1, 2010
Technical Report - July 1, 2010Technical Report - July 1, 2010
Technical Report - July 1, 2010
 
SACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KSACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-K
 
Tech report 18 06 2010
Tech report 18 06 2010Tech report 18 06 2010
Tech report 18 06 2010
 
Operational Data 2015
Operational Data 2015Operational Data 2015
Operational Data 2015
 
Techical Report - July 9, 2010
Techical Report - July 9, 2010Techical Report - July 9, 2010
Techical Report - July 9, 2010
 
Winter summer design_temps_us
Winter summer design_temps_usWinter summer design_temps_us
Winter summer design_temps_us
 

Último

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified Binance Account
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030tarushabhavsar
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 

Último (20)

Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 

CDS Heat Recovery Presentation

  • 1. CURING & DRYING SPECIALISTS WASTE HEAT RECOVERY AND HEAT UTILIZATION SYSTEM
  • 2. Why recover waste heat?  In many cases the amount of waste heat recovered from the kilns is sufficient to satisfy the heat demands of the Product Dryers and Curing Processes as well as providing enough energy to heat the workshops via Air Handling Units.  The system can be used for both continuous Tunnel kilns and intermittent Shuttle Kilns  The system can be applied to both existing and new Kilns and then utilized into either new or existing Dryers and equipment.  The system can be installed with virtually no disruption to the factory process.  The return on investment period can be as little as two years, with every Kw (Therm) of energy saved after than being a direct contribution to profit.
  • 3. What can CDS offer?  Design, consultation and feasibility study concerning the viability of the project.  Factory survey identifying the potential energy users.  Report of the Investment return period.  Flexibility of contract structure. Complete equipment supply from the UK or part ‘local’ content. Supervision of ‘local’ labour or complete installation by CDS Selection of control options.  Comprehensive commissioning service.  After sales service from the UK contribution to profit.
  • 4. Q: Where can the waste heat be claimed from? A: Waste heat can be reclaimed from all available sources on both Tunnel Kilns and Shuttle Kilns. Depending on the design of Tunnel Kiln, waste heat can be recovered from the ‘cooling’, ‘centre’ and ‘exhaust’. On Shuttle Kilns, heat is recovered during the cooling part of the curve.
  • 5. Q: What medium is used to convey the recovered energy? A: The heat may either be transferred in the form of ducted ‘hot air’ or alternatively by means of hot water via pipe work. When used to heat dryers, the hot water system is preferable so as not to compromise the humidity balance within the dryers. Also transferring a large mass of energy is usually uneconomical using ductwork.  Photos show waste heat being collected from a Tunnel Kiln and distributed into Dryers and a pre-kiln Glaze Dryer with residual used for space heating the factory via Air Handling Units.
  • 6. Q: How does the system work? A: The following diagrams show:- • How the ‘waste’ heat is recovered • How the ‘waste’ heat is transferred • How the ‘waste’ heat is utilized
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14. Typical Control Architecture Factory Network Providing Ethernet Switch VPN Connection RSView SCADA PC for Remote Access Located ‘remote’ from the users Ethernet to PLC’s PLC PLC PLC PLC Allen Bradley Panel View C600 HMI Set point and process variable monitoring Heat Recovery Ware Dryers Mould Dryers Environmental systems
  • 18. Heat Recovery Data YEARLY FIGURES (based on 1 x 7 day working week per month) High Temp Circuit (kw/hr's) Low Temp Circuit (kw/hr's) Additional Heat Additional Heat Month Waste Heat Available Total of Heat Users Surplus Heat Waste Heat Available Total of Heat Users Surplus Heat Required Required January 217,710 321,743 5,932 65,821 170,324 340,234 5,644 205,021 February 217,710 311,872 7,321 54,993 172,325 310,652 5,644 165,032 March 217,710 291,263 11,032 49,321 173,654 245,823 5,644 112,032 April 217,710 264,924 16,832 38,112 168,554 158,773 6,435 60,145 May 217,710 239,015 20,883 25,734 165,923 125,712 7,432 35,003 June 217,710 227,774 22,732 24,987 167,083 105,982 12,732 20,821 July 217,710 226,046 23,463 25,832 167,367 116,003 15,943 20,043 August 217,710 233,821 24,632 27,635 166,943 138,664 14,843 35,773 September 217,710 239,732 21,772 29,863 165,773 169,663 6,437 43,921 October 217,710 262,811 17,663 36,832 168,345 200,735 5,644 77,447 November 217,710 290,212 7,322 48,721 173,882 252,994 5,644 133,932 December 217,710 311,084 5,232 57,021 171,992 318,643 5,644 183,032 TOTALS = 2,612,520 3,220,297 184,816 484,872 2,032,165 2,483,878 97,686 1,092,202 YEARLY FIGURES (based on 338 days per annum) High Temp Circuit (kw/hr's) Low Temp Circuit (kw/hr's) Additional Heat Additional Heat Month Waste Heat Available Total of Heat Users Surplus Heat Waste Heat Available Total of Heat Users Surplus Heat Required Required January 876,024 1,294,633 23,869 264,851 685,351 1,369,037 22,710 824,965 February 876,024 1,254,914 29,458 221,281 693,403 1,250,004 22,710 664,057 March 876,024 1,171,987 44,391 198,458 698,751 989,145 22,710 450,795 April 876,024 1,066,004 67,729 153,355 678,229 638,872 25,893 242,012 May 876,024 961,751 84,029 103,549 667,643 505,841 29,905 140,845 June 876,024 916,519 91,469 100,543 672,310 426,451 51,231 83,780 July 876,024 909,566 94,411 103,943 673,453 466,774 64,152 80,649 August 876,024 940,851 99,114 111,198 671,747 557,958 59,725 143,944 September 876,024 964,636 87,606 120,163 667,039 682,692 25,901 176,730 October 876,024 1,057,501 71,073 148,205 677,388 807,719 22,710 311,632 November 876,024 1,167,758 29,462 196,044 699,668 1,018,000 22,710 538,917 December 876,024 1,251,743 21,053 229,442 692,063 1,282,159 22,710 736,486 TOTALS = 10,512,283 12,957,862 743,664 1,951,033 8,177,045 9,994,652 393,070 4,394,813 Total Combined Waste Heat Available = 18,689,328 kw/hr's HT Waste Heat Utilised = 9,768,618 kw/hr's LT Waste Heat Utilised = 7,783,975 kw/hr's %age HT Waste Heat Utilised = 92.93% %age LT Waste Heat Utilised = 95.19% HT Additional Energy Req'd = 1,951,033 kw/hr's LT Additional Energy Req'd = 4,394,813 kw/hr's MAXIMUM AVAILABLE HEAT RECOVERY PER YEAR = 18,689,328 kw/hr's COMBINED USAGE OF HEAT RECOVERY PER YEAR = 17,552,594 kw/hr's %age WASTE HEAT UTLISATION IN THE DRYERS = 93.92% SURPLUS ENERGY PER YEAR = 1,136,734 kw/hr's ADDITIONAL ENERGY REQUIRED PER YEAR = 6,345,845 kw/hr's Note: The surplus 6.08% heat can be used for ancillary heating such as canteen, office space, warehouse etc...
  • 19. Heat Recovery Data High Temperature Circuit Low Temperature Circuit 1,400,000 1,400,000 1,200,000 1,200,000 1,000,000 1,000,000 Kw/Hr's per month Kw/Hr's per month 800,000 800,000 600,000 600,000 400,000 400,000 200,000 200,000 0 0 January February March April May June July August September November October December January February March April May June JulyAugust September November October December Waste Heat Available Total of Heat Users Waste Heat Available Total of Heat Users Surplus Heat Additonal Heat Required Surplus Heat
  • 20. Payback Period • Maximum available heat recovery per annum = 18,689,328 kw/hr’s • Combined usage of heat recovery per annum = 17,552,594 kw/hr’s • Percentage waste heat utilisation in the factory = 93.92% • The remaining 6.08% waste heat can be used in the warehouse, canteen, offices etc… • Surplus energy per annum = 1,136,734 kw/hr’s • Additional energy required per annum = 6,345,845 kw/hr’s • Assumed cost of natural gas per kw = $0.033 • Estimated annual fuel cost saving = $579,236 • Investment cost for waste heat system = $1,500,000 • Return on investment period = 2.59 years
  • 21. There can be NO COMPROMISE when it comes to QUALITY & RELIABILITY.