Towards Ujwal Bharat
UDAY: The Story of Reforms
9th November, 2015
Ministry of Power, Coal and New &
Renewable Energy
1
Team India to serve 125 crore people
Central
Govt.
State
Govt.
CPSUs/
SPSUs/
DISCOMs
Private
Sector
Investors
Consumer
Bodies
Media
2
People
Ministry
of Power
Ministry
of Coal
Ministry
of N&RE
INTEGRATED APPROACH
3
Energy Security
Make in India
Swachh Bharat
Digital India Climate change
Power for
All
24 x 7
Smart Cities
Energy
Efficiency
Skill India
Smart grid, Smart Metering, IT
enablement , National Power Portal
Real time tracking (DELP.in)
Renewable Energy,
INDC
1.28 lakh Toilets constructed for Swachh BharatIPDS covers 82 out of 98 smart cities
Skilling people for IT enablement ,
Gram Vidyut Abhiyantas
Enhanced Power Production, 100% Rural electrification
LED lighting, Industrial
Efficiency, Agricultural
Pumps
$ 250 Bn Investment with substantial
local manufacturing
4
Power Sector Reforms
• Industrial Policy
Resolution (1956)
• Private sector participation
in generation
1956–1991
Pre-liberalization
Era
• Electricity Act (2003)
• Coal Auctions and record coal
production
• Highest Increase in Power
generation and Transmission
capacity addition
• Implementation of Integrated
Power Development Scheme
(IPDS) and Deen Dayal
Upadhyay Gram Jyoti Yojana
(DDUGJY)
• Biggest LED lighting
movement in the World
• Launch of UDAY
Ujwal
Bharat
from
Darkness
• Electricity Regulatory
Commissions Act (1998)
for establishing CERC and
SERCs
• Generation and
distribution of
power under
state ownership
1991- 2014
Post-
liberalization Era
2014 onwards
Accelerated Growth
Trajectory
• Electricity
(Supply) Act 1948
• Legislative and policy
initiatives (1991)
• APDRP/ RAPDRP/ RGGVY
5
Guiding Principles - TRANSPARENCY
• Technology Focus
• Root Cause Analysis
• Accountability
• National Effort – Team India
• Speed, Skill and Smart
• Prioritization
• Achievement Oriented
• Rejuvenate Economic Growth
• Efficiency & Economies of Scale
• National Sustainable Development
• Customer Focus
• Yes We Can
6
Power Value Chain
24x7 Power For All
DISCOMs are the weakest link in providing 24X7
Power for All
7
Accumulated DISCOM losses & debt
have ballooned in the last few years
Source: Audited DISCOM Accounts * 2014-15 figure is a projection based on provisional reporting by States
Accumulated Loss ~ Rs. 3.8 lakh
crore (Mar 15) - Total Loss in last
6 years – Rs. 3.66 lakh crore
8
UDAY (Ujwal DISCOM Assurance
Yojana) aims at permanent resolution
of DISCOM issues
9
Past Present Future
State take
over of debt
Reduction in Interest Cost
Operational
Efficiency
Lower Cost of
Power
Budgetary
Discipline
Future Bank
Lending
Enabling
Quarterly Tariff
Increase
Stage wise Tariff Increase
Activity Benefit End Date
Enabling provision for
quarterly revision to
mitigate cost increase
burden
Such periodic tariff
revision will be easier
to implement and
absorb by consumers
Necessary
changes in
tariff policy in
a month
10
Present
Tariff increase no substitute for
efficiency improvement
• Regulators cannot pass on inefficiency of DISCOMs
to consumers
• States with 30-40% losses can’t expect consumers
to pay for their inefficiency
• Most States have maintained tariff increase
trajectory – Average annual increase in last five
years – 8%
11
Present
Tariff increase not the only
solution to DISCOM distress
12
Present
State
FY2011-
12
FY2012-
13
FY2013-
14
FY2014-
15
FY2015-
16
Average Hike
(%)
Kerala 0% 30% 7.9% 24% 3% 16%
Delhi 22% 22% 5% 8% 0% 14%
Nagaland 34% 12% 7% 0% 5% 14%
Andhra Pradesh 8% 18% 23% 0% 5% 13%
Tamil Nadu 0% 37% 0% 15% 0% 12%
Chhattisgarh 0% 18% 0% 15% 14% 11%
Tripura 0% 17% 31% 0% 0% 11%
Haryana 4% 19% 13% 0% 8% 10%
Meghalaya 0% 13% 7% 15% 8% 10%
Rajasthan 9% 8% 9% 16% 0% 10%
J&K 15% 19% 8.5% 0% 0% 10%
Bihar 19% 12% 7% 0% 2.50% 9%
Uttar Pradesh 0% 18% 5% 11% 5.47% 9%
Odisha 20% 12% 2.40% 0% 4.64% 9%
Goa 0% 12% 0% 8% 14% 8%
Higher than National Average Tariff Hikes
Source: SERCs, News Reports
BILLING EFFICIENCY
AT&C LOSSES
IMPROVED PERFORMANCE OF DISCOMS
COLLECTION EFFICIENCY
BENEFIT TO CONSUMERS
• Honest consumers do not pay for dishonest consumers
• Will avoid unreasonable tariff hike
13
Operational Efficiency is
driven by AT&C loss reduction
Present
85 88 83 82
75 76 72
49
101 96 99 98 101 96 91
104
14 15 18 19 25 27
34
49
0
20
40
60
80
100
120
Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%)
North India
Audited Figures for 2013-14 14
Present
89 87 89 85
78
95 97 94 92
99
15 16 16
22 22
0
20
40
60
80
100
120
Andhra
Pradesh
Puducherry Kerala Karnataka Tamil Nadu
Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%)
South India
Audited Figures for 2013-14 15
Present
88 86 85
76 75
101 100 99 102
96
11 14 16
23
28
0
20
40
60
80
100
120
Goa Maharashtra Gujarat Chattisgarh Madhya
Pradesh
Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%)
West India
Audited Figures for 2013-14 16
Present
68 64 66
56
68
100
95
87
96
42
32
39 42 46
71
0
20
40
60
80
100
120
West Bengal Odisha Jharkhand Bihar Sikkim
Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%)
East India
Audited Figures for 2013-14 17
Present
73 76
69 73 69 73
41
99
92 97
89 89
77 78
28 30 33 35 38 44
68
0
20
40
60
80
100
120
Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%)
North East India
Audited Figures for 2013-14 18
Present
All India
19
82 85
77 73
64
71
99 95 98
91
96 97
18 19
25
34 38
32
0
20
40
60
80
100
120
West South North North East East All India
Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%)
Audited Figures for 2013-14
Present
State Input Energy
18-19
(Mkwh)
AT&C
Losses 13-
14
AT&C Loss
Target by
18-19
Potential Saving if
AT&C Loss reduces to
Target (Rs. Crores)
Haryana 55,788 34 15 5,391
Uttar Pradesh 1,08,378 25 15 5,227
Rajasthan 79,170 27 15 4,654
Madhya Pradesh 68,848 28 15 4,486
Tamil Nadu 1,08,438 22 15 3,986
Odisha 31,654 39 15 3,829
West Bengal 42,770 32 15 3,645
Maharashtra 1,39,659 14 10 3,066
Bihar 18,259 46 15 2,861
Jammu &
Kashmir 16,447 49 15 2,808
Andhra Pradesh 1,15,826 15 10 2,764
Karnataka 77,430 22 15 2,717
Punjab 63,448 18 10 2,508
Gujarat 84,289 16 10 2,501
Jharkhand 11,608 42 15 1,577
Total 52,019
Assumption: (a) Targeted AT&C Loss for States with AT&C loss of >20% = 15.00 % and 10% for balance (b) Avg. Cost of Power Considered as INR 5.00/kwh
Potential Savings
20
Present
State
Input Energy
18-19 (Mkwh)
AT&C
Losses 13-
14
AT&C Loss Target
by 18-19
Potential Saving if AT&C
Loss reduces to Target
(Rs. Crores)
Chattisgarh 27,424 23 15 1,120
Kerala 27,403 16 10 875
Delhi 37,691 14 10 771
Uttarakhand 15,452 19 10 696
Assam 8,804 30 15 671
Himachal Pr. 11,990 15 10 307
Arunachal Pr. 803 68 15 214
Meghalaya 2,035 35 15 207
Sikkim 548 71 15 154
Puducherry 3,825 16 10 118
Manipur 792 44 15 113
Nagaland 854 38 15 100
Tripura 1,375 28 15 88
Mizoram 612 33 15 54
Goa 4,721 11 10 17
Total 5,505
Grand Total 57,523
Potential Savings
18
Present
Improving billing efficiency through
metering and Tracking of losses
Activity Benefit End Date
Compulsory feeder
and Distribution
Transformer (DT)
metering by States
Ability to track losses
at the feeder and DT
level for corrective
action
Feeders - 30th
Jun 2016
DTs – 30th Jun
2017
Consumer Indexing
& GIS Mapping of
losses
Identification of loss
making areas for
corrective action
30th Sep 2018
22
Present
Infra augmentation & Smart Metering
Activity Benefit End Date
2 a) Upgrade or
change
transformers,
meters etc.
Reduce technical losses
and minimize outages
31st Dec 2017
2 b) Smart metering
of all consumers
consuming above
200 units / month
Smart meters will be
tamper proof and allow
remote reading thus
helping reduce theft
Consumption >
500 units / month
- 31st Dec 2017
Others – 31st Dec
2019
23
Present
Improving collection efficiency
through public participation
Activity Benefit End Date
Awareness campaign
against theft to ensure
“honest do not pay for
dishonest”
Enhance public
participation to reduce
power theft
One year
awareness
programme jointly
with States up to
31st December
2016
Assure increased
power supply in areas
where the AT&C losses
reduce
Encourage local
participation to reduce
losses
31st March 2018
24
Present
'Mhara Gaon - Jagmag Gaon‘ –
Haryana’s Scheme to reduce loss
Details Hours of
Supply
Current 12
Identified villages with 25-70% losses 15
Install meters outside houses and replace old
wires
18
After bill payment crosses the mark of 90% 21
Outstanding amount of electricity bills paid in
five equal instalments
24
25
Present
Demand Side Management to
improve efficiency
Activity Benefit
Demand Side Management (DSM) with
energy efficient equipment (by 18-19):
Reduce peak load
and energy
consumption
• LED bulbs: 77 cr. HH bulbs & 3.5 cr.
streetlights
45,000 cr.
• Agricultural pumps – 1 crore 12,000 cr.
• Fans & Air-conditioners – 16 cr. Fans &
18 lakh A/Cs
1,500 cr.
• Industrial equipment through PAT
(Perform, Achieve, Trade)
7,600 cr.
26
Present
Domestic Efficient Lighting
Programme (DELP)
Target Achievement
No of LED bulbs to be replaced 77 crore 2.5 crore
No of towns where work in progress/
complete
Entire country 78/7 = 85
Annual energy savings 105 b KWh 3.16 b KWh
Reduction of peak load 20,000 MW 802 MW
Annual reduction in consumer bills Rs. 40,000 cr Rs. 1,264 cr
Annual reduction in GHG emission 79 mn ton CO2 5.5 mn ton of CO2
Innovative Service Model - entire upfront investment made by EESL and
recovered by sharing energy savings over the project period (DELP: 10
months)
National Domestic LED Programme
Present
Transparency in Procurement -
Reduction in Price
Large scale and transparent procurement has led
to sharp decline in LED bulb prices (with taxes)
•Specs improved from 7W to 9W
•Retail price of LED bulbs reduced by almost 50% (Rs. 599 to Rs. 317)
•For street lights – prices have come down from Rs. 137 per watt to Rs. 85
per watt
500
Energy Conservation through PAT
• PAT (Perform, Achieve & Trade) - Energy-intensive
industries achieve reduction in specific energy
consumption (per unit production)
PAT Cycle Number
of
Sectors
% of national
energy
consumption
covered
Reduction in
specific energy
consumption
2012-15 8 30% 4%
2016-19 11 50% 5%
29
Present
Cost reduction through Central
Support
• Ministry of Power constituted two committees to facilitate
States for mobilizing major equipment
• Committee-A, headed by the Chairperson, CEA, entrusted
with the task of
• listing out major equipment/ material,
• finalize technical specifications,
• aggregate requirement of various states.
• Committee B, headed by Director (Projects) PGCIL, was
entrusted
• prepare bidding documents,
• carry out bid processing through e-tendering under reverse
bidding mode,
• evaluate bids and finalize rate contracts.
Present
Equipment Installation
Area Units Installed
(lakh)
End Date
Feeder & DT Meters 13 2017
Smart Meters > 500 units/ mth
200-500 units/ mth
100
250
2017
2019
DT 4.2 2017
Conductors 11.2 2017
LED Bulbs Domestic
Streetlights
7,700
350
2019
Eff. Agri Pumps 100 2019
Appliances Fans
A/Cs
1,600
18
2019
31
Present
Reducing Cost of thermal Power
• Increased supply of domestic coal – 200 mt – Rs
20,000 cr.
• Coal linkage rationalization – 500 mt – Rs 6,000 cr.
• Liberally allowing coal swaps from inefficient plants
to efficient plants and from plants situated away
from mines to pithead plants to minimize cost of
coal transportation – Rs 10,000 cr.
• Coal price rationalization based on Gross Calorific
Value (GCV)*
• Correction in Coal grade slippage through re-
assessment of each mine*
* Correct tariff fixation and reduce coal theft 32
Present
TargetActual
*
* 1 Bn with additional allocation of mines
Coal India production increase
33
379
404
431 431 436 452 462
494
550
600
663
775
908
0
100
200
300
400
500
600
700
800
900
1000
INCREASE IN PROD. 2014-15 (One Year)- 31.59 Million Metric Ton per Annum (MMT)
INCREASE IN PROD. IN LAST 6 YEARS 2008-14 : 83 MMT
PLANNED INCREASE IN NEXT 6YRS 2014-20 :537.59 MMT
Details:http://coal.nic.in/sites/upload_files/coal/files/webform/notices/RoadMap_for_E
nhancement_of_Coal_Production_26052015.pdf
Area Savings (Rs.
Cr.)
Per Unit
Savings (Rs.)
Substituting imported
coal, MoU/E-Auction
coal by 100% ACQ coal
7,300 0.30
Rationalization /
swapping of coal sources
including freight charges
1,270 0.05
Total 8,570 0.35
Illustration of Savings - NTPC
34
Reducing Cost of Power
• Completion of railway lines
• JV’s with States
• Coal India to supply 100% washed coal for G10
grade and above at plants > 500 km from mines by
1st October 2018
• 100% crushed coal from Coal India by 1st Apr 2016
• Faster completion of delayed transmission lines
• New transmission lines expedited planned for 2030
requirement
• Award of works of about Rs. 1 lakh crore by 31st
March 2016 35
Present
Transmission Capacity Addition
• Highest ever increase in Transmission lines & sub
station capacity since May 2014 (36,000 ckm and
90,000 MVA respectively as on Oct 2015)
• Inter-regional power transfer
• 765 kV Gwalior-Jaipur D/C and 765 kV Jaipur-
Bhiwani lines saving 10 cr/ day
• 765kV Aurangabad-Sholapur will enhance transfer
capacity by 1700MW
• Additional 18,400 MW to Southern Corridor expected by
2018-19 (thrust on reconducting of existing lines)
• Transmission loss presently in the range of 4-5 %, reduce
by at least 1% 36
Present
DISCOM in a debt trap
• DISCOM debt interest rate – Average ~ 12%, as
high as 14-15% for many DISCOMs while States
borrow at ~ 8%
• Regulators don’t allow pass through of interest on
past losses in tariff
• Surgical intervention required to rationalise
outstanding debt
37
Present
State takeover of DISCOM debt
• DISCOM debt is de facto borrowing of States which is
not counted in de jure borrowing
• States shall take over 75% of DISCOM debt as on 30
September 2015
• Principal debt taken over will not be included in fiscal
deficit of States. However, interest has to be serviced
within FRBM limits
• States will issue non-SLR bonds (SDL) with maturity
period of 10-15 years with a moratorium on principal
up to 5 years 38
Past
2015-16 2016-17
Debt taken over 50% 25%
State bond pricing
• 10 year Bond Pricing: 7.92% (as per last RBI auction
of State SDLs) + 0.25% spread for non-SLR status on
semi-annual compounding basis (market driven,
subject to cap of 10 yr. G-Sec + 50 + 25 bps)
39
Past
Debt takeover mechanism
• Debt of DISCOM will be taken over in the priority of
debt already due, followed by debt with highest
cost
• Transfer to DISCOM by State will be as grant with
an option to spread the grant over three years*
* MoP can further relax by 2 years for high debt States like Raj and TN
40
Past
State takeover of DISCOM debt
As on 30 Sep,
2015 2015-16 2016-17 2017-18
DISCOM Debt 40,000
Debt taken over by State 20,000 10,000
Option A) 2yr Grant
Grant 20,000 10,000
Option B) 3 yr Grant
Grant 10,000 10,000 10,000
Loan from State to
DISCOM (at same rate as
State borrowing) 10,000 -10,000
41
Past
Illustration
Treatment of residual debt
• Up to 25% of the grant can be given as equity
• DISCOM debt to be taken over by the State will include
DISCOM bonds which are committed to be taken over
by the State as part of FRP 2012 including bonds
already taken over in 2015-16
• Residual DISCOM debt to be converted into bonds to be
offered to market at a likely rate of State Bond + 0.2%.
If not converted into bonds, Banks can lend at < Base
rate + 0.1%
• Scheme available only for State DISCOMs including
combined generation, transmission and distribution
undertakings 42
Past
Complying with RPO obligations
• DISCOMs to comply with the Renewable Purchase
Obligation (RPO) outstanding since 1st April, 2012,
within a period to be decided in consultation with
MoP
• Clear large number of RPOs with developers
• Impetus to clean energy markets
43
Past
Ongoing DISCOM financing
• Loss financing only as per loss trajectory finalized
with MoP and only through DISCOM bonds backed
by State guarantee
• Working capital will only be allowed up to 25% of
the DISCOM’s previous year’s annual revenue
44
Future
States will fund the future losses (if
any) of DISCOMs in a graded manner
Year 2015-
16
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21 …
Previous Year’s
DISCOM loss to
be taken over
by State
0% of
the loss
of
2014-
15
0% of
the
loss of
2015-
16
5% of
the
loss of
2016-
17
10% of
the loss
of
2017-
18
25% of
the
loss of
2018-
19
50% of
the
previo
us year
loss
Ensures permanent resolution of DISCOM issues
through a hard budget constraint
45
Future
Additional Benefits for States
• States accepting the scheme and performing as per
operational milestones will be given additional /
priority funding through DDUGJY, IPDS, Power
System Development Fund (PSDF) or other such
schemes of MoP and MNRE
• Such States shall also be supported with additional
coal at notified prices and, in case of availability
through higher capacity utilization, low cost power
from NTPC and other Central Public Sector
Undertakings (CPSUs)
46
Future
Outcomes – Breakeven in next 2-3
years
• Reduction of AT&C loss to 15% in 2018-19
• Reduction in gap between Average Revenue
Realized (ARR) & Average Cost of Supply (ACS) to
zero by 2018-19
• Almost all DISCOMs to be profitable by 2017-18, 3-
4 by 2018-19
47
MoU to be signed between MoP,
State and DISCOM(s)
• Clear identification of responsibilities of each of the
three parties
• Details of specific operational activities to be
undertaken in the State
• Circle level targets of loss reduction with
responsibilities, resources and timelines
• MoU targets to be reviewed on a monthly basis by
MoP
48
Benefits of UDAY - Government
• Achievement of 24X7 Power for All
• Power to 5 crore households without electricity
• Speedy achievement of electrification of remaining
18,500 villages
• Energy security through coal and renewables
• Reduce Current Account Deficit (CAD) from higher
diesel import (current annual imports of around Rs.
50,000 crore)
• Meet ambitious renewable energy commitments as
a responsible global citizen
• Revive investments in power sector to create jobs
49
Benefits of UDAY – Industry &
Consumers
• Availability of 24X7 power improving quality of life
and efficiency
• Lower cost of power - Typical 3,000 MW NTPC plant
running at 60% Plant Load Factor (PLF) has a fixed
cost of Rs. 2.67 / unit, vs Rs. 1.80 at 90% PLF
• Global competitiveness of industry
50
Benefits of UDAY – Banks &
Investors
• Avoid banking contagion (Rs, 40,000 crore of
repayments due to banks in 2015-16) which will
create significant NPAs
• Lower risk for existing investments and loans in
power, coal and renewables sector
• Lower capital adequacy
• Increased procurement of power by DISCOMs
revives existing power projects suffering from low
PLFs
• Reduce investment uncertainty across the sector
51
Area Details Amount (Rs.
Cr.)
Interest Rate Reduction 3% on 25% DISCOM debt
4% on 75% DISCOM debt
17,000
Debt takeover by State 8% on 75% DISCOM debt 27,000
AT&C loss reduction 22% to 15% 33,000
Supply of domestic coal
and coal swapping
36,000
DSM LED, Appliances etc. 58,500
PAT 7,600
Transmission Losses 1% of Intra State 1,600
Total 1,80,700
Efficiency Improvement Benefits
52
Other Initiatives in the
Distribution Sector
53
54
• Electrify all 18452 remaining un-electrified villages in the country
• Access of electricity to remaining 5 crore Households
• System Strengthening:
• Power transformers : 14,491 nos.
• Distribution transformers : 3,17,068 nos.
• Conductors : 8,69,521 kms
• Energy Meters : 110,00,000 nos.
• Metering the un-metered
• Feeder/Boundary/ DTs : 11,92,658 nos.
• Energy Meters : 99,93,893 nos.
DeenDayal Upadhyaya Gram Jyoti
Yojana (DDUGJY)
Total Outlay approved for DDUGJY including RE
Component is Rs. 75,893 crores
Integrated Power Development
Scheme (IPDS)
An integrated scheme for urban areas covering:
• Smart Metering and Tamper-proof meters at homes
• Infrastructure upgradation in urban areas -
Comprehensive sub transmission & distribution
• Underground cabling & GIS Sub stations in densely
populated areas
• IT implementation for better customer service
• Solar installations like rooftop solar panels also covered
• Outlay of Rs. 65,424 crores
55
Grant under DDUGJY and IPDS
• Total outlay of Rs 1.4 lakh crore
• Incentive based grant to States of Rs 9,178 crores
linked to:
 Timely completion of the scheme
 Reduction in At &C looses as per the agreed trajectory
 Upfront release of admissible revenue subsidy by the
State Government to DISCOM based on metered
consumption.
56
Impact of IT enablement
• 1st of its kind Impact Assessment of IT enablement
under IPDS
• Estimated savings through AT&C loss reduction could
be INR 5000 Cr
• 1114 towns out of 1409 towns declared Go-Live
• 19 out of 21 Data Centers Operational
• 22 SCADA Control Centers commissioned
57
2587
1197 1405
2677
4323
11452
0
2000
4000
6000
8000
10000
12000
14000
12-13 13-14 14-15 15-16… 15-16… 16-17
HIGHEST IN 12th PLAN
IN FIRST 6 MONTHS
OFF GRID
3000
GRID
DDUGJY – Emphasis on Sustainability of DISCOMs with renewed
focus on rural electrification has fastened the process from 2015
onwards. Expected to electrify all villages by 2017
Villages Electrified in XII Plan
58
59
1. Survey
Report
2. Receipt
of Poles
3. Erection
of Poles
(11 KV)
4. Erection
of Poles
(LT)
5. Receipt
of DT
6. Stringing
(LT)
7. Stringing
(11KV)
8. Receipt
of Line
Material
9. Erection
of DT
10.
Completion
of Works
11.
Inspection
12.
Energisation
12 Stage Monitoring
60
Grameen Vidyutikaran App
• For remote locations, DDG provides operational ease
• Potential to lower overall carbon footprint by maximizing
clean local generation
• Can operate in a standalone mode and interconnected
with the central grid when available.
• Allows for community engagement in electricity supply
• Infrastructure should be Grid compatible
• Cost components include all equipments and
accessories, civil works, O&M for 5 years
Distributed Decentralized
Generation (DDG)
61
• Standalone system permitted under DDUGJY
• Standalone system shall include 200 watt SPV panel,
inverter, battery, internal wiring, LEDs etc.
• 2500 Unelectrified villages under microgrid and 1000
villages to be covered under Stand alone.
• Avg. cost per HH is Rs.0.56 lakhs
• Nearly 3 lacs households to be covered
• Tender to be floated centrally to take advantage of
Economies of scale
• Specifications being finalized by MNRE and REC.
• Reverse auction methodology to be adopted.
Recent amendments in DDG
guidelines
62
63
A New Realm of Possibilities for
Rural India
Proposed Policy
Interventions
64
• Segregation of carriage from content
• Accelerate electricity generation from renewable
energy sources
• Strengthening grid safety and security
• Rationalize tariff determination process
• Review of performance of Regulatory Commissions.
• Provide for recovery of revenue by Licensees without
any revenue gap
• Mandate to Regulators for suo moto proceedings in
determination of tariff (in case the utility companies do
not file their petitions in time) 65
Proposed amendments in the
Electricity Act
• Expansion of existing power plants owned by states permitted for
optimum utilization of existing infrastructure.
• Expansion of private developers up to 100% from existing
capacity; policy for private sector to be decided in 6 months.
• Setting up Coal washery rejects based projects on Cost plus basis
by the PSUs,
• Renewable Energy Generation Obligation (RGO) on all future coal
and lignite based thermal station to be set up.
• Renewable energy estimated to be 15% of total energy
consumption by 2022 (up from 6% now)
• Compulsorily procurement of power from “Waste to Energy”
• Procured waste water to be used in thermal plants in the vicinity
of towns & cities.
• Regulatory Commission to devise a trajectory to ensure 24 hours
supply of adequate and uninterrupted power to all categories of
consumers 66
Suggested Amendments in Tariff
Policy
Renewable Energy
Initiatives
67
175 GW
10 GW5 GW60 GW100 GW
Solar Wind Small Hydro Biomass
& Others68
Road Map for Renewable Power
by 2022
69
Area Solar Wind
Operational Capacity (GW)
(approx.)
(as on Oct’15)
4.4 24
Target Capacity by 2022 (GW)
100 (Ground
mounted – 60 &
Roof top - 40)
60
Investment Already Made
(USD billion) (approx.)
5.5 22
Additional Investment to be
made by 2022 (USD billion)
(approx.)
80 30
Renewable Investments by 2022
Price of Solar Power reduction to
achieve Grid Parity
12.16
8.79 8.73
6.87 6.72
4.63
0
2
4
6
8
10
12
14
2010 2011 2012 2013 2014 2015
LOWEST RATE FOR SOLAR PROJECT
*
WeightedaveragePrice(Rs./KWh)
70
* 500 MW bought by NTPC through Reverse e bidding on 4th Nov at midnight
Total Investment Potential (by 2022)
Area Potential (USD Bn)
Renewables 120
Generation (CPSUs, States,
UMPPs & Private Sectors)
50
Transmission 50
Sub Transmission &
Distribution
25
Energy Efficiency 5
Total 250
71
Thank You
72
Sabka Saath, Sabka Vikas
http://www.ujwalbharat.gov.in/

Mais conteúdo relacionado

Mais procurados

Integration of Renewable Energy Sources
Integration of Renewable Energy SourcesIntegration of Renewable Energy Sources
Integration of Renewable Energy SourcesSandeep Kaushal
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & auditPINAKI ROY
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india pptnavreet singh
 
Electric Vehicle :Literature Review
Electric Vehicle :Literature ReviewElectric Vehicle :Literature Review
Electric Vehicle :Literature Reviewryans09sstc
 
Integrated gasification combined cycle plant
Integrated gasification combined cycle plantIntegrated gasification combined cycle plant
Integrated gasification combined cycle plantAbhijit Prasad
 
Current status of the electric car
Current status of the electric carCurrent status of the electric car
Current status of the electric carvladtempest5
 
Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industrySameer Kumar Rout
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
Renewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaRenewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaSurabhi Pal
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in IndiaRavijesh Kumar
 

Mais procurados (20)

Integration of Renewable Energy Sources
Integration of Renewable Energy SourcesIntegration of Renewable Energy Sources
Integration of Renewable Energy Sources
 
Indian energy scenario (2)
Indian energy scenario (2)Indian energy scenario (2)
Indian energy scenario (2)
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & audit
 
Demand Side Management
Demand Side ManagementDemand Side Management
Demand Side Management
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Energy scenario in India
Energy scenario in IndiaEnergy scenario in India
Energy scenario in India
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india ppt
 
Energy scenario
Energy scenarioEnergy scenario
Energy scenario
 
Solar Thermal Power
Solar Thermal PowerSolar Thermal Power
Solar Thermal Power
 
Electric Vehicle :Literature Review
Electric Vehicle :Literature ReviewElectric Vehicle :Literature Review
Electric Vehicle :Literature Review
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Integrated gasification combined cycle plant
Integrated gasification combined cycle plantIntegrated gasification combined cycle plant
Integrated gasification combined cycle plant
 
Current status of the electric car
Current status of the electric carCurrent status of the electric car
Current status of the electric car
 
Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industry
 
Wind Power in India
Wind Power in IndiaWind Power in India
Wind Power in India
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Renewable energy & its furure prospects in india
Renewable energy & its furure prospects in indiaRenewable energy & its furure prospects in india
Renewable energy & its furure prospects in india
 
Electric vehicles ppt
Electric vehicles pptElectric vehicles ppt
Electric vehicles ppt
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in India
 

Destaque

Mcc tariff models dr harish ahuja
Mcc tariff models dr harish ahujaMcc tariff models dr harish ahuja
Mcc tariff models dr harish ahujamcci175
 
Effect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in IndiaEffect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in IndiaIPPAI
 
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2IPPAI
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGRAVI PAL SINGH
 
Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?IPPAI
 
Financial &amp; operational opportunities for disco ms under uday
Financial &amp; operational opportunities for disco ms under udayFinancial &amp; operational opportunities for disco ms under uday
Financial &amp; operational opportunities for disco ms under udaySakshi Saini
 
Power distribution tariff in india 2016 discom wise and consumer wise compre...
Power distribution tariff in india 2016  discom wise and consumer wise compre...Power distribution tariff in india 2016  discom wise and consumer wise compre...
Power distribution tariff in india 2016 discom wise and consumer wise compre...Sakshi Saini
 
Operational challenges in India's power sector
Operational challenges  in India's power sectorOperational challenges  in India's power sector
Operational challenges in India's power sectorpradhansushil
 
Managing fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaManaging fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaIPPAI
 
Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEAAshish Verma
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorIPPAI
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 
Review of Indian coal sector
Review of Indian coal sectorReview of Indian coal sector
Review of Indian coal sectorManoj Jhawar
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?IPPAI
 
Dhabol PPT power debacle
Dhabol PPT power debacleDhabol PPT power debacle
Dhabol PPT power debacleALOK KUMAR
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in Indiamohkab1
 
Dabhol Case Study presentationn
Dabhol Case Study presentationnDabhol Case Study presentationn
Dabhol Case Study presentationnManoj Kumar Mishra
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulationsAkshat Goel
 

Destaque (20)

Uday Ujjwal
Uday UjjwalUday Ujjwal
Uday Ujjwal
 
Mcc tariff models dr harish ahuja
Mcc tariff models dr harish ahujaMcc tariff models dr harish ahuja
Mcc tariff models dr harish ahuja
 
Effect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in IndiaEffect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in India
 
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
 
Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?
 
Financial &amp; operational opportunities for disco ms under uday
Financial &amp; operational opportunities for disco ms under udayFinancial &amp; operational opportunities for disco ms under uday
Financial &amp; operational opportunities for disco ms under uday
 
Power distribution tariff in india 2016 discom wise and consumer wise compre...
Power distribution tariff in india 2016  discom wise and consumer wise compre...Power distribution tariff in india 2016  discom wise and consumer wise compre...
Power distribution tariff in india 2016 discom wise and consumer wise compre...
 
Operational challenges in India's power sector
Operational challenges  in India's power sectorOperational challenges  in India's power sector
Operational challenges in India's power sector
 
Managing fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaManaging fuel supply & uncertainty in India
Managing fuel supply & uncertainty in India
 
Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEA
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Review of Indian coal sector
Review of Indian coal sectorReview of Indian coal sector
Review of Indian coal sector
 
Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
 
Dhabol PPT power debacle
Dhabol PPT power debacleDhabol PPT power debacle
Dhabol PPT power debacle
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in India
 
Dabhol Case Study presentationn
Dabhol Case Study presentationnDabhol Case Study presentationn
Dabhol Case Study presentationn
 
Electricity laws and regulations
Electricity laws and regulationsElectricity laws and regulations
Electricity laws and regulations
 

Semelhante a Power sector reforms

AGM-PPT-2020.pdf
AGM-PPT-2020.pdfAGM-PPT-2020.pdf
AGM-PPT-2020.pdfYash255856
 
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxOmbabu Saxena
 
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyPower Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyIndiaNotes.com
 
power sector
power sectorpower sector
power sectoryzag66
 
II BTG Pactual Utilities Days
II BTG Pactual Utilities DaysII BTG Pactual Utilities Days
II BTG Pactual Utilities DaysCPFL RI
 
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in DelhiFAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in DelhiTata Power Delhi Distribution Limited
 
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?JLanka Technologies (Pvt) Limited
 
Energy conservation
Energy conservationEnergy conservation
Energy conservationNTPC
 
Skipper Ltd_SKP Securities Ltd
Skipper Ltd_SKP Securities LtdSkipper Ltd_SKP Securities Ltd
Skipper Ltd_SKP Securities LtdAnik Das
 
Energy efficiency improvements in nepalese industries
Energy efficiency improvements in nepalese industriesEnergy efficiency improvements in nepalese industries
Energy efficiency improvements in nepalese industriesDr Ramhari Poudyal
 
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureBanglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureMd Asif Imrul
 
webinar on " Economics Behind the Solutions to Optimize KVAh Billing”
webinar on " Economics Behind the Solutions to Optimize KVAh Billing”webinar on " Economics Behind the Solutions to Optimize KVAh Billing”
webinar on " Economics Behind the Solutions to Optimize KVAh Billing”Ganesh Kondikire
 
Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...
Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...
Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...AurovilleConsulting
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Pathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: NepalPathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: NepalClimate Action Network South Asia
 

Semelhante a Power sector reforms (20)

AGM-PPT-2020.pdf
AGM-PPT-2020.pdfAGM-PPT-2020.pdf
AGM-PPT-2020.pdf
 
TPDDL Excellence Journey
TPDDL Excellence JourneyTPDDL Excellence Journey
TPDDL Excellence Journey
 
PAT scheme.pdf
PAT scheme.pdfPAT scheme.pdf
PAT scheme.pdf
 
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptxENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
 
Delhi Performance Overview and Financial Data
Delhi Performance Overview and Financial DataDelhi Performance Overview and Financial Data
Delhi Performance Overview and Financial Data
 
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; BuyPower Grid Q4FY15: Surplus scenario to continue for next three years; Buy
Power Grid Q4FY15: Surplus scenario to continue for next three years; Buy
 
power sector
power sectorpower sector
power sector
 
Government Solar and Net Metering Policies
Government Solar and Net Metering PoliciesGovernment Solar and Net Metering Policies
Government Solar and Net Metering Policies
 
II BTG Pactual Utilities Days
II BTG Pactual Utilities DaysII BTG Pactual Utilities Days
II BTG Pactual Utilities Days
 
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in DelhiFAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
FAQ’s Sl. No. 1 : Tata Power-DDL’s power distribution operations in Delhi
 
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
Costs and Prices of Electricity in Sri Lanka 2013: Are they reasonable..?
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
 
Skipper Ltd_SKP Securities Ltd
Skipper Ltd_SKP Securities LtdSkipper Ltd_SKP Securities Ltd
Skipper Ltd_SKP Securities Ltd
 
Energy efficiency improvements in nepalese industries
Energy efficiency improvements in nepalese industriesEnergy efficiency improvements in nepalese industries
Energy efficiency improvements in nepalese industries
 
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea BrochureBanglalink (VEON) Ennovators 2.0 Winning Idea Brochure
Banglalink (VEON) Ennovators 2.0 Winning Idea Brochure
 
$MPI 1H20 Results
$MPI 1H20 Results$MPI 1H20 Results
$MPI 1H20 Results
 
webinar on " Economics Behind the Solutions to Optimize KVAh Billing”
webinar on " Economics Behind the Solutions to Optimize KVAh Billing”webinar on " Economics Behind the Solutions to Optimize KVAh Billing”
webinar on " Economics Behind the Solutions to Optimize KVAh Billing”
 
Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...
Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...
Assessing the Impact of Tamil Nadu’s Electricity Tariff Policy on TANGEDCO’S ...
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Pathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: NepalPathways to Low Carbon Development: Impediments and Opportunities: Nepal
Pathways to Low Carbon Development: Impediments and Opportunities: Nepal
 

Mais de PSPCL

Updated master guide on gst annual return and audit including 20 case studies
Updated master guide on gst annual return and audit including 20 case studiesUpdated master guide on gst annual return and audit including 20 case studies
Updated master guide on gst annual return and audit including 20 case studiesPSPCL
 
Master guide on gst annual return and audit
Master guide on gst annual return and auditMaster guide on gst annual return and audit
Master guide on gst annual return and auditPSPCL
 
CHANGES IN ITR FORMS AY 2018-19
CHANGES IN ITR FORMS AY 2018-19CHANGES IN ITR FORMS AY 2018-19
CHANGES IN ITR FORMS AY 2018-19PSPCL
 
Benami property transaction act
Benami property transaction actBenami property transaction act
Benami property transaction actPSPCL
 
Goods and services tax
Goods and services taxGoods and services tax
Goods and services taxPSPCL
 
9.tax invoice-debit-and-credit-note
9.tax invoice-debit-and-credit-note9.tax invoice-debit-and-credit-note
9.tax invoice-debit-and-credit-notePSPCL
 
GOODS AND SERVICES TAX – AN OVERVIEW
GOODS AND SERVICES TAX – AN OVERVIEWGOODS AND SERVICES TAX – AN OVERVIEW
GOODS AND SERVICES TAX – AN OVERVIEWPSPCL
 
1 news0107042017
1 news01070420171 news0107042017
1 news0107042017PSPCL
 
Presentation gst-bill-2017
Presentation gst-bill-2017Presentation gst-bill-2017
Presentation gst-bill-2017PSPCL
 
Cbec gst-migration-help
Cbec gst-migration-helpCbec gst-migration-help
Cbec gst-migration-helpPSPCL
 
incentive for digital payment
incentive for digital paymentincentive for digital payment
incentive for digital paymentPSPCL
 
Gst impact study-icai
Gst impact study-icaiGst impact study-icai
Gst impact study-icaiPSPCL
 
Presentation on igst model
Presentation on igst modelPresentation on igst model
Presentation on igst modelPSPCL
 
Tds rate
Tds rateTds rate
Tds ratePSPCL
 
E tutorial -
E tutorial - E tutorial -
E tutorial - PSPCL
 
19 09 15_form26_a (1)
19 09 15_form26_a (1)19 09 15_form26_a (1)
19 09 15_form26_a (1)PSPCL
 
02 09 15_tax_audit_clausewise
02 09 15_tax_audit_clausewise02 09 15_tax_audit_clausewise
02 09 15_tax_audit_clausewisePSPCL
 
Black money
Black money Black money
Black money PSPCL
 
05 08 15_ecommerce
05 08 15_ecommerce05 08 15_ecommerce
05 08 15_ecommercePSPCL
 

Mais de PSPCL (20)

Updated master guide on gst annual return and audit including 20 case studies
Updated master guide on gst annual return and audit including 20 case studiesUpdated master guide on gst annual return and audit including 20 case studies
Updated master guide on gst annual return and audit including 20 case studies
 
Master guide on gst annual return and audit
Master guide on gst annual return and auditMaster guide on gst annual return and audit
Master guide on gst annual return and audit
 
CHANGES IN ITR FORMS AY 2018-19
CHANGES IN ITR FORMS AY 2018-19CHANGES IN ITR FORMS AY 2018-19
CHANGES IN ITR FORMS AY 2018-19
 
Benami property transaction act
Benami property transaction actBenami property transaction act
Benami property transaction act
 
3b
3b3b
3b
 
Goods and services tax
Goods and services taxGoods and services tax
Goods and services tax
 
9.tax invoice-debit-and-credit-note
9.tax invoice-debit-and-credit-note9.tax invoice-debit-and-credit-note
9.tax invoice-debit-and-credit-note
 
GOODS AND SERVICES TAX – AN OVERVIEW
GOODS AND SERVICES TAX – AN OVERVIEWGOODS AND SERVICES TAX – AN OVERVIEW
GOODS AND SERVICES TAX – AN OVERVIEW
 
1 news0107042017
1 news01070420171 news0107042017
1 news0107042017
 
Presentation gst-bill-2017
Presentation gst-bill-2017Presentation gst-bill-2017
Presentation gst-bill-2017
 
Cbec gst-migration-help
Cbec gst-migration-helpCbec gst-migration-help
Cbec gst-migration-help
 
incentive for digital payment
incentive for digital paymentincentive for digital payment
incentive for digital payment
 
Gst impact study-icai
Gst impact study-icaiGst impact study-icai
Gst impact study-icai
 
Presentation on igst model
Presentation on igst modelPresentation on igst model
Presentation on igst model
 
Tds rate
Tds rateTds rate
Tds rate
 
E tutorial -
E tutorial - E tutorial -
E tutorial -
 
19 09 15_form26_a (1)
19 09 15_form26_a (1)19 09 15_form26_a (1)
19 09 15_form26_a (1)
 
02 09 15_tax_audit_clausewise
02 09 15_tax_audit_clausewise02 09 15_tax_audit_clausewise
02 09 15_tax_audit_clausewise
 
Black money
Black money Black money
Black money
 
05 08 15_ecommerce
05 08 15_ecommerce05 08 15_ecommerce
05 08 15_ecommerce
 

Último

joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 

Último (20)

joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 

Power sector reforms

  • 1. Towards Ujwal Bharat UDAY: The Story of Reforms 9th November, 2015 Ministry of Power, Coal and New & Renewable Energy 1
  • 2. Team India to serve 125 crore people Central Govt. State Govt. CPSUs/ SPSUs/ DISCOMs Private Sector Investors Consumer Bodies Media 2 People
  • 4. Energy Security Make in India Swachh Bharat Digital India Climate change Power for All 24 x 7 Smart Cities Energy Efficiency Skill India Smart grid, Smart Metering, IT enablement , National Power Portal Real time tracking (DELP.in) Renewable Energy, INDC 1.28 lakh Toilets constructed for Swachh BharatIPDS covers 82 out of 98 smart cities Skilling people for IT enablement , Gram Vidyut Abhiyantas Enhanced Power Production, 100% Rural electrification LED lighting, Industrial Efficiency, Agricultural Pumps $ 250 Bn Investment with substantial local manufacturing 4
  • 5. Power Sector Reforms • Industrial Policy Resolution (1956) • Private sector participation in generation 1956–1991 Pre-liberalization Era • Electricity Act (2003) • Coal Auctions and record coal production • Highest Increase in Power generation and Transmission capacity addition • Implementation of Integrated Power Development Scheme (IPDS) and Deen Dayal Upadhyay Gram Jyoti Yojana (DDUGJY) • Biggest LED lighting movement in the World • Launch of UDAY Ujwal Bharat from Darkness • Electricity Regulatory Commissions Act (1998) for establishing CERC and SERCs • Generation and distribution of power under state ownership 1991- 2014 Post- liberalization Era 2014 onwards Accelerated Growth Trajectory • Electricity (Supply) Act 1948 • Legislative and policy initiatives (1991) • APDRP/ RAPDRP/ RGGVY 5
  • 6. Guiding Principles - TRANSPARENCY • Technology Focus • Root Cause Analysis • Accountability • National Effort – Team India • Speed, Skill and Smart • Prioritization • Achievement Oriented • Rejuvenate Economic Growth • Efficiency & Economies of Scale • National Sustainable Development • Customer Focus • Yes We Can 6
  • 7. Power Value Chain 24x7 Power For All DISCOMs are the weakest link in providing 24X7 Power for All 7
  • 8. Accumulated DISCOM losses & debt have ballooned in the last few years Source: Audited DISCOM Accounts * 2014-15 figure is a projection based on provisional reporting by States Accumulated Loss ~ Rs. 3.8 lakh crore (Mar 15) - Total Loss in last 6 years – Rs. 3.66 lakh crore 8
  • 9. UDAY (Ujwal DISCOM Assurance Yojana) aims at permanent resolution of DISCOM issues 9 Past Present Future State take over of debt Reduction in Interest Cost Operational Efficiency Lower Cost of Power Budgetary Discipline Future Bank Lending Enabling Quarterly Tariff Increase
  • 10. Stage wise Tariff Increase Activity Benefit End Date Enabling provision for quarterly revision to mitigate cost increase burden Such periodic tariff revision will be easier to implement and absorb by consumers Necessary changes in tariff policy in a month 10 Present
  • 11. Tariff increase no substitute for efficiency improvement • Regulators cannot pass on inefficiency of DISCOMs to consumers • States with 30-40% losses can’t expect consumers to pay for their inefficiency • Most States have maintained tariff increase trajectory – Average annual increase in last five years – 8% 11 Present
  • 12. Tariff increase not the only solution to DISCOM distress 12 Present State FY2011- 12 FY2012- 13 FY2013- 14 FY2014- 15 FY2015- 16 Average Hike (%) Kerala 0% 30% 7.9% 24% 3% 16% Delhi 22% 22% 5% 8% 0% 14% Nagaland 34% 12% 7% 0% 5% 14% Andhra Pradesh 8% 18% 23% 0% 5% 13% Tamil Nadu 0% 37% 0% 15% 0% 12% Chhattisgarh 0% 18% 0% 15% 14% 11% Tripura 0% 17% 31% 0% 0% 11% Haryana 4% 19% 13% 0% 8% 10% Meghalaya 0% 13% 7% 15% 8% 10% Rajasthan 9% 8% 9% 16% 0% 10% J&K 15% 19% 8.5% 0% 0% 10% Bihar 19% 12% 7% 0% 2.50% 9% Uttar Pradesh 0% 18% 5% 11% 5.47% 9% Odisha 20% 12% 2.40% 0% 4.64% 9% Goa 0% 12% 0% 8% 14% 8% Higher than National Average Tariff Hikes Source: SERCs, News Reports
  • 13. BILLING EFFICIENCY AT&C LOSSES IMPROVED PERFORMANCE OF DISCOMS COLLECTION EFFICIENCY BENEFIT TO CONSUMERS • Honest consumers do not pay for dishonest consumers • Will avoid unreasonable tariff hike 13 Operational Efficiency is driven by AT&C loss reduction Present
  • 14. 85 88 83 82 75 76 72 49 101 96 99 98 101 96 91 104 14 15 18 19 25 27 34 49 0 20 40 60 80 100 120 Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%) North India Audited Figures for 2013-14 14 Present
  • 15. 89 87 89 85 78 95 97 94 92 99 15 16 16 22 22 0 20 40 60 80 100 120 Andhra Pradesh Puducherry Kerala Karnataka Tamil Nadu Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%) South India Audited Figures for 2013-14 15 Present
  • 16. 88 86 85 76 75 101 100 99 102 96 11 14 16 23 28 0 20 40 60 80 100 120 Goa Maharashtra Gujarat Chattisgarh Madhya Pradesh Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%) West India Audited Figures for 2013-14 16 Present
  • 17. 68 64 66 56 68 100 95 87 96 42 32 39 42 46 71 0 20 40 60 80 100 120 West Bengal Odisha Jharkhand Bihar Sikkim Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%) East India Audited Figures for 2013-14 17 Present
  • 18. 73 76 69 73 69 73 41 99 92 97 89 89 77 78 28 30 33 35 38 44 68 0 20 40 60 80 100 120 Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%) North East India Audited Figures for 2013-14 18 Present
  • 19. All India 19 82 85 77 73 64 71 99 95 98 91 96 97 18 19 25 34 38 32 0 20 40 60 80 100 120 West South North North East East All India Billing Efficiency (%) Collection Efficiency (%) AT&C Losses (%) Audited Figures for 2013-14 Present
  • 20. State Input Energy 18-19 (Mkwh) AT&C Losses 13- 14 AT&C Loss Target by 18-19 Potential Saving if AT&C Loss reduces to Target (Rs. Crores) Haryana 55,788 34 15 5,391 Uttar Pradesh 1,08,378 25 15 5,227 Rajasthan 79,170 27 15 4,654 Madhya Pradesh 68,848 28 15 4,486 Tamil Nadu 1,08,438 22 15 3,986 Odisha 31,654 39 15 3,829 West Bengal 42,770 32 15 3,645 Maharashtra 1,39,659 14 10 3,066 Bihar 18,259 46 15 2,861 Jammu & Kashmir 16,447 49 15 2,808 Andhra Pradesh 1,15,826 15 10 2,764 Karnataka 77,430 22 15 2,717 Punjab 63,448 18 10 2,508 Gujarat 84,289 16 10 2,501 Jharkhand 11,608 42 15 1,577 Total 52,019 Assumption: (a) Targeted AT&C Loss for States with AT&C loss of >20% = 15.00 % and 10% for balance (b) Avg. Cost of Power Considered as INR 5.00/kwh Potential Savings 20 Present
  • 21. State Input Energy 18-19 (Mkwh) AT&C Losses 13- 14 AT&C Loss Target by 18-19 Potential Saving if AT&C Loss reduces to Target (Rs. Crores) Chattisgarh 27,424 23 15 1,120 Kerala 27,403 16 10 875 Delhi 37,691 14 10 771 Uttarakhand 15,452 19 10 696 Assam 8,804 30 15 671 Himachal Pr. 11,990 15 10 307 Arunachal Pr. 803 68 15 214 Meghalaya 2,035 35 15 207 Sikkim 548 71 15 154 Puducherry 3,825 16 10 118 Manipur 792 44 15 113 Nagaland 854 38 15 100 Tripura 1,375 28 15 88 Mizoram 612 33 15 54 Goa 4,721 11 10 17 Total 5,505 Grand Total 57,523 Potential Savings 18 Present
  • 22. Improving billing efficiency through metering and Tracking of losses Activity Benefit End Date Compulsory feeder and Distribution Transformer (DT) metering by States Ability to track losses at the feeder and DT level for corrective action Feeders - 30th Jun 2016 DTs – 30th Jun 2017 Consumer Indexing & GIS Mapping of losses Identification of loss making areas for corrective action 30th Sep 2018 22 Present
  • 23. Infra augmentation & Smart Metering Activity Benefit End Date 2 a) Upgrade or change transformers, meters etc. Reduce technical losses and minimize outages 31st Dec 2017 2 b) Smart metering of all consumers consuming above 200 units / month Smart meters will be tamper proof and allow remote reading thus helping reduce theft Consumption > 500 units / month - 31st Dec 2017 Others – 31st Dec 2019 23 Present
  • 24. Improving collection efficiency through public participation Activity Benefit End Date Awareness campaign against theft to ensure “honest do not pay for dishonest” Enhance public participation to reduce power theft One year awareness programme jointly with States up to 31st December 2016 Assure increased power supply in areas where the AT&C losses reduce Encourage local participation to reduce losses 31st March 2018 24 Present
  • 25. 'Mhara Gaon - Jagmag Gaon‘ – Haryana’s Scheme to reduce loss Details Hours of Supply Current 12 Identified villages with 25-70% losses 15 Install meters outside houses and replace old wires 18 After bill payment crosses the mark of 90% 21 Outstanding amount of electricity bills paid in five equal instalments 24 25 Present
  • 26. Demand Side Management to improve efficiency Activity Benefit Demand Side Management (DSM) with energy efficient equipment (by 18-19): Reduce peak load and energy consumption • LED bulbs: 77 cr. HH bulbs & 3.5 cr. streetlights 45,000 cr. • Agricultural pumps – 1 crore 12,000 cr. • Fans & Air-conditioners – 16 cr. Fans & 18 lakh A/Cs 1,500 cr. • Industrial equipment through PAT (Perform, Achieve, Trade) 7,600 cr. 26 Present
  • 27. Domestic Efficient Lighting Programme (DELP) Target Achievement No of LED bulbs to be replaced 77 crore 2.5 crore No of towns where work in progress/ complete Entire country 78/7 = 85 Annual energy savings 105 b KWh 3.16 b KWh Reduction of peak load 20,000 MW 802 MW Annual reduction in consumer bills Rs. 40,000 cr Rs. 1,264 cr Annual reduction in GHG emission 79 mn ton CO2 5.5 mn ton of CO2 Innovative Service Model - entire upfront investment made by EESL and recovered by sharing energy savings over the project period (DELP: 10 months) National Domestic LED Programme Present
  • 28. Transparency in Procurement - Reduction in Price Large scale and transparent procurement has led to sharp decline in LED bulb prices (with taxes) •Specs improved from 7W to 9W •Retail price of LED bulbs reduced by almost 50% (Rs. 599 to Rs. 317) •For street lights – prices have come down from Rs. 137 per watt to Rs. 85 per watt 500
  • 29. Energy Conservation through PAT • PAT (Perform, Achieve & Trade) - Energy-intensive industries achieve reduction in specific energy consumption (per unit production) PAT Cycle Number of Sectors % of national energy consumption covered Reduction in specific energy consumption 2012-15 8 30% 4% 2016-19 11 50% 5% 29 Present
  • 30. Cost reduction through Central Support • Ministry of Power constituted two committees to facilitate States for mobilizing major equipment • Committee-A, headed by the Chairperson, CEA, entrusted with the task of • listing out major equipment/ material, • finalize technical specifications, • aggregate requirement of various states. • Committee B, headed by Director (Projects) PGCIL, was entrusted • prepare bidding documents, • carry out bid processing through e-tendering under reverse bidding mode, • evaluate bids and finalize rate contracts. Present
  • 31. Equipment Installation Area Units Installed (lakh) End Date Feeder & DT Meters 13 2017 Smart Meters > 500 units/ mth 200-500 units/ mth 100 250 2017 2019 DT 4.2 2017 Conductors 11.2 2017 LED Bulbs Domestic Streetlights 7,700 350 2019 Eff. Agri Pumps 100 2019 Appliances Fans A/Cs 1,600 18 2019 31 Present
  • 32. Reducing Cost of thermal Power • Increased supply of domestic coal – 200 mt – Rs 20,000 cr. • Coal linkage rationalization – 500 mt – Rs 6,000 cr. • Liberally allowing coal swaps from inefficient plants to efficient plants and from plants situated away from mines to pithead plants to minimize cost of coal transportation – Rs 10,000 cr. • Coal price rationalization based on Gross Calorific Value (GCV)* • Correction in Coal grade slippage through re- assessment of each mine* * Correct tariff fixation and reduce coal theft 32 Present
  • 33. TargetActual * * 1 Bn with additional allocation of mines Coal India production increase 33 379 404 431 431 436 452 462 494 550 600 663 775 908 0 100 200 300 400 500 600 700 800 900 1000 INCREASE IN PROD. 2014-15 (One Year)- 31.59 Million Metric Ton per Annum (MMT) INCREASE IN PROD. IN LAST 6 YEARS 2008-14 : 83 MMT PLANNED INCREASE IN NEXT 6YRS 2014-20 :537.59 MMT Details:http://coal.nic.in/sites/upload_files/coal/files/webform/notices/RoadMap_for_E nhancement_of_Coal_Production_26052015.pdf
  • 34. Area Savings (Rs. Cr.) Per Unit Savings (Rs.) Substituting imported coal, MoU/E-Auction coal by 100% ACQ coal 7,300 0.30 Rationalization / swapping of coal sources including freight charges 1,270 0.05 Total 8,570 0.35 Illustration of Savings - NTPC 34
  • 35. Reducing Cost of Power • Completion of railway lines • JV’s with States • Coal India to supply 100% washed coal for G10 grade and above at plants > 500 km from mines by 1st October 2018 • 100% crushed coal from Coal India by 1st Apr 2016 • Faster completion of delayed transmission lines • New transmission lines expedited planned for 2030 requirement • Award of works of about Rs. 1 lakh crore by 31st March 2016 35 Present
  • 36. Transmission Capacity Addition • Highest ever increase in Transmission lines & sub station capacity since May 2014 (36,000 ckm and 90,000 MVA respectively as on Oct 2015) • Inter-regional power transfer • 765 kV Gwalior-Jaipur D/C and 765 kV Jaipur- Bhiwani lines saving 10 cr/ day • 765kV Aurangabad-Sholapur will enhance transfer capacity by 1700MW • Additional 18,400 MW to Southern Corridor expected by 2018-19 (thrust on reconducting of existing lines) • Transmission loss presently in the range of 4-5 %, reduce by at least 1% 36 Present
  • 37. DISCOM in a debt trap • DISCOM debt interest rate – Average ~ 12%, as high as 14-15% for many DISCOMs while States borrow at ~ 8% • Regulators don’t allow pass through of interest on past losses in tariff • Surgical intervention required to rationalise outstanding debt 37 Present
  • 38. State takeover of DISCOM debt • DISCOM debt is de facto borrowing of States which is not counted in de jure borrowing • States shall take over 75% of DISCOM debt as on 30 September 2015 • Principal debt taken over will not be included in fiscal deficit of States. However, interest has to be serviced within FRBM limits • States will issue non-SLR bonds (SDL) with maturity period of 10-15 years with a moratorium on principal up to 5 years 38 Past 2015-16 2016-17 Debt taken over 50% 25%
  • 39. State bond pricing • 10 year Bond Pricing: 7.92% (as per last RBI auction of State SDLs) + 0.25% spread for non-SLR status on semi-annual compounding basis (market driven, subject to cap of 10 yr. G-Sec + 50 + 25 bps) 39 Past
  • 40. Debt takeover mechanism • Debt of DISCOM will be taken over in the priority of debt already due, followed by debt with highest cost • Transfer to DISCOM by State will be as grant with an option to spread the grant over three years* * MoP can further relax by 2 years for high debt States like Raj and TN 40 Past
  • 41. State takeover of DISCOM debt As on 30 Sep, 2015 2015-16 2016-17 2017-18 DISCOM Debt 40,000 Debt taken over by State 20,000 10,000 Option A) 2yr Grant Grant 20,000 10,000 Option B) 3 yr Grant Grant 10,000 10,000 10,000 Loan from State to DISCOM (at same rate as State borrowing) 10,000 -10,000 41 Past Illustration
  • 42. Treatment of residual debt • Up to 25% of the grant can be given as equity • DISCOM debt to be taken over by the State will include DISCOM bonds which are committed to be taken over by the State as part of FRP 2012 including bonds already taken over in 2015-16 • Residual DISCOM debt to be converted into bonds to be offered to market at a likely rate of State Bond + 0.2%. If not converted into bonds, Banks can lend at < Base rate + 0.1% • Scheme available only for State DISCOMs including combined generation, transmission and distribution undertakings 42 Past
  • 43. Complying with RPO obligations • DISCOMs to comply with the Renewable Purchase Obligation (RPO) outstanding since 1st April, 2012, within a period to be decided in consultation with MoP • Clear large number of RPOs with developers • Impetus to clean energy markets 43 Past
  • 44. Ongoing DISCOM financing • Loss financing only as per loss trajectory finalized with MoP and only through DISCOM bonds backed by State guarantee • Working capital will only be allowed up to 25% of the DISCOM’s previous year’s annual revenue 44 Future
  • 45. States will fund the future losses (if any) of DISCOMs in a graded manner Year 2015- 16 2016- 17 2017- 18 2018- 19 2019- 20 2020- 21 … Previous Year’s DISCOM loss to be taken over by State 0% of the loss of 2014- 15 0% of the loss of 2015- 16 5% of the loss of 2016- 17 10% of the loss of 2017- 18 25% of the loss of 2018- 19 50% of the previo us year loss Ensures permanent resolution of DISCOM issues through a hard budget constraint 45 Future
  • 46. Additional Benefits for States • States accepting the scheme and performing as per operational milestones will be given additional / priority funding through DDUGJY, IPDS, Power System Development Fund (PSDF) or other such schemes of MoP and MNRE • Such States shall also be supported with additional coal at notified prices and, in case of availability through higher capacity utilization, low cost power from NTPC and other Central Public Sector Undertakings (CPSUs) 46 Future
  • 47. Outcomes – Breakeven in next 2-3 years • Reduction of AT&C loss to 15% in 2018-19 • Reduction in gap between Average Revenue Realized (ARR) & Average Cost of Supply (ACS) to zero by 2018-19 • Almost all DISCOMs to be profitable by 2017-18, 3- 4 by 2018-19 47
  • 48. MoU to be signed between MoP, State and DISCOM(s) • Clear identification of responsibilities of each of the three parties • Details of specific operational activities to be undertaken in the State • Circle level targets of loss reduction with responsibilities, resources and timelines • MoU targets to be reviewed on a monthly basis by MoP 48
  • 49. Benefits of UDAY - Government • Achievement of 24X7 Power for All • Power to 5 crore households without electricity • Speedy achievement of electrification of remaining 18,500 villages • Energy security through coal and renewables • Reduce Current Account Deficit (CAD) from higher diesel import (current annual imports of around Rs. 50,000 crore) • Meet ambitious renewable energy commitments as a responsible global citizen • Revive investments in power sector to create jobs 49
  • 50. Benefits of UDAY – Industry & Consumers • Availability of 24X7 power improving quality of life and efficiency • Lower cost of power - Typical 3,000 MW NTPC plant running at 60% Plant Load Factor (PLF) has a fixed cost of Rs. 2.67 / unit, vs Rs. 1.80 at 90% PLF • Global competitiveness of industry 50
  • 51. Benefits of UDAY – Banks & Investors • Avoid banking contagion (Rs, 40,000 crore of repayments due to banks in 2015-16) which will create significant NPAs • Lower risk for existing investments and loans in power, coal and renewables sector • Lower capital adequacy • Increased procurement of power by DISCOMs revives existing power projects suffering from low PLFs • Reduce investment uncertainty across the sector 51
  • 52. Area Details Amount (Rs. Cr.) Interest Rate Reduction 3% on 25% DISCOM debt 4% on 75% DISCOM debt 17,000 Debt takeover by State 8% on 75% DISCOM debt 27,000 AT&C loss reduction 22% to 15% 33,000 Supply of domestic coal and coal swapping 36,000 DSM LED, Appliances etc. 58,500 PAT 7,600 Transmission Losses 1% of Intra State 1,600 Total 1,80,700 Efficiency Improvement Benefits 52
  • 53. Other Initiatives in the Distribution Sector 53
  • 54. 54 • Electrify all 18452 remaining un-electrified villages in the country • Access of electricity to remaining 5 crore Households • System Strengthening: • Power transformers : 14,491 nos. • Distribution transformers : 3,17,068 nos. • Conductors : 8,69,521 kms • Energy Meters : 110,00,000 nos. • Metering the un-metered • Feeder/Boundary/ DTs : 11,92,658 nos. • Energy Meters : 99,93,893 nos. DeenDayal Upadhyaya Gram Jyoti Yojana (DDUGJY) Total Outlay approved for DDUGJY including RE Component is Rs. 75,893 crores
  • 55. Integrated Power Development Scheme (IPDS) An integrated scheme for urban areas covering: • Smart Metering and Tamper-proof meters at homes • Infrastructure upgradation in urban areas - Comprehensive sub transmission & distribution • Underground cabling & GIS Sub stations in densely populated areas • IT implementation for better customer service • Solar installations like rooftop solar panels also covered • Outlay of Rs. 65,424 crores 55
  • 56. Grant under DDUGJY and IPDS • Total outlay of Rs 1.4 lakh crore • Incentive based grant to States of Rs 9,178 crores linked to:  Timely completion of the scheme  Reduction in At &C looses as per the agreed trajectory  Upfront release of admissible revenue subsidy by the State Government to DISCOM based on metered consumption. 56
  • 57. Impact of IT enablement • 1st of its kind Impact Assessment of IT enablement under IPDS • Estimated savings through AT&C loss reduction could be INR 5000 Cr • 1114 towns out of 1409 towns declared Go-Live • 19 out of 21 Data Centers Operational • 22 SCADA Control Centers commissioned 57
  • 58. 2587 1197 1405 2677 4323 11452 0 2000 4000 6000 8000 10000 12000 14000 12-13 13-14 14-15 15-16… 15-16… 16-17 HIGHEST IN 12th PLAN IN FIRST 6 MONTHS OFF GRID 3000 GRID DDUGJY – Emphasis on Sustainability of DISCOMs with renewed focus on rural electrification has fastened the process from 2015 onwards. Expected to electrify all villages by 2017 Villages Electrified in XII Plan 58
  • 59. 59 1. Survey Report 2. Receipt of Poles 3. Erection of Poles (11 KV) 4. Erection of Poles (LT) 5. Receipt of DT 6. Stringing (LT) 7. Stringing (11KV) 8. Receipt of Line Material 9. Erection of DT 10. Completion of Works 11. Inspection 12. Energisation 12 Stage Monitoring
  • 61. • For remote locations, DDG provides operational ease • Potential to lower overall carbon footprint by maximizing clean local generation • Can operate in a standalone mode and interconnected with the central grid when available. • Allows for community engagement in electricity supply • Infrastructure should be Grid compatible • Cost components include all equipments and accessories, civil works, O&M for 5 years Distributed Decentralized Generation (DDG) 61
  • 62. • Standalone system permitted under DDUGJY • Standalone system shall include 200 watt SPV panel, inverter, battery, internal wiring, LEDs etc. • 2500 Unelectrified villages under microgrid and 1000 villages to be covered under Stand alone. • Avg. cost per HH is Rs.0.56 lakhs • Nearly 3 lacs households to be covered • Tender to be floated centrally to take advantage of Economies of scale • Specifications being finalized by MNRE and REC. • Reverse auction methodology to be adopted. Recent amendments in DDG guidelines 62
  • 63. 63 A New Realm of Possibilities for Rural India
  • 65. • Segregation of carriage from content • Accelerate electricity generation from renewable energy sources • Strengthening grid safety and security • Rationalize tariff determination process • Review of performance of Regulatory Commissions. • Provide for recovery of revenue by Licensees without any revenue gap • Mandate to Regulators for suo moto proceedings in determination of tariff (in case the utility companies do not file their petitions in time) 65 Proposed amendments in the Electricity Act
  • 66. • Expansion of existing power plants owned by states permitted for optimum utilization of existing infrastructure. • Expansion of private developers up to 100% from existing capacity; policy for private sector to be decided in 6 months. • Setting up Coal washery rejects based projects on Cost plus basis by the PSUs, • Renewable Energy Generation Obligation (RGO) on all future coal and lignite based thermal station to be set up. • Renewable energy estimated to be 15% of total energy consumption by 2022 (up from 6% now) • Compulsorily procurement of power from “Waste to Energy” • Procured waste water to be used in thermal plants in the vicinity of towns & cities. • Regulatory Commission to devise a trajectory to ensure 24 hours supply of adequate and uninterrupted power to all categories of consumers 66 Suggested Amendments in Tariff Policy
  • 68. 175 GW 10 GW5 GW60 GW100 GW Solar Wind Small Hydro Biomass & Others68 Road Map for Renewable Power by 2022
  • 69. 69 Area Solar Wind Operational Capacity (GW) (approx.) (as on Oct’15) 4.4 24 Target Capacity by 2022 (GW) 100 (Ground mounted – 60 & Roof top - 40) 60 Investment Already Made (USD billion) (approx.) 5.5 22 Additional Investment to be made by 2022 (USD billion) (approx.) 80 30 Renewable Investments by 2022
  • 70. Price of Solar Power reduction to achieve Grid Parity 12.16 8.79 8.73 6.87 6.72 4.63 0 2 4 6 8 10 12 14 2010 2011 2012 2013 2014 2015 LOWEST RATE FOR SOLAR PROJECT * WeightedaveragePrice(Rs./KWh) 70 * 500 MW bought by NTPC through Reverse e bidding on 4th Nov at midnight
  • 71. Total Investment Potential (by 2022) Area Potential (USD Bn) Renewables 120 Generation (CPSUs, States, UMPPs & Private Sectors) 50 Transmission 50 Sub Transmission & Distribution 25 Energy Efficiency 5 Total 250 71
  • 72. Thank You 72 Sabka Saath, Sabka Vikas http://www.ujwalbharat.gov.in/