SlideShare uma empresa Scribd logo
1 de 193
Continues Improvement Is Better Than
Delayed Perfection
- Mark Twain
• To have a Reliable Infrastructure.
• To have a Green Infrastructure.
• To have a Smart And Safe Infrastructure.
• To have a Human Infrastructure.
• Lifetime engineering
• Fast, hindrance-free maintenance
• Balancing demand and capacity
• Asset management tools
• Saving natural resources
• Emission Control
• Safe design
• Smart design
• Smart communication
• Smart monitoring
• Public security
• Multi-functional use
• Human design
• Highway Location Survey.
• Highway Alignment Survey
• Highway Traffic Survey
• Highway Geotechnical Investigation Survey
• Map study
• Reconnaissance
• Preliminary surveys
• Final location and detailed surveys
• Setting out alignment on ground.
• Taking cross-sections to full right of way at
fixed interval.
• Classified traffic in terms of Car, Two Wheeler,
Three wheeler, Trucks, MAV, Bus, Mini bus, LCV,
Cycle, Animal driven vehicles, cart, etc. are
counted 24/7 on project highway and Average
daily traffic is calculated.
• Traffic varies on road by season, month, week,
week-days, hours.
• Seasonal variation factor is use to convert ADT
to AADT.
• Trail pits / Bore Holes are taken at fixed
interval on projected road.
• Soil samples are tested to know the engineering
properties of soil.
(a) Gradation
(b) Atterber’s limit
(c) Free swelling Index
(d) CBR
• DGPS ( Differential Global Positioning System).
• Total Station.
• Video Graphic Vehicle count .
• Ground Penitrating Radar
.
• Design vehicles are selected motor
vehicles with the weight, dimensions, and
operating characteristics used to
establish highway design controls for
accommodating vehicles of designated
classes.
• For purposes of geometric design, each
design vehicle has larger physical
dimensions and a larger minimum turning
radius than most vehicles in its class.
Dimension
of vehicle
Details Maximum Dimension (m)
(Excluding front and
rear bumper)
• Width All Vehicles. 2.50
• Height (a) Single-Decked vehicle for normal
application .
3.80
(b) Double-decked Vehicle . 4.75
• Length (a) Single-unit truck with two or more
axles. (type 2,3)
11.00
(b) Single-unit bus with two or more
axles. (type 2,3)
12.00
(c) Semi- Trailer tractor combinations
(type 2-s1, 2-s2, 3-s1, 3-s2)
16.00
(d) Tractor and Trailer combinations
(type 2-2, 3-2, 2-3, 3-3)
18.00
• The choice of design vehicle is influenced by the
functional classification of a roadway, and by
the proportions of the various types and sizes
of vehicles expected to use the facility.
• On rural facilities, to accommodate truck
traffic, one of the semitrailer combination
trucks should be considered in design.
• In urban areas that are highly built-up,
intersections may be designed to provide fully
for passenger vehicles but require the larger
vehicles to swing wide upon turning
• The vehicle which occurs with
considerable frequency is often selected
as the design vehicle.
• The largest of all the several design
vehicles are usually accommodated in the
design of freeways, subject to state laws
on permitted vehicles.
• The speed with which vehicles travel on
the road is seldom the maximum speed the
vehicle is capable.
• Choice of design speed depends on the
function of the road as also terrain
conditions. Terrain is classified by the
general slope of the country across the
highway alignment.
S. NO. Terrain classification
Per cent cross
slope of the
country
1 Plain 00-10
2 Rolling 10-25
3 Mountainous 25-60
4 Steep <60
SR.
NO.
Road
Classificati
on
Design Speed (in KMPH)
Plain Terrain Rolling Terrain Mountainous
Terrain
Steep Terrain
Ruling
Design
Speed
Minimu
m
Design
Speed
Ruling
Design
Speed
Minimu
m
Design
Speed
Ruling
Design
Speed
Minimu
m
Design
Speed
Ruling
Design
Speed
Minimu
m
Design
Speed
1 National And
State
Highway
100 80 80 65 50 40 40 30
2 Major
District Road
80 65 65 50 40 30 30 20
3 Other
District Road
65 50 50 40 30 25 25 20
4 Village Road 50 40 40 35 25 20 25 20
Tangent
Curve
Tangent to
Circular Curve
Tangent to
Spiral Curve to
Circular Curve
R = Radius of Circular Curve
PC = Point of Curvature
(or BC = Beginning of Curve )
PT = = Point of Tangency
(or EC= End of Curve )
PI = Point of Intersection
T = Tangent Length
(T = PI – BC = EC - PI)
L = Length of Curvature
(L = EC – BC)
M = Middle Ordinate
E = External Distance
C = Chord Length
Δ = Deflection Angle
Degree of Curvature
• Traditionally, the “steepness” of the
curvature is defined by either the radius
(R) or the degree of curvature (D)
• Degree of curvature = angle subtended
by an arc of length 100 feet
R = 5730 / D
(Degree of curvature is
not used with metric units
because D is defined
in terms of feet.)
Length of Curve
• For a given external angle (Δ), the length of curve
(L) is directly related to the radius (R)
L = (RΔπ) / 180
= RΔ / 57.3
R = Radius of Circular Curve
L = Length of Curvature
Δ = Deflection Angle
• In other words, the longer the curve, the larger
the radius of curvature
Other Formulas…
Tangent: T = R tan(Δ/2)
Chord: C = 2R sin(Δ/2)
Mid Ordinate: M = R – R cos(Δ/2)
External Distance: E = R sec(Δ/2) - R
• The amount by which the outer edge of a curve
on a road or railway is banked above the inner
edge.
Road Plan ViewRoad Section View
CL
2%2%
Road Plan ViewRoad Section View
CL
2%1.5%
Road Plan ViewRoad Section View
CL
2%1%
Road Plan ViewRoad Section View
CL
2%0.5%
Road Plan ViewRoad Section View
CL
2%-0.0%
Road Plan ViewRoad Section View
CL
2%-0.5%
Road Plan ViewRoad Section View
CL
2%-1%
-1.5%
Road Plan ViewRoad Section View
CL
2%2%
Road Plan ViewRoad Section View
2%-2%
CL
Road Plan ViewRoad Section View
3%-3%
CL
Road Plan ViewRoad Section View
4%-4%
CL
Road Plan ViewRoad Section View
3%-3%
CL
Road Plan ViewRoad Section View
2%-2%
CL
Road Plan ViewRoad Section View
2%
CL
-1.5%
Road Plan ViewRoad Section View
2%
CL
-1%
Road Plan ViewRoad Section View
2%
CL
-0.5%
Road Plan ViewRoad Section View
2%
CL
-0.0%
Road Plan ViewRoad Section View
2%
CL
0.5%
Road Plan ViewRoad Section View
2%
CL
1%
Road Plan ViewRoad Section View
2%
CL
1.5%
Road Plan ViewRoad Section View
2%
CL
2%
• Transition curves are provided in between a
straight road and the Curve of a design radius.
So the radius of a transition curve varies from
infinity to the design radius or vice verse. The
length of the transition curve must fulfill some
requirements. It is designed to fulfill the
following three conditions:
(a) Rate of change of centri-fugal Acceleration(C):
As per IRC recommendations, 𝐶 =
80
(75+𝑣)
𝑚/𝑠𝑒𝑐3
Here,
C= allowable rate of change of centrifugal
acceleration (0.5 < 𝐶 < 0.8 𝑚/𝑠𝑒𝑐3)
Ls= Length of the transition curve.
𝐿 𝑠 =
0.0215∗𝑉3
𝐶∗𝑅
(b) Rate of introduction of Designed super-elevation:
If pavement is rotated about center line, then
1/𝑁 = (𝐸/2)/𝐿𝑠
=> 𝐿𝑠 = 𝐸𝑁/2 = 𝑒. 𝐵. 𝑁/2 = 𝑒. (𝑊 + 𝑊𝑒). 𝑁/2
If pavement is rotated about inner edge, then
𝐼/𝑁 = 𝐸/𝐿𝑠
=> 𝐿𝑠 = 𝐸𝑁 = 𝑒. 𝐵. 𝑁 = 𝑒. (𝑊 + 𝑊𝑒). 𝑁
where, Ls= Length of transition curve
B= width of the pavement
(c) By Empirical Formula given by IRC(Indian Roads congress):
It should not be less than
(i) For plain and ruling terrain: 𝐿𝑠 = 2.7 𝑉^2/𝑅
(ii) For mountainous and steep terrain: 𝐿𝑠 = 𝑉^2/𝑅
Find out the greatest length of the transition curve by the above
three criteria and use to construct the transition curve.
• 𝑅 =
𝑉2
127×(𝑒+𝑓)
Where R = Radius in meter
V = Speed of vehicle in kmph
e = Rate of superelevation
f = Design value of lateral friction coefficient =
0.15
• e =
𝑉2
225×𝑅
Superelevation is provided 75%of design speed
Maximum superelevation 7% for plain and rolling
terrain and 10% for hilly and steep terrain
• Mechanical widening
• 𝑊𝑚 =
𝑛∗𝑙2
2∗𝑅
• Psychological widening
𝑊𝑝𝑠 =
𝑉
9.5∗ 𝑅
• Extra widening
𝑊𝑒 = 𝑊𝑚+𝑊𝑝𝑠
• Grade Compensation =
30+𝑅
𝑅
.
• Subjected to maximum value of
75
𝑅
.
• IRC recommends compensation is not necessary
for gradient flatter than 4%.
∝
Crest Curve
Sag Curve
G1
G2 G3
Radius Parabola
y  ax2
 bx  c
Horizontal Curve Vertical Curve
BVC
EVC
L
G
2
G
1
Change in grade: A = G2 - G1
where G is expressed as % (positive /, negative
)
For a crest curve, A is negative.
For a sag curve, A is positive.
L/2
L/2
PI
• Determine the minimum length (or
minimum K) for a given design speed.
– Sufficient sight distance
– Driver comfort
– Appearance
Crest Vertical Curve
• If sight distance requirements are satisfied then
safety, comfort, and appearance will not be a
problem.
h1 = height of driver’s
eyes, in ft.
h2 = height of
object, in ft.
• When L > SSD- 𝐿 =
𝑁𝑠2
4.4
• When L <SSD - 𝐿 = 2𝑆 −
4.4
𝑁
Sag Vertical Curve
• Stopping sight distance not an issue. What are the
criteria?
– Headlight sight distance
– Rider comfort
– Drainage
– Appearance
• When L > SSD - 𝐿 =
𝑁𝑆@
(1.5+0.035𝑆)
• When L < SSD - 𝐿 = 2𝑆 −
(1.5+0.035𝑆)
𝑁
• MX Road
• Civil 3d
• Temperature Stresses
– Due to the temperature differential between the top
and bottom of the slab, curling stresses (similar to
bending stresses) are induced at the bottom or top of
the slab
• Frictional stresses
– Due to the contraction of slab due to shrinkage or due
to drop in temperature tensile stresses are induced at
the middle portion of the slab
• Wheel Load Stresses
– CC slab is subjected to flexural stresses due to the
wheel loads
𝑙 =
4 𝐸ℎ3
12 ∗ 𝑘 ∗ 1 − 𝜇2
Type equation here.Where,
E = Modulus of Elasticity of concrete, MPa
h = thickness of slab, m
μ = Poisson’s ratio
k = modulus of subgrade reaction, MN/m3
–𝑆𝑓 =
𝛾𝑐 𝐿 𝑓𝑎
2
• The contraction joints are spaced to limit the
tensile stress induced in the slab to the value that
can be born by the slab during curing period
• Spacing is found out by taking the allowable tensile
stress as 80 kPa during curing period of concrete
𝐿 =
(2𝑆𝑓 )
(𝛾𝑐 𝑓𝑎)
• For 𝑆𝑓 = 80 kPa, 𝛾𝑐 = 24 kN/m3 and 𝑓𝑎= 1.5
L = 4.52 m
Therefore, the spacing of contraction joints is kept
as 4.5 m.
Slab Thickness
(cm)
Maximum Contraction
joint spacing (m)
15 4.5
20 4.5
25 4.5
30 5.0
35 5.0
• The loads causing failure of pavements are mostly
applied by single and tandem axles, stress must be
determined for the condition shown in chart’s given by
Picket &Ray for stress computation in the interior as well
as edge region
• Using fundamental concept of Westergaard and Picket
&Ray’s pioneering work a computer program IITRIGID
developed at IIT, Kharagpur was used for edge load
condition
• As per IRC 58-2011 stresses in Rigid pavement
by wheel load analyzed for following condition.
• (a) Bottom up Cracking
-By traffic 10.00 AM to 4.00 PM
• (b) Top Down Cracking
-By traffic 00.00 Am to 6.00 AM
• Fixed traffic
– Design is governed by single wheel load – Load
repetitions is not considered as a variable – Multiple
wheels are converted into single wheel – Heaviest wheel
load anticipated is used in design
• Variable traffic and variable vehicle (Spectrum of
Axles Approach)
– Both vehicle and traffic are considered independently.
i.e., treat all axles
separately and use spectrum of axles in the design
Fixed vehicle
– Design is governed by the number of repetitions
of standard vehicle or axle load, usually 80 kN
single axle load – Repetitions of non-standard
axles are converted into equivalent repetitions
of standard axle using equivalent axle load
factors
– The cumulative number of repetitions of
standard axle during the design life is termed as
Equivalent Single Wheel Load (ESAL) and is the
single traffic parameter for design purpose.
• Equivalent Single Axle Load is the equivalent
repetitions of standard axle during the design
life of the pavement.
• IRC terms this ESAL as cumulative number of
standard axles during the design life.
• The number of repetitions of different types of
axles are converted into equivalent repetitions
of standard axle by using Equivalent Axle Load
Factors (EALF).
• Approximate EALF can be worked out using the
fourth power rule
Single Axle Single wheel Load EALF = (Axle Load in
KN/65)^4
• Single Axle Dual wheel Load EALF = (Axle Load in
KN/80)^4
Tandem Axle Load EALF = (Axle load in KN/148)^4
However, as the EALF depends on axle load as wheel
as the pavement configuration, the exact EALF can be
worked out only by using distress models
• Instead of converting each axle pass into
equivalent standard axle passes, It will be
convenient to convert one truck pass into
equivalent standard axle passes.
• The factor that converts the number of trucks
into equivalent standard axle repetitions is
termed as vehicle damage factor or truck factor
• Therefore, Vehicle damage factor is the number
of standard axles per truck
• It is worked out by finding the directional
distribution and lane distribution factors
• Directional Distribution Factor (D)
– The ADT of trucks is the sum of daily truck
traffic volume in both directions
• – D factor is the proportion of ADT of trucks
occurring in the maximum direction
• – The D factor normally varies between 0.5 to
0.6
• Lane Distribution Factor (L)
– Is the proportion of truck traffic occurring on
the design lane
– Lane Distribution Factor depends on
- Number of lanes
- Traffic volume
• Daily Truck Traffic on Design Lane
= (ADT of Trucks) × (D) × (L)
Undivided Roads (Single Carriageway)
No. of Traffic Lanes in Two
Directions
Percentage of Trucks in
Design Lane (D×L)
1 100
2 75
3 40
Divided Roads (Dual Carriageway)
No. of Traffic Lanes in each
Direction
Percentage of Trucks in
Design Lane (L)
1 100
2 75
3 60
4 40
• ESAL = (ADT of Trucks) × (365) × (D) × (L) ×
(VDF) × GF
• GF =𝐺𝐹 =
1+𝑟 𝑛−1
𝑟
r = Growth rate in decimal
n = Design life in years
• Distress models relate the structural
responses to various types of distresses
• These are equations relating the allowable
number of repetitions of standard axle to the
appropriate pavement response as per the failure
criteria adopted
• N
• 𝑁𝑓 = 𝑘3*
1
∈ 𝑡
𝑘1
*
1
𝐸 𝑏𝑡
𝑘2
• =
Nf = No. of cumulative standard axles t produce 20%
cracked surface area
∈t = Tensile strain at the bottom of Bituminous Concrete
layer
E = Elastic Modulus of Bituminous Surface (MPa)
k1, k2 = Laboratory calibrated parameters
k3 = Transfer parameter
• 𝑁 𝑅 = 𝑘5*
1
∈ 𝑐
𝑘4
NR = No. of Repetitions to Rutting failure
∈c = Vertical subgrade strain
k4, k5 = Calibrated parameters
• Allowable number of repetitions (Ni) are
computed separately for each axle type I applying
the distress model
• Expected number of repetitions (ni) of each axle
type i are obtained from traffic cum axle
load survey
• Damage Ratio (DR), which is the ratio between
the expected repetitions and allowable
repetitions, is worked out for each axle type
• The cumulative DR of all axles should be less
than 1
California bearing ratio is defined as the ratio
(expressed as percentage) between the load
sustained by the soil sample at a specified
penetration of a standard plunger (50 mm
diameter) and the load sustained by the standard
crushed stones at the same penetration.
• This consists of causing a plunger of 50 mm
diameter to penetrate a soil sample at the rate of
1.25 mm/min.
• The force (load) required to cause the penetration is
plotted against measured penetration.
• The loads at 2.5 mm and 5 mm penetration are
recorded.
• This load corresponding to 2.5 mm or 5 mm
penetration is expressed as a percentage of
standard load sustained by the crushed aggregates
at the same penetration to obtain CBR value.
• The load – penetration curve may show
initial concavity due to the following
reasons:
– The top layer of the sample might have
become too soft due to soaking in water
– The surface of the plunger or the surface of
the sample might not be horizontal
• Draw a tangent to the load-penetration
curve where it changes concavity to
convexity
• The point of intersection of this tangent
line with the x-axis is taken as the new
origin
• Shift the origin to this point (new origin)
and correct all the penetration values
CBR
(per cent)
Maximum variation
in CBR value
5 ±1
5-10 ±2
11-31 ±3
31 and above ±5
• The average CBR values corresponding to 2.5 mm and
5 mm penetration values should be worked out
• If the average CBR at 2.5 mm penetration is more than
that at 5 mm penetration, then the design CBR is the
average CBR at 2.5 mm penetration
• If the CBR at 5mm penetration is more than that at 2.5
mm penetration, then the test should be repeated. Even
after the repetition, if CBR at 5mm is more than CBR at
2.5 mm, CBR at 5 mm could be adopted as the design
CBR.
The resilient modulus MR is the elastic modulus
based on the recoverable strain under repeated
loads, and is defined as
𝑀𝑟 =
𝜎 𝑑
𝜀 𝑟
𝜎 𝑑= deviator stress
𝜀 𝑟= recoverable elastic strain
Subgrade
E (MPa) = 10 × CBR if CBR<5% and
= 17.6 × (𝐶𝐵𝑅)0.64 for CBR > 5%
Granular subbase and base
𝑬 𝟐 = 𝑬 𝟑 × 𝟎. 𝟐 × 𝒉 𝟎.𝟒𝟓
𝑬 𝟐= Composite modulus of sub-base and base
(MPa)
𝑬 𝟑= Modulus of subgrade (MPa)
𝒉 = Thickness of granular layers (mm)
• Compaction is the process of increasing the bulk density of
a soil or aggregate by driving out air.
• For any soil, at a given compactive effort, the density
obtained depends on the moisture content.
• For any soil, an “optimum water content” exists at which it
will achieve it’s maximum density.
1. To increase strength and stability
2. To decrease permeability
3. To enhance resistance to erosion
4. Decrease compressibility under load and
minimize settlement
• Sheepsfoot
• Padfoot
• Vibratory Roller
• Grid Roller
• The peak dry unit weight is called the "maximum
dry density”.
• The Optimum Water Content, wopt, is the water
content at the soil’s maximum dry density.
• Proctor Compaction Test determines the optimum water
content and maximum dry density of for a soil.
• A required range for moisture is often specified by the
engineer:
• Ie, 3% below and 2% above optimum.
• For example, if optimum water content is 16%, the acceptable
range would be from 13% to 18%.
• Percent compaction is also specified:
• Meaning “required percentage of max dry density”
% Compaction = ρdry field /ρdry max
• Sand Replacement
• Core Cutter test.
• Nuclear Densometer
Particular Modified
Proctor
Standard
Proctor
IS 2720(VIII) 2720(VII)
Hammer Mass 4.8 Kg 2.6 Kg
Free Fall 45 cm 31 cm
Number Of
Layers
5 no. 3 no.
Number Of
Blows
25 25
Work Done In
Joules
270 joules 60.45 joules
Compaction
Efforts
4.46 times
than
Standard
Proctor
22% of
Modified
Proctor
Bituminous construction are classified into four
categories
• Interface Treatments
• Thin Bituminous surface Courses
• Bituminous Surface Courses
• Bituminous Binder Courses
• Prime Coat
• Tack Coat
• Crack Prevention Courses
SAM and SAMI
 Purpose Of Priming:
• To plug the capillary voids
• To coat and bond loose materials on the surface
• To harden or toughen the surface
• To promote adhesion between granular and the
bituminous layer
 Choice of Primer
• The primer shall be bitumen emulsion, complying
with IS 8887 of a type and grade as specified (SS-1)
• The use of medium curing cutback as per IS 217
shall be restricted only for sites at sub-zero
temperatures or for emergency applications
Purpose of Tack Coat:
• To ensure a bond between the new construction
and the old surface
Material for Tack Coat:
• The primer shall be bitumen emulsion, complying
with IS 8887 of a type and grade as specified
(RS-1)
Use of Cutback:
• It should be restricted for sites at subzero
temperatures or for emergency applications
20-30% more quantity of tack coat for milled
surface
Quantities of materials required for 10 m2 (20
mm)
A. Liquid Seal Coat:
comprising of a layer of binder followed by a cover
of stone chipping
Stone chips shall be of 6.7mm size defined as 100
per cent passing through 11.2 mm sieve and retained
on 2.36 mm sieve. The quantity used for spreading
shall be 0.09 cubic meter per 10 square meter area.
B. Premixed Seal Coat:
a thin application of fine aggregates premixed with
bituminous binder
The quantity of bitumen shall be 9.8 kg and 6.8 kg
per 10 m2 area for type A and type B seal coat
respectively
• Close-graded premix carpet is a fairly open
graded mix
• It is an alternative to the open graded premix
carpet and a seal coat
• It may be constructed in one operation
• The total quantity of aggregates used shall be
0.27 cum per 10 m2 area
• The quantity of binder shall be 22.0 kg and
19.0 kg for 10m2 area for Type A and Type B
surfacing respectively
• Preparation of Base to the Required Camber and
Shape
• Application of Primer
• Application of Tack Coat
• Spreading and Rolling First Layer of Coarse
Aggregates (0.5 cu.m/10 sq.m)
• Application of Binder - First Spray (15 kg/10
sq.m)
• Spreading and Rolling of Coarse Aggregates
for the Second Layer.
• Application of Binder - Second Spray (15 kg/10
sq.m).
• Application of Key Aggregates (0.13 cu.m/10
sq.m).
• Roll and Apply Additional key aggregates, if
required.
• Cover with a Seal Coat before opening to
Traffic.
• Lack of adequate compaction in field leads to
reduced pavement life
• Inadequate compaction of hot mix leads to early
oxidation, raveling, cracking and disintegration
before its life expectancy is achieved
• 1% excess voids results in approximately about
10% reduction in life
• Lack of attention to the air voids requirement of
compacted dense graded bituminous mixes is the
most common cause of poor pavement
performance
• Laboratory compaction produces more density,
hence 95-98% of laboratory density or 92% of
theoretical density is preferred in the field
• SCREED
The screed is the first device used to compact the
mat and may be operated in the vibratory mode.
Approximately 75 to 85 percent of Theoretical
Maximum Density (TMD) will be obtained when the
mix passes out from under the screed.
• ROLLERS
• Generally a series of two or three rollers is used.
Contractors can control roller compaction by
varying things such as the types of rollers used,
the number of roller used, roller speed, the number
of roller passes over a given area of the mat, the
location at which each roller works, and the pattern
that each roller uses to compact the mat.
• Approximately 92 to 95 percent TMD will be obtained
when all rollers are finished compacting the mat.
Typical roller position used in compaction are:
– Breakdown Roller The first roller behind the screed. It
generally effects the most density gain of any roller in
the sequence. Breakdown rollers can be of any type but
are most often vibratory steel wheel.
– Intermediate Roller Used behind the breakdown roller if
additional compaction is needed. Pneumatic tire rollers
are sometimes used as intermediate rollers because they
provide a different type of compaction (kneading action)
than a breakdown steel wheel vibratory roller, which can
help further compact the mat or at the very least,
rearrange the aggregate within the mat to make it
receptive to further compaction.
– Finish Roller The last roller in the sequence. It
is used to provide a smooth mat surface. Although
the finish roller does apply compactive effort, by
the time it comes in contact with the mat, the mat
may have cooled below cessation temperature.
Static steel wheel rollers are almost always
used as finishing rollers because they can
produce the smoothest surface of any roller type
• Maintenance: Is the routine work performed to
keep a pavement, under normal conditions of
traffic and normal forces of nature, as nearly
as possible in its as constructed condition.
• Maintenance: The function of preserving,
repairing, and restoring a highway and keeping it
in condition for safe, convenient, and economical
use
• It includes both physical maintenance activities
such as sealing, patching, and so forth and
traffic service activities including painting
pavement markings.
• Rehabilitation: restoring or betterment of
roadway such as resurfacing.
• All Pavements require maintenance.
• Stresses producing minor effects are
constantly working in all pavements.
• Stresses are:
• Change in temperature and moisture;
• Traffic;
• Small movements in underlying or adjacent earth.
• Distresses are visible evidence of pavement wear (i.e.
they are the end result of the wear process which
begins when construction ends).
• Water lines and other utilities are major area of
pavement maintenance.
Functional Overlay
Reconstruction
Importance:
• Protect investments made in highways.
• Economic & safety of public road system.
Challenges:
• increased roads (additional mileage of travel),
• vehicle sizes, and traffic.
• Traveling public expect higher level of maintenance.
• Size of maintenance budget.
• Purpose: to capture information about
maintenance activities performed & resources
expanded.
• Maintenance management systems do not
manage programs, reduce cost or improve
performance, rather they provide maintenance
engineers with the information and analytical
tools needed to allow them to do so.
• Elements of maintenance management programs:
• Development of an annual work program (defining
activities, quantities, establish performance
standards, road inventory & inspection, estimate size
of the work program).
• Budgeting & allocating resources (labor, equipment,
Materials).
• Work authorization & control (various
administration levels).
• Scheduling (balance of workload throughout the
year).
• Performance evaluation (work progress &
productivity).
• Fiscal control (monitor status of expenditures
yearly).
• Road surfaces
• Shoulders & approaches.
• Roadsides
• Bridges, & drainage structures.
• Traffic controls & safety devices.
• Bituminous surfaces
• Failures due to: weathering, failure of base or
subgrade due to material quality or compaction or
improper drainage.
• Repairs:
• Patching
• Paint patching
• Scarifying
• Resealing.
• Non skid surface treatment
• Well graded gravel shoulder : blading to proper
slope and filling ruts or worn out materials.
• Turf shoulders: filling holes & ruts, blading,
seeding, mow & clean shoulders (weed control).
• Approaches: include public side roads, private
driveways, ramps, & turnouts.
• Approach maintenance is similar to shoulder
maintenance + extra efforts to maintain
potholes, ruts, and other types of deterioration
• Roadside: include area between traveled surface &
the limit of the right-of-way (medians, roadside
parks, right-of-way fences, picnic tables, ..etc.
• Vegetation management & control (include mowing,
weed eradication & control, seeding, planting
vegetation, & care of trees & shrubs).
• Mowing is done to provide sight distance, improve
drainage, reduce fire hazards, & improve
appearance of the roadway.
• Seeding & planting vegetation are important for
prevention of erosion.
• Maintenance of rest areas.
• Litter control.
• Bridges: Maintenance is needed to minimize
deterioration or repair damage caused by accidents,
floods, or other unforeseen events.
• Steel bridges: cleaned & painted to prevent erosion.
• Concrete bridge decks deterioration: Corrosion of
reinforcement bars due to penetration of water &
deicing salts or chemicals.
• Bridge decks with minor deterioration: patch with
special concrete.
• Bridge decks with major deterioration: Overlay or
remove & construct
• Drainage structures
• Should be kept in good working conditions.
• Surface drainage, ditches, & culverts
• Safety devices:
Guardrails, barriers, impact attenuators, pedestrian
overpasses & underpasses, fence to restrict access of
pedestrians & animals.
• Safety devices should be frequently &
systematically inspected & repaired
• Proper maintenance extend pavement life.
• However, best-maintained pavements will
deteriorate with time and will need
rehabilitation.
• Conventional rehabilitation:
• Reconstruct with all new material
• Patch & overlay with new wearing surface.
Types of Overlays
• Asphalt overlay over asphalt pavements
• Asphalt overlays on CC pavements
• CC overlays on asphalt pavements
• CC overlays on CC pavements
Measurement and estimation of the strength of
the existing pavement
Design life of overlaid pavement
Estimation of the traffic to be carried by the
overlaid pavement
Determination of the thickness and the type of
overlay
Basic concept
• Thickness of overlay is the difference between
the thickness required for a new pavement and
the effective thickness of the existing pavement
• ℎ 𝑜𝑙=ℎ 𝑛 − ℎ 𝑒
Where,
ℎ 𝑜𝑙=thickness of overlay
ℎ 𝑛 = thickness of new pavement
ℎ 𝑒 = effective thickness of existing pavement
All thicknesses of new and existing materials
must be converted into an equivalent thickness
of AC
ℎ 𝑒 =
𝑖=1
𝑛
ℎ𝑖 × 𝐶𝑖
ℎ𝑖 = thickness of layer i
𝐶𝑖 = conversion factor for layer i
• The structural strength of pavement is assessed
by measuring surface deflections under a
standard axle load
• Larger pavement deflections imply weaker
pavement and subgrade
• The overlay must be thick enough to reduce the
deflection to a tolerable amount
• Rebound deflections are measured with the help
of a Benkelman Beam
• Condition survey and deflection data are used to
establish sections of uniform performance
• At least 10 deflection measurements should be
made for each section per lane subject to a
minimum of 20 measurements per km.
• If the highest or the lowest deflection values
for the section differ from the mean by more
than one-third of the mean, then extra
deflection measurement should be made at 25 m
on either side of point where high or low values
are observed.
• Visual inspection of the road stretch and
grouping into sub-stretches
• Assessment of pavement cracking – type &
percentage cracked area
• Rut depth measurements
• Observations on other types of pavement
deterioration
• axle load of 8170 kg / load of 4085 kg on dual
wheels
• tyre pressure, p = 5.6 kg / cm2
• standard pavement temperature = 35o C
• highest subgrade moisture content soon after
monsoon
-Some precautions during rebound deflection
Observations
• very low or zero values
• variation of individual values, not more than one
third of mean value
• Measurement of pavement temperature (at one
hour intervals)
• Measurement of field moisture content of
subgrade soil
• Typical subgrade soil samples for lab. Tests
(soil classification)
• Other data to be collected
- annual rain fall
- traffic data : classified volume of vehicles of
gross load over 3 t, growth rate, axle load data /
VDF values
• Leg correction, if any, at each point of deflection
observation:
• - If (𝐷i ~ 𝐷f) is less than 0.025 mm (2.5 div.), 𝐷 = 0.02 (D0
~ 𝐷f)
• - If (𝐷i ~ 𝐷f) is more than 0.025 mm (2.5 div.), 𝐷 = [ 0.02
(𝐷0 ~ 𝐷f) + 0.0582(Di – Df) ]
• Mean deflection, 𝑫
• Characteristic Deflection, 𝑫𝒄 = ( 𝑫 + 2𝝈 ) for important
roads to cover
• - 97.7 % deflection values, or 𝐷c = ( 𝐷 +𝜎 )
for low traffic roads, to cover 84.1 % deflection values
Application of temperature correction factor @ 0.01 mm
per 𝒐𝑪 variation from the standard temperature of 35 𝒐𝑪
or 0.01 (𝒕~35)
Temperature Correction
• Stiffness of the Bituminous layers get affected
due to which deflections vary
• Standard temperature is 35 𝑜𝐶
• Correction for temperature variation on
deflection values measured at pavement
temperature other than 35 𝑜𝐶 should be 0.01mm
for each degree change from the standard
temperature.
Correction for Seasonal Variation
• Deflection depends upon the change in the climate
• Worst climate (after monsoon)-considered for design
• Depends on subgrade soil and moisture content
• Correction for seasonal variation depends on type
of soil subgrade (sandy/gravelly or Clayey with
PI<15 or Clayey with PI>15), field moisture content,
average annual rain fall (<1300 mm or >1300 mm)
• The design traffic is considered in terms of the
• cumulative number of standard axles ,
𝑁𝑠 =
365 × 𝐴[(1 + 𝑟) 𝑥 − 1]
𝑟
× 𝑓
• 𝑁𝑠 = The cumulative number of Standard Axles to
be catered for in the design
• 𝐴 = Initial Traffic in the year of completion of
construction on design lane
• 𝑟 = Annual growth rate of commercial vehicles
• 𝑥 = Design life in years
• 𝑓 = Vehicle Damage Factor
• Design curves relating characteristic pavement
deflection to the cumulative number of standard
axles are to be used.
• The Deflection of the pavement after the
corrections i.e., Characteristic Deflection is to
be used for the design purposes.
• The design traffic in terms of cumulative
standard number of axles is to be used
• The thickness obtained from the curves is in
terms of Bituminous Macadam construction.
• If other compositions are to be laid then
-1 cm of Bituminous Macadam = 1.5 cm of
WBM/Wet Mix Macadam/BUSG
-1 cm of Bituminous Macadam = 0.7 cm of
DBM/AC/SDBC
Highway Design - Techniques for proper Planning and Execution .

Mais conteúdo relacionado

Mais procurados

IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET Journal
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highwaysFresher Thinking
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan BishtChetanBisht16
 
Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaKhyati Saggu
 
Site distance in highway engineering
Site distance in highway engineeringSite distance in highway engineering
Site distance in highway engineeringtirath prajapati
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 SupriyaPal10
 
Continuity in RC beams and frames-AFM (Complete).pdf
Continuity in RC beams and frames-AFM (Complete).pdfContinuity in RC beams and frames-AFM (Complete).pdf
Continuity in RC beams and frames-AFM (Complete).pdfaslhal
 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange Spice Shuvo
 
Tteng 441 traffic engineering fall 2021 part5
Tteng 441 traffic engineering fall 2021 part5Tteng 441 traffic engineering fall 2021 part5
Tteng 441 traffic engineering fall 2021 part5Wael ElDessouki
 
Geometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curvesGeometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curvessachin dass
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elementssubbu lakshmi
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeElamathy Murugan
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavementpradip dangar
 
Highway engg. (road m aterial)
Highway engg. (road m aterial)Highway engg. (road m aterial)
Highway engg. (road m aterial)meenakshi sharma
 
Pavement Analysis and Design.pptx
Pavement Analysis and Design.pptxPavement Analysis and Design.pptx
Pavement Analysis and Design.pptxEmaan Sharma
 

Mais procurados (20)

IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS SoftwareIRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
IRJET- Analysis and Design of Multistorey Building (G+3) by using ETABS Software
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highways
 
Bridges and its Types & Components by Chetan Bisht
Bridges and its Types & Components by  Chetan BishtBridges and its Types & Components by  Chetan Bisht
Bridges and its Types & Components by Chetan Bisht
 
Inspection and maintenance of bridges In India
Inspection and maintenance of bridges In IndiaInspection and maintenance of bridges In India
Inspection and maintenance of bridges In India
 
Highway Alignment
Highway Alignment Highway Alignment
Highway Alignment
 
Unit 2
Unit 2Unit 2
Unit 2
 
Site distance in highway engineering
Site distance in highway engineeringSite distance in highway engineering
Site distance in highway engineering
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37
 
Continuity in RC beams and frames-AFM (Complete).pdf
Continuity in RC beams and frames-AFM (Complete).pdfContinuity in RC beams and frames-AFM (Complete).pdf
Continuity in RC beams and frames-AFM (Complete).pdf
 
Vertical Alignment
Vertical Alignment Vertical Alignment
Vertical Alignment
 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange
 
Tteng 441 traffic engineering fall 2021 part5
Tteng 441 traffic engineering fall 2021 part5Tteng 441 traffic engineering fall 2021 part5
Tteng 441 traffic engineering fall 2021 part5
 
Geometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curvesGeometric Design - Horizontal and vertical curves
Geometric Design - Horizontal and vertical curves
 
Hill road
Hill roadHill road
Hill road
 
Design of flyover elements
Design of flyover elementsDesign of flyover elements
Design of flyover elements
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridge
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
Highway engg. (road m aterial)
Highway engg. (road m aterial)Highway engg. (road m aterial)
Highway engg. (road m aterial)
 
Pavement Analysis and Design.pptx
Pavement Analysis and Design.pptxPavement Analysis and Design.pptx
Pavement Analysis and Design.pptx
 
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
 

Destaque

What is the objective of constructing a highway
What is the objective of constructing a highwayWhat is the objective of constructing a highway
What is the objective of constructing a highwayThushan Dharmawardana
 
Highway Construction
Highway Construction  Highway Construction
Highway Construction zapada rahul
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESHImrul Quesh
 
Chapter3 road pavement
Chapter3 road pavementChapter3 road pavement
Chapter3 road pavementpokjak80
 
Road construction equipment.pptx 2
Road construction equipment.pptx 2Road construction equipment.pptx 2
Road construction equipment.pptx 2AhmedZL
 
C3010 bab4
C3010 bab4C3010 bab4
C3010 bab4pokjak80
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsMohit Dagar
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12UTHM
 
Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)Pankti Jethi
 
Laporan Li Yusnita
Laporan Li YusnitaLaporan Li Yusnita
Laporan Li Yusnitaguest3a9eaec
 

Destaque (20)

Spiral Curve - Horizontal Alignment
Spiral Curve - Horizontal AlignmentSpiral Curve - Horizontal Alignment
Spiral Curve - Horizontal Alignment
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
What is the objective of constructing a highway
What is the objective of constructing a highwayWhat is the objective of constructing a highway
What is the objective of constructing a highway
 
ROAD SAFETY AUDIT
ROAD SAFETY AUDITROAD SAFETY AUDIT
ROAD SAFETY AUDIT
 
Highway Construction
Highway Construction  Highway Construction
Highway Construction
 
Highway planning
Highway planningHighway planning
Highway planning
 
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESHPRESENTATION ON ROAD CONSTRUCTION  INTERNSHIP NH34 BY IMRUL QUESH
PRESENTATION ON ROAD CONSTRUCTION INTERNSHIP NH34 BY IMRUL QUESH
 
Widening of curve
Widening of curveWidening of curve
Widening of curve
 
Spiral Curves
Spiral CurvesSpiral Curves
Spiral Curves
 
Chapter3 road pavement
Chapter3 road pavementChapter3 road pavement
Chapter3 road pavement
 
C3010 bab 5
C3010 bab 5C3010 bab 5
C3010 bab 5
 
Design of National Highway-13
Design of National Highway-13Design of National Highway-13
Design of National Highway-13
 
Road construction equipment.pptx 2
Road construction equipment.pptx 2Road construction equipment.pptx 2
Road construction equipment.pptx 2
 
C3010 bab4
C3010 bab4C3010 bab4
C3010 bab4
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Pembinaanjalan w12
Pembinaanjalan w12Pembinaanjalan w12
Pembinaanjalan w12
 
Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)
 
Mpat tahap 3
Mpat tahap 3Mpat tahap 3
Mpat tahap 3
 
Laporan Li Yusnita
Laporan Li YusnitaLaporan Li Yusnita
Laporan Li Yusnita
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 

Semelhante a Highway Design - Techniques for proper Planning and Execution .

Sight Distance for horizontal curves
Sight Distance for horizontal curvesSight Distance for horizontal curves
Sight Distance for horizontal curvesLatif Hyder Wadho
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptGate20241
 
hz alignment lec4.pdf
hz alignment lec4.pdfhz alignment lec4.pdf
hz alignment lec4.pdfamira525139
 
HIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docHIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docsydneyaugust1
 
3 vertical alignment of road by Malyar Talash
3 vertical alignment of road by Malyar Talash3 vertical alignment of road by Malyar Talash
3 vertical alignment of road by Malyar TalashMalyar Talash
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...Malyar Talash
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignmentPiter Biswas
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.ayudge
 
Chapter 2 Track Geometry.pptx
Chapter 2 Track Geometry.pptxChapter 2 Track Geometry.pptx
Chapter 2 Track Geometry.pptxMamushLeta
 
Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Civil Zone
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highwayJunaid Jamadar
 
Vertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptxVertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptxNaniRoy9
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highwayssrinivas2036
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highwayholegajendra
 
Horizontal curve- IRC 38
Horizontal curve- IRC 38Horizontal curve- IRC 38
Horizontal curve- IRC 38Surabhi Suman
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometricsKHUSHBU SHAH
 
Alternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment DesignAlternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment DesignConstantin Ciobanu
 
Geometric design of track
Geometric design of trackGeometric design of track
Geometric design of trackJOYCHENKENGLANG
 

Semelhante a Highway Design - Techniques for proper Planning and Execution . (20)

Sight Distance for horizontal curves
Sight Distance for horizontal curvesSight Distance for horizontal curves
Sight Distance for horizontal curves
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).ppt
 
hz alignment lec4.pdf
hz alignment lec4.pdfhz alignment lec4.pdf
hz alignment lec4.pdf
 
HIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).docHIGHWAY ENGINEERING 1 (ii).doc
HIGHWAY ENGINEERING 1 (ii).doc
 
3 vertical alignment of road by Malyar Talash
3 vertical alignment of road by Malyar Talash3 vertical alignment of road by Malyar Talash
3 vertical alignment of road by Malyar Talash
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
 
Transportation engineering highway part
Transportation engineering highway partTransportation engineering highway part
Transportation engineering highway part
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignment
 
transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.transportation Engineering.Highway planning,alignment and geometry.
transportation Engineering.Highway planning,alignment and geometry.
 
Chapter 2 Track Geometry.pptx
Chapter 2 Track Geometry.pptxChapter 2 Track Geometry.pptx
Chapter 2 Track Geometry.pptx
 
Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
Vertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptxVertical Curves_Presentation_NR.pptx
Vertical Curves_Presentation_NR.pptx
 
CH-2 highway.docx
CH-2 highway.docxCH-2 highway.docx
CH-2 highway.docx
 
Vertical alignment of highways
Vertical alignment of highwaysVertical alignment of highways
Vertical alignment of highways
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
Horizontal curve- IRC 38
Horizontal curve- IRC 38Horizontal curve- IRC 38
Horizontal curve- IRC 38
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Alternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment DesignAlternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment Design
 
Geometric design of track
Geometric design of trackGeometric design of track
Geometric design of track
 

Último

Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Último (20)

FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 

Highway Design - Techniques for proper Planning and Execution .

  • 1. Continues Improvement Is Better Than Delayed Perfection - Mark Twain
  • 2.
  • 3. • To have a Reliable Infrastructure. • To have a Green Infrastructure. • To have a Smart And Safe Infrastructure. • To have a Human Infrastructure.
  • 4. • Lifetime engineering • Fast, hindrance-free maintenance • Balancing demand and capacity • Asset management tools
  • 5. • Saving natural resources • Emission Control
  • 6. • Safe design • Smart design • Smart communication • Smart monitoring
  • 7. • Public security • Multi-functional use • Human design
  • 8.
  • 9. • Highway Location Survey. • Highway Alignment Survey • Highway Traffic Survey • Highway Geotechnical Investigation Survey
  • 10. • Map study • Reconnaissance • Preliminary surveys • Final location and detailed surveys
  • 11. • Setting out alignment on ground. • Taking cross-sections to full right of way at fixed interval.
  • 12. • Classified traffic in terms of Car, Two Wheeler, Three wheeler, Trucks, MAV, Bus, Mini bus, LCV, Cycle, Animal driven vehicles, cart, etc. are counted 24/7 on project highway and Average daily traffic is calculated. • Traffic varies on road by season, month, week, week-days, hours. • Seasonal variation factor is use to convert ADT to AADT.
  • 13. • Trail pits / Bore Holes are taken at fixed interval on projected road. • Soil samples are tested to know the engineering properties of soil. (a) Gradation (b) Atterber’s limit (c) Free swelling Index (d) CBR
  • 14. • DGPS ( Differential Global Positioning System). • Total Station. • Video Graphic Vehicle count . • Ground Penitrating Radar
  • 15. .
  • 16. • Design vehicles are selected motor vehicles with the weight, dimensions, and operating characteristics used to establish highway design controls for accommodating vehicles of designated classes. • For purposes of geometric design, each design vehicle has larger physical dimensions and a larger minimum turning radius than most vehicles in its class.
  • 17.
  • 18. Dimension of vehicle Details Maximum Dimension (m) (Excluding front and rear bumper) • Width All Vehicles. 2.50 • Height (a) Single-Decked vehicle for normal application . 3.80 (b) Double-decked Vehicle . 4.75 • Length (a) Single-unit truck with two or more axles. (type 2,3) 11.00 (b) Single-unit bus with two or more axles. (type 2,3) 12.00 (c) Semi- Trailer tractor combinations (type 2-s1, 2-s2, 3-s1, 3-s2) 16.00 (d) Tractor and Trailer combinations (type 2-2, 3-2, 2-3, 3-3) 18.00
  • 19. • The choice of design vehicle is influenced by the functional classification of a roadway, and by the proportions of the various types and sizes of vehicles expected to use the facility. • On rural facilities, to accommodate truck traffic, one of the semitrailer combination trucks should be considered in design. • In urban areas that are highly built-up, intersections may be designed to provide fully for passenger vehicles but require the larger vehicles to swing wide upon turning • The vehicle which occurs with considerable frequency is often selected as the design vehicle. • The largest of all the several design vehicles are usually accommodated in the design of freeways, subject to state laws on permitted vehicles.
  • 20.
  • 21.
  • 22. • The speed with which vehicles travel on the road is seldom the maximum speed the vehicle is capable. • Choice of design speed depends on the function of the road as also terrain conditions. Terrain is classified by the general slope of the country across the highway alignment. S. NO. Terrain classification Per cent cross slope of the country 1 Plain 00-10 2 Rolling 10-25 3 Mountainous 25-60 4 Steep <60
  • 23. SR. NO. Road Classificati on Design Speed (in KMPH) Plain Terrain Rolling Terrain Mountainous Terrain Steep Terrain Ruling Design Speed Minimu m Design Speed Ruling Design Speed Minimu m Design Speed Ruling Design Speed Minimu m Design Speed Ruling Design Speed Minimu m Design Speed 1 National And State Highway 100 80 80 65 50 40 40 30 2 Major District Road 80 65 65 50 40 30 30 20 3 Other District Road 65 50 50 40 30 25 25 20 4 Village Road 50 40 40 35 25 20 25 20
  • 24. Tangent Curve Tangent to Circular Curve Tangent to Spiral Curve to Circular Curve
  • 25. R = Radius of Circular Curve PC = Point of Curvature (or BC = Beginning of Curve ) PT = = Point of Tangency (or EC= End of Curve ) PI = Point of Intersection T = Tangent Length (T = PI – BC = EC - PI) L = Length of Curvature (L = EC – BC) M = Middle Ordinate E = External Distance C = Chord Length Δ = Deflection Angle
  • 26.
  • 27. Degree of Curvature • Traditionally, the “steepness” of the curvature is defined by either the radius (R) or the degree of curvature (D) • Degree of curvature = angle subtended by an arc of length 100 feet R = 5730 / D (Degree of curvature is not used with metric units because D is defined in terms of feet.)
  • 28. Length of Curve • For a given external angle (Δ), the length of curve (L) is directly related to the radius (R) L = (RΔπ) / 180 = RΔ / 57.3 R = Radius of Circular Curve L = Length of Curvature Δ = Deflection Angle • In other words, the longer the curve, the larger the radius of curvature
  • 29. Other Formulas… Tangent: T = R tan(Δ/2) Chord: C = 2R sin(Δ/2) Mid Ordinate: M = R – R cos(Δ/2) External Distance: E = R sec(Δ/2) - R
  • 30.
  • 31.
  • 32. • The amount by which the outer edge of a curve on a road or railway is banked above the inner edge.
  • 33. Road Plan ViewRoad Section View CL 2%2%
  • 34. Road Plan ViewRoad Section View CL 2%1.5%
  • 35. Road Plan ViewRoad Section View CL 2%1%
  • 36. Road Plan ViewRoad Section View CL 2%0.5%
  • 37. Road Plan ViewRoad Section View CL 2%-0.0%
  • 38. Road Plan ViewRoad Section View CL 2%-0.5%
  • 39. Road Plan ViewRoad Section View CL 2%-1%
  • 40. -1.5% Road Plan ViewRoad Section View CL 2%2%
  • 41. Road Plan ViewRoad Section View 2%-2% CL
  • 42. Road Plan ViewRoad Section View 3%-3% CL
  • 43. Road Plan ViewRoad Section View 4%-4% CL
  • 44. Road Plan ViewRoad Section View 3%-3% CL
  • 45. Road Plan ViewRoad Section View 2%-2% CL
  • 46. Road Plan ViewRoad Section View 2% CL -1.5%
  • 47. Road Plan ViewRoad Section View 2% CL -1%
  • 48. Road Plan ViewRoad Section View 2% CL -0.5%
  • 49. Road Plan ViewRoad Section View 2% CL -0.0%
  • 50. Road Plan ViewRoad Section View 2% CL 0.5%
  • 51. Road Plan ViewRoad Section View 2% CL 1%
  • 52. Road Plan ViewRoad Section View 2% CL 1.5%
  • 53. Road Plan ViewRoad Section View 2% CL 2%
  • 54. • Transition curves are provided in between a straight road and the Curve of a design radius. So the radius of a transition curve varies from infinity to the design radius or vice verse. The length of the transition curve must fulfill some requirements. It is designed to fulfill the following three conditions: (a) Rate of change of centri-fugal Acceleration(C): As per IRC recommendations, 𝐶 = 80 (75+𝑣) 𝑚/𝑠𝑒𝑐3 Here, C= allowable rate of change of centrifugal acceleration (0.5 < 𝐶 < 0.8 𝑚/𝑠𝑒𝑐3) Ls= Length of the transition curve. 𝐿 𝑠 = 0.0215∗𝑉3 𝐶∗𝑅 (b) Rate of introduction of Designed super-elevation: If pavement is rotated about center line, then 1/𝑁 = (𝐸/2)/𝐿𝑠 => 𝐿𝑠 = 𝐸𝑁/2 = 𝑒. 𝐵. 𝑁/2 = 𝑒. (𝑊 + 𝑊𝑒). 𝑁/2 If pavement is rotated about inner edge, then 𝐼/𝑁 = 𝐸/𝐿𝑠 => 𝐿𝑠 = 𝐸𝑁 = 𝑒. 𝐵. 𝑁 = 𝑒. (𝑊 + 𝑊𝑒). 𝑁 where, Ls= Length of transition curve B= width of the pavement (c) By Empirical Formula given by IRC(Indian Roads congress): It should not be less than (i) For plain and ruling terrain: 𝐿𝑠 = 2.7 𝑉^2/𝑅 (ii) For mountainous and steep terrain: 𝐿𝑠 = 𝑉^2/𝑅 Find out the greatest length of the transition curve by the above three criteria and use to construct the transition curve.
  • 55. • 𝑅 = 𝑉2 127×(𝑒+𝑓) Where R = Radius in meter V = Speed of vehicle in kmph e = Rate of superelevation f = Design value of lateral friction coefficient = 0.15 • e = 𝑉2 225×𝑅 Superelevation is provided 75%of design speed Maximum superelevation 7% for plain and rolling terrain and 10% for hilly and steep terrain
  • 56. • Mechanical widening • 𝑊𝑚 = 𝑛∗𝑙2 2∗𝑅 • Psychological widening 𝑊𝑝𝑠 = 𝑉 9.5∗ 𝑅 • Extra widening 𝑊𝑒 = 𝑊𝑚+𝑊𝑝𝑠
  • 57. • Grade Compensation = 30+𝑅 𝑅 . • Subjected to maximum value of 75 𝑅 . • IRC recommends compensation is not necessary for gradient flatter than 4%. ∝
  • 59. Radius Parabola y  ax2  bx  c Horizontal Curve Vertical Curve
  • 60. BVC EVC L G 2 G 1 Change in grade: A = G2 - G1 where G is expressed as % (positive /, negative ) For a crest curve, A is negative. For a sag curve, A is positive. L/2 L/2 PI
  • 61.
  • 62. • Determine the minimum length (or minimum K) for a given design speed. – Sufficient sight distance – Driver comfort – Appearance
  • 63. Crest Vertical Curve • If sight distance requirements are satisfied then safety, comfort, and appearance will not be a problem. h1 = height of driver’s eyes, in ft. h2 = height of object, in ft. • When L > SSD- 𝐿 = 𝑁𝑠2 4.4 • When L <SSD - 𝐿 = 2𝑆 − 4.4 𝑁
  • 64. Sag Vertical Curve • Stopping sight distance not an issue. What are the criteria? – Headlight sight distance – Rider comfort – Drainage – Appearance • When L > SSD - 𝐿 = 𝑁𝑆@ (1.5+0.035𝑆) • When L < SSD - 𝐿 = 2𝑆 − (1.5+0.035𝑆) 𝑁
  • 65. • MX Road • Civil 3d
  • 66.
  • 67.
  • 68. • Temperature Stresses – Due to the temperature differential between the top and bottom of the slab, curling stresses (similar to bending stresses) are induced at the bottom or top of the slab • Frictional stresses – Due to the contraction of slab due to shrinkage or due to drop in temperature tensile stresses are induced at the middle portion of the slab • Wheel Load Stresses – CC slab is subjected to flexural stresses due to the wheel loads
  • 69. 𝑙 = 4 𝐸ℎ3 12 ∗ 𝑘 ∗ 1 − 𝜇2 Type equation here.Where, E = Modulus of Elasticity of concrete, MPa h = thickness of slab, m μ = Poisson’s ratio k = modulus of subgrade reaction, MN/m3
  • 70.
  • 72. • The contraction joints are spaced to limit the tensile stress induced in the slab to the value that can be born by the slab during curing period • Spacing is found out by taking the allowable tensile stress as 80 kPa during curing period of concrete 𝐿 = (2𝑆𝑓 ) (𝛾𝑐 𝑓𝑎) • For 𝑆𝑓 = 80 kPa, 𝛾𝑐 = 24 kN/m3 and 𝑓𝑎= 1.5 L = 4.52 m Therefore, the spacing of contraction joints is kept as 4.5 m.
  • 73. Slab Thickness (cm) Maximum Contraction joint spacing (m) 15 4.5 20 4.5 25 4.5 30 5.0 35 5.0
  • 74.
  • 75. • The loads causing failure of pavements are mostly applied by single and tandem axles, stress must be determined for the condition shown in chart’s given by Picket &Ray for stress computation in the interior as well as edge region • Using fundamental concept of Westergaard and Picket &Ray’s pioneering work a computer program IITRIGID developed at IIT, Kharagpur was used for edge load condition
  • 76. • As per IRC 58-2011 stresses in Rigid pavement by wheel load analyzed for following condition. • (a) Bottom up Cracking -By traffic 10.00 AM to 4.00 PM • (b) Top Down Cracking -By traffic 00.00 Am to 6.00 AM
  • 77. • Fixed traffic – Design is governed by single wheel load – Load repetitions is not considered as a variable – Multiple wheels are converted into single wheel – Heaviest wheel load anticipated is used in design • Variable traffic and variable vehicle (Spectrum of Axles Approach) – Both vehicle and traffic are considered independently. i.e., treat all axles separately and use spectrum of axles in the design
  • 78. Fixed vehicle – Design is governed by the number of repetitions of standard vehicle or axle load, usually 80 kN single axle load – Repetitions of non-standard axles are converted into equivalent repetitions of standard axle using equivalent axle load factors – The cumulative number of repetitions of standard axle during the design life is termed as Equivalent Single Wheel Load (ESAL) and is the single traffic parameter for design purpose.
  • 79. • Equivalent Single Axle Load is the equivalent repetitions of standard axle during the design life of the pavement. • IRC terms this ESAL as cumulative number of standard axles during the design life. • The number of repetitions of different types of axles are converted into equivalent repetitions of standard axle by using Equivalent Axle Load Factors (EALF).
  • 80. • Approximate EALF can be worked out using the fourth power rule Single Axle Single wheel Load EALF = (Axle Load in KN/65)^4 • Single Axle Dual wheel Load EALF = (Axle Load in KN/80)^4 Tandem Axle Load EALF = (Axle load in KN/148)^4 However, as the EALF depends on axle load as wheel as the pavement configuration, the exact EALF can be worked out only by using distress models
  • 81. • Instead of converting each axle pass into equivalent standard axle passes, It will be convenient to convert one truck pass into equivalent standard axle passes. • The factor that converts the number of trucks into equivalent standard axle repetitions is termed as vehicle damage factor or truck factor • Therefore, Vehicle damage factor is the number of standard axles per truck
  • 82. • It is worked out by finding the directional distribution and lane distribution factors • Directional Distribution Factor (D) – The ADT of trucks is the sum of daily truck traffic volume in both directions • – D factor is the proportion of ADT of trucks occurring in the maximum direction • – The D factor normally varies between 0.5 to 0.6
  • 83. • Lane Distribution Factor (L) – Is the proportion of truck traffic occurring on the design lane – Lane Distribution Factor depends on - Number of lanes - Traffic volume • Daily Truck Traffic on Design Lane = (ADT of Trucks) × (D) × (L)
  • 84. Undivided Roads (Single Carriageway) No. of Traffic Lanes in Two Directions Percentage of Trucks in Design Lane (D×L) 1 100 2 75 3 40 Divided Roads (Dual Carriageway) No. of Traffic Lanes in each Direction Percentage of Trucks in Design Lane (L) 1 100 2 75 3 60 4 40
  • 85. • ESAL = (ADT of Trucks) × (365) × (D) × (L) × (VDF) × GF • GF =𝐺𝐹 = 1+𝑟 𝑛−1 𝑟 r = Growth rate in decimal n = Design life in years
  • 86. • Distress models relate the structural responses to various types of distresses • These are equations relating the allowable number of repetitions of standard axle to the appropriate pavement response as per the failure criteria adopted
  • 87.
  • 88. • N • 𝑁𝑓 = 𝑘3* 1 ∈ 𝑡 𝑘1 * 1 𝐸 𝑏𝑡 𝑘2 • = Nf = No. of cumulative standard axles t produce 20% cracked surface area ∈t = Tensile strain at the bottom of Bituminous Concrete layer E = Elastic Modulus of Bituminous Surface (MPa) k1, k2 = Laboratory calibrated parameters k3 = Transfer parameter
  • 89. • 𝑁 𝑅 = 𝑘5* 1 ∈ 𝑐 𝑘4 NR = No. of Repetitions to Rutting failure ∈c = Vertical subgrade strain k4, k5 = Calibrated parameters
  • 90. • Allowable number of repetitions (Ni) are computed separately for each axle type I applying the distress model • Expected number of repetitions (ni) of each axle type i are obtained from traffic cum axle load survey • Damage Ratio (DR), which is the ratio between the expected repetitions and allowable repetitions, is worked out for each axle type • The cumulative DR of all axles should be less than 1
  • 91. California bearing ratio is defined as the ratio (expressed as percentage) between the load sustained by the soil sample at a specified penetration of a standard plunger (50 mm diameter) and the load sustained by the standard crushed stones at the same penetration.
  • 92. • This consists of causing a plunger of 50 mm diameter to penetrate a soil sample at the rate of 1.25 mm/min. • The force (load) required to cause the penetration is plotted against measured penetration. • The loads at 2.5 mm and 5 mm penetration are recorded. • This load corresponding to 2.5 mm or 5 mm penetration is expressed as a percentage of standard load sustained by the crushed aggregates at the same penetration to obtain CBR value.
  • 93.
  • 94. • The load – penetration curve may show initial concavity due to the following reasons: – The top layer of the sample might have become too soft due to soaking in water – The surface of the plunger or the surface of the sample might not be horizontal
  • 95. • Draw a tangent to the load-penetration curve where it changes concavity to convexity • The point of intersection of this tangent line with the x-axis is taken as the new origin • Shift the origin to this point (new origin) and correct all the penetration values
  • 96.
  • 97. CBR (per cent) Maximum variation in CBR value 5 ±1 5-10 ±2 11-31 ±3 31 and above ±5
  • 98. • The average CBR values corresponding to 2.5 mm and 5 mm penetration values should be worked out • If the average CBR at 2.5 mm penetration is more than that at 5 mm penetration, then the design CBR is the average CBR at 2.5 mm penetration • If the CBR at 5mm penetration is more than that at 2.5 mm penetration, then the test should be repeated. Even after the repetition, if CBR at 5mm is more than CBR at 2.5 mm, CBR at 5 mm could be adopted as the design CBR.
  • 99.
  • 100.
  • 101.
  • 102. The resilient modulus MR is the elastic modulus based on the recoverable strain under repeated loads, and is defined as 𝑀𝑟 = 𝜎 𝑑 𝜀 𝑟 𝜎 𝑑= deviator stress 𝜀 𝑟= recoverable elastic strain
  • 103.
  • 104. Subgrade E (MPa) = 10 × CBR if CBR<5% and = 17.6 × (𝐶𝐵𝑅)0.64 for CBR > 5% Granular subbase and base 𝑬 𝟐 = 𝑬 𝟑 × 𝟎. 𝟐 × 𝒉 𝟎.𝟒𝟓 𝑬 𝟐= Composite modulus of sub-base and base (MPa) 𝑬 𝟑= Modulus of subgrade (MPa) 𝒉 = Thickness of granular layers (mm)
  • 105.
  • 106.
  • 107. • Compaction is the process of increasing the bulk density of a soil or aggregate by driving out air. • For any soil, at a given compactive effort, the density obtained depends on the moisture content. • For any soil, an “optimum water content” exists at which it will achieve it’s maximum density.
  • 108. 1. To increase strength and stability 2. To decrease permeability 3. To enhance resistance to erosion 4. Decrease compressibility under load and minimize settlement
  • 109. • Sheepsfoot • Padfoot • Vibratory Roller • Grid Roller
  • 110. • The peak dry unit weight is called the "maximum dry density”. • The Optimum Water Content, wopt, is the water content at the soil’s maximum dry density.
  • 111. • Proctor Compaction Test determines the optimum water content and maximum dry density of for a soil. • A required range for moisture is often specified by the engineer: • Ie, 3% below and 2% above optimum. • For example, if optimum water content is 16%, the acceptable range would be from 13% to 18%. • Percent compaction is also specified: • Meaning “required percentage of max dry density” % Compaction = ρdry field /ρdry max
  • 112.
  • 113. • Sand Replacement • Core Cutter test. • Nuclear Densometer
  • 114. Particular Modified Proctor Standard Proctor IS 2720(VIII) 2720(VII) Hammer Mass 4.8 Kg 2.6 Kg Free Fall 45 cm 31 cm Number Of Layers 5 no. 3 no. Number Of Blows 25 25 Work Done In Joules 270 joules 60.45 joules Compaction Efforts 4.46 times than Standard Proctor 22% of Modified Proctor
  • 115.
  • 116. Bituminous construction are classified into four categories • Interface Treatments • Thin Bituminous surface Courses • Bituminous Surface Courses • Bituminous Binder Courses
  • 117. • Prime Coat • Tack Coat • Crack Prevention Courses SAM and SAMI
  • 118.  Purpose Of Priming: • To plug the capillary voids • To coat and bond loose materials on the surface • To harden or toughen the surface • To promote adhesion between granular and the bituminous layer  Choice of Primer • The primer shall be bitumen emulsion, complying with IS 8887 of a type and grade as specified (SS-1) • The use of medium curing cutback as per IS 217 shall be restricted only for sites at sub-zero temperatures or for emergency applications
  • 119.
  • 120. Purpose of Tack Coat: • To ensure a bond between the new construction and the old surface Material for Tack Coat: • The primer shall be bitumen emulsion, complying with IS 8887 of a type and grade as specified (RS-1) Use of Cutback: • It should be restricted for sites at subzero temperatures or for emergency applications
  • 121.
  • 122.
  • 123.
  • 124.
  • 125.
  • 126. 20-30% more quantity of tack coat for milled surface
  • 127.
  • 128. Quantities of materials required for 10 m2 (20 mm)
  • 129. A. Liquid Seal Coat: comprising of a layer of binder followed by a cover of stone chipping Stone chips shall be of 6.7mm size defined as 100 per cent passing through 11.2 mm sieve and retained on 2.36 mm sieve. The quantity used for spreading shall be 0.09 cubic meter per 10 square meter area. B. Premixed Seal Coat: a thin application of fine aggregates premixed with bituminous binder The quantity of bitumen shall be 9.8 kg and 6.8 kg per 10 m2 area for type A and type B seal coat respectively
  • 130. • Close-graded premix carpet is a fairly open graded mix • It is an alternative to the open graded premix carpet and a seal coat • It may be constructed in one operation
  • 131.
  • 132.
  • 133.
  • 134. • The total quantity of aggregates used shall be 0.27 cum per 10 m2 area • The quantity of binder shall be 22.0 kg and 19.0 kg for 10m2 area for Type A and Type B surfacing respectively
  • 135.
  • 136. • Preparation of Base to the Required Camber and Shape • Application of Primer • Application of Tack Coat • Spreading and Rolling First Layer of Coarse Aggregates (0.5 cu.m/10 sq.m) • Application of Binder - First Spray (15 kg/10 sq.m)
  • 137. • Spreading and Rolling of Coarse Aggregates for the Second Layer. • Application of Binder - Second Spray (15 kg/10 sq.m). • Application of Key Aggregates (0.13 cu.m/10 sq.m). • Roll and Apply Additional key aggregates, if required. • Cover with a Seal Coat before opening to Traffic.
  • 138. • Lack of adequate compaction in field leads to reduced pavement life • Inadequate compaction of hot mix leads to early oxidation, raveling, cracking and disintegration before its life expectancy is achieved • 1% excess voids results in approximately about 10% reduction in life
  • 139. • Lack of attention to the air voids requirement of compacted dense graded bituminous mixes is the most common cause of poor pavement performance • Laboratory compaction produces more density, hence 95-98% of laboratory density or 92% of theoretical density is preferred in the field
  • 140.
  • 141. • SCREED The screed is the first device used to compact the mat and may be operated in the vibratory mode. Approximately 75 to 85 percent of Theoretical Maximum Density (TMD) will be obtained when the mix passes out from under the screed.
  • 142.
  • 143.
  • 144. • ROLLERS • Generally a series of two or three rollers is used. Contractors can control roller compaction by varying things such as the types of rollers used, the number of roller used, roller speed, the number of roller passes over a given area of the mat, the location at which each roller works, and the pattern that each roller uses to compact the mat. • Approximately 92 to 95 percent TMD will be obtained when all rollers are finished compacting the mat.
  • 145.
  • 146. Typical roller position used in compaction are: – Breakdown Roller The first roller behind the screed. It generally effects the most density gain of any roller in the sequence. Breakdown rollers can be of any type but are most often vibratory steel wheel. – Intermediate Roller Used behind the breakdown roller if additional compaction is needed. Pneumatic tire rollers are sometimes used as intermediate rollers because they provide a different type of compaction (kneading action) than a breakdown steel wheel vibratory roller, which can help further compact the mat or at the very least, rearrange the aggregate within the mat to make it receptive to further compaction.
  • 147. – Finish Roller The last roller in the sequence. It is used to provide a smooth mat surface. Although the finish roller does apply compactive effort, by the time it comes in contact with the mat, the mat may have cooled below cessation temperature. Static steel wheel rollers are almost always used as finishing rollers because they can produce the smoothest surface of any roller type
  • 148.
  • 149.
  • 150.
  • 151.
  • 152.
  • 153.
  • 154.
  • 155.
  • 156.
  • 157. • Maintenance: Is the routine work performed to keep a pavement, under normal conditions of traffic and normal forces of nature, as nearly as possible in its as constructed condition. • Maintenance: The function of preserving, repairing, and restoring a highway and keeping it in condition for safe, convenient, and economical use
  • 158. • It includes both physical maintenance activities such as sealing, patching, and so forth and traffic service activities including painting pavement markings. • Rehabilitation: restoring or betterment of roadway such as resurfacing.
  • 159. • All Pavements require maintenance. • Stresses producing minor effects are constantly working in all pavements. • Stresses are: • Change in temperature and moisture; • Traffic; • Small movements in underlying or adjacent earth. • Distresses are visible evidence of pavement wear (i.e. they are the end result of the wear process which begins when construction ends). • Water lines and other utilities are major area of pavement maintenance.
  • 161.
  • 162. Importance: • Protect investments made in highways. • Economic & safety of public road system. Challenges: • increased roads (additional mileage of travel), • vehicle sizes, and traffic. • Traveling public expect higher level of maintenance. • Size of maintenance budget.
  • 163. • Purpose: to capture information about maintenance activities performed & resources expanded. • Maintenance management systems do not manage programs, reduce cost or improve performance, rather they provide maintenance engineers with the information and analytical tools needed to allow them to do so.
  • 164. • Elements of maintenance management programs: • Development of an annual work program (defining activities, quantities, establish performance standards, road inventory & inspection, estimate size of the work program). • Budgeting & allocating resources (labor, equipment, Materials). • Work authorization & control (various administration levels). • Scheduling (balance of workload throughout the year). • Performance evaluation (work progress & productivity). • Fiscal control (monitor status of expenditures yearly).
  • 165. • Road surfaces • Shoulders & approaches. • Roadsides • Bridges, & drainage structures. • Traffic controls & safety devices.
  • 166. • Bituminous surfaces • Failures due to: weathering, failure of base or subgrade due to material quality or compaction or improper drainage. • Repairs: • Patching • Paint patching • Scarifying • Resealing. • Non skid surface treatment
  • 167. • Well graded gravel shoulder : blading to proper slope and filling ruts or worn out materials. • Turf shoulders: filling holes & ruts, blading, seeding, mow & clean shoulders (weed control). • Approaches: include public side roads, private driveways, ramps, & turnouts. • Approach maintenance is similar to shoulder maintenance + extra efforts to maintain potholes, ruts, and other types of deterioration
  • 168. • Roadside: include area between traveled surface & the limit of the right-of-way (medians, roadside parks, right-of-way fences, picnic tables, ..etc. • Vegetation management & control (include mowing, weed eradication & control, seeding, planting vegetation, & care of trees & shrubs). • Mowing is done to provide sight distance, improve drainage, reduce fire hazards, & improve appearance of the roadway. • Seeding & planting vegetation are important for prevention of erosion. • Maintenance of rest areas. • Litter control.
  • 169. • Bridges: Maintenance is needed to minimize deterioration or repair damage caused by accidents, floods, or other unforeseen events. • Steel bridges: cleaned & painted to prevent erosion. • Concrete bridge decks deterioration: Corrosion of reinforcement bars due to penetration of water & deicing salts or chemicals. • Bridge decks with minor deterioration: patch with special concrete. • Bridge decks with major deterioration: Overlay or remove & construct
  • 170. • Drainage structures • Should be kept in good working conditions. • Surface drainage, ditches, & culverts • Safety devices: Guardrails, barriers, impact attenuators, pedestrian overpasses & underpasses, fence to restrict access of pedestrians & animals. • Safety devices should be frequently & systematically inspected & repaired
  • 171. • Proper maintenance extend pavement life. • However, best-maintained pavements will deteriorate with time and will need rehabilitation. • Conventional rehabilitation: • Reconstruct with all new material • Patch & overlay with new wearing surface.
  • 172. Types of Overlays • Asphalt overlay over asphalt pavements • Asphalt overlays on CC pavements • CC overlays on asphalt pavements • CC overlays on CC pavements
  • 173. Measurement and estimation of the strength of the existing pavement Design life of overlaid pavement Estimation of the traffic to be carried by the overlaid pavement Determination of the thickness and the type of overlay
  • 174. Basic concept • Thickness of overlay is the difference between the thickness required for a new pavement and the effective thickness of the existing pavement • ℎ 𝑜𝑙=ℎ 𝑛 − ℎ 𝑒 Where, ℎ 𝑜𝑙=thickness of overlay ℎ 𝑛 = thickness of new pavement ℎ 𝑒 = effective thickness of existing pavement
  • 175. All thicknesses of new and existing materials must be converted into an equivalent thickness of AC ℎ 𝑒 = 𝑖=1 𝑛 ℎ𝑖 × 𝐶𝑖 ℎ𝑖 = thickness of layer i 𝐶𝑖 = conversion factor for layer i
  • 176.
  • 177. • The structural strength of pavement is assessed by measuring surface deflections under a standard axle load • Larger pavement deflections imply weaker pavement and subgrade • The overlay must be thick enough to reduce the deflection to a tolerable amount • Rebound deflections are measured with the help of a Benkelman Beam
  • 178.
  • 179.
  • 180. • Condition survey and deflection data are used to establish sections of uniform performance • At least 10 deflection measurements should be made for each section per lane subject to a minimum of 20 measurements per km. • If the highest or the lowest deflection values for the section differ from the mean by more than one-third of the mean, then extra deflection measurement should be made at 25 m on either side of point where high or low values are observed.
  • 181. • Visual inspection of the road stretch and grouping into sub-stretches • Assessment of pavement cracking – type & percentage cracked area • Rut depth measurements • Observations on other types of pavement deterioration
  • 182. • axle load of 8170 kg / load of 4085 kg on dual wheels • tyre pressure, p = 5.6 kg / cm2 • standard pavement temperature = 35o C • highest subgrade moisture content soon after monsoon -Some precautions during rebound deflection Observations • very low or zero values • variation of individual values, not more than one third of mean value
  • 183.
  • 184. • Measurement of pavement temperature (at one hour intervals) • Measurement of field moisture content of subgrade soil • Typical subgrade soil samples for lab. Tests (soil classification) • Other data to be collected - annual rain fall - traffic data : classified volume of vehicles of gross load over 3 t, growth rate, axle load data / VDF values
  • 185. • Leg correction, if any, at each point of deflection observation: • - If (𝐷i ~ 𝐷f) is less than 0.025 mm (2.5 div.), 𝐷 = 0.02 (D0 ~ 𝐷f) • - If (𝐷i ~ 𝐷f) is more than 0.025 mm (2.5 div.), 𝐷 = [ 0.02 (𝐷0 ~ 𝐷f) + 0.0582(Di – Df) ] • Mean deflection, 𝑫 • Characteristic Deflection, 𝑫𝒄 = ( 𝑫 + 2𝝈 ) for important roads to cover • - 97.7 % deflection values, or 𝐷c = ( 𝐷 +𝜎 ) for low traffic roads, to cover 84.1 % deflection values Application of temperature correction factor @ 0.01 mm per 𝒐𝑪 variation from the standard temperature of 35 𝒐𝑪 or 0.01 (𝒕~35)
  • 186. Temperature Correction • Stiffness of the Bituminous layers get affected due to which deflections vary • Standard temperature is 35 𝑜𝐶 • Correction for temperature variation on deflection values measured at pavement temperature other than 35 𝑜𝐶 should be 0.01mm for each degree change from the standard temperature.
  • 187. Correction for Seasonal Variation • Deflection depends upon the change in the climate • Worst climate (after monsoon)-considered for design • Depends on subgrade soil and moisture content • Correction for seasonal variation depends on type of soil subgrade (sandy/gravelly or Clayey with PI<15 or Clayey with PI>15), field moisture content, average annual rain fall (<1300 mm or >1300 mm)
  • 188.
  • 189. • The design traffic is considered in terms of the • cumulative number of standard axles , 𝑁𝑠 = 365 × 𝐴[(1 + 𝑟) 𝑥 − 1] 𝑟 × 𝑓 • 𝑁𝑠 = The cumulative number of Standard Axles to be catered for in the design • 𝐴 = Initial Traffic in the year of completion of construction on design lane • 𝑟 = Annual growth rate of commercial vehicles • 𝑥 = Design life in years • 𝑓 = Vehicle Damage Factor
  • 190. • Design curves relating characteristic pavement deflection to the cumulative number of standard axles are to be used. • The Deflection of the pavement after the corrections i.e., Characteristic Deflection is to be used for the design purposes. • The design traffic in terms of cumulative standard number of axles is to be used
  • 191.