SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
GÖNKA
                                                 GÖNKA A.S. Afghanistan References




        Afghanistan National Army Military Hospital
Afghanistan National Army Military Hospital




                                              Renovation of the Afghanistan National Army Military Hospital
                                              Location: Kabul, Afghanistan                Project Description:
                                              Project Start Date:: 01.10.2004         !   Renovation of existing Military Hospital in Kabul
                                              Project Completion Date: : 01.04.2006   !   Project consists of patient care building, operationsz
                                              Client: US Army                             building, kitchen, wastewater treatment, rehabilitation
                                                                                          building, polytechnic institute, morgue, engineering
                                                                                          offices, workshops, administration building
                                                                                      !   Approximately 45,000 sqm construction area
     2006
2/3
      2008 Design/Build Communication Support Element Upgrade (CSE)




                       Element Upgrade (CSE)
                       Design/Build Communication Support
Design/Build Communication Support Element Upgrade (CSE)

Location: Kabul, Afghanistan
Project Start Date: : 11.01.2007
Project Completion Date: : 11.01.2008
Client: USACE Afghanistan Engineer District
Project Description:
This project consists of the design and construction of
upgrading an existing compound and new additions in
Kabul, Afghanistan. The work will take place on the existing
Compound. The purpose of this expansion is to support a
600-soldier Communications Support Element (CSE)
compound. Guard houses, maintenance buildings,
dormitory building, communication, training building and all
required utility works will be constructed.
2/3
      2008 Design/Build Communication Support Element Upgrade (CSE)
Air handling unit
    Standard Accessories;                                           Standard Series                                            Optional Accessories;
!   Filter Chambers; Chamber design which provides easy             Application Area: business centers, schools,           !   GONKA vapor humidifier, standard vapor cylinder,
    mounting and de-mounting in filters and filters with            hospitals, factories, hotels and restaurants.              immersion electrodes, stainless vapor distributor and
    different productivity levels on demand.                                                                                   microprocessor control unit.
                                                                !   8 different models which provide required humidity
!   Heating and Cooling Coils; Seamless cooper tubes. In            and temperature by conditioning air volume in the      !   Mufflers which are made up of coulisses to provide
    heating coils, 4 options: warm water, vapor, hot water,                                                                    required sound holding capacity.
                                                                    range of 3000m³/h and 100.000 m³/h.
    electrically heated; in cooling coils, 2 options: chilled
    water and DX (direct expansion).                            !   The framework which is formed by combination of        !   Plate heat exchanger or Heat recovery wheel for
!   Dampers; Rigid aluminum frame in multi airfoil                  aluminum frames, which are connected specially, with       recovery of the heat emitted with exhaust air.
    structure which is the least resistant against airflow.         plastic and aluminum comers.                           !   Electrical board.
    Rubber gaskets which reduce air leakage through
    blades to the minimum level.                                !   Boards which are made up of double skilled             !   Frequency Converter
                                                                    galvanized iron in a standard way.
!   Fans; Statically and dynamically balanced aspirators
    and ventilators in double inlet belt driven centrifugal     !   Polyurethane insulated panels, which are 30 mm in
    type. Forward curved fans in systems with low, medium           thickness, for thermal and acoustic insulation in a
    and high duct pressures,.                                       standard way.
GÖNKA Afghanistan References

                                                                                     - Afghanistan National Army Military
                                                                                      Hospital
                                                                                     - Design/Build Communication Support
                                                                                      Element Upgrade (CSE)
                                                                                     - Qandahar Ana Brigade Project
                                                                                      Communication Building
                                                                                     - Contrack Int. Inc.
                                                                                     - U.S. Army Corps. - Afganistan




FACTORY and MAIN OFFICE        AZERBAIJAN BRANCH OFFICE      GEORGIA BRANCH OFFICE


Sincan Organize Sanayi         Nasimi Rayonu,                .
Bölgesi G öktürk C ad. N o:6   Suleyman Rustem Mah., 7,
Sincan / ANKARA                Az1014 BAKÜ / AZERBAYCAN
Tel :0 312 267 09 90 (pbx)     Tel : (00 994) 12 493 19 29
Fax:0 312 267 09 93            Fax: (00 994) 12 493 19 29
2005 Qandahar Ana Brigade Project Communication Building
                                                           ANA Brigade Headquarters
                                                           construction begins in Farah
                                                           KABUL, Afghanistan – A construction project to build an ANA Brigade Headquarters near Farah City started
                                                           recently.
                                                           The project, which will employ 4,000 workers for the year-long construction period, will house 2,000 soldiers.
                                                           General Jalandershaw, 207th ANA Kandak commander in Herat, praised the construction project as an important
                                                           step in the development of the ANA. “We are very happy to see the construction of a new base that will become one
                                                           of the most important in western Afghanistan.”
                                                           The ANA headquarters is part of the United States Army Corps of Engineers’ plan to improve security in Farah
                                                           province. An excess of $85 million will be spent in Farah on a variety of projects throughout the coming year.
                                                           Projects include eight ANP headquarters; one in each of the following districts: Shib Koh, Lash wa Jowayn,
                                                           Gulestan, Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah and a Border Police headquarters for 100
                                                           men in Qal-e Kah.
                                                           Fazlullah Construction Engineering Company (FCEC) will build the headquarters, which will be built using pre-cast
                                                           construction, a building method new to Afghanistan


                                                           Project Under Construction
                                                           Design/Build an Afghan National Army (ANA) Brigade camp. The Brigade facilities will cover an approximate area
                                                           of 800,000 SQM (198 acres) or 80 hectares. The site contains unexploded ordnance (UXO) and clearing the site is a
                                                           required part of the contract.
                                                           The project consists of a dining facility, a Brigade HQ, Infantry Battalion Complexes, Bachelors Officers Quarters,
                                                           and other centralized maintenance area, Ammunition Supply Point, Helipad, a Training Building and Training
                                                           Ranges, a Reception Center, Fire Station, Class VIII Storage Facility, communications system, construction of a
                                                           6MW prime power plant and electrical distribution system, and other buildings to serve the base.




           2/3
Sincan Organize Sanayi Bölgesi
                      Göktürk Caddesi No : 6
                      Sincan / ANKARA / TURKEY                                            Sincan Organize Sanayi Bölgesi
                      Tel :+90 312 267 09 90(pbx)                                         Göktürk Caddesi No : 6
                      Fax:+90 312 267 09 93                                               Sincan / ANKARA / TURKEY
                                                                                          Tel :+90 312 267 09 90(pbx)
                      http://www.gonka.com.tr                                             Fax:+90 312 267 09 93
                      e-mail: gonka@turk.net
                                                                                          http://www.gonka.com.tr
CUSTOMER    METAG ÝNÞ. TÝC. A.Þ.                                                          e-mail: gonka@turk.net

JOB NAME   QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING
                                                                 CUSTOMER METAG ÝNÞ. TÝC. A.Þ.
EQUIP.NAME PRECISION AIR CONDITIONER                             JOB NAME   QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING

MODEL      GHP 160 S SERIAL NO 05/1006                           EQUIP.NAME CONDENSER UNIT
SUPPLY FAN FLOW RATE                    9.300 m³/h               MODEL      GHP 160 S    SERIAL NO 05/1006
SUPPLY FAN TOTAL PRESSURE                   30    mmSS           CAPACITY                           48,5 kW
MOTOR POWER                                 2.2   kW             FAN BRAND                          ZIEHL-ABEGG
HEATING CAPACITY                            15    kW             OPERATING VOLTAGE                  380V/3/50 Hz
COOLING CAPACITY                        37.5      kW             PRODUCTION DATE                    SEPTEMBER 2005
EXHAUST FAN FLOW RATE                        -                   QUALITY CONTROL DATE               SEPTEMBER 2005
EXHAUST FAN TOTAL PRESSURE                   -
MOTOR POWER                                   -                                   TSEK
OPERATING VOLTAGE                    380V/3/50 Hz                                                   KAZAKHSTAN

PRODUCTION DATE                      SEPTEMBER 2005
QUALITY CONTROL DATE                 SEPTEMBER 2005

              TSEK

                               KAZAKHSTAN
Contrack Int. Inc.


                                                                       Sincan Organize Sanayi Bölgesi
                                                                       Göktürk Caddesi No : 6
                                                                       Sincan / ANKARA / TURKEY
                                                                       Tel :+90 312 267 09 90(pbx)
                                                                       Fax:+90 312 267 09 93
                                                                       http://www.gonka.com.tr
                                                                       e-mail: gonka@turk.net
                           ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA


                     CUSTOMER                   CONTRACK INT. INC.
                     JOB NAME                   AFGANISTAN
                     EQUIP. NAME UNIT HEATER WITH AXIAL FAN
                     MODEL       GTA 4          SERIAL NO 08/1001
                     AIR FLOWRATE                                               650 m3/h
                     HEATING POWER                                              5 kW
                     INLET AIR TEMPERATURE                                      18 °C
                     OUTLET AIR TEMPERATURE                                     39 °C
                     POWER INPUT                                                220V/50Hz
                     ELECTRIC MOTOR POWERR                                      66 W
                     COIL TYPE                                                  STEEL TUBE STEEL FIN
                     PRODUCTION DATE                                            APRIL 2008
                     QUALITY CONTROL DATE                                       APRIL 2008


                                                                     TSEK
  2008




     2/3
2/3
      2007   -u.s. Army Corps. - Afganistan




                  -u.s. Army Corps. - Afganistan

Mais conteúdo relacionado

Semelhante a Afganistan ing referasn albümü hg

Erim Gurdal CV
Erim Gurdal CVErim Gurdal CV
Erim Gurdal CVerimathome
 
Substation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind FarmSubstation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind Farmpbnrambollcom
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxmahmoud909178
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)ABDUL QADIR
 
AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winnerDave Bryant
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newvasanth morais
 
T&D India (September 2016): Technology to the Rescue
T&D India (September 2016): Technology to the RescueT&D India (September 2016): Technology to the Rescue
T&D India (September 2016): Technology to the RescueT&D India
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELkrishna kumar
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...zubeditufail
 

Semelhante a Afganistan ing referasn albümü hg (20)

Afganistan references
Afganistan referencesAfganistan references
Afganistan references
 
Afganistan references
Afganistan references  Afganistan references
Afganistan references
 
We@sp 3 (2010)
We@sp 3 (2010)We@sp 3 (2010)
We@sp 3 (2010)
 
BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1BAZYAN CCPP – Phase 1
BAZYAN CCPP – Phase 1
 
Erim Gurdal CV
Erim Gurdal CVErim Gurdal CV
Erim Gurdal CV
 
Karthick Lekshman- KONE
Karthick Lekshman- KONEKarthick Lekshman- KONE
Karthick Lekshman- KONE
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Substation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind FarmSubstation Design - Anholt Offshore Wind Farm
Substation Design - Anholt Offshore Wind Farm
 
THARANG A KUTTY
THARANG A KUTTYTHARANG A KUTTY
THARANG A KUTTY
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)updated Cv 04-01-2017 (1)
updated Cv 04-01-2017 (1)
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
AEP texas project edison award winner
AEP texas project edison award winnerAEP texas project edison award winner
AEP texas project edison award winner
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
Vasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_newVasanth_Electrical Engineer_CV_new
Vasanth_Electrical Engineer_CV_new
 
T&D India (September 2016): Technology to the Rescue
T&D India (September 2016): Technology to the RescueT&D India (September 2016): Technology to the Rescue
T&D India (September 2016): Technology to the Rescue
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
sharndencv
sharndencvsharndencv
sharndencv
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
 

Último

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 

Último (20)

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 

Afganistan ing referasn albümü hg

  • 1. GÖNKA GÖNKA A.S. Afghanistan References Afghanistan National Army Military Hospital
  • 2. Afghanistan National Army Military Hospital Renovation of the Afghanistan National Army Military Hospital Location: Kabul, Afghanistan Project Description: Project Start Date:: 01.10.2004 ! Renovation of existing Military Hospital in Kabul Project Completion Date: : 01.04.2006 ! Project consists of patient care building, operationsz Client: US Army building, kitchen, wastewater treatment, rehabilitation building, polytechnic institute, morgue, engineering offices, workshops, administration building ! Approximately 45,000 sqm construction area 2006
  • 3.
  • 4. 2/3 2008 Design/Build Communication Support Element Upgrade (CSE) Element Upgrade (CSE) Design/Build Communication Support
  • 5. Design/Build Communication Support Element Upgrade (CSE) Location: Kabul, Afghanistan Project Start Date: : 11.01.2007 Project Completion Date: : 11.01.2008 Client: USACE Afghanistan Engineer District Project Description: This project consists of the design and construction of upgrading an existing compound and new additions in Kabul, Afghanistan. The work will take place on the existing Compound. The purpose of this expansion is to support a 600-soldier Communications Support Element (CSE) compound. Guard houses, maintenance buildings, dormitory building, communication, training building and all required utility works will be constructed.
  • 6. 2/3 2008 Design/Build Communication Support Element Upgrade (CSE)
  • 7. Air handling unit Standard Accessories; Standard Series Optional Accessories; ! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder, mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and different productivity levels on demand. microprocessor control unit. ! 8 different models which provide required humidity ! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity. range of 3000m³/h and 100.000 m³/h. electrically heated; in cooling coils, 2 options: chilled water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for ! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air. structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board. Rubber gaskets which reduce air leakage through blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter galvanized iron in a standard way. ! Fans; Statically and dynamically balanced aspirators and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a and high duct pressures,. standard way.
  • 8. GÖNKA Afghanistan References - Afghanistan National Army Military Hospital - Design/Build Communication Support Element Upgrade (CSE) - Qandahar Ana Brigade Project Communication Building - Contrack Int. Inc. - U.S. Army Corps. - Afganistan FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE Sincan Organize Sanayi Nasimi Rayonu, . Bölgesi G öktürk C ad. N o:6 Suleyman Rustem Mah., 7, Sincan / ANKARA Az1014 BAKÜ / AZERBAYCAN Tel :0 312 267 09 90 (pbx) Tel : (00 994) 12 493 19 29 Fax:0 312 267 09 93 Fax: (00 994) 12 493 19 29
  • 9. 2005 Qandahar Ana Brigade Project Communication Building ANA Brigade Headquarters construction begins in Farah KABUL, Afghanistan – A construction project to build an ANA Brigade Headquarters near Farah City started recently. The project, which will employ 4,000 workers for the year-long construction period, will house 2,000 soldiers. General Jalandershaw, 207th ANA Kandak commander in Herat, praised the construction project as an important step in the development of the ANA. “We are very happy to see the construction of a new base that will become one of the most important in western Afghanistan.” The ANA headquarters is part of the United States Army Corps of Engineers’ plan to improve security in Farah province. An excess of $85 million will be spent in Farah on a variety of projects throughout the coming year. Projects include eight ANP headquarters; one in each of the following districts: Shib Koh, Lash wa Jowayn, Gulestan, Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah and a Border Police headquarters for 100 men in Qal-e Kah. Fazlullah Construction Engineering Company (FCEC) will build the headquarters, which will be built using pre-cast construction, a building method new to Afghanistan Project Under Construction Design/Build an Afghan National Army (ANA) Brigade camp. The Brigade facilities will cover an approximate area of 800,000 SQM (198 acres) or 80 hectares. The site contains unexploded ordnance (UXO) and clearing the site is a required part of the contract. The project consists of a dining facility, a Brigade HQ, Infantry Battalion Complexes, Bachelors Officers Quarters, and other centralized maintenance area, Ammunition Supply Point, Helipad, a Training Building and Training Ranges, a Reception Center, Fire Station, Class VIII Storage Facility, communications system, construction of a 6MW prime power plant and electrical distribution system, and other buildings to serve the base. 2/3
  • 10. Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Sincan / ANKARA / TURKEY Sincan Organize Sanayi Bölgesi Tel :+90 312 267 09 90(pbx) Göktürk Caddesi No : 6 Fax:+90 312 267 09 93 Sincan / ANKARA / TURKEY Tel :+90 312 267 09 90(pbx) http://www.gonka.com.tr Fax:+90 312 267 09 93 e-mail: gonka@turk.net http://www.gonka.com.tr CUSTOMER METAG ÝNÞ. TÝC. A.Þ. e-mail: gonka@turk.net JOB NAME QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING CUSTOMER METAG ÝNÞ. TÝC. A.Þ. EQUIP.NAME PRECISION AIR CONDITIONER JOB NAME QANDAHAR ANA BRIGADE PROJECT COMMUNICATION BUILDING MODEL GHP 160 S SERIAL NO 05/1006 EQUIP.NAME CONDENSER UNIT SUPPLY FAN FLOW RATE 9.300 m³/h MODEL GHP 160 S SERIAL NO 05/1006 SUPPLY FAN TOTAL PRESSURE 30 mmSS CAPACITY 48,5 kW MOTOR POWER 2.2 kW FAN BRAND ZIEHL-ABEGG HEATING CAPACITY 15 kW OPERATING VOLTAGE 380V/3/50 Hz COOLING CAPACITY 37.5 kW PRODUCTION DATE SEPTEMBER 2005 EXHAUST FAN FLOW RATE - QUALITY CONTROL DATE SEPTEMBER 2005 EXHAUST FAN TOTAL PRESSURE - MOTOR POWER - TSEK OPERATING VOLTAGE 380V/3/50 Hz KAZAKHSTAN PRODUCTION DATE SEPTEMBER 2005 QUALITY CONTROL DATE SEPTEMBER 2005 TSEK KAZAKHSTAN
  • 11. Contrack Int. Inc. Sincan Organize Sanayi Bölgesi Göktürk Caddesi No : 6 Sincan / ANKARA / TURKEY Tel :+90 312 267 09 90(pbx) Fax:+90 312 267 09 93 http://www.gonka.com.tr e-mail: gonka@turk.net ISITMA - SOÐUTMA - KLÝMA - HAVALANDIRMA CUSTOMER CONTRACK INT. INC. JOB NAME AFGANISTAN EQUIP. NAME UNIT HEATER WITH AXIAL FAN MODEL GTA 4 SERIAL NO 08/1001 AIR FLOWRATE 650 m3/h HEATING POWER 5 kW INLET AIR TEMPERATURE 18 °C OUTLET AIR TEMPERATURE 39 °C POWER INPUT 220V/50Hz ELECTRIC MOTOR POWERR 66 W COIL TYPE STEEL TUBE STEEL FIN PRODUCTION DATE APRIL 2008 QUALITY CONTROL DATE APRIL 2008 TSEK 2008 2/3
  • 12. 2/3 2007 -u.s. Army Corps. - Afganistan -u.s. Army Corps. - Afganistan