22.14 Quality of galvanizing

a) Galvanizing shall be in accordance to ASTM A 123 7.4.2 and ASTMA 153 8.4.2

b) Minimum thickness of zinc cover shall be 0,05mm

22.15 Quality of painting

a) All painting shall be applied with electrostatic process

b) Paint shall be type EPOXI

c) Paint thickness shall not be less than 0,15 mm

22.16 Hangers and Support Structures
22.16.1General

The Client will provide the primary support structure to support conveyors especially
in the area where conveyors are installed above the ceiling of arrival area and where
conveyors are declining from check in to the baggage hall.
Each fixing attached to the building shall be evaluated and approved by an structural
engineer.
Take special consideration to use correct supports for conveyors due to the special
Building design because of an elevated possibility of seismic activities. In case of an
earthquake event the special supports of the Building foundations will absorb the
major movement of the ground; therefore solid connections between Building
foundation and upper floors are not permitted.

    All equipment fixed to the floor -6,6m is not protected by special shock
     absorbers and will receive the full acceleration force up to 400 cm/sec2.

    Relative movement of basement foundation (-6,60m) and building ceiling
     (-0,40m) could be up to 0,45m in case of earthquake

    Relative movement of building above the shock absorbers (-0,40m arrivals)
     and check in level (+7,60m) could be up to 0,05m in case of earthquake

NOTE
The Client will only provide the primary support structure indicated in the
enclosed drawings; all structure which is necessary additional to operate and
maintain the Systems shall be supplied by the BHS supplier.
The BHS Supplier shall provide as a minimum the following catwalks and
stairs:
System A
CAW-AS1
CAW-A1
CAW-A2
CAW-A3
CAW-A4
CAW-A5
CAW-A6
CAW-A7
CAW-A8
System B
CAW-BS1
CAW-B1
CAW-B2
CAW-B3
System C
CAW-C1
CAW-C2
System D
CAW-D1

22.16.2Supports

a) Maximum distance of supports at Conveyors shall be 3000mm maximum centre

22.16.3Support Material

a) All floor supports shall be of standard "H" type design with vertical adjustment of
+/ total of 75mm. Floor support vertical members shall be constructed of #10 gauge,
hot rolled formed steel channel with heavy-duty foot and head plates.
22.16.4Hangers

a) Ceiling hangers of threaded rod shall have a minimum diameter of 20 mm with
structural angle or channel sills. The hangers have provisions for anchoring to the
ceiling structure. Threaded rods shall have: a single washer and a single nut above
and a star type lock washer a single washer and a single nut below the structural
angle.

b) Fixing on concrete ceiling shall be in according to the enclosed drawing :
     EVN-388-BHS-006-00


The threads of the all thread rod shall be:

a) Deformed below the lowest nut to prevent unthreading. This may be accomplished
by using a flat punch and a hammer.
b) Cut to within 20mm of the button of the lowest nut (hanger rods). In areas where
operational and/or maintenance personnel have access.

22.16.5Sway bracing

a) All conveyors shall be adequately sway braced in both the lateral and longitudinal
directions as required by local engineering and seismic design codes

22.16.6Access ways

a) Installation and layout of header steel shall not pose interference to maintenance
and operational access, such as clearing jams. All support structure shall be
designed and installed so that maintenance access to conveyor components shall
not be inhibited

22.16.7Anchors

a) Shall be of the Chemical Set or the Expandable Type. Explosive type anchors
shall be not to be used.

22.17 Catwalks
22.17.1General

a) Where catwalks are specified, the conveyor and adjacent catwalks shall be
supported by a common sill.

22.17.2Requirement

a) The enclosed Specification is indicating the minimum necessary catwalks, but
nevertheless the BHS supplier shall provide appropriate catwalks, work platforms
and access ladders for operational access (clearing of jams) and minor
maintenance. Where possible the maintenance access catwalks shall be connected
with catwalk walkways to eliminate the need for ladders at all access points. The
extent of the catwalks, access ways, Bridges, platforms, ladders and swingovers
shall be shown on the Tenderer layout drawings.

22.17.3Design Load

a) The catwalk working live load shall be 146 kg per square meter with a
concentrated load of 227kg in 0.5 square metres.

22.17.4Supports

a) All Catwalks shall be adequately sway braced in both the lateral and longitudinal
directions as required by local engineering and seismic design codes
22.17.5Construction

a) Access ladders and catwalks shall be constructed with a walking surface of 5mm
gauge check plate or web grating with a galvanized or painted finish and if required
painted to clients specification

22.17.6Width

a) Minimum catwalk width shall be nominally 600mm with a 50mm gap between the
catwalk and the conveyor, unless otherwise specified.

22.17.7Surface

a) Level catwalks shall have a grated expanded mesh surface. Therefore inclined
catwalks of up to 8° shall be equipped with an anti skid surface.

22.17.8Inclined Catwalks

a) Catwalks of greater than 8° shall be stepped, as well as equipped with anti skid
surface.

22.17.9Handrails

a) Handrails shall be installed on all platforms and catwalks except on sides adjacent
to conveyors.

22.17.10 Toe Kick

a) Platforms and catwalks shall have 50mm high toe boards except where they might
interfere with access to a conveyor or at any entrance/exit location of the catwalk.

22.17.11 OSHA Standards

a) All platforms, catwalks and ladders shall comply with European Agency for
Safety and Health at Work (EU-OSHA) standards.

22.17.12 Access ways

a) For access to the catwalks ladders shall if possible be located a maximum of 30
meters apart and positioned so as to not hinder traffic lanes or walkways.

22.17.13 Pull-down ladders

a) Pull-down ladders for catwalk access may be used where fixed ladders cannot be
installed due to traffic or staging conditions.
22.17.14 Fixed Vertical Ladders

a) Design of ladders shall meet or exceed OSHA 1910.27.

b) All fixed ladders shall be of steel construction.

c) The distance between rungs shall be no more than 300mm and be uniform
throughout the height of the ladder. All rungs shall have a minimum diameter of
20mm and withstand a 180 kg load when in use. All rungs shall be a minimum of 380
wide. The live loads imposed by personnel occupying the ladder shall be considered
to be concentrated at such points as shall cause the maximum stress in the
structural member being considered.

d) Tenderer shall generally allow a minimum of 100mm between the back of the
ladder and the nearest permanent object. A minimum of 760mm shall be allowed
between the front of the ladder and the nearest permanent object. 380mm shall be
allowed from the center of the ladder to the nearest object on each side. The step
across distance from the nearest ladder edge to the nearest equipment or structure
edge a minimum of 63mm and shall not exceed 300mm.

e) Side rails shall be of such cross section as to afford adequate gripping surface
without sharp edges or burrs.


f) Tenderer shall provide protective guards (i.e., chains) at the top of ladders.

g) Tenderer shall Grind smooth all rough surfaces and edges.

h) All fixed vertical ladders shall be painted in safety yellow.

22.17.15 Ship's Ladders

a) Tenderer shall provide fixed steel ship's ladders to access platforms and
walkways as shown on the contract drawings.

b) Design ladders shall meet or exceed OSHA 1910.27.

c) All ship's ladders shall be of steel construction.

d) Tenderer shall provide steel stringers using minimum 150mm channel. Tenderer
shall design the ladder so that the angle between the stringer and the floor shall not
be less than 60° and not more than 65°. The distance between treads shall be a
maximum of 300mm is uniform throughout the height of the ladder.

e) Handrails shall be fitted to both sides using 32NB tubing.
f) Tenderer shall provide protective guards (i.e., chains) at the top of ladders.

g) Tenderer shall Grind smooth all rough surfaces and edges.

h) Tenderer shall paint all ship ladders in safety yellow.

Mais conteúdo relacionado

Mais procurados

Catalog 4 - conventional-pallet-racking - en un
Catalog   4 - conventional-pallet-racking - en unCatalog   4 - conventional-pallet-racking - en un
Catalog 4 - conventional-pallet-racking - en unkhan76
 
Static load test method statement cm - ms- bw - 003
Static load test method statement  cm - ms- bw - 003Static load test method statement  cm - ms- bw - 003
Static load test method statement cm - ms- bw - 003Minh Bui Si
 
Runway resurfacing ppt
Runway resurfacing ppt Runway resurfacing ppt
Runway resurfacing ppt Faiz Ahmed
 
Equipments for tunnels- Special equipments
Equipments for tunnels- Special equipmentsEquipments for tunnels- Special equipments
Equipments for tunnels- Special equipmentsBalasubramaniam S
 

Mais procurados (9)

5706 5710.output
5706 5710.output5706 5710.output
5706 5710.output
 
Catalog 4 - conventional-pallet-racking - en un
Catalog   4 - conventional-pallet-racking - en unCatalog   4 - conventional-pallet-racking - en un
Catalog 4 - conventional-pallet-racking - en un
 
Static load test method statement cm - ms- bw - 003
Static load test method statement  cm - ms- bw - 003Static load test method statement  cm - ms- bw - 003
Static load test method statement cm - ms- bw - 003
 
Telescopic poles nea
Telescopic poles  neaTelescopic poles  nea
Telescopic poles nea
 
Single Belt Oven Conveyor Alignment
Single Belt Oven Conveyor AlignmentSingle Belt Oven Conveyor Alignment
Single Belt Oven Conveyor Alignment
 
SAMPLE WORK
SAMPLE WORKSAMPLE WORK
SAMPLE WORK
 
Runway resurfacing ppt
Runway resurfacing ppt Runway resurfacing ppt
Runway resurfacing ppt
 
Equipments for tunnels- Special equipments
Equipments for tunnels- Special equipmentsEquipments for tunnels- Special equipments
Equipments for tunnels- Special equipments
 
TM 5-272
TM 5-272TM 5-272
TM 5-272
 

Semelhante a Suportes E Catwalks

Escalator replacement specifications rev 2 consolidated comments
Escalator replacement specifications   rev 2 consolidated commentsEscalator replacement specifications   rev 2 consolidated comments
Escalator replacement specifications rev 2 consolidated commentsgulilero
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural DrawingsTodd Mordoh
 
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Patrice Adjei
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.pptssuser523d4d
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.pptssuser523d4d
 
Nepal bridge standards 2067
Nepal bridge standards 2067Nepal bridge standards 2067
Nepal bridge standards 2067Mani Das
 
Fall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardFall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardJohn Newquist
 
Lift elevator work procedures - types, checklist, precautions, maintenance
Lift elevator work procedures - types, checklist, precautions, maintenanceLift elevator work procedures - types, checklist, precautions, maintenance
Lift elevator work procedures - types, checklist, precautions, maintenanceAkshayKamble94
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationShuBham RaNa
 
CES Bridge Building Rules & Tips 2010
CES Bridge Building Rules & Tips 2010CES Bridge Building Rules & Tips 2010
CES Bridge Building Rules & Tips 2010andyoreta
 
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.pptSCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.pptzubersana
 
Scaffolding
ScaffoldingScaffolding
ScaffoldingFFSafety
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 

Semelhante a Suportes E Catwalks (20)

Escalator replacement specifications rev 2 consolidated comments
Escalator replacement specifications   rev 2 consolidated commentsEscalator replacement specifications   rev 2 consolidated comments
Escalator replacement specifications rev 2 consolidated comments
 
2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings2014-05-12 255 138th Street NYCTA Structural Drawings
2014-05-12 255 138th Street NYCTA Structural Drawings
 
26 metal scaffolds
26 metal scaffolds26 metal scaffolds
26 metal scaffolds
 
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
Guidelines on technical_specifications_for_the_installation_of_telecommunicat...
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
C.3.7 ladders
C.3.7 laddersC.3.7 ladders
C.3.7 ladders
 
Nepal bridge standards 2067
Nepal bridge standards 2067Nepal bridge standards 2067
Nepal bridge standards 2067
 
Nepal bridge standards 2067
Nepal bridge standards 2067Nepal bridge standards 2067
Nepal bridge standards 2067
 
Mechanical
Mechanical Mechanical
Mechanical
 
Fall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardFall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standard
 
Lift elevator work procedures - types, checklist, precautions, maintenance
Lift elevator work procedures - types, checklist, precautions, maintenanceLift elevator work procedures - types, checklist, precautions, maintenance
Lift elevator work procedures - types, checklist, precautions, maintenance
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Stairs
StairsStairs
Stairs
 
CES Bridge Building Rules & Tips 2010
CES Bridge Building Rules & Tips 2010CES Bridge Building Rules & Tips 2010
CES Bridge Building Rules & Tips 2010
 
SCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.pptSCHEDULE OF DIMENSIONS.ppt
SCHEDULE OF DIMENSIONS.ppt
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 

Último

Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Último (20)

Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Suportes E Catwalks

  • 1. 22.14 Quality of galvanizing a) Galvanizing shall be in accordance to ASTM A 123 7.4.2 and ASTMA 153 8.4.2 b) Minimum thickness of zinc cover shall be 0,05mm 22.15 Quality of painting a) All painting shall be applied with electrostatic process b) Paint shall be type EPOXI c) Paint thickness shall not be less than 0,15 mm 22.16 Hangers and Support Structures 22.16.1General The Client will provide the primary support structure to support conveyors especially in the area where conveyors are installed above the ceiling of arrival area and where conveyors are declining from check in to the baggage hall. Each fixing attached to the building shall be evaluated and approved by an structural engineer. Take special consideration to use correct supports for conveyors due to the special Building design because of an elevated possibility of seismic activities. In case of an earthquake event the special supports of the Building foundations will absorb the major movement of the ground; therefore solid connections between Building foundation and upper floors are not permitted.  All equipment fixed to the floor -6,6m is not protected by special shock absorbers and will receive the full acceleration force up to 400 cm/sec2.  Relative movement of basement foundation (-6,60m) and building ceiling (-0,40m) could be up to 0,45m in case of earthquake  Relative movement of building above the shock absorbers (-0,40m arrivals) and check in level (+7,60m) could be up to 0,05m in case of earthquake NOTE The Client will only provide the primary support structure indicated in the enclosed drawings; all structure which is necessary additional to operate and maintain the Systems shall be supplied by the BHS supplier. The BHS Supplier shall provide as a minimum the following catwalks and stairs:
  • 2. System A CAW-AS1 CAW-A1 CAW-A2 CAW-A3 CAW-A4 CAW-A5 CAW-A6 CAW-A7 CAW-A8 System B CAW-BS1 CAW-B1 CAW-B2 CAW-B3 System C CAW-C1 CAW-C2 System D CAW-D1 22.16.2Supports a) Maximum distance of supports at Conveyors shall be 3000mm maximum centre 22.16.3Support Material a) All floor supports shall be of standard "H" type design with vertical adjustment of +/ total of 75mm. Floor support vertical members shall be constructed of #10 gauge, hot rolled formed steel channel with heavy-duty foot and head plates. 22.16.4Hangers a) Ceiling hangers of threaded rod shall have a minimum diameter of 20 mm with structural angle or channel sills. The hangers have provisions for anchoring to the ceiling structure. Threaded rods shall have: a single washer and a single nut above and a star type lock washer a single washer and a single nut below the structural angle. b) Fixing on concrete ceiling shall be in according to the enclosed drawing :  EVN-388-BHS-006-00 The threads of the all thread rod shall be: a) Deformed below the lowest nut to prevent unthreading. This may be accomplished by using a flat punch and a hammer.
  • 3. b) Cut to within 20mm of the button of the lowest nut (hanger rods). In areas where operational and/or maintenance personnel have access. 22.16.5Sway bracing a) All conveyors shall be adequately sway braced in both the lateral and longitudinal directions as required by local engineering and seismic design codes 22.16.6Access ways a) Installation and layout of header steel shall not pose interference to maintenance and operational access, such as clearing jams. All support structure shall be designed and installed so that maintenance access to conveyor components shall not be inhibited 22.16.7Anchors a) Shall be of the Chemical Set or the Expandable Type. Explosive type anchors shall be not to be used. 22.17 Catwalks 22.17.1General a) Where catwalks are specified, the conveyor and adjacent catwalks shall be supported by a common sill. 22.17.2Requirement a) The enclosed Specification is indicating the minimum necessary catwalks, but nevertheless the BHS supplier shall provide appropriate catwalks, work platforms and access ladders for operational access (clearing of jams) and minor maintenance. Where possible the maintenance access catwalks shall be connected with catwalk walkways to eliminate the need for ladders at all access points. The extent of the catwalks, access ways, Bridges, platforms, ladders and swingovers shall be shown on the Tenderer layout drawings. 22.17.3Design Load a) The catwalk working live load shall be 146 kg per square meter with a concentrated load of 227kg in 0.5 square metres. 22.17.4Supports a) All Catwalks shall be adequately sway braced in both the lateral and longitudinal directions as required by local engineering and seismic design codes
  • 4. 22.17.5Construction a) Access ladders and catwalks shall be constructed with a walking surface of 5mm gauge check plate or web grating with a galvanized or painted finish and if required painted to clients specification 22.17.6Width a) Minimum catwalk width shall be nominally 600mm with a 50mm gap between the catwalk and the conveyor, unless otherwise specified. 22.17.7Surface a) Level catwalks shall have a grated expanded mesh surface. Therefore inclined catwalks of up to 8° shall be equipped with an anti skid surface. 22.17.8Inclined Catwalks a) Catwalks of greater than 8° shall be stepped, as well as equipped with anti skid surface. 22.17.9Handrails a) Handrails shall be installed on all platforms and catwalks except on sides adjacent to conveyors. 22.17.10 Toe Kick a) Platforms and catwalks shall have 50mm high toe boards except where they might interfere with access to a conveyor or at any entrance/exit location of the catwalk. 22.17.11 OSHA Standards a) All platforms, catwalks and ladders shall comply with European Agency for Safety and Health at Work (EU-OSHA) standards. 22.17.12 Access ways a) For access to the catwalks ladders shall if possible be located a maximum of 30 meters apart and positioned so as to not hinder traffic lanes or walkways. 22.17.13 Pull-down ladders a) Pull-down ladders for catwalk access may be used where fixed ladders cannot be installed due to traffic or staging conditions.
  • 5. 22.17.14 Fixed Vertical Ladders a) Design of ladders shall meet or exceed OSHA 1910.27. b) All fixed ladders shall be of steel construction. c) The distance between rungs shall be no more than 300mm and be uniform throughout the height of the ladder. All rungs shall have a minimum diameter of 20mm and withstand a 180 kg load when in use. All rungs shall be a minimum of 380 wide. The live loads imposed by personnel occupying the ladder shall be considered to be concentrated at such points as shall cause the maximum stress in the structural member being considered. d) Tenderer shall generally allow a minimum of 100mm between the back of the ladder and the nearest permanent object. A minimum of 760mm shall be allowed between the front of the ladder and the nearest permanent object. 380mm shall be allowed from the center of the ladder to the nearest object on each side. The step across distance from the nearest ladder edge to the nearest equipment or structure edge a minimum of 63mm and shall not exceed 300mm. e) Side rails shall be of such cross section as to afford adequate gripping surface without sharp edges or burrs. f) Tenderer shall provide protective guards (i.e., chains) at the top of ladders. g) Tenderer shall Grind smooth all rough surfaces and edges. h) All fixed vertical ladders shall be painted in safety yellow. 22.17.15 Ship's Ladders a) Tenderer shall provide fixed steel ship's ladders to access platforms and walkways as shown on the contract drawings. b) Design ladders shall meet or exceed OSHA 1910.27. c) All ship's ladders shall be of steel construction. d) Tenderer shall provide steel stringers using minimum 150mm channel. Tenderer shall design the ladder so that the angle between the stringer and the floor shall not be less than 60° and not more than 65°. The distance between treads shall be a maximum of 300mm is uniform throughout the height of the ladder. e) Handrails shall be fitted to both sides using 32NB tubing.
  • 6. f) Tenderer shall provide protective guards (i.e., chains) at the top of ladders. g) Tenderer shall Grind smooth all rough surfaces and edges. h) Tenderer shall paint all ship ladders in safety yellow.