SlideShare uma empresa Scribd logo
1 de 32
NPP VIIRS Pre-Launch Performance and SDR Validation Frank De Luccia, The Aerospace Corporation, El Segundo, CA Bruce Guenther, NOAA - Joint Polar Satellite System, Goddard Space Flight Center, Greenbelt, MD Chris Moeller, University of Wisconsin, Madison, WI, XiaoxiongXiongand Robert Wolfe ,  NASA’s Goddard Space Flight Center, Greenbelt, MD 2011 IEEE International Geoscience and Remote Sensing Symposium (IGARSS) 24-29 July, Vancouver, Canada
Topics Instrument Background Pre-Launch Performance  Comparisons to MODIS Aqua as reference Spectral characteristics Spatial characteristics  Radiometric sensitivity - SNR and NEdT Polarization sensitivity Performance summary and issues   SDR Validation  Calibration and Validation (Cal/Val) team Cal/Val plans and task structure Principal activities per Cal/Val phase Summary  2
Instrument Background
Instrument Background NPP VIIRS manufactured by Raytheon under subcontract to Northrop Grumman for NPOESS NPP instruments now under JPSS program management VIIRS design draws on MODIS heritage MODIS also built by Raytheon (SBRS) On-board calibrators and calibration strategy very similar 4
Instrument Background – cont’d 5
Environmental Data Products (EDRs) Derived from VIIRS Sensor Data Records (SDRs) * *  Key Performance Parameter (KPP) **  Intermediate Product (not an EDR) 6
Pre-Launch Performance
VIIRS Spectral Characteristics VIIRS has 22 bands from 0.4 m to 12.5 m (8 dual gain) 7 moderate resolution, 2 imaging resolution and 1 broadband day/night band in 0.4 to 1.0 m  range 6 moderate resolution and 2 imaging resolution bands in 1 to 5 m  range 3 moderate resolution and 1 imaging resolution bands in 5 to 15 m  range 8
VIIRS Spatial Characteristics 16 moderate resolution bands with 750 m footprint at nadir 5 imaging resolution bands with 375 m footprint at nadir 1 DNB with 750 m footprint constant across scan. Pixel aggregation used to control footprint growth across scan.  9
VIIRS Radiometric Sensitivity VIIRS SNR and NEdT are comparable or  superior to MODIS SNR and NEdT when normalized to the same spatial scale and the same radiance level 10
VIIRS Polarization Sensitivity VIIRS polarization performance is generally better than that of MODIS.   Unlike MODIS, NPP VIIRS polarization sensitivity varies strongly with field angle  resulting in detector dependence.   VIIRS pre-launch characterization provides high-quality, per-pixel characterization of polarization sensitivity and phase for use in data product processing.  11
Performance Summary and Issues VIIRS performance is comparable or superior to that of MODIS Aqua in corresponding bands in all key performance areas except crosstalk and out-of-band spectral response.   NPP VIIRS has optical crosstalk in the VisNIR (0.8% average) due to high angle scattering in the spectral filters May impact Ocean Color/Chlorophyll and Aerosol data products.   NPP VIIRS out-of-band (OOB) spectral response somewhat higher than MODIS Aqua due to same scattering mechanism in filters Second and subsequent VIIRS flight units will have reduced optical crosstalk and OOB response due to improved spectral filters.  VIIRS polarization sensitivity is lower than that of MODIS Aqua but is detector dependent Requires per-pixel correction in Ocean Color processing Banding effects in SDRs displayed as images In other key performance areas not addressed here, such as band-to-band registration, near-field response and stray light response, VIIRS performance compares favorably with that of MODIS Aqua.  12
SDR Validation
VIIRS SDR Cal/Val Team 14
Evolution of VIIRS Calibration and Validation Plans  On-orbit cal/val tasks were defined in an intensive government-contractor team collaboration Cal/val strategies draw heavily on MODIS experience Inputs on specific activities distilled into 54 tasks  VIIRS SDR Calibration Plan produced and peer reviewed in 2009 Comprehensive description of VIIRS calibration program Describes team, team interactions, tasks, tools and ground truth resources Maps cal/val activities into cal/val phases Provides metrics for evaluating SDR product maturity VIIRS SDR Calibration/Validation Operations Concept (OPSCON) Document developed in 2011  Infrastructure support definition Data flow and process definition to support cal/val rehearsals  Managerial leadership has transitioned to Changyong Cao of NOAA STAR Roles and responsibilities  have evolved to reflect increased participation of NOAA STAR 15
Six Broad Categories of On-Orbit Cal/Val Tasks Functional Performance and Format Evaluation (FPF 1-7) FPF tasks involve evaluating instrument functions and verifying the correctness of data formats.  Performed early in the mission, and will not be repeated unless the instrument suffers a catastrophic event. Calibration System Evaluation (CSE 1-6) CSE tasks evaluate the performance of the onboard calibration system and update the calibration algorithm databases accordingly. Image Quality Evaluation (IMG 1-4) IMG tasks evaluate the quantitative and qualitative spatial performance characteristics of the instrument.  Radiometric Evaluation (RAD 1-25) RAD tasks evaluate the radiometric performance of the data product algorithm.  Radiometric evaluation will include evaluation of spectral characteristics since changes in these characteristics relative to the pre-launch baseline will mainly manifest themselves as in-band radiometric errors.  Geolocation Evaluation (GEO 1-7) GEO tasks evaluate the geolocation accuracy of the data product. Performance and Telemetry Trending (PTT 1-5) PTT tasks evaluate long-term changes in the performance of both the instrument and the data product. 16
Pre-Launch Activities Continued analysis and refinement of performance baseline based on test program Verification of at-launch SDR algorithm look-up tables (LUTs) Improvements where warranted Operational code review and error checking Cal/val tool development RDR and SDR readers, LUT readers/writers Custom tools for cal/val analysis tasks Practice and training in operation of VIIRS SDR operational code Algorithm Development Library (ADL) version of code allows cal/val team to modify and test LUT updates and potential algorithm improvements Task rehearsals to demonstrate readiness for on-orbit cal/val 17
Early Orbit Checkout (EOC) Verify instrument operability and functionality Signal  Noise Scan rate Compare signal and noise characteristics to pre-launch baseline Verify RDR, SDR and intermediate product formats and validity of content Early use of Solar Diffuser Stability Monitor Critical for beginning time series to trend change in Solar Diffuser reflectance 18
Intensive Calibration & Validation (ICV) Radiance match-ups Ground sites Inter-satellite comparisons Comparisons with Cross-Track Infrared Sounder (CrIS) Aircraft underflights Geolocation match-ups Ground Control Points (GCPs) from Landsat Feedback on SDR quality from EDR validation efforts Maneuvers Exploitation of lunar data SDR algorithm tuning and LUT updates Continued performance and telemetry trending 19 Objective is achievement of stable, “validated/calibrated” SDRs by end of ICV.
Long-Term Monitoring (LTM) Routine performance of reflective band off-line calibration  Periodic measurement and trending of key instrument characteristics Operability Noise/SNR Gains Critical temperatures, voltages, currents in telemetry Periodic repetition of ICV tasks to maintain calibration and SDR quality Radiometry Geolocation 20
21 VIIRS Cal/Val Activitiesby Phase
SDR Product Maturity Levels Beta Early release product, initial calibration applied, minimally validated and may still contain significant errors  Available to allow users to gain familiarity with data formats and parameters  Product is not appropriate as the basis for quantitative scientific publications studies and applications Provisional Product quality may not be optimal  Incremental product improvements are still occurring as calibration parameters are adjusted with sensor on-orbit characterization General research community is encouraged to participate in the QA and validation of the product, but need to be aware that product validation and QA are ongoing  Users are urged to contact NPP Cal/Val Team representatives prior to use of the data in publications  Validated/Calibrated On-orbit sensor performance characterized and calibration parameters adjusted accordingly Ready for use by the Centrals, and in scientific publications There may be later improved versions 22
Inter-Satellite Comparisons Analysis of Simultaneous Nadir Overpass (SNO) data from VIIRS and other satellites will reveal relative biases Off-nadir inter-satellite comparisons will be exploited also, particularly to evaluate Response vs Scan Angle effects Leverages validation performed for other satellite systems VIIRS/MODIS comparisons expected to be particularly useful MODIS instruments well validated Many similar bands with similar radiometric performance MODIS Terra/AVHRR 11 m Band Comparison (Xiong et al., CEOS-IVOS 2004) 23
CrIS-VIIRS Cal/Val (heritage AIRS-MODIS) 24 Abundant matchups  on every Aqua orbit. 14 orbits per day (>10E6 matchups/day) Radiometric performance as function of scene temperature AIRS footprints overlain  on MODIS image.  Filter the sample to retain  spatially uniform scenes. Radiometric performance as function of scan mirror angle
Use of Maneuvers for VIIRS SDR Validation (1) S/C Maneuvers for VIIRS Calibration   Scientific benefits and implementation strategies are based on lessons and experience from heritage missions and sensors, such as MODIS and SeaWiFS All 3 types of VIIRS maneuvers have been approved for the NPP mission Roll Maneuvers Near monthly event with lunar phase angles at 55 degree and roll angles less than -14 degrees   Provide an accurate and long-term monitoring of VIIRS RSB calibration stability and independent monitoring of SD degradation Yaw Maneuvers Once during initial S/C checkout; could repeat every 3 years depending on the SD degradation rate     Validate SD solar attenuation screen (SAS) and SDSM sun view screen transmission as a function of solar illumination angles and assure VIIRS SDR quality for the RSB 25
Use of Maneuvers for VIIRS SDR Validation (2) Pitch Maneuvers Once during initial S/C checkout; could repeat depending on scan-angle dependent changes in TEB responses Validate sensor response versus scan angle (RVS) and assure VIIRS SDR quality for the TEB Operation and Data Analysis Support Maneuver implementation working group established to coordinate among different groups (and instruments)  VIIRS maneuver data analysis tools developed primarily from MODIS experience 26
Use of Lunar Data for VIIRS SDR Validation (1) Track Changes in Sensor Responses for VIIRS Reflective Solar Bands Both MODIS and SeaWiFS have used lunar time series to track changes in sensor responses; lunar viewing geometry corrections are made using ROLO lunar model  Provide Independent Monitoring of VIIRS Solar Diffuser  Degradation The angle of incidence (AOI) of VIIRS space view, through which the lunar observations are made, is identical to the AOI of SD observations Enable Calibration Inter-comparison with Other Sensors (e.g. MODIS) This is similar to the effort made to inter-compare Terra and Aqua MODIS, MODIS and SeaWiFS 27
Use of Lunar Data for VIIRS SDR Validation (2) SeaWiFS Normalized Lunar Radiance Terra and Aqua MODIS B1 Lunar Irradiance 28
VIIRS Geolocation Matchups Example of first 90 days of control point matchups from MODIS/Terra Good (> 60% normalized cross correlation) control point matchups per day: 260 Used to perform initial refinement of instrument to spacecraft alignment and to refine rotating telescope and half angle mirror geometric parameters 29 Number of Control Point Matchups Track Residuals (nadir adjusted) Scan Residuals (nadir adjusted)
Aircraft Campaigns Aircraft underflights can provide high quality radiometric validation across the VIIRS spectrum Direct observations of the integrated upwelling earth scene radiance in nearly same time, space, and geometry as the on-orbit sensor NIST traceable uncertainties for some airborne instruments Approach based upon heritage validation of AIRS, MODIS, IASI. Preliminary plans for aircraft campaigns have been developed but are currently “on hold” due to funding constraints  Platforms:  ER-2 and/or WB-57 Instruments desired for VIIRS SDR validation Enhanced MODIS Airborne Simulator (EMAS) 50 channel Vis/IR spectrometer, 50 m resolution, 36 km swath  Expected to include reflective solar band (RSB) Hyperspectral Imager (HSI) Scanning High-resolution Interferometer Sounder (SHIS) Scanning M/LWIR 0.5 cm-1 interferometer, 2 km resolution, 32 km swath NIST traceable calibration NPOESS Airborne Sounder Testbed (NAST-I)  Scanning MWIR/LWIR interferometer, 2km resolution, 40 km swath NIST traceable calibration Cloud Physics Lidar (CPL)  Micropulse dual polarization lidar, 15 m resolution, nadir only 30
31 11.01 um MODIS on  Terra/Aqua SHIS, etc. on ER-2 705 km 20 km q Approach based upon heritage efforts for AIRS and MODIS Histogram of radiometric matchups Fly instrumented ER-2 along satellite track Matching geometry of earth scene observations
Summary VIIRS calibration and validation plans draw heavily on MODIS strategies and  experience Similar data products Similar on-board calibrators Similar radiometric and geolocation retrieval approaches VIIRS pre-launch performance baseline very well established Extensive instrument characterization provided in test program Independent data analysis by multiple contractor and government teams has provided highly reliable parameter values for SDR algorithm LUTs Experienced, multi-organization calibration/validation team is well prepared to execute VIIRS on-orbit validation 32

Mais conteúdo relacionado

Mais procurados

Andrew.petro
Andrew.petroAndrew.petro
Andrew.petroNASAPMC
 
Thomas.sutliff
Thomas.sutliffThomas.sutliff
Thomas.sutliffNASAPMC
 
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEWTH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEWgrssieee
 
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...Michael LaMarr
 
Overview of NASA JSC White Sands Test Facility (WSTF)
Overview of NASA JSC White Sands Test Facility (WSTF)Overview of NASA JSC White Sands Test Facility (WSTF)
Overview of NASA JSC White Sands Test Facility (WSTF)dlnv2iz
 
DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0Kuishon Brown
 
Robertson.brent
Robertson.brentRobertson.brent
Robertson.brentNASAPMC
 
Ground penetrating radar
Ground penetrating radarGround penetrating radar
Ground penetrating radarkasarlanaga
 
APM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudyAPM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudySergio A. Guerra
 
Boyer.roger
Boyer.rogerBoyer.roger
Boyer.rogerNASAPMC
 
Zebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint PresentationZebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint PresentationZEBRA Environmental
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaGlobal CCS Institute
 
Non Destructive Testing Using GPR
Non Destructive Testing Using GPRNon Destructive Testing Using GPR
Non Destructive Testing Using GPRAli Baluwala
 
West Med Seismic Survey Project Report - June 2009
West Med Seismic Survey Project Report - June 2009 West Med Seismic Survey Project Report - June 2009
West Med Seismic Survey Project Report - June 2009 Victoria Oil and Gas Plc
 
WE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADAR
WE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADARWE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADAR
WE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADARgrssieee
 
Huang_IGARSS2011_VIIRS_Aerosol_JH_20110727.ppt
Huang_IGARSS2011_VIIRS_Aerosol_JH_20110727.pptHuang_IGARSS2011_VIIRS_Aerosol_JH_20110727.ppt
Huang_IGARSS2011_VIIRS_Aerosol_JH_20110727.pptgrssieee
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...Global CCS Institute
 

Mais procurados (20)

Andrew.petro
Andrew.petroAndrew.petro
Andrew.petro
 
moscow
moscowmoscow
moscow
 
Thomas.sutliff
Thomas.sutliffThomas.sutliff
Thomas.sutliff
 
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEWTH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
TH3.L10.1: THE NASA SOIL MOISTURE ACTIVE PASSIVE (SMAP) MISSION: OVERVIEW
 
Ianson
IansonIanson
Ianson
 
I Hcantabria Datasets
I Hcantabria DatasetsI Hcantabria Datasets
I Hcantabria Datasets
 
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...
 
Overview of NASA JSC White Sands Test Facility (WSTF)
Overview of NASA JSC White Sands Test Facility (WSTF)Overview of NASA JSC White Sands Test Facility (WSTF)
Overview of NASA JSC White Sands Test Facility (WSTF)
 
DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0DiagnosticsOverview_CP_CDR_Rev0
DiagnosticsOverview_CP_CDR_Rev0
 
Robertson.brent
Robertson.brentRobertson.brent
Robertson.brent
 
Ground penetrating radar
Ground penetrating radarGround penetrating radar
Ground penetrating radar
 
APM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research StudyAPM Subcommmittee Update on PRIME2 Research Study
APM Subcommmittee Update on PRIME2 Research Study
 
Boyer.roger
Boyer.rogerBoyer.roger
Boyer.roger
 
Zebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint PresentationZebra - TRIAD-ES Joint Presentation
Zebra - TRIAD-ES Joint Presentation
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Non Destructive Testing Using GPR
Non Destructive Testing Using GPRNon Destructive Testing Using GPR
Non Destructive Testing Using GPR
 
West Med Seismic Survey Project Report - June 2009
West Med Seismic Survey Project Report - June 2009 West Med Seismic Survey Project Report - June 2009
West Med Seismic Survey Project Report - June 2009
 
WE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADAR
WE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADARWE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADAR
WE3.L10.3: THE FUTURE OF SPACEBORNE SYNTHETIC APERTURE RADAR
 
Huang_IGARSS2011_VIIRS_Aerosol_JH_20110727.ppt
Huang_IGARSS2011_VIIRS_Aerosol_JH_20110727.pptHuang_IGARSS2011_VIIRS_Aerosol_JH_20110727.ppt
Huang_IGARSS2011_VIIRS_Aerosol_JH_20110727.ppt
 
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...Apec workshop 2 presentation 13  r wright apec-gccsi  engineering disclipines...
Apec workshop 2 presentation 13 r wright apec-gccsi engineering disclipines...
 

Semelhante a 1 NPP VIIRS Pre-Launch Performance and SDR Validation- IGARSS 2011.pptx

IGARSS 2011_Priestley.ppt
IGARSS 2011_Priestley.pptIGARSS 2011_Priestley.ppt
IGARSS 2011_Priestley.pptgrssieee
 
IGARSS_DESDynI_2011.pptx
IGARSS_DESDynI_2011.pptxIGARSS_DESDynI_2011.pptx
IGARSS_DESDynI_2011.pptxgrssieee
 
TU2.T10.1.pptx
TU2.T10.1.pptxTU2.T10.1.pptx
TU2.T10.1.pptxgrssieee
 
1 IGARSS 2011 JPSS Monday Goldberg.pptx
1 IGARSS 2011 JPSS Monday Goldberg.pptx1 IGARSS 2011 JPSS Monday Goldberg.pptx
1 IGARSS 2011 JPSS Monday Goldberg.pptxgrssieee
 
Vicarious Radiometric Calibration
Vicarious Radiometric CalibrationVicarious Radiometric Calibration
Vicarious Radiometric CalibrationBetsy Kenaston
 
WE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATION
WE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATIONWE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATION
WE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATIONgrssieee
 
Radiometric Calibration of Digital Images
Radiometric Calibration of Digital ImagesRadiometric Calibration of Digital Images
Radiometric Calibration of Digital ImagesSean Thibert
 
A Precision Flight Test Application of a Differential Global Positioning Syst...
A Precision Flight Test Application of a Differential Global Positioning Syst...A Precision Flight Test Application of a Differential Global Positioning Syst...
A Precision Flight Test Application of a Differential Global Positioning Syst...Mark Hardesty
 
IGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.pptIGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.pptgrssieee
 
Navy Integrated Tactical Environmental System (NITES2)
Navy Integrated Tactical Environmental System (NITES2)Navy Integrated Tactical Environmental System (NITES2)
Navy Integrated Tactical Environmental System (NITES2)guest4a1658
 
4 ROMAN_IGARSS'11.ppt
4 ROMAN_IGARSS'11.ppt4 ROMAN_IGARSS'11.ppt
4 ROMAN_IGARSS'11.pptgrssieee
 
Two-year assessment of Nowcasting performance in the CASA system
Two-year assessment of Nowcasting performance in the CASA systemTwo-year assessment of Nowcasting performance in the CASA system
Two-year assessment of Nowcasting performance in the CASA systemgrssieee
 
PR5 IGARSS_2011_MODIS.ppt
PR5  IGARSS_2011_MODIS.pptPR5  IGARSS_2011_MODIS.ppt
PR5 IGARSS_2011_MODIS.pptgrssieee
 
Developmental Test & Evaluation of Helicopters Using a Precision Differential...
Developmental Test & Evaluation of Helicopters Using a Precision Differential...Developmental Test & Evaluation of Helicopters Using a Precision Differential...
Developmental Test & Evaluation of Helicopters Using a Precision Differential...Mark Hardesty
 
The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...
The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...
The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...Mark Hardesty
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnavcochez
 
Small-Scale Payload Operations Simulator for Proximity Operations Paper
Small-Scale Payload Operations Simulator for Proximity Operations PaperSmall-Scale Payload Operations Simulator for Proximity Operations Paper
Small-Scale Payload Operations Simulator for Proximity Operations PaperJared Cokley
 
Raymetrics at Open Coffee Athens #92
Raymetrics at Open Coffee Athens #92Raymetrics at Open Coffee Athens #92
Raymetrics at Open Coffee Athens #92Open Coffee Greece
 

Semelhante a 1 NPP VIIRS Pre-Launch Performance and SDR Validation- IGARSS 2011.pptx (20)

IGARSS 2011_Priestley.ppt
IGARSS 2011_Priestley.pptIGARSS 2011_Priestley.ppt
IGARSS 2011_Priestley.ppt
 
GPS IN AVIATION SYSTEM
GPS IN AVIATION SYSTEMGPS IN AVIATION SYSTEM
GPS IN AVIATION SYSTEM
 
IGARSS_DESDynI_2011.pptx
IGARSS_DESDynI_2011.pptxIGARSS_DESDynI_2011.pptx
IGARSS_DESDynI_2011.pptx
 
TU2.T10.1.pptx
TU2.T10.1.pptxTU2.T10.1.pptx
TU2.T10.1.pptx
 
1 IGARSS 2011 JPSS Monday Goldberg.pptx
1 IGARSS 2011 JPSS Monday Goldberg.pptx1 IGARSS 2011 JPSS Monday Goldberg.pptx
1 IGARSS 2011 JPSS Monday Goldberg.pptx
 
Vicarious Radiometric Calibration
Vicarious Radiometric CalibrationVicarious Radiometric Calibration
Vicarious Radiometric Calibration
 
vermote.pptx
vermote.pptxvermote.pptx
vermote.pptx
 
WE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATION
WE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATIONWE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATION
WE1.L10 - USE OF NASA DATA IN THE JOINT CENTER FOR SATELLITE DATA ASSIMILATION
 
Radiometric Calibration of Digital Images
Radiometric Calibration of Digital ImagesRadiometric Calibration of Digital Images
Radiometric Calibration of Digital Images
 
A Precision Flight Test Application of a Differential Global Positioning Syst...
A Precision Flight Test Application of a Differential Global Positioning Syst...A Precision Flight Test Application of a Differential Global Positioning Syst...
A Precision Flight Test Application of a Differential Global Positioning Syst...
 
IGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.pptIGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.ppt
 
Navy Integrated Tactical Environmental System (NITES2)
Navy Integrated Tactical Environmental System (NITES2)Navy Integrated Tactical Environmental System (NITES2)
Navy Integrated Tactical Environmental System (NITES2)
 
4 ROMAN_IGARSS'11.ppt
4 ROMAN_IGARSS'11.ppt4 ROMAN_IGARSS'11.ppt
4 ROMAN_IGARSS'11.ppt
 
Two-year assessment of Nowcasting performance in the CASA system
Two-year assessment of Nowcasting performance in the CASA systemTwo-year assessment of Nowcasting performance in the CASA system
Two-year assessment of Nowcasting performance in the CASA system
 
PR5 IGARSS_2011_MODIS.ppt
PR5  IGARSS_2011_MODIS.pptPR5  IGARSS_2011_MODIS.ppt
PR5 IGARSS_2011_MODIS.ppt
 
Developmental Test & Evaluation of Helicopters Using a Precision Differential...
Developmental Test & Evaluation of Helicopters Using a Precision Differential...Developmental Test & Evaluation of Helicopters Using a Precision Differential...
Developmental Test & Evaluation of Helicopters Using a Precision Differential...
 
The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...
The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...
The Use of GPS Tracking & Guidance Systems for the Chicken LIttle Joint Proje...
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnav
 
Small-Scale Payload Operations Simulator for Proximity Operations Paper
Small-Scale Payload Operations Simulator for Proximity Operations PaperSmall-Scale Payload Operations Simulator for Proximity Operations Paper
Small-Scale Payload Operations Simulator for Proximity Operations Paper
 
Raymetrics at Open Coffee Athens #92
Raymetrics at Open Coffee Athens #92Raymetrics at Open Coffee Athens #92
Raymetrics at Open Coffee Athens #92
 

Mais de grssieee

Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...grssieee
 
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODELSEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODELgrssieee
 
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...grssieee
 
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIESTHE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIESgrssieee
 
GMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUSGMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUSgrssieee
 
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETERPROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETERgrssieee
 
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...grssieee
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...grssieee
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...grssieee
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...grssieee
 
test 34mb wo animations
test  34mb wo animationstest  34mb wo animations
test 34mb wo animationsgrssieee
 
2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdf2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdfgrssieee
 
DLR open house
DLR open houseDLR open house
DLR open housegrssieee
 
DLR open house
DLR open houseDLR open house
DLR open housegrssieee
 
DLR open house
DLR open houseDLR open house
DLR open housegrssieee
 
Tana_IGARSS2011.ppt
Tana_IGARSS2011.pptTana_IGARSS2011.ppt
Tana_IGARSS2011.pptgrssieee
 
Solaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.pptSolaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.pptgrssieee
 

Mais de grssieee (20)

Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
Tangent height accuracy of Superconducting Submillimeter-Wave Limb-Emission S...
 
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODELSEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
SEGMENTATION OF POLARIMETRIC SAR DATA WITH A MULTI-TEXTURE PRODUCT MODEL
 
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
TWO-POINT STATISTIC OF POLARIMETRIC SAR DATA TWO-POINT STATISTIC OF POLARIMET...
 
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIESTHE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
THE SENTINEL-1 MISSION AND ITS APPLICATION CAPABILITIES
 
GMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUSGMES SPACE COMPONENT:PROGRAMMATIC STATUS
GMES SPACE COMPONENT:PROGRAMMATIC STATUS
 
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETERPROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
PROGRESSES OF DEVELOPMENT OF CFOSAT SCATTEROMETER
 
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
DEVELOPMENT OF ALGORITHMS AND PRODUCTS FOR SUPPORTING THE ITALIAN HYPERSPECTR...
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
 
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
EO-1/HYPERION: NEARING TWELVE YEARS OF SUCCESSFUL MISSION SCIENCE OPERATION A...
 
Test
TestTest
Test
 
test 34mb wo animations
test  34mb wo animationstest  34mb wo animations
test 34mb wo animations
 
Test 70MB
Test 70MBTest 70MB
Test 70MB
 
Test 70MB
Test 70MBTest 70MB
Test 70MB
 
2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdf2011_Fox_Tax_Worksheets.pdf
2011_Fox_Tax_Worksheets.pdf
 
DLR open house
DLR open houseDLR open house
DLR open house
 
DLR open house
DLR open houseDLR open house
DLR open house
 
DLR open house
DLR open houseDLR open house
DLR open house
 
Tana_IGARSS2011.ppt
Tana_IGARSS2011.pptTana_IGARSS2011.ppt
Tana_IGARSS2011.ppt
 
Solaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.pptSolaro_IGARSS_2011.ppt
Solaro_IGARSS_2011.ppt
 

Último

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 

Último (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 

1 NPP VIIRS Pre-Launch Performance and SDR Validation- IGARSS 2011.pptx

  • 1. NPP VIIRS Pre-Launch Performance and SDR Validation Frank De Luccia, The Aerospace Corporation, El Segundo, CA Bruce Guenther, NOAA - Joint Polar Satellite System, Goddard Space Flight Center, Greenbelt, MD Chris Moeller, University of Wisconsin, Madison, WI, XiaoxiongXiongand Robert Wolfe , NASA’s Goddard Space Flight Center, Greenbelt, MD 2011 IEEE International Geoscience and Remote Sensing Symposium (IGARSS) 24-29 July, Vancouver, Canada
  • 2. Topics Instrument Background Pre-Launch Performance Comparisons to MODIS Aqua as reference Spectral characteristics Spatial characteristics Radiometric sensitivity - SNR and NEdT Polarization sensitivity Performance summary and issues SDR Validation Calibration and Validation (Cal/Val) team Cal/Val plans and task structure Principal activities per Cal/Val phase Summary 2
  • 4. Instrument Background NPP VIIRS manufactured by Raytheon under subcontract to Northrop Grumman for NPOESS NPP instruments now under JPSS program management VIIRS design draws on MODIS heritage MODIS also built by Raytheon (SBRS) On-board calibrators and calibration strategy very similar 4
  • 6. Environmental Data Products (EDRs) Derived from VIIRS Sensor Data Records (SDRs) * * Key Performance Parameter (KPP) ** Intermediate Product (not an EDR) 6
  • 8. VIIRS Spectral Characteristics VIIRS has 22 bands from 0.4 m to 12.5 m (8 dual gain) 7 moderate resolution, 2 imaging resolution and 1 broadband day/night band in 0.4 to 1.0 m range 6 moderate resolution and 2 imaging resolution bands in 1 to 5 m range 3 moderate resolution and 1 imaging resolution bands in 5 to 15 m range 8
  • 9. VIIRS Spatial Characteristics 16 moderate resolution bands with 750 m footprint at nadir 5 imaging resolution bands with 375 m footprint at nadir 1 DNB with 750 m footprint constant across scan. Pixel aggregation used to control footprint growth across scan. 9
  • 10. VIIRS Radiometric Sensitivity VIIRS SNR and NEdT are comparable or superior to MODIS SNR and NEdT when normalized to the same spatial scale and the same radiance level 10
  • 11. VIIRS Polarization Sensitivity VIIRS polarization performance is generally better than that of MODIS. Unlike MODIS, NPP VIIRS polarization sensitivity varies strongly with field angle resulting in detector dependence. VIIRS pre-launch characterization provides high-quality, per-pixel characterization of polarization sensitivity and phase for use in data product processing. 11
  • 12. Performance Summary and Issues VIIRS performance is comparable or superior to that of MODIS Aqua in corresponding bands in all key performance areas except crosstalk and out-of-band spectral response. NPP VIIRS has optical crosstalk in the VisNIR (0.8% average) due to high angle scattering in the spectral filters May impact Ocean Color/Chlorophyll and Aerosol data products. NPP VIIRS out-of-band (OOB) spectral response somewhat higher than MODIS Aqua due to same scattering mechanism in filters Second and subsequent VIIRS flight units will have reduced optical crosstalk and OOB response due to improved spectral filters. VIIRS polarization sensitivity is lower than that of MODIS Aqua but is detector dependent Requires per-pixel correction in Ocean Color processing Banding effects in SDRs displayed as images In other key performance areas not addressed here, such as band-to-band registration, near-field response and stray light response, VIIRS performance compares favorably with that of MODIS Aqua. 12
  • 14. VIIRS SDR Cal/Val Team 14
  • 15. Evolution of VIIRS Calibration and Validation Plans On-orbit cal/val tasks were defined in an intensive government-contractor team collaboration Cal/val strategies draw heavily on MODIS experience Inputs on specific activities distilled into 54 tasks VIIRS SDR Calibration Plan produced and peer reviewed in 2009 Comprehensive description of VIIRS calibration program Describes team, team interactions, tasks, tools and ground truth resources Maps cal/val activities into cal/val phases Provides metrics for evaluating SDR product maturity VIIRS SDR Calibration/Validation Operations Concept (OPSCON) Document developed in 2011 Infrastructure support definition Data flow and process definition to support cal/val rehearsals Managerial leadership has transitioned to Changyong Cao of NOAA STAR Roles and responsibilities have evolved to reflect increased participation of NOAA STAR 15
  • 16. Six Broad Categories of On-Orbit Cal/Val Tasks Functional Performance and Format Evaluation (FPF 1-7) FPF tasks involve evaluating instrument functions and verifying the correctness of data formats. Performed early in the mission, and will not be repeated unless the instrument suffers a catastrophic event. Calibration System Evaluation (CSE 1-6) CSE tasks evaluate the performance of the onboard calibration system and update the calibration algorithm databases accordingly. Image Quality Evaluation (IMG 1-4) IMG tasks evaluate the quantitative and qualitative spatial performance characteristics of the instrument. Radiometric Evaluation (RAD 1-25) RAD tasks evaluate the radiometric performance of the data product algorithm. Radiometric evaluation will include evaluation of spectral characteristics since changes in these characteristics relative to the pre-launch baseline will mainly manifest themselves as in-band radiometric errors. Geolocation Evaluation (GEO 1-7) GEO tasks evaluate the geolocation accuracy of the data product. Performance and Telemetry Trending (PTT 1-5) PTT tasks evaluate long-term changes in the performance of both the instrument and the data product. 16
  • 17. Pre-Launch Activities Continued analysis and refinement of performance baseline based on test program Verification of at-launch SDR algorithm look-up tables (LUTs) Improvements where warranted Operational code review and error checking Cal/val tool development RDR and SDR readers, LUT readers/writers Custom tools for cal/val analysis tasks Practice and training in operation of VIIRS SDR operational code Algorithm Development Library (ADL) version of code allows cal/val team to modify and test LUT updates and potential algorithm improvements Task rehearsals to demonstrate readiness for on-orbit cal/val 17
  • 18. Early Orbit Checkout (EOC) Verify instrument operability and functionality Signal Noise Scan rate Compare signal and noise characteristics to pre-launch baseline Verify RDR, SDR and intermediate product formats and validity of content Early use of Solar Diffuser Stability Monitor Critical for beginning time series to trend change in Solar Diffuser reflectance 18
  • 19. Intensive Calibration & Validation (ICV) Radiance match-ups Ground sites Inter-satellite comparisons Comparisons with Cross-Track Infrared Sounder (CrIS) Aircraft underflights Geolocation match-ups Ground Control Points (GCPs) from Landsat Feedback on SDR quality from EDR validation efforts Maneuvers Exploitation of lunar data SDR algorithm tuning and LUT updates Continued performance and telemetry trending 19 Objective is achievement of stable, “validated/calibrated” SDRs by end of ICV.
  • 20. Long-Term Monitoring (LTM) Routine performance of reflective band off-line calibration Periodic measurement and trending of key instrument characteristics Operability Noise/SNR Gains Critical temperatures, voltages, currents in telemetry Periodic repetition of ICV tasks to maintain calibration and SDR quality Radiometry Geolocation 20
  • 21. 21 VIIRS Cal/Val Activitiesby Phase
  • 22. SDR Product Maturity Levels Beta Early release product, initial calibration applied, minimally validated and may still contain significant errors Available to allow users to gain familiarity with data formats and parameters Product is not appropriate as the basis for quantitative scientific publications studies and applications Provisional Product quality may not be optimal Incremental product improvements are still occurring as calibration parameters are adjusted with sensor on-orbit characterization General research community is encouraged to participate in the QA and validation of the product, but need to be aware that product validation and QA are ongoing Users are urged to contact NPP Cal/Val Team representatives prior to use of the data in publications Validated/Calibrated On-orbit sensor performance characterized and calibration parameters adjusted accordingly Ready for use by the Centrals, and in scientific publications There may be later improved versions 22
  • 23. Inter-Satellite Comparisons Analysis of Simultaneous Nadir Overpass (SNO) data from VIIRS and other satellites will reveal relative biases Off-nadir inter-satellite comparisons will be exploited also, particularly to evaluate Response vs Scan Angle effects Leverages validation performed for other satellite systems VIIRS/MODIS comparisons expected to be particularly useful MODIS instruments well validated Many similar bands with similar radiometric performance MODIS Terra/AVHRR 11 m Band Comparison (Xiong et al., CEOS-IVOS 2004) 23
  • 24. CrIS-VIIRS Cal/Val (heritage AIRS-MODIS) 24 Abundant matchups on every Aqua orbit. 14 orbits per day (>10E6 matchups/day) Radiometric performance as function of scene temperature AIRS footprints overlain on MODIS image. Filter the sample to retain spatially uniform scenes. Radiometric performance as function of scan mirror angle
  • 25. Use of Maneuvers for VIIRS SDR Validation (1) S/C Maneuvers for VIIRS Calibration Scientific benefits and implementation strategies are based on lessons and experience from heritage missions and sensors, such as MODIS and SeaWiFS All 3 types of VIIRS maneuvers have been approved for the NPP mission Roll Maneuvers Near monthly event with lunar phase angles at 55 degree and roll angles less than -14 degrees Provide an accurate and long-term monitoring of VIIRS RSB calibration stability and independent monitoring of SD degradation Yaw Maneuvers Once during initial S/C checkout; could repeat every 3 years depending on the SD degradation rate Validate SD solar attenuation screen (SAS) and SDSM sun view screen transmission as a function of solar illumination angles and assure VIIRS SDR quality for the RSB 25
  • 26. Use of Maneuvers for VIIRS SDR Validation (2) Pitch Maneuvers Once during initial S/C checkout; could repeat depending on scan-angle dependent changes in TEB responses Validate sensor response versus scan angle (RVS) and assure VIIRS SDR quality for the TEB Operation and Data Analysis Support Maneuver implementation working group established to coordinate among different groups (and instruments) VIIRS maneuver data analysis tools developed primarily from MODIS experience 26
  • 27. Use of Lunar Data for VIIRS SDR Validation (1) Track Changes in Sensor Responses for VIIRS Reflective Solar Bands Both MODIS and SeaWiFS have used lunar time series to track changes in sensor responses; lunar viewing geometry corrections are made using ROLO lunar model Provide Independent Monitoring of VIIRS Solar Diffuser Degradation The angle of incidence (AOI) of VIIRS space view, through which the lunar observations are made, is identical to the AOI of SD observations Enable Calibration Inter-comparison with Other Sensors (e.g. MODIS) This is similar to the effort made to inter-compare Terra and Aqua MODIS, MODIS and SeaWiFS 27
  • 28. Use of Lunar Data for VIIRS SDR Validation (2) SeaWiFS Normalized Lunar Radiance Terra and Aqua MODIS B1 Lunar Irradiance 28
  • 29. VIIRS Geolocation Matchups Example of first 90 days of control point matchups from MODIS/Terra Good (> 60% normalized cross correlation) control point matchups per day: 260 Used to perform initial refinement of instrument to spacecraft alignment and to refine rotating telescope and half angle mirror geometric parameters 29 Number of Control Point Matchups Track Residuals (nadir adjusted) Scan Residuals (nadir adjusted)
  • 30. Aircraft Campaigns Aircraft underflights can provide high quality radiometric validation across the VIIRS spectrum Direct observations of the integrated upwelling earth scene radiance in nearly same time, space, and geometry as the on-orbit sensor NIST traceable uncertainties for some airborne instruments Approach based upon heritage validation of AIRS, MODIS, IASI. Preliminary plans for aircraft campaigns have been developed but are currently “on hold” due to funding constraints Platforms: ER-2 and/or WB-57 Instruments desired for VIIRS SDR validation Enhanced MODIS Airborne Simulator (EMAS) 50 channel Vis/IR spectrometer, 50 m resolution, 36 km swath Expected to include reflective solar band (RSB) Hyperspectral Imager (HSI) Scanning High-resolution Interferometer Sounder (SHIS) Scanning M/LWIR 0.5 cm-1 interferometer, 2 km resolution, 32 km swath NIST traceable calibration NPOESS Airborne Sounder Testbed (NAST-I) Scanning MWIR/LWIR interferometer, 2km resolution, 40 km swath NIST traceable calibration Cloud Physics Lidar (CPL) Micropulse dual polarization lidar, 15 m resolution, nadir only 30
  • 31. 31 11.01 um MODIS on Terra/Aqua SHIS, etc. on ER-2 705 km 20 km q Approach based upon heritage efforts for AIRS and MODIS Histogram of radiometric matchups Fly instrumented ER-2 along satellite track Matching geometry of earth scene observations
  • 32. Summary VIIRS calibration and validation plans draw heavily on MODIS strategies and experience Similar data products Similar on-board calibrators Similar radiometric and geolocation retrieval approaches VIIRS pre-launch performance baseline very well established Extensive instrument characterization provided in test program Independent data analysis by multiple contractor and government teams has provided highly reliable parameter values for SDR algorithm LUTs Experienced, multi-organization calibration/validation team is well prepared to execute VIIRS on-orbit validation 32