THE DELHI METRO PROJECT
EFFECTIVE PROJECT MANAGEMENT IN PUBLIC SECTOR
PRESENTED BY :-
Gourav Ranjan &
Group
INTRODUCTION
 The need for a reliable public
transportation was felt in Delhi for a long
time.
 A comprehensive traffic and
transportation study completed in 1990
highlighted the urgent need for a rail-
based transit system comprising a
network of underground elevated and
surface corridors to meet the traffic
demand projected for 2021. To make this
dream a reality , the Delhi Metro Rail
Corporation Limited (DMRC) was
rd
Reasons
 Population of over 1 million.
 More registered vehicles than Mumbai,
Kolkata & Chennai put together.
 Automobiles contributing to more than two –
thirds of the total atmospheric pollution.
 High rate of road accidents
 More than 35 studies recommended Mass
Rapid Transit System.
Challenges
 Delhi Metro is the biggest successful urban
project in India since independence in 1947
 Project has to be executed in very difficult urban
environment
 Being the capital city, all actions under close
scrutiny of VIPs
 Project implementation period compressed from
10 years to 7 years
 Metro being constructed to world class
standards with frontline technologies
 Expertise and technology not available in the
country.
The Delhi Metro
Project
 Second project in country after Kolkata
Metro:1984.
 A 50:50 joint venture of GoI and GNCTD
 DMRC incorporated under Companies Act 1995
 Duration of completion of Phase – 10 years by the
end of 2005
 Get approved by GoI in Sept 1996 (after civic
organizations recommendations)
 Phase-I to connect Delhi’s business, education
and shopping districts.
 Total land needed 340 hectares (58% govt., 39%
private agriculture and 3% private urban land)
 Phase-I consists 3 Lines, total length 56 km, 50
stations (10 underground) and 3 maintenance
depots.
Line Length of Line Route
Line 1 Red Line 22km Shahdara to Rithala
Line 2 Yellow Line 11km Vishwa Vidyalaya to Central
Secretariat
Line 3 Blue Line 23km Barakhamba to Dwarka
Project
 GoI and GNCTD arranged the all capital required.
 Initial estimation of cost in 1996 Rs 60 billion
 Revised estimation cost in 2002 was Rs 89.27 billion
 Final cost of project approx Rs 99 billion.
 2.2 million passenger/day to become the project viable
later revised to 1.5 million passenger/day
 Economic IRR 21.4%
 Financial IRR 3% (low IRR some minister suggested to
drop the project)
 Social sector project can benefit the regional economy
in more than one ways.
Cost Structure
 Repayment period 30 years including 10 years grace
period.
 Debt to equity ratio 2:1
 Exchange rate risk bore equally by GoI and GNCTD.
 Sources of Revenues: fares, property development, taxes
on local public.
 Property Development: Shopping Mall, IT Part, Multiplex,
Restaurant and Stores etc.
 This project was exempted from custom and excise
S. No. Source of Fund % of total
cost
Remark
1 Equity 28% Equally subscribed by
GoI & GNCTD
2 Interest Free Loan 5% Land Acquisition
3 JBIC 64% Time Sliced Soft Loan
4 Property
Development
3% Commercial activities
The Project Team
 Mr. E. Sreedharan was appointed as project
manager and managing director in Nov 1997.
 A technocrat retired from IR in 1990.
 Earned reputation for completing the project
on time and within budget.
 70% of senior staff hired on deputation from
IR
 DMRC opted lean structure.
 Effective contract awarding and
procurement process (to tackle with time,
cost and corruption)
 Contract awarding process transparent and
simple & fair and just
 Removed subjectivity from tender
Contd…
 Had two departments: project organization and
operation & maintenance
 Experts required from: Civil, electrical and
communications area etc.
 Young 18-30 years motivated team of professionals
personally interviewed by MD.
 Faced skill shortage problem everyone was new to
metro project
 No technical institute of such kind in the country.
 Suitable candidates sent HongKong MTRC for training.
 Metro Training School at Shastri Park
 Unique work culture: hard working, dedicated and
professionally competent
The Project Plan
 Individual accountability.
 Daily monitoring of progress.
 Weekly reviews and targets.
 Delhi Metro Act, 2002
 Superseded Delhi Municipal Laws.
 Lower courts barred from issuing stay orders.
 Dedicated team of lawyers to prevent property
disputes.
 Cost centers
 Manpower.
 Energy.
 Material & maintenance.
Road Blocks
 Low Financial IRR prompted second
thoughts on the project
 Criticism due to inability to recruit, 70% were
deputed from Indian Railways
 Lack of experience & specialized experts in
Civil, Electrical & Communication
Engineering
 Loss of Rs 5 million if one day lost
 Difference of opinion on gauge to be adopted
Critical Success
Factors
 ‘We mean business’ attitudes.
 Efficiency, courtesy & integrity in corporate
culture.
 Corruption free Contract Awarding System &
Procurement Process.
 Autonomy in decision making.
 Advance planning in utility diversion,
minimizing public inconvenience.
THANK
YOU

Mais conteúdo relacionado

Mais procurados

Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project ManagementAnurag Sureka
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Delhi metro - Project Finance
Delhi metro - Project FinanceDelhi metro - Project Finance
Delhi metro - Project FinancePrashant Dabhade
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study Soumya Bhadani
 
INDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METROINDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METRONAVEEN12JOSHI
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metrojerry christo
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and EconomicsKunal Bhadane
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.docSuryadev Maity
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Aashna Sharma
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project managerYogesh Vijay
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro Onekopila
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYShabaz Khan
 

Mais procurados (20)

Delhi Metro Rail Project Management
Delhi Metro Rail Project ManagementDelhi Metro Rail Project Management
Delhi Metro Rail Project Management
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
delhi metro
delhi metrodelhi metro
delhi metro
 
Delhi metro - Project Finance
Delhi metro - Project FinanceDelhi metro - Project Finance
Delhi metro - Project Finance
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
INDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METROINDUSTRIAL REPORT ON DELHI METRO
INDUSTRIAL REPORT ON DELHI METRO
 
Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project manager
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro One
 
Delhi Gurgaon expressway
Delhi Gurgaon expresswayDelhi Gurgaon expressway
Delhi Gurgaon expressway
 
Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
Feasibility Report of Hyd Metro
Feasibility Report of Hyd MetroFeasibility Report of Hyd Metro
Feasibility Report of Hyd Metro
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 

Destaque

Interaction Design Project - Delhi Metro
Interaction Design Project - Delhi MetroInteraction Design Project - Delhi Metro
Interaction Design Project - Delhi MetroKaran Dudeja
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC pptVimal Maurya
 
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014
Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014apollohyperbaric
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCAl Hakam Khan
 
Module 1 project planning and appraisal
Module 1 project planning and appraisalModule 1 project planning and appraisal
Module 1 project planning and appraisaldmkanchepalya
 
Delhi Metro Rail Corporation-Phase III
Delhi Metro Rail Corporation-Phase IIIDelhi Metro Rail Corporation-Phase III
Delhi Metro Rail Corporation-Phase IIIAmurtya Aggarwal
 

Destaque (8)

Interaction Design Project - Delhi Metro
Interaction Design Project - Delhi MetroInteraction Design Project - Delhi Metro
Interaction Design Project - Delhi Metro
 
Summer training DMRC ppt
Summer training DMRC pptSummer training DMRC ppt
Summer training DMRC ppt
 
Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014
Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014Seminar for Tunneling & Compressed  Air Workers  Delhi Metro 2014
Seminar for Tunneling & Compressed Air Workers Delhi Metro 2014
 
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRCDELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
DELHI METRO UNDERGROUND TUNNELING : SHAHBAZ KHAN DMRC
 
Module 1 project planning and appraisal
Module 1 project planning and appraisalModule 1 project planning and appraisal
Module 1 project planning and appraisal
 
Delhi Metro Rail Corporation-Phase III
Delhi Metro Rail Corporation-Phase IIIDelhi Metro Rail Corporation-Phase III
Delhi Metro Rail Corporation-Phase III
 

Semelhante a Delhi metro project evaluation

Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyMohit Gaur
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01Akshay Gaikwad
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptxBalpreetSingh47890
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1OmkarRasal
 
Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road ProjectIOSR Journals
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersAnil Kumar Gupta
 
Ppp final project
Ppp final projectPpp final project
Ppp final projectAbinJohnson
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONMd Shadab
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineeringvivatechijri
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationAdam Smith
 
Kushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal Vashishth
 
Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...Minakshi Patel
 

Semelhante a Delhi metro project evaluation (20)

Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road Project
 
Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway Engineers
 
Ppp final project
Ppp final projectPpp final project
Ppp final project
 
Airport express line
Airport express lineAirport express line
Airport express line
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineering
 
Presentation on Dhaka Metro Rail.pptx
Presentation on Dhaka Metro Rail.pptxPresentation on Dhaka Metro Rail.pptx
Presentation on Dhaka Metro Rail.pptx
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
TeamVision
TeamVisionTeamVision
TeamVision
 
New Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint PresentationNew Microsoft Office PowerPoint Presentation
New Microsoft Office PowerPoint Presentation
 
Metro
MetroMetro
Metro
 
Kushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analytics
 
Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...Future of Integrated Transport Systems: Best Sustainable Practices Around The...
Future of Integrated Transport Systems: Best Sustainable Practices Around The...
 

Mais de gouravranjan27

Mais de gouravranjan27 (11)

Honesty is a best policy
Honesty is a best policyHonesty is a best policy
Honesty is a best policy
 
Rural marketing and micro-finance
Rural marketing and micro-finance Rural marketing and micro-finance
Rural marketing and micro-finance
 
Research on "MERGERS and ACQUISITIONS"
Research on "MERGERS and ACQUISITIONS"Research on "MERGERS and ACQUISITIONS"
Research on "MERGERS and ACQUISITIONS"
 
Database Marketing
Database MarketingDatabase Marketing
Database Marketing
 
The brand ipl
The brand iplThe brand ipl
The brand ipl
 
PRODUCT DEVELOPMENT PROCESS
PRODUCT DEVELOPMENT PROCESSPRODUCT DEVELOPMENT PROCESS
PRODUCT DEVELOPMENT PROCESS
 
COMPANY REGISTRATION
COMPANY REGISTRATIONCOMPANY REGISTRATION
COMPANY REGISTRATION
 
IPO
IPOIPO
IPO
 
business leader
business leaderbusiness leader
business leader
 
Hyatt ppt (1)
Hyatt ppt (1)Hyatt ppt (1)
Hyatt ppt (1)
 
employees satisfication
employees satisficationemployees satisfication
employees satisfication
 

Último

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Último (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 

Delhi metro project evaluation

  • 1. THE DELHI METRO PROJECT EFFECTIVE PROJECT MANAGEMENT IN PUBLIC SECTOR PRESENTED BY :- Gourav Ranjan & Group
  • 2. INTRODUCTION  The need for a reliable public transportation was felt in Delhi for a long time.  A comprehensive traffic and transportation study completed in 1990 highlighted the urgent need for a rail- based transit system comprising a network of underground elevated and surface corridors to meet the traffic demand projected for 2021. To make this dream a reality , the Delhi Metro Rail Corporation Limited (DMRC) was rd
  • 3. Reasons  Population of over 1 million.  More registered vehicles than Mumbai, Kolkata & Chennai put together.  Automobiles contributing to more than two – thirds of the total atmospheric pollution.  High rate of road accidents  More than 35 studies recommended Mass Rapid Transit System.
  • 4. Challenges  Delhi Metro is the biggest successful urban project in India since independence in 1947  Project has to be executed in very difficult urban environment  Being the capital city, all actions under close scrutiny of VIPs  Project implementation period compressed from 10 years to 7 years  Metro being constructed to world class standards with frontline technologies  Expertise and technology not available in the country.
  • 5. The Delhi Metro Project  Second project in country after Kolkata Metro:1984.  A 50:50 joint venture of GoI and GNCTD  DMRC incorporated under Companies Act 1995  Duration of completion of Phase – 10 years by the end of 2005  Get approved by GoI in Sept 1996 (after civic organizations recommendations)  Phase-I to connect Delhi’s business, education and shopping districts.  Total land needed 340 hectares (58% govt., 39% private agriculture and 3% private urban land)  Phase-I consists 3 Lines, total length 56 km, 50 stations (10 underground) and 3 maintenance depots.
  • 6. Line Length of Line Route Line 1 Red Line 22km Shahdara to Rithala Line 2 Yellow Line 11km Vishwa Vidyalaya to Central Secretariat Line 3 Blue Line 23km Barakhamba to Dwarka
  • 7. Project  GoI and GNCTD arranged the all capital required.  Initial estimation of cost in 1996 Rs 60 billion  Revised estimation cost in 2002 was Rs 89.27 billion  Final cost of project approx Rs 99 billion.  2.2 million passenger/day to become the project viable later revised to 1.5 million passenger/day  Economic IRR 21.4%  Financial IRR 3% (low IRR some minister suggested to drop the project)  Social sector project can benefit the regional economy in more than one ways.
  • 8. Cost Structure  Repayment period 30 years including 10 years grace period.  Debt to equity ratio 2:1  Exchange rate risk bore equally by GoI and GNCTD.  Sources of Revenues: fares, property development, taxes on local public.  Property Development: Shopping Mall, IT Part, Multiplex, Restaurant and Stores etc.  This project was exempted from custom and excise S. No. Source of Fund % of total cost Remark 1 Equity 28% Equally subscribed by GoI & GNCTD 2 Interest Free Loan 5% Land Acquisition 3 JBIC 64% Time Sliced Soft Loan 4 Property Development 3% Commercial activities
  • 9. The Project Team  Mr. E. Sreedharan was appointed as project manager and managing director in Nov 1997.  A technocrat retired from IR in 1990.  Earned reputation for completing the project on time and within budget.  70% of senior staff hired on deputation from IR  DMRC opted lean structure.  Effective contract awarding and procurement process (to tackle with time, cost and corruption)  Contract awarding process transparent and simple & fair and just  Removed subjectivity from tender
  • 10. Contd…  Had two departments: project organization and operation & maintenance  Experts required from: Civil, electrical and communications area etc.  Young 18-30 years motivated team of professionals personally interviewed by MD.  Faced skill shortage problem everyone was new to metro project  No technical institute of such kind in the country.  Suitable candidates sent HongKong MTRC for training.  Metro Training School at Shastri Park  Unique work culture: hard working, dedicated and professionally competent
  • 11. The Project Plan  Individual accountability.  Daily monitoring of progress.  Weekly reviews and targets.  Delhi Metro Act, 2002  Superseded Delhi Municipal Laws.  Lower courts barred from issuing stay orders.  Dedicated team of lawyers to prevent property disputes.  Cost centers  Manpower.  Energy.  Material & maintenance.
  • 12. Road Blocks  Low Financial IRR prompted second thoughts on the project  Criticism due to inability to recruit, 70% were deputed from Indian Railways  Lack of experience & specialized experts in Civil, Electrical & Communication Engineering  Loss of Rs 5 million if one day lost  Difference of opinion on gauge to be adopted