As a part of the Institute's strategic focus on assisting CCS projects through knowledge sharing, three North American roadshow events will help the industry share project experiences and knowledge about CCS. Taking place in the US and Canada, the three events include:
• Austin, Texas on November 8, 2011;
• Calgary, Canada on 10 November, 2011; and
• Washington, D.C. on 19 January, 2012.
The first roadshow focused on sharing project experiences and knowledge from the projects in North America but also brought in projects from Europe (Don valley) and Australia (Callide) so that regionally diverse experiences could be shared amongst a global audience.
Attendance at the event was around 30 to 35 which allowed open and frank discussions around technical, management, and regulatory issues and how these challenges can impact on a project’s advancement and decision making processes.
2. Enhance’s Vision
The World’s Largest
CCS and Enhanced
Oil Recovery project
Creation of new infrastructure
for new industry in Alberta
And sustainable development
of Alberta’s oilsands
2
3. Alberta’s Resources
Oil sands development
Second largest proven oil reserves after Saudi Arabia
1 billion barrels of light oil recoverable using EOR
CO2 from oil sands enables EOR and produces fuels with
the lowest carbon footprint in the world
3
4. Alberta Gas Trunk Line (“AGTL”)
1954 Alberta Gas Trunk Line
Government of Alberta under
Premier Ernest Manning
Single gathering system made
sense
Maintained Alberta’s
jurisdiction over its resources
Courtesy of TransCanada Pipelines
4
5. AGTL
Impact on Alberta:
An Alberta petrochemical industry -$13B
products annually
Natural gas market and industry
Royalties, taxes and jobs $5-8 Billion/yr
5
6. Government Support for the ACTL
Government of Alberta investment of
$495 Million in a $1.2B project
Government cofunding will help us build
infrastructure for the future
Funding is provided when project
milestones are achieved
40% during construction over next 3 years
20% at commercial operation
40% over 10 years tied to injection of CO2
6
7. Alberta Carbon Trunkline
Building Alberta’s First CO2 Trunk Line
240 km 16” diameter (Phase 1)
Capacity of 40,000 tonnes per day
Landowners have been extremely
supportive
ERCB approval received
Construction start 2012
Operational early 2014
•18
7
8. U.S. Experience
Approximately 100 CO2 EOR projects in
North America
•Great Plains
Started in the 1970 - now over 3600 miles of CO2 •Coal Synfuels
•Plant
pipelines •LaBarge
•Gas Plant
•Gas Plant
600 million tonnes of CO2 injected •McElmo Dome /
•Doe Cyn. •Ethanol Plant
•Sheep Mtn.
51 million tonnes of CO2 move every year •Bravo •Ammonia / Fertilizer
•Dome •Plant
Oil production from CO2 EOR is currently •Jackson Dome
•Gas
260,000Bpd Plants •Pet. Coke to
•Ammonia Plant
(planned)
•Potential Natural CO2 Source •CO2 Project
•Natural CO2 Source •CO2 Pipeline
•Industrial CO2 Source •Planned CO2 Pipeline
8
9. ACTL Expansion
1 billion barrels of light oil
2 billion tonnes of CO2 stored
Laterals have been designed to
allow for multiple entry points and
multiple exits
Potential suppliers and CO2
emitters :
Coal power
Upgrading/refining
Petrochemicals
Natural gas processing
9
10. Enhance’s Current CO2 Suppliers
Agrium Redwater facility
700-1600T/d
Northwest Redwater
Refinery
3,500-4,200T/d
10
12. Agrium CO2 Recovery Facility
Detailed engineering is complete and procurement underway
12
13. ACRF Equipment
Siemens 6 stage
centrifugal compressor
Electric drive 4800hp
Handling wet CO2
Dehydration package,
separators, condensors also
purchased
Engineers: Caber Engineering
13
14. North West Redwater Refinery
North West Redwater Refinery Phase 1 is a $5Billion 50/50 joint
venture between North West Upgrading and CNRL
Processing 37,500bbls Crown bitumen and 12,500bbls CNRL bitumen
Produces refined products such as Ultra Low Sulphur diesel and
gasoline
Using Lurgi gasifier to produce pure dry CO2 (no coking)
Oxygen
Steam Hydrogen
Purification
Feed
Pure Hydrogen
Gasifier
Shift Reactors
CO to CO2
Rectisol
Pure CO2
Soot Filter Cake
H2 S
14
15. North West Redwater Refinery
Long lead items have been procured
3 phases have been approved by ERCB
8000 jobs during construction of each phase
15
16. NW Redwater CO2 Capture
FEED study complete
Booster compression on
site with final compression
adjacent
Pure dry CO2
0-2600psig
16
17. ACTL Pipe
20 km 12” pipe, 220 km 16” pipe
Carbon Steel
Sweet, dry operation at 2600psig
Construction slated for summer
2013
Engineers: SAW Engineering
17
19. Safe Secure Storage
Oil and gas reservoirs have
been around for a long time
Many of the best reservoirs for
EOR are Devonian
400 million years of safe, secure
storage of oil and gas
Partnered with AITF to formalize
MMV plan
19
21. How far can you drive before emitting 1 CO2?
How Far Can You Drive and Emit 1 Tonne
Tonne of CO2?
22. How far can you drive before emitting 1CO2?
How Far Can You Drive and Emit 1 Tonne
Tonne of CO2?
22
23. The Impact of the ACTL
Establishes new industries in Alberta
Supports future development of the
oilsands
Produces fuels with the lowest carbon
footprint in the world
Thousands of permanent jobs
Substantial revenues from EOR
Return to Alberta in the form of royalties
and taxes
23
24. The Alberta Carbon Trunk Line
Doing it now
Enhance Energy Inc.
www.enhanceenergy.com