08448380779 Call Girls In Friends Colony Women Seeking Men
INC 281 Weekly Report Progress
1. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] April 19, 2012
Name-Surname NuttapongHansiriwattanakit
Student ID. 54261508
Group Name Is
Engineering Team Jane , Best ,Not ,Su ,Jum-O ,Love , Tew ,Go ,Mut and
Members Benz
Product Design
Sa-tang ,Ped ,Fon ,Tip ,Earng[ID] and Mind [interior]
Team Members
Weekly Progress
I ,Jum-O and Love have calculated the phase control circuit.
And test the circuit on the circuit can operate. The maximum
temperature at 43 degrees Celsius, because the water
pressure is less.
I made a PCB for the circuit using Proteus.My friend teach
how to use the Proteus and the design of electronic circuits.
Figure 1.Test circuit Figure 2.Proteus
Engineering Analysis
Strong Point
- This week is the week that I learned something new.
Week Point
- I have no knowledge of programming and design of Proteus PCB.
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI
2. [INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT] April 19, 2012
Next Week Job
Next week I will take all the circuits connected together and test circuits.
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI