Feasibility Study is an assessment of the
practicality of a proposed project or
system.
In feasibility analysis, the project idea is
examined from the point of view whether
to go in for making a detailed investment
proposal or not.
2
While making a feasibility analysis, there could
be only 3 alternatives which are the following:
1. When the project idea seems to be feasible, then we proceed with the idea.
2. When the project idea is not feasible, then we abandon the idea.
3. When we are unable to arrive at a conclusion, then we make efforts to collect
the required data and design the development.
3
 Techno - Economic feasibility refers to the estimation of
project demand potential and choice of optimal technology.
 Techno- Economic feasibility is an analysis on the existing
market and technology.
 The choice of technology itself will be based on the demand
potential in project design.
 Techno - Economic feasibility analyze the project on
individual criteria or different aspects and sets the stage for
detailed design development.
4
 A feasibility report of a new enterprise or of an
expanding enterprise consist of some
background info. about the industry to which
the project belongs, and the enterprise
submitting the report in general.
5
1. Objective and scope of the report.
2. Product characteristics.
3. Market position and trends.
4. Raw material requirement, prices, sources and properties of raw
materials.
5. Manufacturing processes, selection of process, production
schedule and techniques.
6. Plant and machinery.
7. Requirement of land area, building, construction schedule.
8. Financial implications.
9. Marketing channels, their trending practices and marketing
strategies.
10. Requirement o personnel, labour and expenses on wage system.
6
PRE - FEASIBILITY
STUDY
DETAILED FEASIBILITY
STUDY
7
Factors to be considerd while
preparing report
Technical
considerations
Economic
considerations
Financial
considerations
Managerial
consideration
Implementation
schedule
8
 Technical Considerations : It establishes whether the
project is technically feasible or not. In this various
technical alternatives on employment, ecology ,
infrastructure demands, capital services , balance of
payments and other factors are taken in account.
 Economic Considerations : Economic data relates to
market, the data required for analysis of this aspect can be
obtained from secondary sources like government
agencies, trade associations. Data can also be obtained
through primary sources like mailed questionnaire and
market survey.
 Financial Considerations : Financial considerations help
the project to evaluate the different measures of
commercial profitability and the magnitude of financing
required . It requires the current status of the market with
respect to the project.
9
 Managerial Competence : A proper assessment of the number
and skills of staff required for the project is to be considered
under this aspect. For this purpose an appropriate
organization structure is decided, then the skills and talents
required by man power is determined.
Managerial competence consideration :
a) Activity analysis involving anticipated work flow and the
activities involved in the project.
b) Grouping of activities into tasks which employees can
perform effectively.
c) Classification of tasks are the building blocks of the
organization structure.
d) Determining inter-relationships between different
positions to decide the chain of command
 Implementation Schedule : The implementation schedule is
prepared to ensure timely completion of the project. It helps
in saving time and cost. Delays in project completion may
10
PRODUCTIO
N
PURCHASE
INSTALLATI
ON,
RECRUITME
NT AND
TRIALS
WATER AND
POWER
CONNECTIO
N
CONSTRUC
TION OF
FACTORY
LAND
PROCCURE
MENT
TERM-LOAN
app.
11
12
 A record to verify that the running facets of the project are
analyzed just before implementation.
 To make sure the suggested project/business is a effective
venture.
 Provide guideline which will help the management in easy
monitoring and controlling project implementation and
production activity.
 Helps you to convince bankers, partners, government to avail
necessary help.
13
1. Management capacity to handle the company.
2. Government clearance and approval feasibility.
3. Marketability from the products towards the extent of production
suggested.
4.Technical feasibility of production.
5. Financial stability to make sure of profit.
14
I. Management capacity to employ THE PROJECT and keep it
check effectively:
o Personal particulars from the marketers.
o Financial status from the marketers.
o Stake from the marketers / equity participation particulars.
o The connection between the marketers.
o Organization chart /determining clearly government bodies and
duties.
o Particulars from the key personnel.
o Write the kind of skilled persons needed for that project as well as
their availability.
o Bankers / auditors particulars.
15
II. Government clearances to become acquired:
o Licence for production and exports
o Licence for imports of machines/ recyclables /many other
materials
o Foreign nation guidelines highly relevant to the company
o Work law and Industrial facilities act/industries act / boiler act
o Register of companies -Tax act ,Excise duty and ISO
certification
o Maximum retail cost
o Storing the raw materials , many other materials
o Packing and moving
o Investment subsidy supplied by the government
o Location from the project
o Government reservation list for SSI sector
16
III. Marketing aspects:
a) Creating the near future DEMAND /SUPPLY in quantity terms
 Projecting THE NEAR FUTURE DEMND
 Study yesteryear demand pattern
 Consumption , market size , exports , role of competition
 Starting at the present trend and future expected
demand thinking about above points
 Projecting THE NEAR FUTURE SUPPLY
 Study yesteryear supply pattern
 Production sector market , capital utilisation, imports and
quantity of models
 Starting at the present trend and future expected supply
thinking about above points
b) The scope of promoting the merchandise to at least one
 Consumer market
 Industrial market
 Export market
 Government and institutional market
17
c) The marketing mix ( product, cost, place promotion) of
competitors
Companies analyzed to reach a suitable means of organisation
d) Scope for ANCILLARY status unit to motor unit , marketing
correct arrangement , opening show rooms , acquiring job
work , captive consumption , ETC analyzed.
18
1. Quality parameters from the items suggested to
become created.
2. Product specifications.
3. Quantity to become created in every variety.
4. Suggested technology.
5. Highlights around the suggested technology.
6. Procedure for manufacture.
7. Production line balancing.
8. Listings of machines.
9. Supplier selections.
10. Raw material. (cost, quality etc.)
19
1. Price of land.
2. Price of building.
3. Price of machines.
4. Contingencies.
5. Preliminary and pre operative expenses.
6. Miscellaneous fixed assets.
7. Margin money for capital.
20
1. Promoter’s capital.
2. Term loan from bank.
3. Investment subsidy.
Term loan component is debt promoter’s capital and
investment subsidy components may be the equity.
21
22
1. Profit on sales.
2. Profit on investment with various investment
options.
3. Break even point.
4. DET service coverage ratio.
5. Sensitivity analysis.
6. Internal rate of return.
23
Entrepreneurship Development By S.Anil
kumar
Paper onTEFR of the industrial project
– Prof.V S RangarajAN
Entrepreneurship and Economic development
by-Wim Naude 24

Mais conteúdo relacionado

Mais procurados

Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industrieszeeshanabdullateef
 
Entrpreneurial development programme
Entrpreneurial development programmeEntrpreneurial development programme
Entrpreneurial development programmeSimran Kaur
 
Entrepreneurship (Project identification)
Entrepreneurship (Project identification)Entrepreneurship (Project identification)
Entrepreneurship (Project identification)Sonam kapil
 
Small scale industries..ppt
Small scale industries..pptSmall scale industries..ppt
Small scale industries..pptHems Tekwani
 
Entrepreneurship development
Entrepreneurship developmentEntrepreneurship development
Entrepreneurship developmentPrajeesh Menon
 
Project Management- Unit II
Project Management- Unit IIProject Management- Unit II
Project Management- Unit IILamay Sabir
 
government institutions for entrepreneurship development
government institutions for entrepreneurship developmentgovernment institutions for entrepreneurship development
government institutions for entrepreneurship developmentMita Meher
 
ppt on micro small and medium enterprises
ppt on micro small and medium enterprisesppt on micro small and medium enterprises
ppt on micro small and medium enterprisesShreya Sharma
 
Introduction to Technological Forecasting
Introduction to Technological ForecastingIntroduction to Technological Forecasting
Introduction to Technological ForecastingHarinadh Karimikonda
 
Presentation done by MSME
Presentation done by MSME Presentation done by MSME
Presentation done by MSME Dr. Amit Kapoor
 
Seting up an enterprises
Seting up an enterprisesSeting up an enterprises
Seting up an enterprisesMohit Chauhan
 
Project Management- Unit III
Project Management- Unit IIIProject Management- Unit III
Project Management- Unit IIILamay Sabir
 
New industrial policy 1991
New industrial policy 1991New industrial policy 1991
New industrial policy 1991Sunil Meena
 
Entrepreneurship : project
Entrepreneurship : projectEntrepreneurship : project
Entrepreneurship : projectshweta saxena
 
Entrepreneurship development
Entrepreneurship developmentEntrepreneurship development
Entrepreneurship developmentrohit25786
 
Entrepreneurship development - schemes of governament
Entrepreneurship development - schemes of governamentEntrepreneurship development - schemes of governament
Entrepreneurship development - schemes of governamentmounika ramachandruni
 
finance and institutional support for entreprenurship
finance and institutional support for entreprenurshipfinance and institutional support for entreprenurship
finance and institutional support for entreprenurshipSameer Chandrakar
 

Mais procurados (20)

Procedure to start small scale industries
Procedure to start small scale industriesProcedure to start small scale industries
Procedure to start small scale industries
 
Entrpreneurial development programme
Entrpreneurial development programmeEntrpreneurial development programme
Entrpreneurial development programme
 
Entrepreneurship (Project identification)
Entrepreneurship (Project identification)Entrepreneurship (Project identification)
Entrepreneurship (Project identification)
 
Small scale industries..ppt
Small scale industries..pptSmall scale industries..ppt
Small scale industries..ppt
 
Entrepreneurship development
Entrepreneurship developmentEntrepreneurship development
Entrepreneurship development
 
Project Management- Unit II
Project Management- Unit IIProject Management- Unit II
Project Management- Unit II
 
government institutions for entrepreneurship development
government institutions for entrepreneurship developmentgovernment institutions for entrepreneurship development
government institutions for entrepreneurship development
 
ppt on micro small and medium enterprises
ppt on micro small and medium enterprisesppt on micro small and medium enterprises
ppt on micro small and medium enterprises
 
Entrepreneurial motivation
Entrepreneurial motivationEntrepreneurial motivation
Entrepreneurial motivation
 
Introduction to Technological Forecasting
Introduction to Technological ForecastingIntroduction to Technological Forecasting
Introduction to Technological Forecasting
 
Critical Evaluation of EDPs in India
Critical Evaluation of EDPs in IndiaCritical Evaluation of EDPs in India
Critical Evaluation of EDPs in India
 
Presentation done by MSME
Presentation done by MSME Presentation done by MSME
Presentation done by MSME
 
Seting up an enterprises
Seting up an enterprisesSeting up an enterprises
Seting up an enterprises
 
Project Management- Unit III
Project Management- Unit IIIProject Management- Unit III
Project Management- Unit III
 
New industrial policy 1991
New industrial policy 1991New industrial policy 1991
New industrial policy 1991
 
Entrepreneurship : project
Entrepreneurship : projectEntrepreneurship : project
Entrepreneurship : project
 
Entrepreneurship development
Entrepreneurship developmentEntrepreneurship development
Entrepreneurship development
 
Entrepreneurship development - schemes of governament
Entrepreneurship development - schemes of governamentEntrepreneurship development - schemes of governament
Entrepreneurship development - schemes of governament
 
finance and institutional support for entreprenurship
finance and institutional support for entreprenurshipfinance and institutional support for entreprenurship
finance and institutional support for entreprenurship
 
Ssi
SsiSsi
Ssi
 

Semelhante a Techno Economic Feasibility Report I Gaurav Singh Rajput

Feasibility-Studies.ppt
Feasibility-Studies.pptFeasibility-Studies.ppt
Feasibility-Studies.pptSoumaYukihira8
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.pptMohd Zulhairi Mohd Noor
 
Entrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small BusinessEntrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small BusinessSOMASUNDARAM T
 
Entrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small BusinessEntrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small BusinessSOMASUNDARAM T
 
Feasibility study ppt
Feasibility study pptFeasibility study ppt
Feasibility study pptkunal kishore
 
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.pptproceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.pptDrkalaivani2
 
UNIT-II-Business opportunity Identification and Preliminary Project Report BB...
UNIT-II-Business opportunity Identification and Preliminary Project Report BB...UNIT-II-Business opportunity Identification and Preliminary Project Report BB...
UNIT-II-Business opportunity Identification and Preliminary Project Report BB...Reena Nath
 
projectformulationandappraisal.pptx
projectformulationandappraisal.pptxprojectformulationandappraisal.pptx
projectformulationandappraisal.pptxAlkaPandya5
 
M&E Module 4.docx
M&E Module 4.docxM&E Module 4.docx
M&E Module 4.docxswamy62
 
Project Feasibility Study of Project
Project Feasibility Study of ProjectProject Feasibility Study of Project
Project Feasibility Study of ProjectMobasshera Jahan
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...BBAsourashtracollege
 
Project appraisal and its techniques
Project appraisal and its techniquesProject appraisal and its techniques
Project appraisal and its techniquesAksharaMahesh
 
Entrepreneurship and Ethics Mod 3
Entrepreneurship and Ethics Mod 3Entrepreneurship and Ethics Mod 3
Entrepreneurship and Ethics Mod 3Chetan T R
 
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptxAmit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptxmcdopex6
 
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptxPROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptxPawanMishra226835
 
Over Air (OTA) Engine Control Module Market
Over Air (OTA) Engine Control Module MarketOver Air (OTA) Engine Control Module Market
Over Air (OTA) Engine Control Module MarketshubhamRandive11
 

Semelhante a Techno Economic Feasibility Report I Gaurav Singh Rajput (20)

Feasibility-Studies.ppt
Feasibility-Studies.pptFeasibility-Studies.ppt
Feasibility-Studies.ppt
 
525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt525412627-2-Project-Management-2018-BAIS-3-4.ppt
525412627-2-Project-Management-2018-BAIS-3-4.ppt
 
Entrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small BusinessEntrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small Business
 
Entrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small BusinessEntrepreneurship development - Venturing Small Business
Entrepreneurship development - Venturing Small Business
 
Feasibility study ppt
Feasibility study pptFeasibility study ppt
Feasibility study ppt
 
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.pptproceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
proceduretostartsmallscaleindustries-150501004358-conversion-gate01.ppt
 
UNIT-II-Business opportunity Identification and Preliminary Project Report BB...
UNIT-II-Business opportunity Identification and Preliminary Project Report BB...UNIT-II-Business opportunity Identification and Preliminary Project Report BB...
UNIT-II-Business opportunity Identification and Preliminary Project Report BB...
 
projectformulationandappraisal.pptx
projectformulationandappraisal.pptxprojectformulationandappraisal.pptx
projectformulationandappraisal.pptx
 
M&E Module 4.docx
M&E Module 4.docxM&E Module 4.docx
M&E Module 4.docx
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
Feasibility report
Feasibility reportFeasibility report
Feasibility report
 
Pm chapter 2...
Pm chapter 2...Pm chapter 2...
Pm chapter 2...
 
Pm chapter 2
Pm chapter 2Pm chapter 2
Pm chapter 2
 
Project Feasibility Study of Project
Project Feasibility Study of ProjectProject Feasibility Study of Project
Project Feasibility Study of Project
 
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
ED chapter 3- by Dr.K.G.Raja Sabarish Babu, Assistant Professor, Research Dep...
 
Project appraisal and its techniques
Project appraisal and its techniquesProject appraisal and its techniques
Project appraisal and its techniques
 
Entrepreneurship and Ethics Mod 3
Entrepreneurship and Ethics Mod 3Entrepreneurship and Ethics Mod 3
Entrepreneurship and Ethics Mod 3
 
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptxAmit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
 
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptxPROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
PROJECT IDENTIFICATION AND SELECTION(PAWAN).pptx
 
Over Air (OTA) Engine Control Module Market
Over Air (OTA) Engine Control Module MarketOver Air (OTA) Engine Control Module Market
Over Air (OTA) Engine Control Module Market
 

Mais de Gaurav Singh Rajput

Site Emergency Response | Gaurav Singh Rajput
Site Emergency Response | Gaurav Singh RajputSite Emergency Response | Gaurav Singh Rajput
Site Emergency Response | Gaurav Singh RajputGaurav Singh Rajput
 
Quantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh Rajput
Quantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh RajputQuantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh Rajput
Quantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh RajputGaurav Singh Rajput
 
Basic of Instrumentation and Control | Gaurav Singh Rajput
Basic of Instrumentation and Control | Gaurav Singh RajputBasic of Instrumentation and Control | Gaurav Singh Rajput
Basic of Instrumentation and Control | Gaurav Singh RajputGaurav Singh Rajput
 
Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...
Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...
Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...Gaurav Singh Rajput
 
Fire Protection System | Gaurav Singh Rajput
Fire Protection System | Gaurav Singh RajputFire Protection System | Gaurav Singh Rajput
Fire Protection System | Gaurav Singh RajputGaurav Singh Rajput
 
Basic Instrumentation Symbols | P&ID | PFD | Gaurav Singh Rajput
Basic Instrumentation Symbols | P&ID | PFD | Gaurav Singh RajputBasic Instrumentation Symbols | P&ID | PFD | Gaurav Singh Rajput
Basic Instrumentation Symbols | P&ID | PFD | Gaurav Singh RajputGaurav Singh Rajput
 
Hzard Communication | Gaurav Singh Rajput
Hzard Communication | Gaurav Singh RajputHzard Communication | Gaurav Singh Rajput
Hzard Communication | Gaurav Singh RajputGaurav Singh Rajput
 
Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Gaurav Singh Rajput
 
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh RajputInspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh RajputGaurav Singh Rajput
 
Basic LNG Training | Liquefied Natural Gas | Gaurav Singh Rajput
Basic LNG Training | Liquefied Natural Gas | Gaurav Singh RajputBasic LNG Training | Liquefied Natural Gas | Gaurav Singh Rajput
Basic LNG Training | Liquefied Natural Gas | Gaurav Singh RajputGaurav Singh Rajput
 
Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput Gaurav Singh Rajput
 
BBS - Behaviour Based Safety | Gaurav Singh Rajput
BBS - Behaviour Based Safety | Gaurav Singh RajputBBS - Behaviour Based Safety | Gaurav Singh Rajput
BBS - Behaviour Based Safety | Gaurav Singh RajputGaurav Singh Rajput
 
HAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh RajputHAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh RajputGaurav Singh Rajput
 
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...Gaurav Singh Rajput
 
Accident & Incident Investigation | Gaurav Singh Rajput
Accident & Incident Investigation | Gaurav Singh RajputAccident & Incident Investigation | Gaurav Singh Rajput
Accident & Incident Investigation | Gaurav Singh RajputGaurav Singh Rajput
 
Calculating Scaffold Loads | Gaurav Singh Rajput
Calculating Scaffold Loads | Gaurav Singh RajputCalculating Scaffold Loads | Gaurav Singh Rajput
Calculating Scaffold Loads | Gaurav Singh RajputGaurav Singh Rajput
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputGaurav Singh Rajput
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 

Mais de Gaurav Singh Rajput (20)

Site Emergency Response | Gaurav Singh Rajput
Site Emergency Response | Gaurav Singh RajputSite Emergency Response | Gaurav Singh Rajput
Site Emergency Response | Gaurav Singh Rajput
 
Quantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh Rajput
Quantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh RajputQuantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh Rajput
Quantitative Risk Assessment | QRA | Risk Assessment | Gaurav Singh Rajput
 
Basic of Instrumentation and Control | Gaurav Singh Rajput
Basic of Instrumentation and Control | Gaurav Singh RajputBasic of Instrumentation and Control | Gaurav Singh Rajput
Basic of Instrumentation and Control | Gaurav Singh Rajput
 
Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...
Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...
Lifting Plan | Lifting Plan for Different Process Equipment | Gaurav Singh Ra...
 
Fire Protection System | Gaurav Singh Rajput
Fire Protection System | Gaurav Singh RajputFire Protection System | Gaurav Singh Rajput
Fire Protection System | Gaurav Singh Rajput
 
Basic Instrumentation Symbols | P&ID | PFD | Gaurav Singh Rajput
Basic Instrumentation Symbols | P&ID | PFD | Gaurav Singh RajputBasic Instrumentation Symbols | P&ID | PFD | Gaurav Singh Rajput
Basic Instrumentation Symbols | P&ID | PFD | Gaurav Singh Rajput
 
Hzard Communication | Gaurav Singh Rajput
Hzard Communication | Gaurav Singh RajputHzard Communication | Gaurav Singh Rajput
Hzard Communication | Gaurav Singh Rajput
 
Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput Risk Analysis & Management | Gaurav Singh Rajput
Risk Analysis & Management | Gaurav Singh Rajput
 
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh RajputInspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
 
Basic LNG Training | Liquefied Natural Gas | Gaurav Singh Rajput
Basic LNG Training | Liquefied Natural Gas | Gaurav Singh RajputBasic LNG Training | Liquefied Natural Gas | Gaurav Singh Rajput
Basic LNG Training | Liquefied Natural Gas | Gaurav Singh Rajput
 
Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput
 
BBS - Behaviour Based Safety | Gaurav Singh Rajput
BBS - Behaviour Based Safety | Gaurav Singh RajputBBS - Behaviour Based Safety | Gaurav Singh Rajput
BBS - Behaviour Based Safety | Gaurav Singh Rajput
 
HAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh RajputHAZID | Hazard Indentification | Gaurav Singh Rajput
HAZID | Hazard Indentification | Gaurav Singh Rajput
 
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
SIL Awareness | Introduction to Safety Life-Cycle | IEC - 61508 & IEC- 61511 ...
 
Accident & Incident Investigation | Gaurav Singh Rajput
Accident & Incident Investigation | Gaurav Singh RajputAccident & Incident Investigation | Gaurav Singh Rajput
Accident & Incident Investigation | Gaurav Singh Rajput
 
Calculating Scaffold Loads | Gaurav Singh Rajput
Calculating Scaffold Loads | Gaurav Singh RajputCalculating Scaffold Loads | Gaurav Singh Rajput
Calculating Scaffold Loads | Gaurav Singh Rajput
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
 
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh RajputPigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
Pigging | Pipeline Cleaning | Pigging Safety | Gaurav Singh Rajput
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 

Último

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 

Último (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Techno Economic Feasibility Report I Gaurav Singh Rajput

  • 1. 1
  • 2. Feasibility Study is an assessment of the practicality of a proposed project or system. In feasibility analysis, the project idea is examined from the point of view whether to go in for making a detailed investment proposal or not. 2
  • 3. While making a feasibility analysis, there could be only 3 alternatives which are the following: 1. When the project idea seems to be feasible, then we proceed with the idea. 2. When the project idea is not feasible, then we abandon the idea. 3. When we are unable to arrive at a conclusion, then we make efforts to collect the required data and design the development. 3
  • 4.  Techno - Economic feasibility refers to the estimation of project demand potential and choice of optimal technology.  Techno- Economic feasibility is an analysis on the existing market and technology.  The choice of technology itself will be based on the demand potential in project design.  Techno - Economic feasibility analyze the project on individual criteria or different aspects and sets the stage for detailed design development. 4
  • 5.  A feasibility report of a new enterprise or of an expanding enterprise consist of some background info. about the industry to which the project belongs, and the enterprise submitting the report in general. 5
  • 6. 1. Objective and scope of the report. 2. Product characteristics. 3. Market position and trends. 4. Raw material requirement, prices, sources and properties of raw materials. 5. Manufacturing processes, selection of process, production schedule and techniques. 6. Plant and machinery. 7. Requirement of land area, building, construction schedule. 8. Financial implications. 9. Marketing channels, their trending practices and marketing strategies. 10. Requirement o personnel, labour and expenses on wage system. 6
  • 7. PRE - FEASIBILITY STUDY DETAILED FEASIBILITY STUDY 7
  • 8. Factors to be considerd while preparing report Technical considerations Economic considerations Financial considerations Managerial consideration Implementation schedule 8
  • 9.  Technical Considerations : It establishes whether the project is technically feasible or not. In this various technical alternatives on employment, ecology , infrastructure demands, capital services , balance of payments and other factors are taken in account.  Economic Considerations : Economic data relates to market, the data required for analysis of this aspect can be obtained from secondary sources like government agencies, trade associations. Data can also be obtained through primary sources like mailed questionnaire and market survey.  Financial Considerations : Financial considerations help the project to evaluate the different measures of commercial profitability and the magnitude of financing required . It requires the current status of the market with respect to the project. 9
  • 10.  Managerial Competence : A proper assessment of the number and skills of staff required for the project is to be considered under this aspect. For this purpose an appropriate organization structure is decided, then the skills and talents required by man power is determined. Managerial competence consideration : a) Activity analysis involving anticipated work flow and the activities involved in the project. b) Grouping of activities into tasks which employees can perform effectively. c) Classification of tasks are the building blocks of the organization structure. d) Determining inter-relationships between different positions to decide the chain of command  Implementation Schedule : The implementation schedule is prepared to ensure timely completion of the project. It helps in saving time and cost. Delays in project completion may 10
  • 12. 12
  • 13.  A record to verify that the running facets of the project are analyzed just before implementation.  To make sure the suggested project/business is a effective venture.  Provide guideline which will help the management in easy monitoring and controlling project implementation and production activity.  Helps you to convince bankers, partners, government to avail necessary help. 13
  • 14. 1. Management capacity to handle the company. 2. Government clearance and approval feasibility. 3. Marketability from the products towards the extent of production suggested. 4.Technical feasibility of production. 5. Financial stability to make sure of profit. 14
  • 15. I. Management capacity to employ THE PROJECT and keep it check effectively: o Personal particulars from the marketers. o Financial status from the marketers. o Stake from the marketers / equity participation particulars. o The connection between the marketers. o Organization chart /determining clearly government bodies and duties. o Particulars from the key personnel. o Write the kind of skilled persons needed for that project as well as their availability. o Bankers / auditors particulars. 15
  • 16. II. Government clearances to become acquired: o Licence for production and exports o Licence for imports of machines/ recyclables /many other materials o Foreign nation guidelines highly relevant to the company o Work law and Industrial facilities act/industries act / boiler act o Register of companies -Tax act ,Excise duty and ISO certification o Maximum retail cost o Storing the raw materials , many other materials o Packing and moving o Investment subsidy supplied by the government o Location from the project o Government reservation list for SSI sector 16
  • 17. III. Marketing aspects: a) Creating the near future DEMAND /SUPPLY in quantity terms  Projecting THE NEAR FUTURE DEMND  Study yesteryear demand pattern  Consumption , market size , exports , role of competition  Starting at the present trend and future expected demand thinking about above points  Projecting THE NEAR FUTURE SUPPLY  Study yesteryear supply pattern  Production sector market , capital utilisation, imports and quantity of models  Starting at the present trend and future expected supply thinking about above points b) The scope of promoting the merchandise to at least one  Consumer market  Industrial market  Export market  Government and institutional market 17
  • 18. c) The marketing mix ( product, cost, place promotion) of competitors Companies analyzed to reach a suitable means of organisation d) Scope for ANCILLARY status unit to motor unit , marketing correct arrangement , opening show rooms , acquiring job work , captive consumption , ETC analyzed. 18
  • 19. 1. Quality parameters from the items suggested to become created. 2. Product specifications. 3. Quantity to become created in every variety. 4. Suggested technology. 5. Highlights around the suggested technology. 6. Procedure for manufacture. 7. Production line balancing. 8. Listings of machines. 9. Supplier selections. 10. Raw material. (cost, quality etc.) 19
  • 20. 1. Price of land. 2. Price of building. 3. Price of machines. 4. Contingencies. 5. Preliminary and pre operative expenses. 6. Miscellaneous fixed assets. 7. Margin money for capital. 20
  • 21. 1. Promoter’s capital. 2. Term loan from bank. 3. Investment subsidy. Term loan component is debt promoter’s capital and investment subsidy components may be the equity. 21
  • 22. 22
  • 23. 1. Profit on sales. 2. Profit on investment with various investment options. 3. Break even point. 4. DET service coverage ratio. 5. Sensitivity analysis. 6. Internal rate of return. 23
  • 24. Entrepreneurship Development By S.Anil kumar Paper onTEFR of the industrial project – Prof.V S RangarajAN Entrepreneurship and Economic development by-Wim Naude 24