Top Down Construction

Presentation by:
Gagan Goswami

1
Why Top Down Construction Required






Top Down Construction are commonly used in
congested areas. These can be installed in close
proximity to existing structure with minimal loss of
support to existing foundations. In addition,
construction dewatering is not required, so there is
no associated subsidence. Top Down Construction
are practically suited in the construction of deep
basements , Metro Railway Projects.
The “Top Down” method of construction is
designated to enable above ground construction
work to be carried out simultaneously with the
excavation of the basement resulting in significant
saving of time on a project.
Using Top Down Construction more Building and
Basement Area can use. Suitable for two or more
basement.
2
METHODOLOGY OF TOP DOWN
CONSTRUCTION







Diaphragm wall Installed in both side up to design
depth with coupler bars/dowel bars for different
level slabs as per alignment. if span is more
between diaphragm wall Barrete Piles can be use as
a intermediate Columns to support the slabs.
The soil is excavated just below roof slab level with
margin for P.C.C. thickness, if roof slab level is
more than 3 meter and span is more than
structural strut to be provided to support
diaphragm wall as per design.
Coupler bars/ Dowel bars to be exposed from
Diaphragm wall both end reinforcement to be
completed as per design.
3








R.C.C. slab to be cast with suitable size openings
for further Construction in suitable interval (around
40 t0 50 mtr) suit to site and for proper air
ventilation.
Coupler bars/Dowels bars provisions to be kept for
centre wall (In Tunnel case) and opening closing
after construction. 100/150 mm pipe (1 meter
C/C)opening to be kept in roof slab thickness for
concreting of center wall.
After Casting of slab, excavation to be continued
through opening provided with the help of Long
arm excavators/Crane and Bucket.
Small excavator to be lowered inside to feed soils
for long arm excavator.(Proper Lighting, Air
Circulation is must).
4










P.C.C. to be break by using small excavator and
excavation to be continued till base slab level.
Coupler bars to be exposed and base slab to be
cast as per design.
Center wall to be cast with dowel bars from Base
slab and finally connect with coupler bars from roof
slab.
Scaffolding and bottom form work to be fixed below
openings , coupler bars to be exposed and
reinforcement for opening to be completed and
concreting to be done.
After concreting of openings , water proofing if
required to be done than backfilling to be done in
layers and finally surface to be leveled and
reinstating the same.
5
Schematic section of Top Down
Construction

6
Schematic section of Top Down
Construction

7
Schematic section of Top Down
Construction

8
PROJECT PHOTOGRAPHS

Anchor Slab

9
PROJECT PHOTOGRAPHS

Anchor Slab

10
Contact Details
Gagan Goswami
 Cell-+919662506595
Address HERITAGE INFRASPACE INDIA PVT. LTD
 F-36,Sukh Shine Complex,
 Opposite to Himalaya Mall
 Sunrise park Road, Drive In ,
 Ahmedabad-380052, Gujarat ,India


E mail- info@diaphragmwallconstruction.com,gagangoswami@yahoo.co.in
Website- www.diaphragmwallconstruction.com

11

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Diaphragm Wall
 Diaphragm Wall Diaphragm Wall
Diaphragm Wall
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
1. SELECTION OF FOUNDATION AND SUBSOIL EXPLORATION/INVESTIGATION (FE) 2180609...
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
BCT MODULE 2 - Caisson
BCT MODULE 2 - CaissonBCT MODULE 2 - Caisson
BCT MODULE 2 - Caisson
 
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm walls
 
Pile cap
Pile cap Pile cap
Pile cap
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Foundation and its types and detailed explanation
Foundation and its types and detailed explanationFoundation and its types and detailed explanation
Foundation and its types and detailed explanation
 
TYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONSTYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONS
 
Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Foundation
FoundationFoundation
Foundation
 
Top down construction
Top down constructionTop down construction
Top down construction
 
TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)TYPES OF FOUNDATION(PPT)
TYPES OF FOUNDATION(PPT)
 
Well foundation pdf
Well foundation pdfWell foundation pdf
Well foundation pdf
 
Project Execution Plan for High Rise Building
Project Execution Plan for High Rise BuildingProject Execution Plan for High Rise Building
Project Execution Plan for High Rise Building
 

Destaque

My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
Filipe Mello
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
Junaida Wally
 

Destaque (20)

Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Guidelines
GuidelinesGuidelines
Guidelines
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydro...
 
Tunneling
Tunneling  Tunneling
Tunneling
 
Bridge
BridgeBridge
Bridge
 
NEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHODNEW AUSTRIAN TUNNELING METHOD
NEW AUSTRIAN TUNNELING METHOD
 
Precast segmental concrete bridges a
Precast segmental concrete bridges aPrecast segmental concrete bridges a
Precast segmental concrete bridges a
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)Strukturas General Presentation (200ppi)
Strukturas General Presentation (200ppi)
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel SolutionsCorrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...Areas related to circles - Area of sector and segment of a circle (Class 10 m...
Areas related to circles - Area of sector and segment of a circle (Class 10 m...
 

Semelhante a Top down construction presentation

Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakamba
John Chakamba
 
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm walls
Nguyen Bao
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
juwes
 
Lesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxLesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptx
sydneyaugust1
 

Semelhante a Top down construction presentation (20)

bulding foundation for costruction (6).ppt
bulding foundation for costruction (6).pptbulding foundation for costruction (6).ppt
bulding foundation for costruction (6).ppt
 
Eport work copy pdf
Eport work copy pdfEport work copy pdf
Eport work copy pdf
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Tutor cavity wall construction .ppt 1
Tutor cavity wall construction .ppt 1Tutor cavity wall construction .ppt 1
Tutor cavity wall construction .ppt 1
 
Construction Technology Essay Sample Harvard
Construction Technology Essay Sample HarvardConstruction Technology Essay Sample Harvard
Construction Technology Essay Sample Harvard
 
Floors, roofs, shoring and underpinning.pptx
Floors, roofs, shoring and underpinning.pptxFloors, roofs, shoring and underpinning.pptx
Floors, roofs, shoring and underpinning.pptx
 
Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakamba
 
Floors
FloorsFloors
Floors
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Diaphragm walls
Diaphragm wallsDiaphragm walls
Diaphragm walls
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4am
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinning
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
pile wall
pile wallpile wall
pile wall
 
Lesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptxLesson 3 Floor screeds _suspended floors.pptx
Lesson 3 Floor screeds _suspended floors.pptx
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
1.2 Diaphragm walls.pptx
1.2 Diaphragm walls.pptx1.2 Diaphragm walls.pptx
1.2 Diaphragm walls.pptx
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

Top down construction presentation

  • 2. Why Top Down Construction Required    Top Down Construction are commonly used in congested areas. These can be installed in close proximity to existing structure with minimal loss of support to existing foundations. In addition, construction dewatering is not required, so there is no associated subsidence. Top Down Construction are practically suited in the construction of deep basements , Metro Railway Projects. The “Top Down” method of construction is designated to enable above ground construction work to be carried out simultaneously with the excavation of the basement resulting in significant saving of time on a project. Using Top Down Construction more Building and Basement Area can use. Suitable for two or more basement. 2
  • 3. METHODOLOGY OF TOP DOWN CONSTRUCTION    Diaphragm wall Installed in both side up to design depth with coupler bars/dowel bars for different level slabs as per alignment. if span is more between diaphragm wall Barrete Piles can be use as a intermediate Columns to support the slabs. The soil is excavated just below roof slab level with margin for P.C.C. thickness, if roof slab level is more than 3 meter and span is more than structural strut to be provided to support diaphragm wall as per design. Coupler bars/ Dowel bars to be exposed from Diaphragm wall both end reinforcement to be completed as per design. 3
  • 4.     R.C.C. slab to be cast with suitable size openings for further Construction in suitable interval (around 40 t0 50 mtr) suit to site and for proper air ventilation. Coupler bars/Dowels bars provisions to be kept for centre wall (In Tunnel case) and opening closing after construction. 100/150 mm pipe (1 meter C/C)opening to be kept in roof slab thickness for concreting of center wall. After Casting of slab, excavation to be continued through opening provided with the help of Long arm excavators/Crane and Bucket. Small excavator to be lowered inside to feed soils for long arm excavator.(Proper Lighting, Air Circulation is must). 4
  • 5.      P.C.C. to be break by using small excavator and excavation to be continued till base slab level. Coupler bars to be exposed and base slab to be cast as per design. Center wall to be cast with dowel bars from Base slab and finally connect with coupler bars from roof slab. Scaffolding and bottom form work to be fixed below openings , coupler bars to be exposed and reinforcement for opening to be completed and concreting to be done. After concreting of openings , water proofing if required to be done than backfilling to be done in layers and finally surface to be leveled and reinstating the same. 5
  • 6. Schematic section of Top Down Construction 6
  • 7. Schematic section of Top Down Construction 7
  • 8. Schematic section of Top Down Construction 8
  • 11. Contact Details Gagan Goswami  Cell-+919662506595 Address HERITAGE INFRASPACE INDIA PVT. LTD  F-36,Sukh Shine Complex,  Opposite to Himalaya Mall  Sunrise park Road, Drive In ,  Ahmedabad-380052, Gujarat ,India  E mail- info@diaphragmwallconstruction.com,gagangoswami@yahoo.co.in Website- www.diaphragmwallconstruction.com 11