Diagram of a typical coal-fired thermal power station
Diagram of a typical coal-fired thermal power station 1. Cooling tower 10. Steam Control valve 19. Superheater 2. Cooling water pump 11. High pressure steam turbine 20. Forced draught (draft) fan 3. transmission line (3-phase) 12. Deaerator 21. Reheater 4. Step-up transformer (3-phase) 13. Feed water heater 22. Combustion air intake 5. Electrical generator (3-phase) 14. Coal conveyor 23. Economiser 6. Low pressure steam turbine 15. Coal hopper 24. Air preheater 7. Condensate pump 16. Coal pulveriser 25. Precipitator 8. Surface condenser 17. Boiler steam drum 26. Induced draught (draft) fan 9. Intermediate pressure steam turbine 18. Bottom ash hopper 27. Flue gas stack
 
Main parts of the plant are 1.  Coal conveyor  2.  Stoker  3.  Pulveriser  4.  Boiler  5.  Super heater 6.  Reheater 7.  Air preheater 8.  Deaerator 9.  Turbine( PRIME MOVER ) 10.  Condenser 11. Cooling towers 12. Electrostatic precipitator 13. Smoke stack  14. Generator   15. Transformers   16. Control room & Switchyard
Coal conveyor :  This is a belt type of arrangement. With this coal is transported from coal storage place in power plant to the place near by boiler.  Stoker :   The coal which is brought near by boiler has to put in boiler furnace for combustion. This stoker is a mechanical device for feeding coal to a furnace. Pulverizer  :  The coal is put in the boiler after pulverization. For this pulverizer is used. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant.  A pulverizer is a device for grinding coal for combustion in a furnace in a power plant.
Boiler :  Now that pulverized coal is put in boiler furnace. Boiler is an enclosed vessel in which water is heated and circulated until the water is turned in to steam at the required pressure. Coal is burned inside the combustion chamber of boiler. The products of combustion are nothing but gases. These gases which are at high temperature vaporize the water inside the boiler to steam. Some times this steam is further heated in a super heater as higher the steam pressure and temperature the greater efficiency the engine will have in converting the heat in steam in to mechanical work. This steam at high pressure and temperature is used directly as a heating medium, or as the working fluid in a prime mover to convert thermal energy to mechanical work, which in turn may be converted to electrical energy. Although other fluids are sometimes used for these purposes, water is by far the most common because of its economy and suitable thermodynamic characteristics. Superheater :  Most of the modern boilers are having super heater and reheater arrangement. Superheater is a component of a steam-generating unit in which steam, after it has left the boiler drum, is heated above its saturation temperature. The amount of superheat added to the steam is influenced by the location, arrangement, and amount of super heater surface installed, as well as the rating of the boiler. The super heater may consist of one or more stages of tube banks arranged to effectively transfer heat from the products of combustion. Super heaters are classified as convection , radiant or combination of these.
Reheater :  Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy. Reheater is also steam boiler component in which heat is added to this intermediate-pressure steam, which has given up some of its energy in expansion through the high-pressure turbine. The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy. This mechanical energy is used to run the alternator, which is coupled to turbine , there by generating electrical energy.
Economiser  :  Flue gases coming out of the boiler carry lot of heat. Function of economiser is to recover some of the heat from the heat carried away in the flue gases up the chimney and utilize for heating the feed water to the boiler. It is placed in the passage of flue gases in between the exit from the boiler and the entry to the chimney. The use of economiser results in saving in coal consumption , increase in steaming rate and high boiler efficiency but needs extra investment and increase in maintenance costs and floor area required for the plant. This is used in all modern plants. In this a large number of small diameter thin walled tubes are placed between two headers. Feed water enters the tube through one header and leaves through the other.  The flue gases flow out side the tubes usually in counter flow.   Air preheater  :  The remaining heat of flue gases is utilized by air preheater. It is a device used in steam boilers to transfer heat from the flue gases to the combustion air before the air enters the furnace. Also known as air heater; air-heating system. It is not shown in the lay out. But it is kept at a place near by where the air enters in to the boiler. The purpose of the air preheater is to recover the heat from the flue gas from the boiler to improve boiler efficiency by burning warm air which increases combustion efficiency, and reducing useful heat lost from the flue.
Deaerator :  A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones, in order to avoid corrosion of the metal. Generally, power stations use a Deaerator to provide for the removal of air and other dissolved gases from the boiler feed water. A deaerator typically includes a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as the deaerated boiler feed water storage tank.
Prime Movers:  These depend on the fuel used. Coal fired plants use Steam Turbines. In case of coal fired plants steam produced in the boiler is passed through an axial flow turbine. The turbine is coupled to the generator and thus energy conversion is achieved. Increasing the unit capacity from 100MW to 250MW results in saving of about 15% in their capital cost per kW. Moreover units of this magnitude result in fuel saving of almost 8% per kWh. The cost of installation is also low for such units.
 
Condenser :  Steam after rotating steam turbine comes to condenser. Condenser refers here to the shell and tube heat exchanger (or surface condenser) installed at the outlet of every steam turbine in Thermal power stations of utility companies generally. These condensers are heat exchangers which convert steam from its gaseous to its liquid state, also known as phase transition. In so doing, the latent heat of steam is given out inside the condenser. Where water is in short supply an air cooled condenser is often used. An air cooled condenser is however significantly more expensive and cannot achieve as low a steam turbine backpressure (and therefore less efficient) as a surface condenser. The purpose is to condense the outlet (or exhaust) steam from steam turbine to obtain maximum efficiency and also to get the condensed steam in the form of pure water, otherwise known as condensate, back to steam generator or (boiler) as boiler feed water.
Cooling Towers : The condensate (water) formed in the condenser after condensation is initially at high temperature. This hot water is passed to cooling towers. It is a tower- or building-like device in which atmospheric air (the heat receiver) circulates in direct or indirect contact with warmer water (the heat source) and the water is thereby cooled. A cooling tower may serve as the heat sink in a conventional thermodynamic process, such as refrigeration or steam power generation, and when it is convenient or desirable to make final heat rejection to atmospheric air. Water, acting as the heat-transfer fluid, gives up heat to atmospheric air, and thus cooled, is recirculated through the system, affording economical operation of the process.
Electrostatic precipitator :  It is a device which removes dust or other finely divided particles from flue gases by charging the particles inductively with an electric field, then attracting them to highly charged collector plates. Also known as precipitator. The process depends on two steps. In the first step the suspension passes through an electric discharge (corona discharge) area where ionization of the gas occurs. The ions produced collide with the suspended particles and confer on them an electric charge. The charged particles drift toward an electrode of opposite sign and are deposited on the electrode where their electric charge is neutralized. The phenomenon would be more correctly designated as electrode position from the gas phase.
Smoke stack :  A chimney is a system for venting hot flue gases or smoke from a boiler, stove, furnace or fireplace to the outside atmosphere. They are typically almost vertical to ensure that the hot gases flow smoothly, drawing air into the combustion through the chimney effect (also known as the stack effect). The space inside a chimney is called a flue. Chimneys may be found in buildings, steam locomotives and ships. In the US, the term smokestack (colloquially, stack) is also used when referring to locomotive chimneys. The term funnel is generally used for ship chimneys and sometimes used to refer to locomotive chimneys. Chimneys are tall to increase their draw of air for combustion and to disperse pollutants in the flue gases over a greater area so as to reduce the pollutant concentrations in compliance with regulatory or other limits.
Generator :  An alternator is an electromechanical device that converts mechanical energy to alternating current electrical energy. Most alternators use a rotating magnetic field. Different geometries - such as a linear alternator for use with stirling engines - are also occasionally used. In principle, any AC generator can be called an alternator, but usually the word refers to small rotating machines driven by automotive and other internal combustion engines. Transformers :  It is a device that transfers electric energy from one alternating-current circuit to one or more other circuits, either increasing (stepping up) or reducing (stepping down) the voltage. Uses for transformers include reducing the line voltage to operate low-voltage devices and raising the voltage from electric generators so that electric power can be transmitted over long distances. Transformers act through electromagnetic induction; current in the primary coil induces current in the secondary coil. The secondary voltage is calculated by multiplying the primary voltage by the ratio of the number of turns in the secondary coil to that in the primary.
Monitoring and alarm system :   Most of the power plant operational controls are automatic. However, at times, manual intervention may be required. Thus, the plant is provided with monitors and alarm systems that alert the plant operators when certain operating parameters are seriously deviating from their normal range. Battery supplied emergency lighting and communication :  A central battery system consisting of lead acid cell units is provided to supply emergency electric power, when needed, to essential items such as the power plant's control systems, communication systems, turbine lube oil pumps, and emergency lighting. This is essential for a safe, damage-free shutdown of the units in an emergency situation. Control Room and Switchyard :  The control room monitors the overall operation of the plant. It is provided with controls for real and reactive power flow. It is provided with safety relays and switchgears.
 

Mais conteúdo relacionado

Mais procurados

Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
Manish Kumar
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
Rama Charan
 

Mais procurados (20)

Thermal Power Plant
Thermal  Power  PlantThermal  Power  Plant
Thermal Power Plant
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Power plant
Power plantPower plant
Power plant
 
Coal Fired Power Plant
Coal Fired Power PlantCoal Fired Power Plant
Coal Fired Power Plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANT
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power station
Thermal power stationThermal power station
Thermal power station
 
Thermal Power Generation
Thermal Power GenerationThermal Power Generation
Thermal Power Generation
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Thermal Power Station
Thermal Power StationThermal Power Station
Thermal Power Station
 
Thermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeThermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to Knowledge
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 

Destaque

Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpur
Madhur Sharma
 

Destaque (11)

bhushan steel ppt
bhushan steel pptbhushan steel ppt
bhushan steel ppt
 
durgapur steel plant
 durgapur steel plant durgapur steel plant
durgapur steel plant
 
WRM & BM
WRM & BMWRM & BM
WRM & BM
 
Industrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpurIndustrial summer training at ntpc,badarpur
Industrial summer training at ntpc,badarpur
 
Blast furnace
Blast furnaceBlast furnace
Blast furnace
 
Blast furnace presentation
Blast furnace presentation Blast furnace presentation
Blast furnace presentation
 
Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)
 
M1 seminar
M1 seminarM1 seminar
M1 seminar
 
Summer training report on bhushan steels
Summer training report on bhushan steelsSummer training report on bhushan steels
Summer training report on bhushan steels
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training ppt
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 

Semelhante a Thermal power plant

Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
arvind singh rathore
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
kini_niki
 
Power Plant Report
Power Plant ReportPower Plant Report
Power Plant Report
Eslam Ahmed
 

Semelhante a Thermal power plant (20)

SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Bandel training
Bandel trainingBandel training
Bandel training
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Sandeep verma ppt on kstps
Sandeep verma ppt on kstps   Sandeep verma ppt on kstps
Sandeep verma ppt on kstps
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
lecture on steam plant
 lecture on steam  plant lecture on steam  plant
lecture on steam plant
 
Ntpc2
Ntpc2Ntpc2
Ntpc2
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
ntpc thermal power plant.ppt
ntpc thermal power plant.pptntpc thermal power plant.ppt
ntpc thermal power plant.ppt
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
 
Power Plant Report
Power Plant ReportPower Plant Report
Power Plant Report
 
Power-Plant-Engineering.pptx
Power-Plant-Engineering.pptxPower-Plant-Engineering.pptx
Power-Plant-Engineering.pptx
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 

Último

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Último (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 

Thermal power plant

  • 1. ABHISHEK KUMAR ASIF AHMAD NIKET RAKESHAN ZEESHAN ALI
  • 2.
  • 3.
  • 4. Diagram of a typical coal-fired thermal power station
  • 5. Diagram of a typical coal-fired thermal power station 1. Cooling tower 10. Steam Control valve 19. Superheater 2. Cooling water pump 11. High pressure steam turbine 20. Forced draught (draft) fan 3. transmission line (3-phase) 12. Deaerator 21. Reheater 4. Step-up transformer (3-phase) 13. Feed water heater 22. Combustion air intake 5. Electrical generator (3-phase) 14. Coal conveyor 23. Economiser 6. Low pressure steam turbine 15. Coal hopper 24. Air preheater 7. Condensate pump 16. Coal pulveriser 25. Precipitator 8. Surface condenser 17. Boiler steam drum 26. Induced draught (draft) fan 9. Intermediate pressure steam turbine 18. Bottom ash hopper 27. Flue gas stack
  • 6.  
  • 7. Main parts of the plant are 1. Coal conveyor  2. Stoker  3. Pulveriser  4. Boiler  5. Super heater 6. Reheater 7. Air preheater 8. Deaerator 9. Turbine( PRIME MOVER ) 10. Condenser 11. Cooling towers 12. Electrostatic precipitator 13. Smoke stack  14. Generator   15. Transformers   16. Control room & Switchyard
  • 8. Coal conveyor :  This is a belt type of arrangement. With this coal is transported from coal storage place in power plant to the place near by boiler.  Stoker :   The coal which is brought near by boiler has to put in boiler furnace for combustion. This stoker is a mechanical device for feeding coal to a furnace. Pulverizer  : The coal is put in the boiler after pulverization. For this pulverizer is used. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant. A pulverizer is a device for grinding coal for combustion in a furnace in a power plant.
  • 9. Boiler :  Now that pulverized coal is put in boiler furnace. Boiler is an enclosed vessel in which water is heated and circulated until the water is turned in to steam at the required pressure. Coal is burned inside the combustion chamber of boiler. The products of combustion are nothing but gases. These gases which are at high temperature vaporize the water inside the boiler to steam. Some times this steam is further heated in a super heater as higher the steam pressure and temperature the greater efficiency the engine will have in converting the heat in steam in to mechanical work. This steam at high pressure and temperature is used directly as a heating medium, or as the working fluid in a prime mover to convert thermal energy to mechanical work, which in turn may be converted to electrical energy. Although other fluids are sometimes used for these purposes, water is by far the most common because of its economy and suitable thermodynamic characteristics. Superheater :  Most of the modern boilers are having super heater and reheater arrangement. Superheater is a component of a steam-generating unit in which steam, after it has left the boiler drum, is heated above its saturation temperature. The amount of superheat added to the steam is influenced by the location, arrangement, and amount of super heater surface installed, as well as the rating of the boiler. The super heater may consist of one or more stages of tube banks arranged to effectively transfer heat from the products of combustion. Super heaters are classified as convection , radiant or combination of these.
  • 10. Reheater :  Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy. Reheater is also steam boiler component in which heat is added to this intermediate-pressure steam, which has given up some of its energy in expansion through the high-pressure turbine. The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy. This mechanical energy is used to run the alternator, which is coupled to turbine , there by generating electrical energy.
  • 11. Economiser :  Flue gases coming out of the boiler carry lot of heat. Function of economiser is to recover some of the heat from the heat carried away in the flue gases up the chimney and utilize for heating the feed water to the boiler. It is placed in the passage of flue gases in between the exit from the boiler and the entry to the chimney. The use of economiser results in saving in coal consumption , increase in steaming rate and high boiler efficiency but needs extra investment and increase in maintenance costs and floor area required for the plant. This is used in all modern plants. In this a large number of small diameter thin walled tubes are placed between two headers. Feed water enters the tube through one header and leaves through the other. The flue gases flow out side the tubes usually in counter flow. Air preheater :  The remaining heat of flue gases is utilized by air preheater. It is a device used in steam boilers to transfer heat from the flue gases to the combustion air before the air enters the furnace. Also known as air heater; air-heating system. It is not shown in the lay out. But it is kept at a place near by where the air enters in to the boiler. The purpose of the air preheater is to recover the heat from the flue gas from the boiler to improve boiler efficiency by burning warm air which increases combustion efficiency, and reducing useful heat lost from the flue.
  • 12. Deaerator : A steam generating boiler requires that the boiler feed water should be devoid of air and other dissolved gases, particularly corrosive ones, in order to avoid corrosion of the metal. Generally, power stations use a Deaerator to provide for the removal of air and other dissolved gases from the boiler feed water. A deaerator typically includes a vertical, domed deaeration section mounted on top of a horizontal cylindrical vessel which serves as the deaerated boiler feed water storage tank.
  • 13. Prime Movers: These depend on the fuel used. Coal fired plants use Steam Turbines. In case of coal fired plants steam produced in the boiler is passed through an axial flow turbine. The turbine is coupled to the generator and thus energy conversion is achieved. Increasing the unit capacity from 100MW to 250MW results in saving of about 15% in their capital cost per kW. Moreover units of this magnitude result in fuel saving of almost 8% per kWh. The cost of installation is also low for such units.
  • 14.  
  • 15. Condenser :  Steam after rotating steam turbine comes to condenser. Condenser refers here to the shell and tube heat exchanger (or surface condenser) installed at the outlet of every steam turbine in Thermal power stations of utility companies generally. These condensers are heat exchangers which convert steam from its gaseous to its liquid state, also known as phase transition. In so doing, the latent heat of steam is given out inside the condenser. Where water is in short supply an air cooled condenser is often used. An air cooled condenser is however significantly more expensive and cannot achieve as low a steam turbine backpressure (and therefore less efficient) as a surface condenser. The purpose is to condense the outlet (or exhaust) steam from steam turbine to obtain maximum efficiency and also to get the condensed steam in the form of pure water, otherwise known as condensate, back to steam generator or (boiler) as boiler feed water.
  • 16. Cooling Towers : The condensate (water) formed in the condenser after condensation is initially at high temperature. This hot water is passed to cooling towers. It is a tower- or building-like device in which atmospheric air (the heat receiver) circulates in direct or indirect contact with warmer water (the heat source) and the water is thereby cooled. A cooling tower may serve as the heat sink in a conventional thermodynamic process, such as refrigeration or steam power generation, and when it is convenient or desirable to make final heat rejection to atmospheric air. Water, acting as the heat-transfer fluid, gives up heat to atmospheric air, and thus cooled, is recirculated through the system, affording economical operation of the process.
  • 17. Electrostatic precipitator :  It is a device which removes dust or other finely divided particles from flue gases by charging the particles inductively with an electric field, then attracting them to highly charged collector plates. Also known as precipitator. The process depends on two steps. In the first step the suspension passes through an electric discharge (corona discharge) area where ionization of the gas occurs. The ions produced collide with the suspended particles and confer on them an electric charge. The charged particles drift toward an electrode of opposite sign and are deposited on the electrode where their electric charge is neutralized. The phenomenon would be more correctly designated as electrode position from the gas phase.
  • 18. Smoke stack : A chimney is a system for venting hot flue gases or smoke from a boiler, stove, furnace or fireplace to the outside atmosphere. They are typically almost vertical to ensure that the hot gases flow smoothly, drawing air into the combustion through the chimney effect (also known as the stack effect). The space inside a chimney is called a flue. Chimneys may be found in buildings, steam locomotives and ships. In the US, the term smokestack (colloquially, stack) is also used when referring to locomotive chimneys. The term funnel is generally used for ship chimneys and sometimes used to refer to locomotive chimneys. Chimneys are tall to increase their draw of air for combustion and to disperse pollutants in the flue gases over a greater area so as to reduce the pollutant concentrations in compliance with regulatory or other limits.
  • 19. Generator :  An alternator is an electromechanical device that converts mechanical energy to alternating current electrical energy. Most alternators use a rotating magnetic field. Different geometries - such as a linear alternator for use with stirling engines - are also occasionally used. In principle, any AC generator can be called an alternator, but usually the word refers to small rotating machines driven by automotive and other internal combustion engines. Transformers : It is a device that transfers electric energy from one alternating-current circuit to one or more other circuits, either increasing (stepping up) or reducing (stepping down) the voltage. Uses for transformers include reducing the line voltage to operate low-voltage devices and raising the voltage from electric generators so that electric power can be transmitted over long distances. Transformers act through electromagnetic induction; current in the primary coil induces current in the secondary coil. The secondary voltage is calculated by multiplying the primary voltage by the ratio of the number of turns in the secondary coil to that in the primary.
  • 20. Monitoring and alarm system : Most of the power plant operational controls are automatic. However, at times, manual intervention may be required. Thus, the plant is provided with monitors and alarm systems that alert the plant operators when certain operating parameters are seriously deviating from their normal range. Battery supplied emergency lighting and communication : A central battery system consisting of lead acid cell units is provided to supply emergency electric power, when needed, to essential items such as the power plant's control systems, communication systems, turbine lube oil pumps, and emergency lighting. This is essential for a safe, damage-free shutdown of the units in an emergency situation. Control Room and Switchyard : The control room monitors the overall operation of the plant. It is provided with controls for real and reactive power flow. It is provided with safety relays and switchgears.