SlideShare uma empresa Scribd logo
1 de 8
Chapter 3
Defining the Project

Irwin/McGraw-Hill

©The McGraw-Hill Companies, 2000
Project Management Trade-Offs
Figure 3-1

Performance

Quality

Cost
Irwin/McGraw-Hill

Time
©The McGraw-Hill Companies, 2000
Project Priority Matrix
Figure 3-2

Time

Performance

Cost

Constrain
Enhance
Accept

Irwin/McGraw-Hill

©The McGraw-Hill Companies, 2000
Hierarchical Breakdown of the WBS
Figure 3-3

Level

Hierarchical breakdown

1

Project

2

Deliverable

3
4

Subdeliverable
Lowest subdeliverable

Description
Complete project
Major deliverables
Supporting deliverables
Lowest management
responsibility level

Cost account*

Grouping of work packages
for monitoring progress and
responsibility

Work package

5

Identifiable work activities

*This breakdown groups work packages by type of work within a deliverable and allows assignment of
responsibility to an organizational unit. This extra step facilities a system for monitoring project progress
(discussed in Chapter 12).

Irwin/McGraw-Hill

©The McGraw-Hill Companies, 2000
Work Breakdown Structure
Figure 3-4

Personal computer
prototype

Level
1

2

Vendor,
software,
applications
~

3

Mouse,
keyboard,
voice
~
Floppy
~

Microprocessor
unit

Disk
storage
units
Optical

More
items

Hard

Internal
memory
unit

~

BIOS (basic
input/output
system)

ROM

Lowest manageable
subdeliverables

Irwin/McGraw-Hill

Motor

Circuit
board

Chassis
frame

WP-1M

5

WP-1 CB
WP-2 CB
WP-3 CB
WP-4 CB
WP-5 CB
WP-6 CB
WP-7 CB

WP-1 CF
WP-2 CF
WP-3 CF

RAM

I/O

File

~

4

~

~

~

Utilities
~

Read/write
head
WP-1 RWH
WP-2 RWH
WP-3 RWH
WP-4 RWH
WP-5 RWH

Work packages

©The McGraw-Hill Companies, 2000
Integration of WBS and OBS
Figure 3-5

Personal computer
prototype

Level
1

More
items

1.0
1.3

1.2
2

Vendor,
software,
applications

1.1

Mouse,
keyboard,
voice

3

Floppy
~

Microprocessor
unit

Disk
storage
units

~ 1.1.1

~

1.4

1.1.2

Optical

1.4.1

1.1.3

Internal
memory
unit

Hard

~

1.4.1.1
4

1.4.2

BIOS (basic
input/output
system)
1.4.1.2

1.4.2.1

1.4.2.2

Lowest manageable
subdeliverables

1.1.3.1

Motor

Production
Test
Purchasing
Software

Irwin/McGraw-Hill

Circuit
board
Cost
account
Cost
account
Cost
account

Design
Manufacturing
Organization

1.1.3.2

Cost
account
Cost
account

RAM

I/O

File

~
5

ROM

~

~

~

1.1.3.3

Chassis
frame

1.4.2.3

Utilities
~

1.1.3.4

Read/write
head
1.1.3.4.1

Cost
account
Cost
account

Cost account
number
Work packages
WP1.1.3.4.2.1
WP1.1.3.4.2.2
WP1.1.3.4.2.3
Budget by
period
Time

©The McGraw-Hill Companies, 2000
Read/Write Head Design
Figure 3-8

Work package cost estimate
Cost
Direct Costs
Design engineers
Proto engineers
Materials
Equipment rental
Total direct costs

Irwin/McGraw-Hill

Low

Average

High

$ 80
130
25
25

$100
150
25
25

$150
280
25
30

$260

$300

$485

©The McGraw-Hill Companies, 2000
Three Views of Cost
Figure 3-9

$6,000
5,000

Costs

4,000
3,000
2,000
1,000

Committed
Actual cost
Scheduled budget

Project Duration
Irwin/McGraw-Hill

©The McGraw-Hill Companies, 2000

Mais conteúdo relacionado

Mais procurados

Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
Asa Chan
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
9anm12
 
Revised recovery programme preparation practical guide rev.00
Revised recovery programme preparation practical guide rev.00Revised recovery programme preparation practical guide rev.00
Revised recovery programme preparation practical guide rev.00
ElHusseinAllam
 
05.scope management updated
05.scope management updated05.scope management updated
05.scope management updated
Shraddha PMP
 

Mais procurados (20)

It2403 spm
It2403 spmIt2403 spm
It2403 spm
 
Spm unit1
Spm unit1Spm unit1
Spm unit1
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
 
Spm project planning
Spm project planning Spm project planning
Spm project planning
 
Pmp brain-dump
Pmp brain-dumpPmp brain-dump
Pmp brain-dump
 
Chap06 project time management
Chap06 project time managementChap06 project time management
Chap06 project time management
 
Spm unit 4
Spm unit 4Spm unit 4
Spm unit 4
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost Estimation
 
How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2
 
Lean planning with Oracle Primavera Cloud
Lean planning  with Oracle Primavera CloudLean planning  with Oracle Primavera Cloud
Lean planning with Oracle Primavera Cloud
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Agile Business Rhythm
Agile Business RhythmAgile Business Rhythm
Agile Business Rhythm
 
project on software industry
project on software industryproject on software industry
project on software industry
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
PM Flashcards
PM FlashcardsPM Flashcards
PM Flashcards
 
Recovery Scheduling
Recovery SchedulingRecovery Scheduling
Recovery Scheduling
 
Revised recovery programme preparation practical guide rev.00
Revised recovery programme preparation practical guide rev.00Revised recovery programme preparation practical guide rev.00
Revised recovery programme preparation practical guide rev.00
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
05.scope management updated
05.scope management updated05.scope management updated
05.scope management updated
 

Destaque (9)

Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Definitions Of Project
Definitions Of ProjectDefinitions Of Project
Definitions Of Project
 
Chap005
Chap005Chap005
Chap005
 
Project Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic IndustriesProject Management: New Product Development for Amazon Ceramic Industries
Project Management: New Product Development for Amazon Ceramic Industries
 
Project Definition
Project DefinitionProject Definition
Project Definition
 
PM Session 4
PM Session 4PM Session 4
PM Session 4
 
Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007Bangkok Mega Bridge Project Management 2007
Bangkok Mega Bridge Project Management 2007
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importance
 
Wal-Mart Analysis (Strategic Management)
Wal-Mart Analysis (Strategic Management)Wal-Mart Analysis (Strategic Management)
Wal-Mart Analysis (Strategic Management)
 

Semelhante a Chpt03 defining the project

BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docxBoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
jasoninnes20
 
Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805
Udaya Kumar
 
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docxSheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
maoanderton
 
Feasibility Analysis.ppt
Feasibility Analysis.pptFeasibility Analysis.ppt
Feasibility Analysis.ppt
BetshaTizazu2
 
Bizier.brenda
Bizier.brendaBizier.brenda
Bizier.brenda
NASAPMC
 
Iwsm2014 performance measurement for cloud computing applications using iso...
Iwsm2014   performance measurement for cloud computing applications using iso...Iwsm2014   performance measurement for cloud computing applications using iso...
Iwsm2014 performance measurement for cloud computing applications using iso...
Nesma
 

Semelhante a Chpt03 defining the project (20)

BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docxBoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
BoardSprintUser Story ScenarioDesignDevelopmentTestUAT Release1U .docx
 
Summary of Accelerate - 2019 State of Devops report by Google Cloud's DORA
Summary of Accelerate - 2019 State of Devops report by Google Cloud's DORASummary of Accelerate - 2019 State of Devops report by Google Cloud's DORA
Summary of Accelerate - 2019 State of Devops report by Google Cloud's DORA
 
Print report
Print reportPrint report
Print report
 
NCV 3 Project Management Hands-On Support Slide Show - Module 6
NCV 3 Project Management Hands-On Support Slide Show - Module 6NCV 3 Project Management Hands-On Support Slide Show - Module 6
NCV 3 Project Management Hands-On Support Slide Show - Module 6
 
Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805Appendix b functionaldesignphasebusinessequirementsdocument021805
Appendix b functionaldesignphasebusinessequirementsdocument021805
 
Agile transformation and scaling
Agile transformation and scalingAgile transformation and scaling
Agile transformation and scaling
 
Sow p9
Sow p9Sow p9
Sow p9
 
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docxSheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
Sheet1[Project Name]0Gantt ChartSecurity Network UpgradeTeam BToda.docx
 
Feasibility Analysis.ppt
Feasibility Analysis.pptFeasibility Analysis.ppt
Feasibility Analysis.ppt
 
Brd template
Brd template Brd template
Brd template
 
Bizier.brenda
Bizier.brendaBizier.brenda
Bizier.brenda
 
Game plan wkshp1
Game plan wkshp1Game plan wkshp1
Game plan wkshp1
 
Iwsm2014 performance measurement for cloud computing applications using iso...
Iwsm2014   performance measurement for cloud computing applications using iso...Iwsm2014   performance measurement for cloud computing applications using iso...
Iwsm2014 performance measurement for cloud computing applications using iso...
 
Cloud Storage and Security
Cloud Storage and SecurityCloud Storage and Security
Cloud Storage and Security
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 
Realizing Fiber Design Efficiency Through FME
Realizing Fiber Design Efficiency Through FMERealizing Fiber Design Efficiency Through FME
Realizing Fiber Design Efficiency Through FME
 
MGT3342BUS - Architecting Data Protection with Rubrik - VMworld 2017
MGT3342BUS - Architecting Data Protection with Rubrik - VMworld 2017MGT3342BUS - Architecting Data Protection with Rubrik - VMworld 2017
MGT3342BUS - Architecting Data Protection with Rubrik - VMworld 2017
 
Architecture Document Template
Architecture Document TemplateArchitecture Document Template
Architecture Document Template
 
IRJET- Secure Scheme For Cloud-Based Multimedia Content Storage
IRJET-  	  Secure Scheme For Cloud-Based Multimedia Content StorageIRJET-  	  Secure Scheme For Cloud-Based Multimedia Content Storage
IRJET- Secure Scheme For Cloud-Based Multimedia Content Storage
 
Unit vi
Unit  viUnit  vi
Unit vi
 

Último

Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Dubai Multi Commodity Centre
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
brennadilys816
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Último (20)

Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot ReportFuture of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
Future of Trade 2024 - Decoupled and Reconfigured - Snapshot Report
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
stock price prediction using machine learning
stock price prediction using machine learningstock price prediction using machine learning
stock price prediction using machine learning
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
 
MEANING AND CHARACTERISTICS OF TAXATION.
MEANING AND CHARACTERISTICS OF TAXATION.MEANING AND CHARACTERISTICS OF TAXATION.
MEANING AND CHARACTERISTICS OF TAXATION.
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptxExploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
Exploring-Pipe-Flanges-Applications-Types-and-Benefits.pptx
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 

Chpt03 defining the project

  • 1. Chapter 3 Defining the Project Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000
  • 2. Project Management Trade-Offs Figure 3-1 Performance Quality Cost Irwin/McGraw-Hill Time ©The McGraw-Hill Companies, 2000
  • 3. Project Priority Matrix Figure 3-2 Time Performance Cost Constrain Enhance Accept Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000
  • 4. Hierarchical Breakdown of the WBS Figure 3-3 Level Hierarchical breakdown 1 Project 2 Deliverable 3 4 Subdeliverable Lowest subdeliverable Description Complete project Major deliverables Supporting deliverables Lowest management responsibility level Cost account* Grouping of work packages for monitoring progress and responsibility Work package 5 Identifiable work activities *This breakdown groups work packages by type of work within a deliverable and allows assignment of responsibility to an organizational unit. This extra step facilities a system for monitoring project progress (discussed in Chapter 12). Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000
  • 5. Work Breakdown Structure Figure 3-4 Personal computer prototype Level 1 2 Vendor, software, applications ~ 3 Mouse, keyboard, voice ~ Floppy ~ Microprocessor unit Disk storage units Optical More items Hard Internal memory unit ~ BIOS (basic input/output system) ROM Lowest manageable subdeliverables Irwin/McGraw-Hill Motor Circuit board Chassis frame WP-1M 5 WP-1 CB WP-2 CB WP-3 CB WP-4 CB WP-5 CB WP-6 CB WP-7 CB WP-1 CF WP-2 CF WP-3 CF RAM I/O File ~ 4 ~ ~ ~ Utilities ~ Read/write head WP-1 RWH WP-2 RWH WP-3 RWH WP-4 RWH WP-5 RWH Work packages ©The McGraw-Hill Companies, 2000
  • 6. Integration of WBS and OBS Figure 3-5 Personal computer prototype Level 1 More items 1.0 1.3 1.2 2 Vendor, software, applications 1.1 Mouse, keyboard, voice 3 Floppy ~ Microprocessor unit Disk storage units ~ 1.1.1 ~ 1.4 1.1.2 Optical 1.4.1 1.1.3 Internal memory unit Hard ~ 1.4.1.1 4 1.4.2 BIOS (basic input/output system) 1.4.1.2 1.4.2.1 1.4.2.2 Lowest manageable subdeliverables 1.1.3.1 Motor Production Test Purchasing Software Irwin/McGraw-Hill Circuit board Cost account Cost account Cost account Design Manufacturing Organization 1.1.3.2 Cost account Cost account RAM I/O File ~ 5 ROM ~ ~ ~ 1.1.3.3 Chassis frame 1.4.2.3 Utilities ~ 1.1.3.4 Read/write head 1.1.3.4.1 Cost account Cost account Cost account number Work packages WP1.1.3.4.2.1 WP1.1.3.4.2.2 WP1.1.3.4.2.3 Budget by period Time ©The McGraw-Hill Companies, 2000
  • 7. Read/Write Head Design Figure 3-8 Work package cost estimate Cost Direct Costs Design engineers Proto engineers Materials Equipment rental Total direct costs Irwin/McGraw-Hill Low Average High $ 80 130 25 25 $100 150 25 25 $150 280 25 30 $260 $300 $485 ©The McGraw-Hill Companies, 2000
  • 8. Three Views of Cost Figure 3-9 $6,000 5,000 Costs 4,000 3,000 2,000 1,000 Committed Actual cost Scheduled budget Project Duration Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000