Growth of India’s Power Sector
0
20
40
60
80
100
120
140
1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
InstalledGenerationCapacity(GW)
0
100
200
300
400
500
600
700
1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
Year
PerCapitaConsumption(kWh)
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
1940 1950 1960 1970 1980 1990 2000 2010 2020
NumberofVillagesElectrified (Projected)
• Serious Growth after 60’s
• Generation 6th
largest in world
• Per capita consumption low
• Close to 95% villages electrified
Ministry of Power, Government of India
The Status
Coal
67166
Gas
11840
Diesel
1196
Hydro
30135
Nuclear
2720
Wind
2488
• Installed Capacity > 120 GW
• Gross Generation: 620 billion kWh
• Per Capita Consumption ~ 600 kWh
• Coal dominant energy source (58%)
Ministry of Power, Government of India
India’s Future Growth
• India needs sustained economic
growth > 8% to radically
improve its HDI
• Growth in last few years ~ 5%-
7%
• Growth hampered by
infrastructure: electric power
– Peak shortfall
– Average shortfall
– High T&D Losses:
– Unscheduled black-outs,
especially in rural areas
– Supply to agriculture sector
not metered and almost free
Source: Groningen Growth and Development Center Total
Economy Database, http://www.ggdc.net/.
Growth Areas
• Present growth is skills or resource driven
(exports: software, gems and jewels, garment manufacture)
• Future Growth will have to be on value addition & engineering
• Rural sector to play a major role
(agricultural and dairy produce; minimizing wastage and improving
efficiency)
• Infrastructure building
(roads, buildings, railroads etc.,)
• Manufacturing
The elasticity has to be greater than 1 for powering
future growth
Elasticity and Electric Power Needs
• Target economic growth ~ 8%
• Elasticity of electricity with GDP
stabilizing at ~ 1.2
• Implications for future electric
power requirements by 2015:
– Capacity addition
– Investments
– Fuel mix
– Pricing and Policies
– T&D reforms
0
1
2
3
4
5
6
1951-
56
1956-
61
1961-
66
1969-
74
1974-
78
1980-
85
1985-
90
1992-
97
ElasticityofGenerationvsGDP
Review of State Electricity Boards
Electric Power Requirements
Generation(billionkWh)
Year
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
600
800
1000
1200
1400
1600
1800
2000
Key GDP Growth Rate
0.05
0.06
0.07
0.08
0.09
0.1
Required for 8% economic growth by 2015:
Installed Capacity 250 GW
Generation 1500 billion kWh
Per Capita Consumption 1000 kWh
CapacityNeeded(GW)
Year
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
100
120
140
160
180
200
220
240
260
280
300
Key GDP Growth Rate
0.05
0.06
0.07
0.08
0.09
0.1
The Task Ahead
• Need to add 135 GW in ten years
– 13,500 MW required per annum
– ~ One power plant per month
– China adds one per week !!
– Maximum added till now is
4,600 MW (One in four months)
0
5000
10000
15000
20000
25000
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
2014
AnnualCapacityAddition(MW)
Annual added capacity
Total Capacity addition required
Fuel Supply: Options for Future
• Coal
– Conventional
– Gasification
• Natural Gas
• Hydro
• Nuclear
– PHWR + FB + AHWR
– PLWR
• Wind
– On-shore
– Off-shore
• Biomass
• Solar
– Photo voltaic
– Concentrating Solar Power
Fuel Present In 2015
Coal 67,166 MW ?
Gas 11,840 MW ?
Hydro 30,135 MW ?
Nuclear 2,720 MW ?
Wind 2,488 MW ?
Biomass 1,000 MW ?
Solar - ?
TOTAL 115,035 MW 250,000 MW
King Coal !
• Reserves
– Proven 91 billion Tons
– Indicated 116 billion Tons
– Inferred 37 billion Tons
– TOTAL 245 billion Tons
• Coal reserves: > 250 years at present
levels of consumption
• Concentrated in Eastern India
Madhya
Pradesh
7%
Others
13%
Jharkhand
29%
Chattisgarh
16%
West Bengal
11%
Orissa
24%
Indian Coal Quality
• High ash: 25%-45%
• Low sulfur < 0.5%
• Low energy content
• CO2 emissions > 1 kg per kWh
• Issues with coal:
– Ash disposal: annual ash
generation > 90 million tons
– CO2 emissions
Heating
Value
(BTU/lb)
Ash
Content
(%)
Sulfur
(%)
Illinois # 6 10,900 11.00 3.25
Wyodak 11,960 5.97 0.40
WPC Utah 11,240 5.32 0.61
Indian Coal 6,500 25-45 <0.5
Coal: Future Scenarios
• Projections of coal demand (2015):
– High growth : 580 MT
– BAU scenario : 380 MT
– Domestic production will not be
enough. Imports needed
• Issues:
– Ash generation > 200 million Tons
– CO2 emissions > 850 Million Tons
– Particulate and NOx emissions
(presently not regulated)
– Coal transportation bottleneck: Rail
transportation stagnation
0
100
200
300
400
500
600
700
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
CoalRequirementinPowerSector(MillionTons)
Coal Transport by Railways
Business as Usual
Accelerated growth scenario
India’s CO2 Emissions
• India’s fossil based CO2 emissions in
2003:
– Coal 666 MMT
– Petroleum 305 MMT
– Natural Gas 53 MMT
• India’s CO2 emissions rapidly growing
– Trebled during 1981-2001
• India and China presently not subject to
mandatory cuts in CO2
– However future may not be so
0%
5%
10%
15%
20%
25%
30%
35%
1980 1985 1990 1995 2000 2005
ShareofGlobalCO2Emissions(%)
US
Western Europe
China
India
EIA, US Department of Energy
India China Total
1980 1.64% 7.83% 9.47%
2003 5.60% 19.34% 24.93%
Share of global emissions
Options with Coal
• Coal’s dominance will undoubtedly continue.
– Availability
– Cheap
• The question is: How much do we want to add with coal given the constraints
of quality, transportation, carbon emissions and environmental issues.
Installed Capacity
of Coal (GW)
Coal Required
(Million MT)
CO2 Emissions
(Million MT)
Upper Case Coal still
contributes 60%
of capacity
~ 150 GW 580 MMT 850 MMT
Lower Case Aggressive
deployment of
nuclear and
natural gas
technologies
~ 120 GW 470 MMT 690 MMT
Coal scenarios for high economic growth ~ 8%
Hydro-Electricity
• Inferred potential > 120 GW
• Installed capacity 30 GW
• Most big projects are in North-
Eastern states of Arunachal
Pradesh, Sikkim, Uttaranchal and
J&K
• Problems of rehabilitation and
resettlement with large projects
• Environmental issues
• Water sharing agreements with
neighbors
National Hydro Power Corporation, Government of India
Hydro-Electric Potential
State Capacity
(MW)
Dulhasti J&K 390
Dhauliganga Stage - I * Uttaranchal 140
Teesta Stage V Sikkim 510
Loktak Downstream Manipur 90
Parbati-II Himachal Pradesh 800
Sewa-II J&K 120
Subansiri Lower Arunachal Pradesh 2000
Teesta Lower Dam-III West Bengal 132
Omkareshwar Madhya Pradesh 520
TOTAL 4702
Details of projects under construction
Projects awaiting
clearance and
government approval
2,570 MW
Projects at DPR and
infrastructure
development stage
11,620 MW
Projects under survey
and investigation
11,000 MW
Ongoing and Planned Projects
Possible to add 10,000 MW by 2015
Natural Gas
• Fastest growing primary fuel, worldwide
• Indian statistics (2004-05):
Consumption: > 31 BCM/year
Primary uses:
Power 41%
Fertilizer 32%
Sponge Iron 4%
Other 23%
Growing needs for transportation (and some cooking)
Latent demand estimated as high as 80 BCM (depends on
price, of course)
Natural Gas
Pipelines
Indore
- onwards
to India
TAPS
TAPS
(across water)
CENTGAS
- to Pakistan
Indore
Baroda
333333333
KarachiGwadar
222222222
444444444
Gas supplyConsumption
center
New Delhi
Multan
1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar
111111111
Pakistan
Afghanistan
Iran
Turkmenistan
Qatar
India
Oman
Gas Authority of India Limited
India’s Gas Pipelines
Possible Gas Imports (Tongia & Arunachalam, 1999)
Imports of Gas
• LNG growing (5+ million tons/annum), but prices
remain high
– 1 ton LNG can power ~ 1 GW of power
– 1 BCM gas ~ .8 GW of power
thus, 20 BCM ~ 16,000 MW of gas power
• Initial imports won’t necessarily add to elec. capacity
– Will substitute naphtha in power plants and find other uses
as well
• More than half the fertilizer feedstock is gas
• Industry has already claimed the bulk of current LNG supplies
Biomass
• India predominantly agricultural
country.
• Annual production of agro-forest and
processing residues: 350 million tons
• Power generation potential > 22,000
MW
• Advantages:
– Decentralized generation: close to
rural load centers.
– Technology reasonably well
developed
– Environmentally friendly: No net CO2
emissions
Feedstock Examples Potential Installed
Agro-forest
residues
Wood chips,
mulberry,
coconut
shells
17,000 MW 50 MW
Processing
residues
Rice husk,
sugarcane
bagasse
5,000 MW 1000 MW
Biomass Conversion Technologies
• Gasifier-reciprocating engine
– Power plants of 5 kW – 100 kW possible
– Diesel engine needs ~ 15%-20% for
ignition
• Cost of electricity is high
– Gas engine can operate on 100% syngas
– Overall efficiency ~ 20%
– Largest gasifier 100 kW
• Fluidized bed combustion boilers
– Rice husk and bagasse
– 25%-30%
– Power plants of 5 MW – 35 MW operating in
various sugar mills
– Producing electricity is sweeter than sugar !!
50 kW biomass gasifier power plant in Karnataka
Biomass for Decentralized Rural
Power
• Electric power requirement of typical Indian village < 100 kW
– ~ 75% is irrigation pumps
– Presently these get virtually free, un-metered grid supply of poor quality, few
hours a day
• Locally available biomass can sustain a plant of 25 kW-100 kW
– Gasifier-reciprocating engine technology is fairly robust
• Cost of generation reasonable
– $ 0.06-0.07 per kWh
• BUT, still widespread dissemination not visible:
– Economics unviable due to low PLF
– People not willing to pay when state gives free !
– Loss of organic fertilizer on land
• Good potential from bagasse and husk:
– Can expect to add 3000 MW by 2015.
Wind Energy
• Gross potential : 45,000 MW
(assuming 1% land availability in potential areas)
• Technical potential : 13,000 MW
(assuming 20% grid penetration in potential areas)
• Rapid growth in installed capacity
from 1990s
• India ranks 5th
in the world
– Present installed capacity ~ 3000
MW
• Site selection issues:
– More from fiscal benefits than from
power
– Many plants not operating
– Low average load factor~13%
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
Germany
Spain
US
Denmark
India
Italy
Netherlands
UK
Japan
China
InstalledCapacity(MW)
Global Wind Energy Council
World Wind Installed Capacity (2005)
Wind Speed Maps of Selected
Countries
Denmark
In general, wind speeds lower (~200W/m2)
in India as compared to Europe (350 W/m2)
and US US
Off-shore Wind in Europe
• Europe and US have taken up several off-shore projects.
• Wind speeds higher
• Distance from shore in some cases ~ 30 – 40 km !
Country Capacity Depth (m) Distance
from Shore
(km)
Remarks
Denmark 160 MW 6 – 12 m 14 – 20 km Completed
UK 60 MW 4 – 8 m 2.3 km Completed
Denmark 23 MW 20 m 3.5 km Completed
Denmark 5 MW 3 – 5 m 6 km Completed
Sweden 10 MW 6 – 10 m 5 km Completed
Germany 1040 MW 30 m 43 – 50 km Planned
Netherlands 120 MW 20 – 24 m 23 km Planned
Germany 240 MW 20 m 34 km Planned
Ireland 520 MW 2 – 5 m 10 km Partly
complete
India: Off Shore Wind Scenario
0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0 1 6 0 0 1 8 0 0 2 0 0 0 2 2 0 0 2 4 0 0
D is t a n c e ( K m )
0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0 1 6 0 0 1 8 0 0 2 0 0 0 2 2 0 0 2 4 0 0
D is t a n c e ( K m )
0
2 0 0
4 0 0
6 0 0
8 0 0
1 0 0 0
1 2 0 0
1 4 0 0
1 6 0 0
1 8 0 0
2 0 0 0
2 2 0 0
2 4 0 0
Distance(Km)
0
2 0 0
4 0 0
6 0 0
8 0 0
1 0 0 0
1 2 0 0
1 4 0 0
1 6 0 0
1 8 0 0
2 0 0 0
2 2 0 0
2 4 0 0
Distance(Km)
B a t h y m e t r y o f In d ia n S e a s
D e p t h ( m e t r e s )
Nuclear Power: The Present Status
0
2000
4000
6000
8000
10000
12000
14000
1969 1973 1981 1984 1986 1991 1992 1993 1995 2000 2005 2006 2015
InstalledCapacity(MW)
Planned
Presently installed
Indian Nuclear Program: The Present
Status
• 12 PHWR & 2 BWR now under operation
• 4 PHWR and 2 LWR under commission
• 2950 MW generation & 3000 MW under
commission
• Successful experiments with Fast Breeder Test
Reactor (FBTR)
• Prototype Fast Breeder Reactor (PFBR) for
500MWe under construction
• Advanced Heavy Water Reactor (AHWR) using
(Pu-Th) O2 MOX for 300MWe: advanced stage of
design approval; construction soon to begin.
Indian Nuclear Program: The
Constraints
• Uranium ore reserves for only 10,000MWe for 40
years
• Non-signatory to NPT: no access to global
technologies, materials or services
• Slow growth of nuclear electric power: ~1000
MWe annually
• Major dependence on Pu and U233 MOX for fuel
• Complex fuel technologies. Total capacity limited
Why Cooperate?
• India needs electric power now, more than
ever, for human development and growth
• It must generate power from all energy
sources
• Excessive and continued dependence on
coal contributes to environmental
degradation & global warming
• Limitations of renewable energy sources
Why Cooperate?
• Politics of Non-Proliferation: Power &
Responsibility
• R&D: cooperation and Collaboration
• Bilateral trade & economic issues
• Sharing global energy resources
• Environmental concerns
• Shared vision: secular, democratic &
caring society
Why Cooperate?
Climate change is a greater threat to
humanity than terrorism, and no less
urgent.
---David King, Science Advisor to Prime
Minister of UK
An Action Plan
Until Nuclear Fusion and Hydrogen
technologies mature
• Minimizing wastage; energy conservation;
Development of Energy Plan
• Installation of nuclear power ( 34GW in 10
years)
• Investments in R&D to make renewable
technologies efficient, sustainable
&affordable
An Action Plan
• Strict enforcement of export controls of
technologies, equipment and services
• Nuclear power reactors under international
safeguards
• Collaboration in developing technologies
for utilizing MOX fuels for electric power
generation
• Participation in Gen. 4 R&D initiatives
Indian Energy Scenarios: 2015
Coal
60.44%
Gas
14.49%
Diesel
0.48%
Nuclear
5.06%
Hydro
15.96%
Solar thermal
0.40%
Biomass
1.19%
Wind
1.99%
Gas
14.49%
Diesel
0.48%
Nuclear
14.60%
Hydro
15.96%
Solar thermal
0.40%
Biomass
1.19%
Wind
1.99%
Coal
50.90%
Same Fuel Mix as now Aggressive Nuclear Capacity Addition
• Reduction in annual coal consumption ~ 100 Million Tons
• Reduction in annual CO2 Emissions > 170 Million Tons
• ~ Total present CO2 emissions of Netherlands !
Primary energy consumption per
capita
What If….
India & China Were “Developed”by 2013?
• Expected Carbon Emission:
14,400 Million Tons (2.5 times
present global emissions !!)
• CO2 concentration > 400 ppm
• Temperature rise > 0.5 C
0
1000
2000
3000
4000
5000
OECD India China Others
2002
2013
Global Carbon Emissions (Million Tons per Year)
US > 14,000
India 600
China 1300
Present Electricity Per Capita (kWh)
Target: 14,000 kWh by 2013
(Calculations Based on Data in Climate Change 2001, IPCC)
What If
India & China Guzzle Oil?
0
40
80
120
160
India China US Other
OECD
Others
MillionBarrelsperDay
2003
2013
Global Oil Consumption (Million Barrels per Day)
US > 750
India 4
China 8
Present Number of Cars per 1000
• World Oil Consumption: 387
Million Barrels a Day
• At Present 77 Million Barrels a Day
• Oil reserves deplete in 8 years !!
• At Present 42 years
Target: 250 Cars per 1000
I saw God In the smile of the poor
Mahatma Gandhi
The cost of Power
0
1
2
3
4
5
6
7
0 50 100 150 200 250 300
Plant Capacity (kW)
CostofGeneration
(RsperkWh)
Utility's Cost of Supply
Residential Tariff
Irrigation Tariff

Mais conteúdo relacionado

Mais procurados

Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energyManoj Bhambu
 
Present Indian energy scenario
Present Indian energy scenarioPresent Indian energy scenario
Present Indian energy scenarioBISHAL DAS
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india pptnavreet singh
 
Energy scenario of india
Energy scenario of indiaEnergy scenario of india
Energy scenario of indiaGaurav Gandhi
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Energy scenario -past -present & Future
Energy scenario -past -present & Future  Energy scenario -past -present & Future
Energy scenario -past -present & Future VS E
 
Ret leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural indiaRet leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural indiaB.k. Das
 
Renewable energy scenario in india opportunities and challenges
Renewable energy scenario in india opportunities and challengesRenewable energy scenario in india opportunities and challenges
Renewable energy scenario in india opportunities and challengesSurjeet Randhir Singh Dhaka
 
Future energy scenario of world
Future energy scenario of worldFuture energy scenario of world
Future energy scenario of worldAsma1122
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...SINGHZEE
 
Power generation scenario of India
Power generation scenario of IndiaPower generation scenario of India
Power generation scenario of Indiapriyadarshi123
 

Mais procurados (20)

Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
 
Energyscenario
EnergyscenarioEnergyscenario
Energyscenario
 
Power Ppt
Power PptPower Ppt
Power Ppt
 
Future of the Indian power sector
Future of the Indian power sectorFuture of the Indian power sector
Future of the Indian power sector
 
Present Indian energy scenario
Present Indian energy scenarioPresent Indian energy scenario
Present Indian energy scenario
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india ppt
 
Power Sector Report January 2018
Power Sector Report  January 2018Power Sector Report  January 2018
Power Sector Report January 2018
 
Renewable Energy Sector
Renewable Energy SectorRenewable Energy Sector
Renewable Energy Sector
 
Energy scenario of india
Energy scenario of indiaEnergy scenario of india
Energy scenario of india
 
Energy scenario
Energy scenarioEnergy scenario
Energy scenario
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Energy scenario -past -present & Future
Energy scenario -past -present & Future  Energy scenario -past -present & Future
Energy scenario -past -present & Future
 
Power Sector Report - February 2019
Power Sector Report - February 2019Power Sector Report - February 2019
Power Sector Report - February 2019
 
Ret leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural indiaRet leccture 2 energy scenario in rural india
Ret leccture 2 energy scenario in rural india
 
Energy Needs And Road Map Of India
Energy Needs And Road Map Of IndiaEnergy Needs And Road Map Of India
Energy Needs And Road Map Of India
 
Renewable energy scenario in india opportunities and challenges
Renewable energy scenario in india opportunities and challengesRenewable energy scenario in india opportunities and challenges
Renewable energy scenario in india opportunities and challenges
 
Future energy scenario of world
Future energy scenario of worldFuture energy scenario of world
Future energy scenario of world
 
Renewable Energy in India
Renewable Energy in IndiaRenewable Energy in India
Renewable Energy in India
 
Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...Energy cost and energy shortage in nepal potential of solar, wind and other f...
Energy cost and energy shortage in nepal potential of solar, wind and other f...
 
Power generation scenario of India
Power generation scenario of IndiaPower generation scenario of India
Power generation scenario of India
 

Destaque

Destaque (20)

India:The Nuclear Power
India:The Nuclear PowerIndia:The Nuclear Power
India:The Nuclear Power
 
Nuclear power & india
Nuclear power & indiaNuclear power & india
Nuclear power & india
 
Ppt on present energy scenario
Ppt on present energy scenarioPpt on present energy scenario
Ppt on present energy scenario
 
Wage & Hour eLunch: A year in review
Wage & Hour eLunch: A year in reviewWage & Hour eLunch: A year in review
Wage & Hour eLunch: A year in review
 
Nuclear Deal
Nuclear DealNuclear Deal
Nuclear Deal
 
India Relations
India RelationsIndia Relations
India Relations
 
Is there any chance of ww3
Is there any chance of ww3Is there any chance of ww3
Is there any chance of ww3
 
Nuclear Energy in India: Overview, Obstacles, and Opportunities
Nuclear Energy in India: Overview, Obstacles, and OpportunitiesNuclear Energy in India: Overview, Obstacles, and Opportunities
Nuclear Energy in India: Overview, Obstacles, and Opportunities
 
The Post War World Part 3
The Post War World Part 3The Post War World Part 3
The Post War World Part 3
 
Nuclear Energy
Nuclear EnergyNuclear Energy
Nuclear Energy
 
Nuclear Energy in India
Nuclear Energy in IndiaNuclear Energy in India
Nuclear Energy in India
 
Indian nuclear power programme
Indian nuclear power programmeIndian nuclear power programme
Indian nuclear power programme
 
Cyber War ( World War 3 )
Cyber War ( World War 3 )Cyber War ( World War 3 )
Cyber War ( World War 3 )
 
Opportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in IndiaOpportunities & Challenges in Developing Wind Energy in India
Opportunities & Challenges in Developing Wind Energy in India
 
World War III
World War IIIWorld War III
World War III
 
Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)Energy Sector - 12th Plan (2012 - 2017)
Energy Sector - 12th Plan (2012 - 2017)
 
The South China Sea Dispute
The South China Sea DisputeThe South China Sea Dispute
The South China Sea Dispute
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plant Nuclear power plant
Nuclear power plant
 
nuclear power plant
nuclear power plantnuclear power plant
nuclear power plant
 

Semelhante a Nuclear India Dr.Arunachalam (Barc)

Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistanOwais Hassan
 
15. Future Power System for the year 2030.pptx
15. Future Power System for the year 2030.pptx15. Future Power System for the year 2030.pptx
15. Future Power System for the year 2030.pptxssuser0f80df
 
Energy Sector Pakistan
Energy Sector PakistanEnergy Sector Pakistan
Energy Sector PakistanUltraspectra
 
Presentation of Ministry of Energy and Mines
Presentation of Ministry of Energy and MinesPresentation of Ministry of Energy and Mines
Presentation of Ministry of Energy and Minesswgardlao
 
Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017Salman Haider
 
Long-term Coal Market Outlook - Q1 2016 FINAL
Long-term Coal Market Outlook - Q1 2016 FINALLong-term Coal Market Outlook - Q1 2016 FINAL
Long-term Coal Market Outlook - Q1 2016 FINALRODRIGO ECHEVERRI
 
QLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjjQLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjjbitseeeRandD
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyAbhishek Ashok
 
Energy security and environmental concerns: By Chandrabhushan
Energy security and environmental concerns: By ChandrabhushanEnergy security and environmental concerns: By Chandrabhushan
Energy security and environmental concerns: By Chandrabhushanbmbks321
 
Captive Power Plants
Captive Power PlantsCaptive Power Plants
Captive Power PlantsKoos Smit
 
Acc investor presentation_august_12
Acc investor presentation_august_12Acc investor presentation_august_12
Acc investor presentation_august_12Company Spotlight
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...IPPAI
 
AGM-PPT-2020.pdf
AGM-PPT-2020.pdfAGM-PPT-2020.pdf
AGM-PPT-2020.pdfYash255856
 
Improving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-KazakhstanImproving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-KazakhstanIEA-ETSAP
 
Electricity in India_SMS_R1.pptx
Electricity in India_SMS_R1.pptxElectricity in India_SMS_R1.pptx
Electricity in India_SMS_R1.pptxNIRAVKUMARPATEL20
 
Energy Management andLecture 2 (1).pptx
Energy Management andLecture 2 (1).pptxEnergy Management andLecture 2 (1).pptx
Energy Management andLecture 2 (1).pptxMuhammadAdeelJamil
 

Semelhante a Nuclear India Dr.Arunachalam (Barc) (20)

India thermal coal_markets
India thermal coal_marketsIndia thermal coal_markets
India thermal coal_markets
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
15. Future Power System for the year 2030.pptx
15. Future Power System for the year 2030.pptx15. Future Power System for the year 2030.pptx
15. Future Power System for the year 2030.pptx
 
Energy Sector Pakistan
Energy Sector PakistanEnergy Sector Pakistan
Energy Sector Pakistan
 
Presentation of Ministry of Energy and Mines
Presentation of Ministry of Energy and MinesPresentation of Ministry of Energy and Mines
Presentation of Ministry of Energy and Mines
 
Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017Power Sector in Pakistan - 2017
Power Sector in Pakistan - 2017
 
Long-term Coal Market Outlook - Q1 2016 FINAL
Long-term Coal Market Outlook - Q1 2016 FINALLong-term Coal Market Outlook - Q1 2016 FINAL
Long-term Coal Market Outlook - Q1 2016 FINAL
 
Morales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdfMorales_PES_GM_2015.pdf
Morales_PES_GM_2015.pdf
 
QLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjjQLW C9 India Mr G M Pillai asdfggjjjkjjj
QLW C9 India Mr G M Pillai asdfggjjjkjjj
 
Prospects and Challenges of Solar Energy
Prospects and Challenges of Solar EnergyProspects and Challenges of Solar Energy
Prospects and Challenges of Solar Energy
 
Energy security and environmental concerns: By Chandrabhushan
Energy security and environmental concerns: By ChandrabhushanEnergy security and environmental concerns: By Chandrabhushan
Energy security and environmental concerns: By Chandrabhushan
 
Energy
EnergyEnergy
Energy
 
Captive Power Plants
Captive Power PlantsCaptive Power Plants
Captive Power Plants
 
Acc investor presentation_august_12
Acc investor presentation_august_12Acc investor presentation_august_12
Acc investor presentation_august_12
 
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...The SAARC Grid:Policy, Regulatory, Infra-structure, Contractual Issues in C...
The SAARC Grid: Policy, Regulatory, Infra-structure, Contractual Issues in C...
 
AGM-PPT-2020.pdf
AGM-PPT-2020.pdfAGM-PPT-2020.pdf
AGM-PPT-2020.pdf
 
Improving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-KazakhstanImproving residential sector in TIMES-Kazakhstan
Improving residential sector in TIMES-Kazakhstan
 
Electricity in India_SMS_R1.pptx
Electricity in India_SMS_R1.pptxElectricity in India_SMS_R1.pptx
Electricity in India_SMS_R1.pptx
 
Energy Management andLecture 2 (1).pptx
Energy Management andLecture 2 (1).pptxEnergy Management andLecture 2 (1).pptx
Energy Management andLecture 2 (1).pptx
 
Energy crisis in pakistan
Energy crisis in pakistanEnergy crisis in pakistan
Energy crisis in pakistan
 

Último

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 

Último (20)

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 

Nuclear India Dr.Arunachalam (Barc)

  • 1. Why Nuclear Electricity for India? V S Arunachalam Center for Study of Science, Technology and Policy, Bangalore, INDIA & Department of Engineering & Public Policy Carnegie Mellon University, Pittsburgh PA, USA
  • 2. Growth of India’s Power Sector 0 20 40 60 80 100 120 140 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 InstalledGenerationCapacity(GW) 0 100 200 300 400 500 600 700 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 Year PerCapitaConsumption(kWh) 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 1940 1950 1960 1970 1980 1990 2000 2010 2020 NumberofVillagesElectrified (Projected) • Serious Growth after 60’s • Generation 6th largest in world • Per capita consumption low • Close to 95% villages electrified Ministry of Power, Government of India
  • 3. The Status Coal 67166 Gas 11840 Diesel 1196 Hydro 30135 Nuclear 2720 Wind 2488 • Installed Capacity > 120 GW • Gross Generation: 620 billion kWh • Per Capita Consumption ~ 600 kWh • Coal dominant energy source (58%) Ministry of Power, Government of India
  • 4. India’s Future Growth • India needs sustained economic growth > 8% to radically improve its HDI • Growth in last few years ~ 5%- 7% • Growth hampered by infrastructure: electric power – Peak shortfall – Average shortfall – High T&D Losses: – Unscheduled black-outs, especially in rural areas – Supply to agriculture sector not metered and almost free Source: Groningen Growth and Development Center Total Economy Database, http://www.ggdc.net/.
  • 5. Growth Areas • Present growth is skills or resource driven (exports: software, gems and jewels, garment manufacture) • Future Growth will have to be on value addition & engineering • Rural sector to play a major role (agricultural and dairy produce; minimizing wastage and improving efficiency) • Infrastructure building (roads, buildings, railroads etc.,) • Manufacturing The elasticity has to be greater than 1 for powering future growth
  • 6. Elasticity and Electric Power Needs • Target economic growth ~ 8% • Elasticity of electricity with GDP stabilizing at ~ 1.2 • Implications for future electric power requirements by 2015: – Capacity addition – Investments – Fuel mix – Pricing and Policies – T&D reforms 0 1 2 3 4 5 6 1951- 56 1956- 61 1961- 66 1969- 74 1974- 78 1980- 85 1985- 90 1992- 97 ElasticityofGenerationvsGDP Review of State Electricity Boards
  • 7. Electric Power Requirements Generation(billionkWh) Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 600 800 1000 1200 1400 1600 1800 2000 Key GDP Growth Rate 0.05 0.06 0.07 0.08 0.09 0.1 Required for 8% economic growth by 2015: Installed Capacity 250 GW Generation 1500 billion kWh Per Capita Consumption 1000 kWh CapacityNeeded(GW) Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 100 120 140 160 180 200 220 240 260 280 300 Key GDP Growth Rate 0.05 0.06 0.07 0.08 0.09 0.1
  • 8. The Task Ahead • Need to add 135 GW in ten years – 13,500 MW required per annum – ~ One power plant per month – China adds one per week !! – Maximum added till now is 4,600 MW (One in four months) 0 5000 10000 15000 20000 25000 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 AnnualCapacityAddition(MW) Annual added capacity Total Capacity addition required
  • 9. Fuel Supply: Options for Future • Coal – Conventional – Gasification • Natural Gas • Hydro • Nuclear – PHWR + FB + AHWR – PLWR • Wind – On-shore – Off-shore • Biomass • Solar – Photo voltaic – Concentrating Solar Power Fuel Present In 2015 Coal 67,166 MW ? Gas 11,840 MW ? Hydro 30,135 MW ? Nuclear 2,720 MW ? Wind 2,488 MW ? Biomass 1,000 MW ? Solar - ? TOTAL 115,035 MW 250,000 MW
  • 10. King Coal ! • Reserves – Proven 91 billion Tons – Indicated 116 billion Tons – Inferred 37 billion Tons – TOTAL 245 billion Tons • Coal reserves: > 250 years at present levels of consumption • Concentrated in Eastern India Madhya Pradesh 7% Others 13% Jharkhand 29% Chattisgarh 16% West Bengal 11% Orissa 24%
  • 11. Indian Coal Quality • High ash: 25%-45% • Low sulfur < 0.5% • Low energy content • CO2 emissions > 1 kg per kWh • Issues with coal: – Ash disposal: annual ash generation > 90 million tons – CO2 emissions Heating Value (BTU/lb) Ash Content (%) Sulfur (%) Illinois # 6 10,900 11.00 3.25 Wyodak 11,960 5.97 0.40 WPC Utah 11,240 5.32 0.61 Indian Coal 6,500 25-45 <0.5
  • 12. Coal: Future Scenarios • Projections of coal demand (2015): – High growth : 580 MT – BAU scenario : 380 MT – Domestic production will not be enough. Imports needed • Issues: – Ash generation > 200 million Tons – CO2 emissions > 850 Million Tons – Particulate and NOx emissions (presently not regulated) – Coal transportation bottleneck: Rail transportation stagnation 0 100 200 300 400 500 600 700 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 CoalRequirementinPowerSector(MillionTons) Coal Transport by Railways Business as Usual Accelerated growth scenario
  • 13. India’s CO2 Emissions • India’s fossil based CO2 emissions in 2003: – Coal 666 MMT – Petroleum 305 MMT – Natural Gas 53 MMT • India’s CO2 emissions rapidly growing – Trebled during 1981-2001 • India and China presently not subject to mandatory cuts in CO2 – However future may not be so 0% 5% 10% 15% 20% 25% 30% 35% 1980 1985 1990 1995 2000 2005 ShareofGlobalCO2Emissions(%) US Western Europe China India EIA, US Department of Energy India China Total 1980 1.64% 7.83% 9.47% 2003 5.60% 19.34% 24.93% Share of global emissions
  • 14. Options with Coal • Coal’s dominance will undoubtedly continue. – Availability – Cheap • The question is: How much do we want to add with coal given the constraints of quality, transportation, carbon emissions and environmental issues. Installed Capacity of Coal (GW) Coal Required (Million MT) CO2 Emissions (Million MT) Upper Case Coal still contributes 60% of capacity ~ 150 GW 580 MMT 850 MMT Lower Case Aggressive deployment of nuclear and natural gas technologies ~ 120 GW 470 MMT 690 MMT Coal scenarios for high economic growth ~ 8%
  • 15. Hydro-Electricity • Inferred potential > 120 GW • Installed capacity 30 GW • Most big projects are in North- Eastern states of Arunachal Pradesh, Sikkim, Uttaranchal and J&K • Problems of rehabilitation and resettlement with large projects • Environmental issues • Water sharing agreements with neighbors National Hydro Power Corporation, Government of India
  • 16. Hydro-Electric Potential State Capacity (MW) Dulhasti J&K 390 Dhauliganga Stage - I * Uttaranchal 140 Teesta Stage V Sikkim 510 Loktak Downstream Manipur 90 Parbati-II Himachal Pradesh 800 Sewa-II J&K 120 Subansiri Lower Arunachal Pradesh 2000 Teesta Lower Dam-III West Bengal 132 Omkareshwar Madhya Pradesh 520 TOTAL 4702 Details of projects under construction Projects awaiting clearance and government approval 2,570 MW Projects at DPR and infrastructure development stage 11,620 MW Projects under survey and investigation 11,000 MW Ongoing and Planned Projects Possible to add 10,000 MW by 2015
  • 17. Natural Gas • Fastest growing primary fuel, worldwide • Indian statistics (2004-05): Consumption: > 31 BCM/year Primary uses: Power 41% Fertilizer 32% Sponge Iron 4% Other 23% Growing needs for transportation (and some cooking) Latent demand estimated as high as 80 BCM (depends on price, of course)
  • 18. Natural Gas Pipelines Indore - onwards to India TAPS TAPS (across water) CENTGAS - to Pakistan Indore Baroda 333333333 KarachiGwadar 222222222 444444444 Gas supplyConsumption center New Delhi Multan 1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar1 Turkmenistan 2 Iran 3 Oman 4 Qatar 111111111 Pakistan Afghanistan Iran Turkmenistan Qatar India Oman Gas Authority of India Limited India’s Gas Pipelines Possible Gas Imports (Tongia & Arunachalam, 1999)
  • 19. Imports of Gas • LNG growing (5+ million tons/annum), but prices remain high – 1 ton LNG can power ~ 1 GW of power – 1 BCM gas ~ .8 GW of power thus, 20 BCM ~ 16,000 MW of gas power • Initial imports won’t necessarily add to elec. capacity – Will substitute naphtha in power plants and find other uses as well • More than half the fertilizer feedstock is gas • Industry has already claimed the bulk of current LNG supplies
  • 20. Biomass • India predominantly agricultural country. • Annual production of agro-forest and processing residues: 350 million tons • Power generation potential > 22,000 MW • Advantages: – Decentralized generation: close to rural load centers. – Technology reasonably well developed – Environmentally friendly: No net CO2 emissions Feedstock Examples Potential Installed Agro-forest residues Wood chips, mulberry, coconut shells 17,000 MW 50 MW Processing residues Rice husk, sugarcane bagasse 5,000 MW 1000 MW
  • 21. Biomass Conversion Technologies • Gasifier-reciprocating engine – Power plants of 5 kW – 100 kW possible – Diesel engine needs ~ 15%-20% for ignition • Cost of electricity is high – Gas engine can operate on 100% syngas – Overall efficiency ~ 20% – Largest gasifier 100 kW • Fluidized bed combustion boilers – Rice husk and bagasse – 25%-30% – Power plants of 5 MW – 35 MW operating in various sugar mills – Producing electricity is sweeter than sugar !! 50 kW biomass gasifier power plant in Karnataka
  • 22. Biomass for Decentralized Rural Power • Electric power requirement of typical Indian village < 100 kW – ~ 75% is irrigation pumps – Presently these get virtually free, un-metered grid supply of poor quality, few hours a day • Locally available biomass can sustain a plant of 25 kW-100 kW – Gasifier-reciprocating engine technology is fairly robust • Cost of generation reasonable – $ 0.06-0.07 per kWh • BUT, still widespread dissemination not visible: – Economics unviable due to low PLF – People not willing to pay when state gives free ! – Loss of organic fertilizer on land • Good potential from bagasse and husk: – Can expect to add 3000 MW by 2015.
  • 23. Wind Energy • Gross potential : 45,000 MW (assuming 1% land availability in potential areas) • Technical potential : 13,000 MW (assuming 20% grid penetration in potential areas) • Rapid growth in installed capacity from 1990s • India ranks 5th in the world – Present installed capacity ~ 3000 MW • Site selection issues: – More from fiscal benefits than from power – Many plants not operating – Low average load factor~13% 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 Germany Spain US Denmark India Italy Netherlands UK Japan China InstalledCapacity(MW) Global Wind Energy Council World Wind Installed Capacity (2005)
  • 24. Wind Speed Maps of Selected Countries Denmark In general, wind speeds lower (~200W/m2) in India as compared to Europe (350 W/m2) and US US
  • 25. Off-shore Wind in Europe • Europe and US have taken up several off-shore projects. • Wind speeds higher • Distance from shore in some cases ~ 30 – 40 km ! Country Capacity Depth (m) Distance from Shore (km) Remarks Denmark 160 MW 6 – 12 m 14 – 20 km Completed UK 60 MW 4 – 8 m 2.3 km Completed Denmark 23 MW 20 m 3.5 km Completed Denmark 5 MW 3 – 5 m 6 km Completed Sweden 10 MW 6 – 10 m 5 km Completed Germany 1040 MW 30 m 43 – 50 km Planned Netherlands 120 MW 20 – 24 m 23 km Planned Germany 240 MW 20 m 34 km Planned Ireland 520 MW 2 – 5 m 10 km Partly complete
  • 26. India: Off Shore Wind Scenario 0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0 1 6 0 0 1 8 0 0 2 0 0 0 2 2 0 0 2 4 0 0 D is t a n c e ( K m ) 0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0 1 6 0 0 1 8 0 0 2 0 0 0 2 2 0 0 2 4 0 0 D is t a n c e ( K m ) 0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0 1 6 0 0 1 8 0 0 2 0 0 0 2 2 0 0 2 4 0 0 Distance(Km) 0 2 0 0 4 0 0 6 0 0 8 0 0 1 0 0 0 1 2 0 0 1 4 0 0 1 6 0 0 1 8 0 0 2 0 0 0 2 2 0 0 2 4 0 0 Distance(Km) B a t h y m e t r y o f In d ia n S e a s D e p t h ( m e t r e s )
  • 27. Nuclear Power: The Present Status 0 2000 4000 6000 8000 10000 12000 14000 1969 1973 1981 1984 1986 1991 1992 1993 1995 2000 2005 2006 2015 InstalledCapacity(MW) Planned Presently installed
  • 28. Indian Nuclear Program: The Present Status • 12 PHWR & 2 BWR now under operation • 4 PHWR and 2 LWR under commission • 2950 MW generation & 3000 MW under commission • Successful experiments with Fast Breeder Test Reactor (FBTR) • Prototype Fast Breeder Reactor (PFBR) for 500MWe under construction • Advanced Heavy Water Reactor (AHWR) using (Pu-Th) O2 MOX for 300MWe: advanced stage of design approval; construction soon to begin.
  • 29. Indian Nuclear Program: The Constraints • Uranium ore reserves for only 10,000MWe for 40 years • Non-signatory to NPT: no access to global technologies, materials or services • Slow growth of nuclear electric power: ~1000 MWe annually • Major dependence on Pu and U233 MOX for fuel • Complex fuel technologies. Total capacity limited
  • 30. Why Cooperate? • India needs electric power now, more than ever, for human development and growth • It must generate power from all energy sources • Excessive and continued dependence on coal contributes to environmental degradation & global warming • Limitations of renewable energy sources
  • 31. Why Cooperate? • Politics of Non-Proliferation: Power & Responsibility • R&D: cooperation and Collaboration • Bilateral trade & economic issues • Sharing global energy resources • Environmental concerns • Shared vision: secular, democratic & caring society
  • 32. Why Cooperate? Climate change is a greater threat to humanity than terrorism, and no less urgent. ---David King, Science Advisor to Prime Minister of UK
  • 33. An Action Plan Until Nuclear Fusion and Hydrogen technologies mature • Minimizing wastage; energy conservation; Development of Energy Plan • Installation of nuclear power ( 34GW in 10 years) • Investments in R&D to make renewable technologies efficient, sustainable &affordable
  • 34. An Action Plan • Strict enforcement of export controls of technologies, equipment and services • Nuclear power reactors under international safeguards • Collaboration in developing technologies for utilizing MOX fuels for electric power generation • Participation in Gen. 4 R&D initiatives
  • 35. Indian Energy Scenarios: 2015 Coal 60.44% Gas 14.49% Diesel 0.48% Nuclear 5.06% Hydro 15.96% Solar thermal 0.40% Biomass 1.19% Wind 1.99% Gas 14.49% Diesel 0.48% Nuclear 14.60% Hydro 15.96% Solar thermal 0.40% Biomass 1.19% Wind 1.99% Coal 50.90% Same Fuel Mix as now Aggressive Nuclear Capacity Addition • Reduction in annual coal consumption ~ 100 Million Tons • Reduction in annual CO2 Emissions > 170 Million Tons • ~ Total present CO2 emissions of Netherlands !
  • 37. What If…. India & China Were “Developed”by 2013? • Expected Carbon Emission: 14,400 Million Tons (2.5 times present global emissions !!) • CO2 concentration > 400 ppm • Temperature rise > 0.5 C 0 1000 2000 3000 4000 5000 OECD India China Others 2002 2013 Global Carbon Emissions (Million Tons per Year) US > 14,000 India 600 China 1300 Present Electricity Per Capita (kWh) Target: 14,000 kWh by 2013 (Calculations Based on Data in Climate Change 2001, IPCC)
  • 38. What If India & China Guzzle Oil? 0 40 80 120 160 India China US Other OECD Others MillionBarrelsperDay 2003 2013 Global Oil Consumption (Million Barrels per Day) US > 750 India 4 China 8 Present Number of Cars per 1000 • World Oil Consumption: 387 Million Barrels a Day • At Present 77 Million Barrels a Day • Oil reserves deplete in 8 years !! • At Present 42 years Target: 250 Cars per 1000
  • 39. I saw God In the smile of the poor Mahatma Gandhi
  • 40. The cost of Power 0 1 2 3 4 5 6 7 0 50 100 150 200 250 300 Plant Capacity (kW) CostofGeneration (RsperkWh) Utility's Cost of Supply Residential Tariff Irrigation Tariff