Tysons West Wastewater Conveyance Systems Modifications
Project
Wastewater Project – Virtual Community Meeting
May 10, 2022
Administrative Items
Tysons West Wastewater Conveyance Project
• Attendee Virtual Sign-In (2 options)
o Use Q/A on MS Teams – Name, Property Address, Email, Phone Number
o Email agata.fallon@fairfaxcounty.gov - Name, Property Address, Email, Phone
Number
• The Q/A is available and monitored throughout the presentation
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 2
Please type your questions in the Q/A throughout the presentation!
Meeting Agenda
Tysons West Wastewater Conveyance Project
• Welcome
• Supervisor Walter Alcorn, Hunter Mill District
• Mike Wing, Providence District
• Project Presentation
• Questions and Answers
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 3
A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Tysons West Wastewater Conveyance Systems Modifications
Project
Wastewater Project – Virtual Community Meeting
May 10, 2022
Project Team Introductions
Tysons West Wastewater Conveyance Project
• Fairfax County
o Agata Fallon, PE, Fairfax County Project Manager
• CDM Smith
o Kraig R. Schenkelberg, PE, BCEE, PMP, Project Technical Leader
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 5
Goals
Tysons West Wastewater Conveyance Project
• Inform the community about the upcoming project
• Share results of the study
• Understand community concerns
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 6
Presentation Agenda
Tysons West Wastewater Conveyance Project
• Project Needs and Goals
• Tysons West Study
• Next Steps - Design
• Next Steps - Construction
• Project Schedule
• Continuing Engagement
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 7
Growth in Northern Fairfax County – Wastewater Flows are Increasing
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 8
• Future wastewater flows in
northern Fairfax County exceed
existing system capacity
• Treatment capacity is available in
Noman M. Cole Jr. Pollution
Control Plant in Lorton, VA
• New pipes and pumps are needed
to move future flows to treatment
plant
Growth in Northern Fairfax County – Project Locations
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 9
Difficult Run PS
Carderock Sewer
Rehabilitation
Tysons East PS
Accotink
Gravity Sewer
Tysons West PS
Tysons Area Flows and Needs
Tysons West Wastewater Conveyance Project
• Existing system installed 1960’s
• Existing infrastructure improvements
needed
• Future flows exceed existing system
capacity
• Capacity improvements needed
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 10
Tysons West Study
Tysons West Wastewater Conveyance Project
• Tysons West study identified the need for
o Larger sewer collection
o Larger pump station
o New force main to treatment plant in Lorton
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 11
Sewer Collection
Tysons West Wastewater Conveyance Project
• Collect flow from new
development
• Divert flow from existing
interceptor pipe
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 12
Sewer Collection Evaluation Criteria
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 13
Goal to minimize impacts
Community
• residential
• commercial
• traffic
• parking
• noise/dust
Hydraulics
factors
• gravity flow to
pump station
• length
Constructability
• space available
• depth of pipe
• existing
facilities and
utilities
Environmental
• streams
• parks
• trails
• trees
• wetlands
• open spaces
Land Rights
• easements
• rights of way
Utilities
• existing utility
coordination
• temporary
utilities
• utility
relocations
Costs
• construction
• maintenance
and operation
Stakeholders
• public
• permitting
• regulations
Sewer Collection Evaluation Criteria
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 14
Goal to minimize impacts
Community
• residential
• commercial
• traffic
• parking
• noise/dust
Hydraulics
factors
• gravity flow to
pump station
• length
Constructability
• space available
• depth of pipe
• existing
facilities and
utilities
Environmental
• streams
• parks
• trails
• trees
• wetlands
• open spaces
Land Rights
• easements
• rights of way
Utilities
• existing utility
coordination
• temporary
utilities
• utility
relocations
Costs
• construction
• maintenance
and operation
Stakeholders
• public
• permitting
• regulations
Sewer Collection Selected Alternative
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 15
Pump Station
Tysons West Wastewater Conveyance Project
• Existing facility is at a low point
for gravity flow
• Increase size of pump station
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 16
Pump Station Expansion
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 17
Goal to minimize impacts
Community
• residential
• commercial
• traffic
• parking
• noise/dust
Hydraulics
factors
• size
• gravity flow to
pump station
Constructability
• space available
• existing
facilities and
utilities
Environmental
• streams
• parks
• trails
• trees
• wetlands
• open spaces
Land Rights
• easements
• rights of way
Utilities
• continuous
service
• existing utility
coordination
• utility
relocations
Costs
• construction
• maintenance
and operation
Stakeholders
• public
• permitting
• regulations
Pump Station Expansion Selected Alternative
Tysons West Wastewater Conveyance Project
• ~ 25 million gallons
• ~ 1 acre facility
• Construction Estimate ~
$37 million
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 18
Force Main
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 19
• Transport flow to Lorton via
Accotink Interceptor
Force Main Evaluation Criteria
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 20
Goal to minimize impacts
Community
• residential
• commercial
• traffic
• parking
• noise/dust
Hydraulics
factors
• length
• elevation
difference
• number of
bends
• pressure losses
Constructability
• space available
• depth of pipe
• existing
facilities and
utilities
Environmental
• streams
• parks
• trails
• trees
• wetlands
• open spaces
Land Rights
• easements
• rights of way
Utilities
• existing utility
coordination
• temporary
utilities
• utility
relocations
Costs
• construction
• maintenance
and operation
Stakeholders
• public
• permitting
• regulations
Force Main Selected Alternative
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 21
• ~ 27,500 feet
• 36-inch pipe
• Construction Estimate ~
$44.5 million
Selected System
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 22
• New ~ 9,200 feet sewer
• New ~ 25 million gallons per day pump
station
• New ~ 27,500 feet force main
• Construction Estimate ~ $ 106 million
Design – Next Steps
Tysons West Wastewater Conveyance Project
• Field investigations / surveys
• Finalize alignments and pump station layout
• Use of open cut excavation
• Use of trenchless methods
• Easement acquisition needed
• Develop traffic control plans
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 23
Open Cut Pipeline Construction
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 24
During Construction After Construction
Trenchless Pipeline Construction
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 25
Trenchless Pipeline Construction
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 26
During Construction
After Construction
Pump Station Construction
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 27
During Construction After Construction
Schedule and Key Milestones
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 28
May 2022
Review Public Meeting
Feedback and Develop
Design
May 2022
Public Meeting
Project Introduction
May 2023
(Anticipated) Public Meeting
May 2024
(Anticipated) Public Meeting
March 2023
Gravity Sewer Design
Completed
April 2023
Pump Station
Design Completed
July 2026
Construction
Completed
May 2024
Force Main
Design Completed
Summary of Project Needs and Benefits
Tysons West Wastewater Conveyance Project
• Critical project to provide continuous reliable service
• Protection of public health and quality of life
• Need to start now
• Mitigate impacts to community and environment
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 29
Our Commitment
Tysons West Wastewater Conveyance Project
Capital Facilities/Wastewater Design and Construction Division/Collections Branch 30
Engagement will continue throughout
project until completion
Agata Fallon, PE
703.324.5613
agata.fallon@fairfaxcounty.gov
https://www.fairfaxcounty.gov/publicworks/capital-projects/tysons-west-wastewater-system-enhancements

Mais conteúdo relacionado

Mais procurados (11)

Eosiniphiles biology disorders
Eosiniphiles biology disordersEosiniphiles biology disorders
Eosiniphiles biology disorders
 
Renal pathology the nephrotic syndrome- prof wadie
Renal pathology  the nephrotic syndrome- prof wadieRenal pathology  the nephrotic syndrome- prof wadie
Renal pathology the nephrotic syndrome- prof wadie
 
Lupus nephritis
Lupus nephritisLupus nephritis
Lupus nephritis
 
Approach to anemia
Approach to anemiaApproach to anemia
Approach to anemia
 
Chronic granulomatous disease
Chronic granulomatous diseaseChronic granulomatous disease
Chronic granulomatous disease
 
approach to a patient with htalassemia by Hari Sedai
approach to a patient with htalassemia by Hari Sedaiapproach to a patient with htalassemia by Hari Sedai
approach to a patient with htalassemia by Hari Sedai
 
Metastasis pg activity
Metastasis pg activityMetastasis pg activity
Metastasis pg activity
 
Diagnosis and management sle
Diagnosis  and  management sleDiagnosis  and  management sle
Diagnosis and management sle
 
4. OROFACIAL GRANULOMATOSIS 2015
4. OROFACIAL GRANULOMATOSIS 20154. OROFACIAL GRANULOMATOSIS 2015
4. OROFACIAL GRANULOMATOSIS 2015
 
Hemolytic anemia
Hemolytic anemiaHemolytic anemia
Hemolytic anemia
 
Lupus nephritis
Lupus nephritisLupus nephritis
Lupus nephritis
 

Semelhante a Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx

Semelhante a Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx (20)

Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
 
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood  Stormwater Improvement Preliminary Design ReviewTucker Avenue Neighborhood  Stormwater Improvement Preliminary Design Review
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design Review
 
Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015Columbia Road/Randolph Court Stream Restoration July 2015
Columbia Road/Randolph Court Stream Restoration July 2015
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation Project
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen Bondy
 
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
Old Courthouse Spring Branch at Ashgrove Historic Park Stream Restoration Pro...
 
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
Leigh Meadow and Towlston Basin Kickoff Presentation Jan 2018
 
Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Retrofit Facility DP0625 West Potomac High School
Retrofit Facility DP0625 West Potomac High SchoolRetrofit Facility DP0625 West Potomac High School
Retrofit Facility DP0625 West Potomac High School
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFranklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement Project
 
Andrea Collier, MDNR, Water Resources Center Regional Planning Projects, Miss...
Andrea Collier, MDNR, Water Resources Center Regional Planning Projects, Miss...Andrea Collier, MDNR, Water Resources Center Regional Planning Projects, Miss...
Andrea Collier, MDNR, Water Resources Center Regional Planning Projects, Miss...
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015
 

Mais de Fairfax County

Mais de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Último (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Tysons West Wastewater Conveyance Systems Modifications Project Wastewater Project – Virtual Community Meeting May 10, 2022
  • 2. Administrative Items Tysons West Wastewater Conveyance Project • Attendee Virtual Sign-In (2 options) o Use Q/A on MS Teams – Name, Property Address, Email, Phone Number o Email agata.fallon@fairfaxcounty.gov - Name, Property Address, Email, Phone Number • The Q/A is available and monitored throughout the presentation Capital Facilities/Wastewater Design and Construction Division/Collections Branch 2 Please type your questions in the Q/A throughout the presentation!
  • 3. Meeting Agenda Tysons West Wastewater Conveyance Project • Welcome • Supervisor Walter Alcorn, Hunter Mill District • Mike Wing, Providence District • Project Presentation • Questions and Answers Capital Facilities/Wastewater Design and Construction Division/Collections Branch 3
  • 4. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Tysons West Wastewater Conveyance Systems Modifications Project Wastewater Project – Virtual Community Meeting May 10, 2022
  • 5. Project Team Introductions Tysons West Wastewater Conveyance Project • Fairfax County o Agata Fallon, PE, Fairfax County Project Manager • CDM Smith o Kraig R. Schenkelberg, PE, BCEE, PMP, Project Technical Leader Capital Facilities/Wastewater Design and Construction Division/Collections Branch 5
  • 6. Goals Tysons West Wastewater Conveyance Project • Inform the community about the upcoming project • Share results of the study • Understand community concerns Capital Facilities/Wastewater Design and Construction Division/Collections Branch 6
  • 7. Presentation Agenda Tysons West Wastewater Conveyance Project • Project Needs and Goals • Tysons West Study • Next Steps - Design • Next Steps - Construction • Project Schedule • Continuing Engagement Capital Facilities/Wastewater Design and Construction Division/Collections Branch 7
  • 8. Growth in Northern Fairfax County – Wastewater Flows are Increasing Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 8 • Future wastewater flows in northern Fairfax County exceed existing system capacity • Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA • New pipes and pumps are needed to move future flows to treatment plant
  • 9. Growth in Northern Fairfax County – Project Locations Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 9 Difficult Run PS Carderock Sewer Rehabilitation Tysons East PS Accotink Gravity Sewer Tysons West PS
  • 10. Tysons Area Flows and Needs Tysons West Wastewater Conveyance Project • Existing system installed 1960’s • Existing infrastructure improvements needed • Future flows exceed existing system capacity • Capacity improvements needed Capital Facilities/Wastewater Design and Construction Division/Collections Branch 10
  • 11. Tysons West Study Tysons West Wastewater Conveyance Project • Tysons West study identified the need for o Larger sewer collection o Larger pump station o New force main to treatment plant in Lorton Capital Facilities/Wastewater Design and Construction Division/Collections Branch 11
  • 12. Sewer Collection Tysons West Wastewater Conveyance Project • Collect flow from new development • Divert flow from existing interceptor pipe Capital Facilities/Wastewater Design and Construction Division/Collections Branch 12
  • 13. Sewer Collection Evaluation Criteria Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 13 Goal to minimize impacts Community • residential • commercial • traffic • parking • noise/dust Hydraulics factors • gravity flow to pump station • length Constructability • space available • depth of pipe • existing facilities and utilities Environmental • streams • parks • trails • trees • wetlands • open spaces Land Rights • easements • rights of way Utilities • existing utility coordination • temporary utilities • utility relocations Costs • construction • maintenance and operation Stakeholders • public • permitting • regulations
  • 14. Sewer Collection Evaluation Criteria Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 14 Goal to minimize impacts Community • residential • commercial • traffic • parking • noise/dust Hydraulics factors • gravity flow to pump station • length Constructability • space available • depth of pipe • existing facilities and utilities Environmental • streams • parks • trails • trees • wetlands • open spaces Land Rights • easements • rights of way Utilities • existing utility coordination • temporary utilities • utility relocations Costs • construction • maintenance and operation Stakeholders • public • permitting • regulations
  • 15. Sewer Collection Selected Alternative Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 15
  • 16. Pump Station Tysons West Wastewater Conveyance Project • Existing facility is at a low point for gravity flow • Increase size of pump station Capital Facilities/Wastewater Design and Construction Division/Collections Branch 16
  • 17. Pump Station Expansion Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 17 Goal to minimize impacts Community • residential • commercial • traffic • parking • noise/dust Hydraulics factors • size • gravity flow to pump station Constructability • space available • existing facilities and utilities Environmental • streams • parks • trails • trees • wetlands • open spaces Land Rights • easements • rights of way Utilities • continuous service • existing utility coordination • utility relocations Costs • construction • maintenance and operation Stakeholders • public • permitting • regulations
  • 18. Pump Station Expansion Selected Alternative Tysons West Wastewater Conveyance Project • ~ 25 million gallons • ~ 1 acre facility • Construction Estimate ~ $37 million Capital Facilities/Wastewater Design and Construction Division/Collections Branch 18
  • 19. Force Main Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 19 • Transport flow to Lorton via Accotink Interceptor
  • 20. Force Main Evaluation Criteria Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 20 Goal to minimize impacts Community • residential • commercial • traffic • parking • noise/dust Hydraulics factors • length • elevation difference • number of bends • pressure losses Constructability • space available • depth of pipe • existing facilities and utilities Environmental • streams • parks • trails • trees • wetlands • open spaces Land Rights • easements • rights of way Utilities • existing utility coordination • temporary utilities • utility relocations Costs • construction • maintenance and operation Stakeholders • public • permitting • regulations
  • 21. Force Main Selected Alternative Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 21 • ~ 27,500 feet • 36-inch pipe • Construction Estimate ~ $44.5 million
  • 22. Selected System Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 22 • New ~ 9,200 feet sewer • New ~ 25 million gallons per day pump station • New ~ 27,500 feet force main • Construction Estimate ~ $ 106 million
  • 23. Design – Next Steps Tysons West Wastewater Conveyance Project • Field investigations / surveys • Finalize alignments and pump station layout • Use of open cut excavation • Use of trenchless methods • Easement acquisition needed • Develop traffic control plans Capital Facilities/Wastewater Design and Construction Division/Collections Branch 23
  • 24. Open Cut Pipeline Construction Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 24 During Construction After Construction
  • 25. Trenchless Pipeline Construction Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 25
  • 26. Trenchless Pipeline Construction Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 26 During Construction After Construction
  • 27. Pump Station Construction Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 27 During Construction After Construction
  • 28. Schedule and Key Milestones Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 28 May 2022 Review Public Meeting Feedback and Develop Design May 2022 Public Meeting Project Introduction May 2023 (Anticipated) Public Meeting May 2024 (Anticipated) Public Meeting March 2023 Gravity Sewer Design Completed April 2023 Pump Station Design Completed July 2026 Construction Completed May 2024 Force Main Design Completed
  • 29. Summary of Project Needs and Benefits Tysons West Wastewater Conveyance Project • Critical project to provide continuous reliable service • Protection of public health and quality of life • Need to start now • Mitigate impacts to community and environment Capital Facilities/Wastewater Design and Construction Division/Collections Branch 29
  • 30. Our Commitment Tysons West Wastewater Conveyance Project Capital Facilities/Wastewater Design and Construction Division/Collections Branch 30 Engagement will continue throughout project until completion Agata Fallon, PE 703.324.5613 agata.fallon@fairfaxcounty.gov https://www.fairfaxcounty.gov/publicworks/capital-projects/tysons-west-wastewater-system-enhancements

Notas do Editor

  1. Focus on the criteria and the selection process and criteria. This is the key the process and how we met the criteria.