Booster Shot Hiring
Agency Division Classification Status Comments
1 CAP Engineer III S27 1 - Filled Street Light Focus
2 DPZ Zoning Administration Planner III S27 1 - Filled
3 DPZ Zoning Evaluation Planner III S27 1 - Filled
4 Fire Marshal Fire Inspector II S20 1 - Filled
5 Fire Marshal Fire Inspector II S20 1 - Filled
6 Fire Marshal Administrative Assistant II S13 1 - Filled
7
Health
Department Environmental Health Environmental Health Spec II S23 1 - Filled
8 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled
9 LDS Director's Office Management Analyst I S21 1 - Filled
10 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled
11 LDS Code Development & Compliance Code Specialist II S24 1 - Filled
12 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled
13 LDS Code Development & Compliance Code Specialist II S24 1 - Filled
14 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled
15 LDS IT Business Analyst III S27 1 - Filled
16 LDS Director's Office Planner IV S29 1 - Filled
17 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled
18 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled
19 Urban Forestry Urban Forester II S24 1 - Filled
20 FCDOT Transportation Planner II S24 2 - Interviews project to fill by mid-October
21 FCDOT Transportation Planner II S24 2 - Interviews project to fill by early November
22 Fire Marshal Engineer III S27 2 - Interviews interviews complete; offer pending
23 Fire Marshal Engineer III S27 2 - Interviews interviews complete; offer pending
24 DPZ Zoning Evaluation Planner III/II S27/S24 3 - Advertising readvertising for Planner II
25 LDS Site Development & Inspections Senior Engineering Inspector S21 3 - Advertising readvertising; interviews projected end of September
26 LDS Building Plan Review & Inspections Engineer III S27 4 - Pre-Advertisement Reclassifying to Eng IV
27 LDS HR Human Resources Generalist II S24 4 - Pre-Advertisement PD drafted; review in progress
28 LDS Director's Office Assistant Director S34 4 - Pre-Advertisement
Position established-LDS Ops Director; preparing to
advertise
Average Site Plan Timelines
Plan Types Target Jul - Sep
Last Period
(Jul-Sep)
Average for
2015
Average for
2014
Infill Lot Grading Plan (INF,
Non-bonded Single Family) 28 26 27 26.0 25.9
Major Plan First Submission
(SP, SD, PI) 60 57 55 58.5 66.8
Major (SP, SD, PI) Second
DPE
21 21 25 22.2 33.1
Major (SP, SD, PI)
Subsequent Non-DPE 60 50 58 62.1 68.6
Average Review Time
Residential Building
Average Review Time
Commercial Building
Consultant Study
Seven Cross Agency Initiatives
• Joint Training Academy
• Joint Information Center
• Expansion of Project Management Pilot
• Proffer Improvement
• Retail Strategy
• Parking Management Process
• Unified Restaurant Process
LDS’s Top Six
• Combine DPWES and VDOT initial inspection
• VDOT package tracking tool to be modified and made
available online
• Bond Review: Provide a list of "common errors" and place
online
• Create a "Minimum Submission Review (MSR)“
• Reevaluate RPA review process
• E-plans
E-Plans
• Workflow /
System
Integration
• Training
• Equipment
• Pilot
New NVBIA/NAIOP Webpage
http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm
Fire Marshal’s Office – Plan Inventory
55 (Burkholder Backlog) plus 13 (Herrity Backlog) yields 68 plans
(Ceiling is 100 total plans in backlog.)
Plan Type
No. on
Hand
Oldest Date Work Day Lag
Sprinkler, Tenant plans without calculations 9 10-29-15 3
Sprinkler, Tenant plans with calculations 1 10-29-15 3
Sprinkler, Shell Bldgs., NFPA 13 systems 4 10-28-15 4
Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 1 11-2-15 1
Town of Herndon Building Tenant 0 -- 0
Fire Alarm, Tenant plans 16 10-29-15 3
Fire Alarm, Shell Bldgs. 5 10-16-15 12
Door Lock / Security plans 0 -- 0
Range Hood/Tanks/Foam/Public Safety Plans /Misc. 5 10-20-15 10
Site Plans/Rezoning 11 / 0 10-15-15 13
High-Piled Storage Plans 0 -- 0
Evacuation / Lockdown Plans 3 10-20-15 10
Burkholder Building Summary 55 10-15-15 XXXXXXXXX
FM Architectural Review done at Herrity Building
(Class 4 and Greater Building Plans)
6 10-21-15 9
FM Architectural Review (Fast Track Tenant Plans) 0 -- 0
FM Arch. Review (non-Fast Track Tenant Plans) 7 11-2-15 1
Herrity Building (B-2) Summary 13 10-21-15 XXXXXXXXX
Planning & Zoning

Mais conteúdo relacionado

Mais procurados

336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form
Edelyn Ambos
 
Black presentation
Black presentationBlack presentation
Black presentation
RPO America
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
Rob Smith
 
NGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline DiscussionNGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline Discussion
en3pro
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
apwacoachellavalley
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
Mike Darwich
 
Tom Hamilton Resume 2015
Tom Hamilton Resume 2015Tom Hamilton Resume 2015
Tom Hamilton Resume 2015
Tom Hamilton
 
2015 Annual Report of The Porter County GIS Departmant
2015 Annual Report of The Porter County GIS Departmant2015 Annual Report of The Porter County GIS Departmant
2015 Annual Report of The Porter County GIS Departmant
Charles T. Miller, GISP
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce Stephan
Bruce Stephan
 
John C. Shaw_LinkedIn
John C. Shaw_LinkedInJohn C. Shaw_LinkedIn
John C. Shaw_LinkedIn
John Shaw
 

Mais procurados (20)

Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)Alaska LNG Project Update (10.30.2015)
Alaska LNG Project Update (10.30.2015)
 
Brian Nicholls resume 2016-08-11
Brian Nicholls resume   2016-08-11Brian Nicholls resume   2016-08-11
Brian Nicholls resume 2016-08-11
 
336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form336742956 individual-performance-commitment-and-review-ipcr-form
336742956 individual-performance-commitment-and-review-ipcr-form
 
NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016NVBIA NAIOP Update July 14, 2016
NVBIA NAIOP Update July 14, 2016
 
ASCE Utility Standards
ASCE Utility StandardsASCE Utility Standards
ASCE Utility Standards
 
Abdul basit resume
Abdul basit resumeAbdul basit resume
Abdul basit resume
 
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
Hayfield Road Project Citizens Association Meeting Jan. 17, 2018
 
Black presentation
Black presentationBlack presentation
Black presentation
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
NGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline DiscussionNGS Owners Initial Proposal Timeline Discussion
NGS Owners Initial Proposal Timeline Discussion
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
 
Resume
ResumeResume
Resume
 
243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s243-249 MANN STREET GOSFORD 1 s
243-249 MANN STREET GOSFORD 1 s
 
GlennN Resume
GlennN ResumeGlennN Resume
GlennN Resume
 
Tom Hamilton Resume 2015
Tom Hamilton Resume 2015Tom Hamilton Resume 2015
Tom Hamilton Resume 2015
 
Newsletter 2015 january
Newsletter 2015 januaryNewsletter 2015 january
Newsletter 2015 january
 
2015 Annual Report of The Porter County GIS Departmant
2015 Annual Report of The Porter County GIS Departmant2015 Annual Report of The Porter County GIS Departmant
2015 Annual Report of The Porter County GIS Departmant
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce Stephan
 
John C. Shaw_LinkedIn
John C. Shaw_LinkedInJohn C. Shaw_LinkedIn
John C. Shaw_LinkedIn
 

Destaque

Destaque (20)

Crook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration ProjectCrook Branch at Mantua Elementary School Stream Restoration Project
Crook Branch at Mantua Elementary School Stream Restoration Project
 
NVBIA-NAIOP Presentation
NVBIA-NAIOP Presentation NVBIA-NAIOP Presentation
NVBIA-NAIOP Presentation
 
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
Wolftrap Creek Restoration in Vienna’s Wildwood Park, October 2013
 
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
Hunter Mill District Community Outreach Meeting: Nov. 4, 2015
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit Project
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Flood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly DriveFlood Mitigation Project on Overly Drive
Flood Mitigation Project on Overly Drive
 
Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014Miller Heights Outfall Rehabilitation Project 2014
Miller Heights Outfall Rehabilitation Project 2014
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
Bullneck Run at Spring Hill Rec Center Stream Restoration Project June 2014
 
Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)Banks Property Stream Restoration (DC9218)
Banks Property Stream Restoration (DC9218)
 
Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016Contractor Awareness Training Above Ground Facilities Part 1 2016
Contractor Awareness Training Above Ground Facilities Part 1 2016
 
Huntington Levee Community Meeting
Huntington Levee Community Meeting Huntington Levee Community Meeting
Huntington Levee Community Meeting
 
Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015Mason Neck West Park Pond Retrofit July 2015
Mason Neck West Park Pond Retrofit July 2015
 
Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 

Semelhante a Land Development Update: November 12, 2015

Tobacco road meets the technology highway part iii ppt
Tobacco road meets the technology highway part iii pptTobacco road meets the technology highway part iii ppt
Tobacco road meets the technology highway part iii ppt
p6academy
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
Brad Wilson
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
Russell and Dawson
 
NEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docx
NEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docxNEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docx
NEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docx
henrymartin15260
 
Project controls for csx engineering ppt
Project controls for csx engineering pptProject controls for csx engineering ppt
Project controls for csx engineering ppt
p6academy
 
Motorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio ManagementMotorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio Management
Aras
 

Semelhante a Land Development Update: November 12, 2015 (20)

Website project summary pages 131107
Website project summary pages 131107Website project summary pages 131107
Website project summary pages 131107
 
The construction programme - assurance and controls
The construction programme - assurance and controlsThe construction programme - assurance and controls
The construction programme - assurance and controls
 
Tobacco road meets the technology highway part iii ppt
Tobacco road meets the technology highway part iii pptTobacco road meets the technology highway part iii ppt
Tobacco road meets the technology highway part iii ppt
 
Collaboration - A Key Enabler of Innovation (Mirion).pdf
Collaboration - A Key Enabler of Innovation (Mirion).pdfCollaboration - A Key Enabler of Innovation (Mirion).pdf
Collaboration - A Key Enabler of Innovation (Mirion).pdf
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
 
MJDDeuna_CV
MJDDeuna_CVMJDDeuna_CV
MJDDeuna_CV
 
MJDDeuna_CV
MJDDeuna_CVMJDDeuna_CV
MJDDeuna_CV
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
NEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docx
NEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docxNEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docx
NEW YORK DEPARTMENT OF TRANSPORTATION - PROJECT2N.docx
 
WPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptxWPR_02.01.2023 W-114 - Copy (1).pptx
WPR_02.01.2023 W-114 - Copy (1).pptx
 
Project controls for csx engineering ppt
Project controls for csx engineering pptProject controls for csx engineering ppt
Project controls for csx engineering ppt
 
Abdul Latif Updated 2022.docx
Abdul Latif   Updated 2022.docxAbdul Latif   Updated 2022.docx
Abdul Latif Updated 2022.docx
 
3rd Technical Meeting - WP6
3rd Technical Meeting - WP63rd Technical Meeting - WP6
3rd Technical Meeting - WP6
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
P7512-EXT-SQ-0030
P7512-EXT-SQ-0030P7512-EXT-SQ-0030
P7512-EXT-SQ-0030
 
APBI Briefing Slides 9 May 2022
APBI Briefing Slides 9 May 2022APBI Briefing Slides 9 May 2022
APBI Briefing Slides 9 May 2022
 
Schedule Training
Schedule TrainingSchedule Training
Schedule Training
 
2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments
 
Motorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio ManagementMotorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio Management
 

Mais de Fairfax County

Mais de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
lunadelior
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Último (20)

06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 

Land Development Update: November 12, 2015

  • 1. Land Development Update NAIOP/NVBIA Joint Meeting November 12, 2015
  • 2. Booster Shot Hiring Agency Division Classification Status Comments 1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 Fire Marshal Fire Inspector II S20 1 - Filled 5 Fire Marshal Fire Inspector II S20 1 - Filled 6 Fire Marshal Administrative Assistant II S13 1 - Filled 7 Health Department Environmental Health Environmental Health Spec II S23 1 - Filled 8 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 9 LDS Director's Office Management Analyst I S21 1 - Filled 10 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 11 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 12 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 13 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 14 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 15 LDS IT Business Analyst III S27 1 - Filled 16 LDS Director's Office Planner IV S29 1 - Filled 17 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 18 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled 19 Urban Forestry Urban Forester II S24 1 - Filled 20 FCDOT Transportation Planner II S24 2 - Interviews project to fill by mid-October 21 FCDOT Transportation Planner II S24 2 - Interviews project to fill by early November 22 Fire Marshal Engineer III S27 2 - Interviews interviews complete; offer pending 23 Fire Marshal Engineer III S27 2 - Interviews interviews complete; offer pending 24 DPZ Zoning Evaluation Planner III/II S27/S24 3 - Advertising readvertising for Planner II 25 LDS Site Development & Inspections Senior Engineering Inspector S21 3 - Advertising readvertising; interviews projected end of September 26 LDS Building Plan Review & Inspections Engineer III S27 4 - Pre-Advertisement Reclassifying to Eng IV 27 LDS HR Human Resources Generalist II S24 4 - Pre-Advertisement PD drafted; review in progress 28 LDS Director's Office Assistant Director S34 4 - Pre-Advertisement Position established-LDS Ops Director; preparing to advertise
  • 3. Average Site Plan Timelines Plan Types Target Jul - Sep Last Period (Jul-Sep) Average for 2015 Average for 2014 Infill Lot Grading Plan (INF, Non-bonded Single Family) 28 26 27 26.0 25.9 Major Plan First Submission (SP, SD, PI) 60 57 55 58.5 66.8 Major (SP, SD, PI) Second DPE 21 21 25 22.2 33.1 Major (SP, SD, PI) Subsequent Non-DPE 60 50 58 62.1 68.6
  • 7. Seven Cross Agency Initiatives • Joint Training Academy • Joint Information Center • Expansion of Project Management Pilot • Proffer Improvement • Retail Strategy • Parking Management Process • Unified Restaurant Process
  • 8. LDS’s Top Six • Combine DPWES and VDOT initial inspection • VDOT package tracking tool to be modified and made available online • Bond Review: Provide a list of "common errors" and place online • Create a "Minimum Submission Review (MSR)“ • Reevaluate RPA review process • E-plans
  • 9. E-Plans • Workflow / System Integration • Training • Equipment • Pilot
  • 11. Fire Marshal’s Office – Plan Inventory 55 (Burkholder Backlog) plus 13 (Herrity Backlog) yields 68 plans (Ceiling is 100 total plans in backlog.) Plan Type No. on Hand Oldest Date Work Day Lag Sprinkler, Tenant plans without calculations 9 10-29-15 3 Sprinkler, Tenant plans with calculations 1 10-29-15 3 Sprinkler, Shell Bldgs., NFPA 13 systems 4 10-28-15 4 Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 1 11-2-15 1 Town of Herndon Building Tenant 0 -- 0 Fire Alarm, Tenant plans 16 10-29-15 3 Fire Alarm, Shell Bldgs. 5 10-16-15 12 Door Lock / Security plans 0 -- 0 Range Hood/Tanks/Foam/Public Safety Plans /Misc. 5 10-20-15 10 Site Plans/Rezoning 11 / 0 10-15-15 13 High-Piled Storage Plans 0 -- 0 Evacuation / Lockdown Plans 3 10-20-15 10 Burkholder Building Summary 55 10-15-15 XXXXXXXXX FM Architectural Review done at Herrity Building (Class 4 and Greater Building Plans) 6 10-21-15 9 FM Architectural Review (Fast Track Tenant Plans) 0 -- 0 FM Arch. Review (non-Fast Track Tenant Plans) 7 11-2-15 1 Herrity Building (B-2) Summary 13 10-21-15 XXXXXXXXX