SlideShare uma empresa Scribd logo
1 de 23
County of Fairfax, Virginia
Department of Transportation
1
December 1, 2015
Board of Supervisors
Transportation Committee
Leonard Wolfenstein & Dan Rathbone
Fairfax County Department of Transportation
County of Fairfax, Virginia
2
This presentation summarizes
the draft recommendations for
Fairfax County’s proposed
High Quality Transit Network
(HQTN).
The study team is currently
conducting analyses to reflect
the most recently adopted
(October 2015) Constrained
Long Range Plan and plans to
present the proposed HQTN
to the public in early 2016.
Presentation Context
Department of Transportation
County of Fairfax, Virginia
3
Establish the most effective
way to serve the County’s
future growth by improving
public transit usage.
Replace the Enhanced Public
Transportation Corridors
(EPTC) in the Comp Plan with
High Quality Transit Network
(HQTN) and further define
modes, right-of-way needs,
and station locations.
Study Purpose
Department of Transportation
County of Fairfax, Virginia Study Process
We are at the final stage of public
involvement and review:
• Goals/objectives (July 2012)
• Corridor functions (November 2012)
• Proposed High Quality Transit Network
Concept (July 2013)
• Final concept (early 2016)
Our remaining steps are to:
• Reflect current CLRP as baseline
• Complete stakeholder engagement
• Develop additional details on
alignments, stations, and costs
• Finalize recommendations
4 Department of Transportation
County of Fairfax, Virginia
5
Land Use Concept
The proposed
HQTN
supports the
County’s
Concept for
Future
Development
by focusing on
service to and
from activity
centers both
within the
County and
region-wide.
Department of Transportation
County of Fairfax, Virginia
6
High Quality Transit
Department of Transportation
Defining elements of
the HQTN include
providing improved
travel speeds and
reliable travel times,
typically on exclusive
right-of-way.
Commuter rail,
Metrorail, LRT, and
BRT are all examples
of High Quality Transit
modes.
County of Fairfax, Virginia
The type of premium transit service appropriate for each corridor will
reflect the traveler needs and land use context in that corridor.
7
Destination corridors, like the
Crystal City Potomac Yards
Transitway, connect
neighborhoods to multiple activity
centers, functioning primarily to
provide access.
Commuter corridors, like the
Virginia Railway Express, primarily
serve one major activity center and
tend to focus on journey-to-work
trips and function primarily to
provide mobility.
Transit Corridor Function
Department of Transportation
Source: Center for Transit Oriented Development
County of Fairfax, Virginia
The November 2012 public meeting presented different functional concepts for a
High Quality Transit Network. The access focus attracted more total transit riders,
whereas the mobility focus provided better access to regional jobs. Both had a
similar benefit in reducing vehicle travel.
MobilityAccess
Functional Concepts
8 Department of Transportation
County of Fairfax, Virginia
The public values multiple objectives:
• Increase access to destinations
• Include both high demand
commuter and destination corridors
• Reduce roadway congestion
• Increase transit ridership
• Take cars off the road
• Encourage TOD
• Support Countywide vision for
managed growth
• Be affordable
• Be understandable/usable
• Be connected
Four concepts were reviewed with
the public in November 2012. The
proposed HQTN concept utilizes the
best ideas from each for a context-
sensitive fit to individual corridor
needs.
Alternative Concepts
9 Department of Transportation
County of Fairfax, Virginia
Extensive coordination
with current studies in
past two years:
• Transform 66
• Richmond Highway
• Envision Route 7
• Alexandria transitway
planning
• Route 7 west of Tysons
Study Coordination
10 Department of Transportation
Coordination at time of 2014 CLRP
County of Fairfax, Virginia Proposed HQTN
The proposed HQTN builds
upon the existing and CLRP
transit investments to create
an interconnected network
of commuter and destination
corridors, supported by
connecting express bus
routes.
11 Department of Transportation
County of Fairfax, Virginia
Existing HQTN elements
serving Fairfax County
include Metrorail and VRE
with supportive express bus
services on high-occupancy
vehicle (HOV) or high-
occupancy/toll (HOT) lanes.
Proposed HQTN Elements
12 Department of Transportation
County of Fairfax, Virginia
2015 Constrained Long
Range Plan transit
connections provide the
starting point for the
proposed HQTN:
• Silver Line extension
(Metrorail)
• Richmond Highway (BRT)
• Alexandria’s West End and
Duke Street transitways (BRT)
Proposed HQTN Elements (Cont.)
13 Department of Transportation
County of Fairfax, Virginia
Metrorail Extensions
provide capacity to both
connect Fairfax County with
other jurisdictions for
longer-distance trips as
region expands over time
and to serve the County’s
activity centers:
• Metrorail Orange Line
• Metrorail Blue Line
• Metrorail Yellow Line
Proposed HQTN Elements (Cont.)
14 Department of Transportation
County of Fairfax, Virginia
Light Rail Transit (LRT) /
Bus Rapid Transit (BRT)
provide service to support
access to and within transit-
oriented development along
linear corridors:
• Route 28 Corridor LRT/BRT
• Route 7 LRT/BRT
• Gallows Road LRT/BRT
The choice of LRT or BRT will be
finalized during alternatives
analysis.
Proposed HQTN Elements (Cont.)
15 Department of Transportation
County of Fairfax, Virginia
Express Bus services
connect activity centers as
well as other transit services,
including Transit Centers and
Park & Rides, and provide
greater routing flexibility:
Proposed HQTN Elements (Cont.)
16 Department of Transportation
Radial Circumferential
Route 50
Route 236
Van Dorn Street
Beltway Express
Fairfax County Parkway
Route 28
Bus lanes may also include HOV/HOT.
Express bus to be > 50% on exclusive
right-of-way inclusive of HOV/HOT lanes.
County of Fairfax, Virginia
The proposed HQTN would
result in changes to the
Transportation Plan Map,
including mode and alignment
details in the following corridors:
• Blue Line Extension
• Yellow Line Extension
• Gallows Road: BRT/LRT
• Richmond Highway:
BRT/Metrorail Extension
• Route 7: BRT/LRT
• Route Corridor 28: BRT/LRT
Transportation Plan Changes
17 Department of Transportation
County of Fairfax, Virginia
Recommends the following in
addition to the current CLRP
in Fairfax County:
• Metrorail: 34 miles & 10
Stations
• LRT/BRT: 33 miles & 27
Stations
• Supported by:
• Express Bus: 113 miles
& 25 stations
Proposed HQTN
18 Department of Transportation
County of Fairfax, Virginia Measures of Effectiveness
19 Department of Transportation
Pending refinement with 2015 CLRP base
Goal Achievement (compared to 2050 CLRP conditions)
CONNECT
Provide more transportation choices for
Fairfax County
and regional connectivity
Allows average County resident to reach 190,000 more jobs within a 45 minute
transit commute
Increases Fairfax County transit trips by 150,000 per day, a 35%
over base conditions.
Introduces rail service to 14 previously unserved activity centers
Estimated Cost per passenger consistent with recent New Starts approvals
GROW
Support local
and regional economic development goals
Serves 27 new station areas within designated activity centers.
Brings 120,000 new County households and 263,000 County jobs within ½ mile
of high quality transit station
THRIVE
Strengthen quality of life by making transit-
friendly, sustainable investments
Serves 28 new station areas with higher than average transit dependent
populations
Reduces weekday peak period Vehicle Hours of Travel by 68,000 and Vehicle
Miles of Travel by 147,000
Furthers Comprehensive Plan concepts for Enhanced Public Transportation
Corridors
County of Fairfax, Virginia Measures of Effectiveness (Cont.)
• Capital cost per annual
weekday passenger is a
measure of cost
effectiveness.
• Tested Transit Network
projects compare favorably
to New Starts approved
projects.
20 Department of Transportation
Pending refinement with 2015 CLRP base
County of Fairfax, Virginia
Supporting policies for the CTNS include:
• Concentrated growth in Activity Centers
• Quality TOD
• Feeder Bus Services
• Park & Rides
• Transit Centers
• Circulator Systems
Supporting Policies
21 Department of Transportation
County of Fairfax, Virginia
• Complete documentation
(early 2016)
• Publish Draft Final Report
(early 2016)
• Obtain additional public
comments (early 2016)
• Present Final Report to Board
for endorsement (mid-2016)
• Initiate process to incorporate
study recommendations in
Comprehensive Plan (mid-
2016)
Next Steps
22 Department of Transportation
County of Fairfax, Virginia Questions?
Leonard Wolfenstein
Leonard.Wolfenstein@fairfaxcounty.gov
Dan Rathbone
Daniel.Rathbone@fairvaxcounty.gov
http://www.fairfaxcounty.gov/fcdot/2050transitstudy/
23 Department of Transportation

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia RoadProposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
Proposed Bicycle Facilities: VDOT Summer 2015 Repaving-Franconia Road
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
 
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed FacilitiesTransportation Plan Map In County Comprehensive Plan-Completed Facilities
Transportation Plan Map In County Comprehensive Plan-Completed Facilities
 
Fairfax County Capital Bikeshare
Fairfax County Capital BikeshareFairfax County Capital Bikeshare
Fairfax County Capital Bikeshare
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOT
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation Results
 
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)
 
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor StudyFairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
 
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017Silver Line Update: Board Transportation Committee: Feb. 7, 2017
Silver Line Update: Board Transportation Committee: Feb. 7, 2017
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public MeetingsFairfax County Countywide Transit Network Study-February 2016 Public Meetings
Fairfax County Countywide Transit Network Study-February 2016 Public Meetings
 
Student Free Fare Program Update and Recommendations
Student Free Fare Program Update and RecommendationsStudent Free Fare Program Update and Recommendations
Student Free Fare Program Update and Recommendations
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
 
VDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives AnalysisVDRPT Route 1 Multimodal Alternatives Analysis
VDRPT Route 1 Multimodal Alternatives Analysis
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
 
Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 

Destaque

Destaque (20)

Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Fairfax County Parkway Corridor Study
Fairfax County Parkway Corridor StudyFairfax County Parkway Corridor Study
Fairfax County Parkway Corridor Study
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Student Free Fare Program
Student Free Fare ProgramStudent Free Fare Program
Student Free Fare Program
 
Protective Helmets
Protective HelmetsProtective Helmets
Protective Helmets
 
Reston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost AllocationsReston Funding Plan: Potential Cost Allocations
Reston Funding Plan: Potential Cost Allocations
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2Fairfax County Countywide Transit Network Study: Public Workshop #2
Fairfax County Countywide Transit Network Study: Public Workshop #2
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the Beltway
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 
Citizens Information Meeting: North West Street and Great Falls Street Sidewalks
Citizens Information Meeting: North West Street and Great Falls Street SidewalksCitizens Information Meeting: North West Street and Great Falls Street Sidewalks
Citizens Information Meeting: North West Street and Great Falls Street Sidewalks
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
 
Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015Silver Line Update: Dec. 1, 2015
Silver Line Update: Dec. 1, 2015
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Fairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development Plan
 
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD TrailDesign Public Hearing Presentation for Wiehle Avenue at W&OD Trail
Design Public Hearing Presentation for Wiehle Avenue at W&OD Trail
 
Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016
 
Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting
 

Semelhante a Fairfax Countywide Transit Network Study: Proposed High Quality Transit Network

Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
RPO America
 

Semelhante a Fairfax Countywide Transit Network Study: Proposed High Quality Transit Network (20)

Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
 
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
Fairfax County Countywide Transit Network Study-February 2016 Public Meeting:...
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
 
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
 
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018Richmond Highway Bus Rapid TransitPublic Meeting #1:April 17 & 18, 2018
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Reston Transportation Infrastructure and Funding
Reston Transportation Infrastructure and FundingReston Transportation Infrastructure and Funding
Reston Transportation Infrastructure and Funding
 
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
Fairfax County and the NVTA TransAction Update: Feb. 7, 2017
 
Silver Line Phase II Herndon-Reston Area Bus Service Review: Herndon Town Cou...
Silver Line Phase II Herndon-Reston Area Bus Service Review: Herndon Town Cou...Silver Line Phase II Herndon-Reston Area Bus Service Review: Herndon Town Cou...
Silver Line Phase II Herndon-Reston Area Bus Service Review: Herndon Town Cou...
 
Board of Supervisors Transportation Committee: Next Steps for Urban Street St...
Board of Supervisors Transportation Committee: Next Steps for Urban Street St...Board of Supervisors Transportation Committee: Next Steps for Urban Street St...
Board of Supervisors Transportation Committee: Next Steps for Urban Street St...
 
New Developments in Transit Oriented Development
New Developments in Transit Oriented DevelopmentNew Developments in Transit Oriented Development
New Developments in Transit Oriented Development
 
2021 Scholars Program: Ms. Tamiko Brim-Burnell
2021 Scholars Program: Ms. Tamiko Brim-Burnell2021 Scholars Program: Ms. Tamiko Brim-Burnell
2021 Scholars Program: Ms. Tamiko Brim-Burnell
 
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
 
Transportation Alternatives Program Workshop and Public Comment
Transportation Alternatives Program Workshop and Public CommentTransportation Alternatives Program Workshop and Public Comment
Transportation Alternatives Program Workshop and Public Comment
 
Silver Line Phase II Reston-Herndon Area Bus Service Review: Reston Public Me...
Silver Line Phase II Reston-Herndon Area Bus Service Review: Reston Public Me...Silver Line Phase II Reston-Herndon Area Bus Service Review: Reston Public Me...
Silver Line Phase II Reston-Herndon Area Bus Service Review: Reston Public Me...
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
Johnson gilmer presentation
Johnson gilmer presentationJohnson gilmer presentation
Johnson gilmer presentation
 
BC Ministry of Transportation Transit Presentation
BC Ministry of Transportation Transit PresentationBC Ministry of Transportation Transit Presentation
BC Ministry of Transportation Transit Presentation
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 

Mais de Fairfax County

Mais de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Último (20)

BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf02052024_First India Newspaper Jaipur.pdf
02052024_First India Newspaper Jaipur.pdf
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 

Fairfax Countywide Transit Network Study: Proposed High Quality Transit Network

  • 1. County of Fairfax, Virginia Department of Transportation 1 December 1, 2015 Board of Supervisors Transportation Committee Leonard Wolfenstein & Dan Rathbone Fairfax County Department of Transportation
  • 2. County of Fairfax, Virginia 2 This presentation summarizes the draft recommendations for Fairfax County’s proposed High Quality Transit Network (HQTN). The study team is currently conducting analyses to reflect the most recently adopted (October 2015) Constrained Long Range Plan and plans to present the proposed HQTN to the public in early 2016. Presentation Context Department of Transportation
  • 3. County of Fairfax, Virginia 3 Establish the most effective way to serve the County’s future growth by improving public transit usage. Replace the Enhanced Public Transportation Corridors (EPTC) in the Comp Plan with High Quality Transit Network (HQTN) and further define modes, right-of-way needs, and station locations. Study Purpose Department of Transportation
  • 4. County of Fairfax, Virginia Study Process We are at the final stage of public involvement and review: • Goals/objectives (July 2012) • Corridor functions (November 2012) • Proposed High Quality Transit Network Concept (July 2013) • Final concept (early 2016) Our remaining steps are to: • Reflect current CLRP as baseline • Complete stakeholder engagement • Develop additional details on alignments, stations, and costs • Finalize recommendations 4 Department of Transportation
  • 5. County of Fairfax, Virginia 5 Land Use Concept The proposed HQTN supports the County’s Concept for Future Development by focusing on service to and from activity centers both within the County and region-wide. Department of Transportation
  • 6. County of Fairfax, Virginia 6 High Quality Transit Department of Transportation Defining elements of the HQTN include providing improved travel speeds and reliable travel times, typically on exclusive right-of-way. Commuter rail, Metrorail, LRT, and BRT are all examples of High Quality Transit modes.
  • 7. County of Fairfax, Virginia The type of premium transit service appropriate for each corridor will reflect the traveler needs and land use context in that corridor. 7 Destination corridors, like the Crystal City Potomac Yards Transitway, connect neighborhoods to multiple activity centers, functioning primarily to provide access. Commuter corridors, like the Virginia Railway Express, primarily serve one major activity center and tend to focus on journey-to-work trips and function primarily to provide mobility. Transit Corridor Function Department of Transportation Source: Center for Transit Oriented Development
  • 8. County of Fairfax, Virginia The November 2012 public meeting presented different functional concepts for a High Quality Transit Network. The access focus attracted more total transit riders, whereas the mobility focus provided better access to regional jobs. Both had a similar benefit in reducing vehicle travel. MobilityAccess Functional Concepts 8 Department of Transportation
  • 9. County of Fairfax, Virginia The public values multiple objectives: • Increase access to destinations • Include both high demand commuter and destination corridors • Reduce roadway congestion • Increase transit ridership • Take cars off the road • Encourage TOD • Support Countywide vision for managed growth • Be affordable • Be understandable/usable • Be connected Four concepts were reviewed with the public in November 2012. The proposed HQTN concept utilizes the best ideas from each for a context- sensitive fit to individual corridor needs. Alternative Concepts 9 Department of Transportation
  • 10. County of Fairfax, Virginia Extensive coordination with current studies in past two years: • Transform 66 • Richmond Highway • Envision Route 7 • Alexandria transitway planning • Route 7 west of Tysons Study Coordination 10 Department of Transportation Coordination at time of 2014 CLRP
  • 11. County of Fairfax, Virginia Proposed HQTN The proposed HQTN builds upon the existing and CLRP transit investments to create an interconnected network of commuter and destination corridors, supported by connecting express bus routes. 11 Department of Transportation
  • 12. County of Fairfax, Virginia Existing HQTN elements serving Fairfax County include Metrorail and VRE with supportive express bus services on high-occupancy vehicle (HOV) or high- occupancy/toll (HOT) lanes. Proposed HQTN Elements 12 Department of Transportation
  • 13. County of Fairfax, Virginia 2015 Constrained Long Range Plan transit connections provide the starting point for the proposed HQTN: • Silver Line extension (Metrorail) • Richmond Highway (BRT) • Alexandria’s West End and Duke Street transitways (BRT) Proposed HQTN Elements (Cont.) 13 Department of Transportation
  • 14. County of Fairfax, Virginia Metrorail Extensions provide capacity to both connect Fairfax County with other jurisdictions for longer-distance trips as region expands over time and to serve the County’s activity centers: • Metrorail Orange Line • Metrorail Blue Line • Metrorail Yellow Line Proposed HQTN Elements (Cont.) 14 Department of Transportation
  • 15. County of Fairfax, Virginia Light Rail Transit (LRT) / Bus Rapid Transit (BRT) provide service to support access to and within transit- oriented development along linear corridors: • Route 28 Corridor LRT/BRT • Route 7 LRT/BRT • Gallows Road LRT/BRT The choice of LRT or BRT will be finalized during alternatives analysis. Proposed HQTN Elements (Cont.) 15 Department of Transportation
  • 16. County of Fairfax, Virginia Express Bus services connect activity centers as well as other transit services, including Transit Centers and Park & Rides, and provide greater routing flexibility: Proposed HQTN Elements (Cont.) 16 Department of Transportation Radial Circumferential Route 50 Route 236 Van Dorn Street Beltway Express Fairfax County Parkway Route 28 Bus lanes may also include HOV/HOT. Express bus to be > 50% on exclusive right-of-way inclusive of HOV/HOT lanes.
  • 17. County of Fairfax, Virginia The proposed HQTN would result in changes to the Transportation Plan Map, including mode and alignment details in the following corridors: • Blue Line Extension • Yellow Line Extension • Gallows Road: BRT/LRT • Richmond Highway: BRT/Metrorail Extension • Route 7: BRT/LRT • Route Corridor 28: BRT/LRT Transportation Plan Changes 17 Department of Transportation
  • 18. County of Fairfax, Virginia Recommends the following in addition to the current CLRP in Fairfax County: • Metrorail: 34 miles & 10 Stations • LRT/BRT: 33 miles & 27 Stations • Supported by: • Express Bus: 113 miles & 25 stations Proposed HQTN 18 Department of Transportation
  • 19. County of Fairfax, Virginia Measures of Effectiveness 19 Department of Transportation Pending refinement with 2015 CLRP base Goal Achievement (compared to 2050 CLRP conditions) CONNECT Provide more transportation choices for Fairfax County and regional connectivity Allows average County resident to reach 190,000 more jobs within a 45 minute transit commute Increases Fairfax County transit trips by 150,000 per day, a 35% over base conditions. Introduces rail service to 14 previously unserved activity centers Estimated Cost per passenger consistent with recent New Starts approvals GROW Support local and regional economic development goals Serves 27 new station areas within designated activity centers. Brings 120,000 new County households and 263,000 County jobs within ½ mile of high quality transit station THRIVE Strengthen quality of life by making transit- friendly, sustainable investments Serves 28 new station areas with higher than average transit dependent populations Reduces weekday peak period Vehicle Hours of Travel by 68,000 and Vehicle Miles of Travel by 147,000 Furthers Comprehensive Plan concepts for Enhanced Public Transportation Corridors
  • 20. County of Fairfax, Virginia Measures of Effectiveness (Cont.) • Capital cost per annual weekday passenger is a measure of cost effectiveness. • Tested Transit Network projects compare favorably to New Starts approved projects. 20 Department of Transportation Pending refinement with 2015 CLRP base
  • 21. County of Fairfax, Virginia Supporting policies for the CTNS include: • Concentrated growth in Activity Centers • Quality TOD • Feeder Bus Services • Park & Rides • Transit Centers • Circulator Systems Supporting Policies 21 Department of Transportation
  • 22. County of Fairfax, Virginia • Complete documentation (early 2016) • Publish Draft Final Report (early 2016) • Obtain additional public comments (early 2016) • Present Final Report to Board for endorsement (mid-2016) • Initiate process to incorporate study recommendations in Comprehensive Plan (mid- 2016) Next Steps 22 Department of Transportation
  • 23. County of Fairfax, Virginia Questions? Leonard Wolfenstein Leonard.Wolfenstein@fairfaxcounty.gov Dan Rathbone Daniel.Rathbone@fairvaxcounty.gov http://www.fairfaxcounty.gov/fcdot/2050transitstudy/ 23 Department of Transportation