O slideshow foi denunciado.
Utilizamos seu perfil e dados de atividades no LinkedIn para personalizar e exibir anúncios mais relevantes. Altere suas preferências de anúncios quando desejar.

Chichester Lane at Lismore Lane Walkway

12 visualizações

Publicada em

Chichester Lane at Lismore Lane Walkway extended a five-foot wide concrete walkway 91 linear feet. The improvements include construction of sidewalk, adjusting an existing sanitary manhole to grade, and applying topsoil, seed and matting to disturbed areas.

Publicada em: Governo e ONGs
  • Seja o primeiro a comentar

  • Seja a primeira pessoa a gostar disto

Chichester Lane at Lismore Lane Walkway

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Chichester Lane at Lismore Lane Walkway Contract No. CN 16026001 Task Order No. 67 Project No. ST-000036-19 Providence District Tax Map No. 49-3 April 18, 2019
  2. 2. Chichester Lane at Lismore Lane Walkway Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  3. 3. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Chichester Lane at Lismore Lane Walkway Providence District, Tax Map No. 49-3 PROJECT LOCATION
  4. 4. Project Details Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Description: Chichester Lane at Lismore Lane Walkway was substantially completed on April 12, 2019 . The project extends a 5-foot wide concrete walkway for a distance of approximately 91 LF. The Improvements include construction of sidewalk, adjusting existing sanitary manhole to grade, applying top soil, seed and matting to disturbed areas. Project Overview: • Project Delivery: Annual Contract with Unit Price Project Team: • Contractor • Ashburn Contracting Corporation • Fairfax County • Department of Transportation – Jeanmarie Roberson • Utilities Design and Construction Division – Samuel Engida • Project Inspector, UDCD – Keith Ferrell • Land Survey Branch, UDCD – Gregory Harper Chichester Lane at Lismore Lane Walkway
  5. 5. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Chichester Lane at Lismore Lane Walkway Pre-Existing Conditions
  6. 6. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Chichester Lane at Lismore Lane Walkway Pre-Existing Conditions
  7. 7. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Chichester Lane at Lismore Lane Walkway Preparing Sub-Base for Concrete
  8. 8. Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Chichester Lane at Lismore Lane Walkway Concrete Placement Completed
  9. 9. Chichester Lane at Lismore Lane Walkway Top Soil and Matting Placement Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
  10. 10. Before After Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Chichester Lane at Lismore Lane Walkway
  11. 11. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Gallows Rd. and Prosperity Ave. Improvements Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch Matthew Kaiser, Public Information Officer 703-324-8455, TTY 711 Matthew.kaiser@fairfaxcounty.gov

×