Overview
• Background and purpose
• Development process
• Coordination with schools
• Timeline and next steps
Department of Transportation
2
County of Fairfax, Virginia
Background and Purpose
• The student bus pass and school outreach pilot program
– Developed in response to a Board matter and the FY2015 budget
language requesting the Department of Transportation explore
transportation partnerships with Fairfax County Public Schools (FCPS)
• FCDOT staff met with:
– Washington Metropolitan Area Transportation Authority (WMATA)
– City of Fairfax CUE
– FCPS
– Department of Neighborhood and Community Services
• Discussed both short- and long-term opportunities for
encouraging increased student and youth ridership on
public transit services in Fairfax County
Department of Transportation
3
County of Fairfax, Virginia
Coordinated Response
• Formation of an inter-department/inter-
division working group to plan and
implement a student bus pass and school
outreach pilot program
Department of Transportation
4
County of Fairfax, Virginia
Student Fare and School Education
Program Working Group
• Working group established by FCDOT to
allow for coordinated planning of student
pass and associated school education
program
• Working group includes representatives
from FCDOT and FCPS
Department of Transportation
5
County of Fairfax, Virginia
Working Group Focus
Strategy –
• Provide free trips on Fairfax Connector buses
to Fairfax County high school and middle
school students
• Provide students with information on how to
use Fairfax Connector bus services
Department of Transportation
6
County of Fairfax, Virginia
Working Group Focus
Defining Program Limitations –
• Set-up as an “opt-in” program; a specific pass
is required
• Passes will be valid on Fairfax Connector only
• Passes will be valid between 6 a.m. and 8 p.m.
Monday through Friday
• Parent/guardian permission is required
• Students will need to conform to the same
rules of conduct as all other passengers
Department of Transportation
7
County of Fairfax, Virginia
Fairfax Connector Responsibilities
• Bus operator training
• Farebox programming
• Public outreach
– School outreach
– Public outreach
• Pass production
– Printing cost shared with
FCPS
Department of Transportation
8
County of Fairfax, Virginia
FCPS Responsibilities
• Distribution and tracking of passes
– Passes have been delivered to FCPS
Administration for distribution to schools
– All passes contain a unique serial number that
will allow individual schools to passes
assigned to students
• Coordinating with FCDOT on school
outreach
Department of Transportation
9
County of Fairfax, Virginia
Student Bus Pass
Department of Transportation
10
SAMPLE
County of Fairfax, Virginia
Working Group Accomplishments to
Date
• Design and development of student pass
program
– Program operating parameters
– Bus pass design and production
• Coordinated planning of school outreach
program.
– Defining in-school outreach at five high schools, as a
pilot for the outreach efforts
Department of Transportation
11
County of Fairfax, Virginia
In-School Outreach
• Targeted schools were chosen based on
availability of nearby Fairfax Connector bus
service, and geographic distribution
• Schools
– Chantilly High School
– Edison High School
– Madison High School
– Mount Vernon High School
– South Lakes High School
Department of Transportation
12
County of Fairfax, Virginia
Timeline
• Working Group Meetings
– Began in December 2014
– Group continues to meet to prepare for program start
• School outreach
• General outreach
• Start of pass program
– Monitoring of ridership and identification of any issues
(i.e. load factors, lost passes, student conduct, load
factors, etc.) – Year 1
Department of Transportation
13
County of Fairfax, Virginia
Questions?
Department of Transportation
14

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
 
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
Status of I-66 Corridor Improvement Projects: US Route 15 to I-495
 
Transportation Alternatives Public Meeting: Sept. 14, 2017
Transportation Alternatives Public Meeting: Sept. 14, 2017Transportation Alternatives Public Meeting: Sept. 14, 2017
Transportation Alternatives Public Meeting: Sept. 14, 2017
 
Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016
Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016
Citizens Information Meeting: Baron Road Walkway: Oct. 20, 2016
 
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
Citizens Information Meeting: Kirby Road Sidewalks: Nov. 9, 2016
 
Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting Reston Network Analysis: Stakeholder Kick-off Meeting
Reston Network Analysis: Stakeholder Kick-off Meeting
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
 
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
Reston Network Analysis: Mid-Buildout Results and Roadway Classifications- Ap...
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)
 
Snow Summit Follow-Up July 2016
Snow Summit Follow-Up July 2016Snow Summit Follow-Up July 2016
Snow Summit Follow-Up July 2016
 
Urban Street Standards Progress Report
Urban Street Standards Progress ReportUrban Street Standards Progress Report
Urban Street Standards Progress Report
 
Interstate 66 Corridor Improvements
Interstate 66 Corridor ImprovementsInterstate 66 Corridor Improvements
Interstate 66 Corridor Improvements
 
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County RoadsBi-County Parkway: Evaluation of Impacts on Fairfax County Roads
Bi-County Parkway: Evaluation of Impacts on Fairfax County Roads
 
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal MobilitySouthrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
Southrun Road-2016 VDOT Repaving: Complete Streets-Improving Multimodal Mobility
 
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to HaymarketTransform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
Transform 66 Outside the Beltway: Multimodal Solutions- 495 to Haymarket
 
Vienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access StudyVienna Metro Station Area Bicycle Access Study
Vienna Metro Station Area Bicycle Access Study
 
Transportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax CountyTransportation Services Group: Employer Services in Fairfax County
Transportation Services Group: Employer Services in Fairfax County
 
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
Reston Network Analysis Community Meeting 2050 Results and Funding Plan: Nov....
 
Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....
Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....
Scotts Run Trail: Magarity Road to Colshire Meadow Drive Public Hearing: Nov....
 

Destaque

Destaque (20)

Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
Fairfax County Countywide Transit Network Study: Proposed High Quality Transi...
 
Citizens Information Meeting: North West Street and Great Falls Street Sidewalks
Citizens Information Meeting: North West Street and Great Falls Street SidewalksCitizens Information Meeting: North West Street and Great Falls Street Sidewalks
Citizens Information Meeting: North West Street and Great Falls Street Sidewalks
 
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
Reston Transportation Funding Plan-Updates and Funding Scenarios: Sept. 12, 2016
 
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
Reston Transportation Funding Plan: Community Meeting: Nov. 7, 2016
 
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
Countywide Transit Network Study: Proposed High Quality Transit Network: Janu...
 
Mobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-WayMobile Food Vending within VDOT Right-of-Way
Mobile Food Vending within VDOT Right-of-Way
 
Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016Reston Network Analysis Unmitigated Results: Jan.15, 2016
Reston Network Analysis Unmitigated Results: Jan.15, 2016
 
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
Reston Funding Plan: Updates and Funding Scenarios - Aug. 8 & 10, 2016
 
Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016   Fairfax County TDM in Land Development: April 19, 2016
Fairfax County TDM in Land Development: April 19, 2016
 
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework AgreementI-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
I-66 Inside the Beltway Initial Traffic Analysis and Framework Agreement
 
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
Transportation Alternatives Workshop and Public Comment: Sept. 15, 2016
 
Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016Tysons Trails: Snow Removal & Lighting July 2016
Tysons Trails: Snow Removal & Lighting July 2016
 
Transportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future UpdatesTransportation Priorities Plan: Future Updates
Transportation Priorities Plan: Future Updates
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the Beltway
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014Silver Line Phase 1-Status Report: Feb. 4, 2014
Silver Line Phase 1-Status Report: Feb. 4, 2014
 
Protective Helmets
Protective HelmetsProtective Helmets
Protective Helmets
 
Reston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation ResultsReston Network Analysis: 2050 1st Tier Mitigation Results
Reston Network Analysis: 2050 1st Tier Mitigation Results
 
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor StudyFairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
 
Fairfax County Capital Bikeshare
Fairfax County Capital BikeshareFairfax County Capital Bikeshare
Fairfax County Capital Bikeshare
 

Semelhante a Student Free Fare Program

Semelhante a Student Free Fare Program (20)

Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...Student Free Fare Program Update and Recommendations: Board Transportation Co...
Student Free Fare Program Update and Recommendations: Board Transportation Co...
 
ACT 2014 San Francisco Safe Routes to School Program
ACT 2014 San Francisco Safe Routes to School ProgramACT 2014 San Francisco Safe Routes to School Program
ACT 2014 San Francisco Safe Routes to School Program
 
Making School Travel as Easy as ABC
Making School Travel as Easy as ABCMaking School Travel as Easy as ABC
Making School Travel as Easy as ABC
 
1/28/2016 - Active Routes to School
1/28/2016 - Active Routes to School1/28/2016 - Active Routes to School
1/28/2016 - Active Routes to School
 
Vienna Metro Station Bicycle Access Study
Vienna Metro Station Bicycle Access StudyVienna Metro Station Bicycle Access Study
Vienna Metro Station Bicycle Access Study
 
Fairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development PlanFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development Plan
 
South Carolina Safe Routes to School Resource Center
South Carolina Safe Routes to School Resource CenterSouth Carolina Safe Routes to School Resource Center
South Carolina Safe Routes to School Resource Center
 
School siting and children's travel - How can we balance community and transp...
School siting and children's travel - How can we balance community and transp...School siting and children's travel - How can we balance community and transp...
School siting and children's travel - How can we balance community and transp...
 
Juniper Lane Connectivity Study: August 1, 2018
Juniper Lane Connectivity Study: August 1, 2018Juniper Lane Connectivity Study: August 1, 2018
Juniper Lane Connectivity Study: August 1, 2018
 
St. Louis Youth - Drive for Tomorrow
St. Louis Youth - Drive for TomorrowSt. Louis Youth - Drive for Tomorrow
St. Louis Youth - Drive for Tomorrow
 
Starting a Youth Education Program - IL Bike Summit 2016
Starting a Youth Education Program - IL Bike Summit 2016Starting a Youth Education Program - IL Bike Summit 2016
Starting a Youth Education Program - IL Bike Summit 2016
 
Futures Working Group: Update to BOS Transportation Committee as of April 16,...
Futures Working Group: Update to BOS Transportation Committee as of April 16,...Futures Working Group: Update to BOS Transportation Committee as of April 16,...
Futures Working Group: Update to BOS Transportation Committee as of April 16,...
 
Operation Red to Green_Employee Engagement RoadMap
Operation Red to Green_Employee Engagement RoadMapOperation Red to Green_Employee Engagement RoadMap
Operation Red to Green_Employee Engagement RoadMap
 
County/School Coordination on Transportation
County/School Coordination on TransportationCounty/School Coordination on Transportation
County/School Coordination on Transportation
 
Update on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives AnalysisUpdate on Route 1 Multimodal Alternatives Analysis
Update on Route 1 Multimodal Alternatives Analysis
 
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
Reston Network Analysis - Community Kick-Off: Feb. 1, 2016
 
Eugene SRTS Program
Eugene SRTS ProgramEugene SRTS Program
Eugene SRTS Program
 
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016 Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
Fairfax County Capital Bikeshare - TAC Presentation: June 21, 2016
 
NCCCS Teacher Preparation
NCCCS Teacher PreparationNCCCS Teacher Preparation
NCCCS Teacher Preparation
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
 

Mais de Fairfax County

Mais de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 

Último (20)

Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 

Student Free Fare Program

  • 1. County of Fairfax, Virginia Student Free Fare Program Board Transportation Committee July 14, 2015 Stuart Boggs Transit Services Division Department of Transportation Department of Transportation 1
  • 2. County of Fairfax, Virginia Overview • Background and purpose • Development process • Coordination with schools • Timeline and next steps Department of Transportation 2
  • 3. County of Fairfax, Virginia Background and Purpose • The student bus pass and school outreach pilot program – Developed in response to a Board matter and the FY2015 budget language requesting the Department of Transportation explore transportation partnerships with Fairfax County Public Schools (FCPS) • FCDOT staff met with: – Washington Metropolitan Area Transportation Authority (WMATA) – City of Fairfax CUE – FCPS – Department of Neighborhood and Community Services • Discussed both short- and long-term opportunities for encouraging increased student and youth ridership on public transit services in Fairfax County Department of Transportation 3
  • 4. County of Fairfax, Virginia Coordinated Response • Formation of an inter-department/inter- division working group to plan and implement a student bus pass and school outreach pilot program Department of Transportation 4
  • 5. County of Fairfax, Virginia Student Fare and School Education Program Working Group • Working group established by FCDOT to allow for coordinated planning of student pass and associated school education program • Working group includes representatives from FCDOT and FCPS Department of Transportation 5
  • 6. County of Fairfax, Virginia Working Group Focus Strategy – • Provide free trips on Fairfax Connector buses to Fairfax County high school and middle school students • Provide students with information on how to use Fairfax Connector bus services Department of Transportation 6
  • 7. County of Fairfax, Virginia Working Group Focus Defining Program Limitations – • Set-up as an “opt-in” program; a specific pass is required • Passes will be valid on Fairfax Connector only • Passes will be valid between 6 a.m. and 8 p.m. Monday through Friday • Parent/guardian permission is required • Students will need to conform to the same rules of conduct as all other passengers Department of Transportation 7
  • 8. County of Fairfax, Virginia Fairfax Connector Responsibilities • Bus operator training • Farebox programming • Public outreach – School outreach – Public outreach • Pass production – Printing cost shared with FCPS Department of Transportation 8
  • 9. County of Fairfax, Virginia FCPS Responsibilities • Distribution and tracking of passes – Passes have been delivered to FCPS Administration for distribution to schools – All passes contain a unique serial number that will allow individual schools to passes assigned to students • Coordinating with FCDOT on school outreach Department of Transportation 9
  • 10. County of Fairfax, Virginia Student Bus Pass Department of Transportation 10 SAMPLE
  • 11. County of Fairfax, Virginia Working Group Accomplishments to Date • Design and development of student pass program – Program operating parameters – Bus pass design and production • Coordinated planning of school outreach program. – Defining in-school outreach at five high schools, as a pilot for the outreach efforts Department of Transportation 11
  • 12. County of Fairfax, Virginia In-School Outreach • Targeted schools were chosen based on availability of nearby Fairfax Connector bus service, and geographic distribution • Schools – Chantilly High School – Edison High School – Madison High School – Mount Vernon High School – South Lakes High School Department of Transportation 12
  • 13. County of Fairfax, Virginia Timeline • Working Group Meetings – Began in December 2014 – Group continues to meet to prepare for program start • School outreach • General outreach • Start of pass program – Monitoring of ridership and identification of any issues (i.e. load factors, lost passes, student conduct, load factors, etc.) – Year 1 Department of Transportation 13
  • 14. County of Fairfax, Virginia Questions? Department of Transportation 14

Notas do Editor

  1. Supervisor Catherine M. Hudgins (Hunter Mill District) Board Matter, September 10, 2013 – Common Transportation Goals. Exploring county/school system collaboration on meeting the transportation needs of both organizations.
  2. Working group members: Nicholas E Perfili, FCDOT Anna Nissinen, FCDOT Sharon Crane, FCDOT Daniel Pool, MV Transportation Jeffrey Platenberg, FCPS Jeanna Muhoro, Fairfax County NCS Kris L. Miller, FCDOT Thomas D. Borkowski, FCDOT Florita Wesley, FCDOT Thomas A. Italiano, FCPS
  3. In-school outreach will take place at five area high schools: Edison High School James Madison High School Chantilly High School Mt. Vernon High School South Lakes High School Printing cost was $2,873 for plastic, sequentially numbered passes.
  4. FCPS is developing a parental approval form that must be signed and returned by the student applying for a bus pass. FCPS school administrators will track passes by way of the unique identifier (serial #) imprinted on each pass.
  5. Student pass is good for one year. Each successive year will be a different color to insure bus operator know that presented pass is valid. Pass includes Fairfax Connector rules of conduct for passengers on the reverse side of the pass. Students will be treated like all other Connector passengers when it comes to violations of conduct rules.
  6. Passes have been printed and distributed to FCPS Administration for subsequent distribution to the schools. MV Divisions have been supplied with sample passes for operator training.
  7. Farebox programming to allow for identification of student trips. Ridership date will be monitored in the coming year to assess utilization of program. Information compiled from ridership reports, FAST reports, and customer service input will be used to identify any program modifications that should be considered in the following years of the student bus pass program.