Deepwater Offshore Wind Installations 4th Year Project ProposalMonday 19th April 2010 Ewan Baird, SIMarEST, RINA
Purpose To explain choice of  Proposed 4th Year Project on Deepwater Offshore Wind Installations
Ewan Baird - Origin 1989: Stavanger, Norway, parents with BP Exploration Father: BP Controls EngineerForties, Magnus, ULA, GYDA, Thistle Mother: BP Technical AssistantForties Alpha Cofferdam Step Father: Kongsberg MaritimeUK General Manager (Offshore)
Wind Power Sustainable infinite Source of Energy ≈ 72 TW ≈ 54,000 Million Tons of Oil ≈ 5x world Energy use in all forms Current OperationsWorldwide capacity 160 GW≈ 340 TWhr≈ 2% worldwide Electricity Consumption => Current Operations 0.222% of total source!
Wind Power in the UK UK demand around 40 GWeWind Resource of Offshore Only  2000 GWe – 50x demand UK Current:  	2757 Turbines 	 4.113 GW UK Proposed: 	7000+ Turbines 	25+ GW Capacity					[Target 35 GW by 2020] Target of 60% reduction in CO₂ Emissions by 2050Intermediate Target of 30% by 2020
EU2020 20% of EU Energy from Renewable Sources by 2020,with unique target per EU country UK Target 15% Energy Consumption from renewable Sources by 2020 	= 35%-40% of UK Electricity Consumption= 33-35 GW of Wind Capacity
Rounds 1-3 UK proposed 3 Rounds of installation of Offshore Farms Round 1 – Completed and OperatingShallow Waters314 Turbines, 962.4 MW Capacity Round 2 – Under ConstructionIncreased water depth, still shallow2033 turbines, 7491 MW Capacity Round 3 – Future ProjectsSome Deepwater Operations32000+ MW Capacity
Deepwater Operations Proved feasible by UMass in 1970’s Increased Efficiency – lack of topographical features =>Competitive capital costs against near-shore installations Situated >12 miles, Reduced visual pollution– debatable! No real solutions for deepwater. No proven Concepts Experience lies in Shallow Fixed
Project Focus/Objectives With Offshore Wind Power moving into deeper water, the focus is to analyse and discuss deepwater concepts Related Subsea Infrastructure Round 3 includes deepwater regions, so a study of a suitable solution for application in this particular field of operation will be undertaken Methods of offshore installation for turbines
Methodology Floating Platform Concepts SPAR  TLP Buoyancy Stabilised Installation Methods Barge Specialised Turbine vessel Subsea Infrastructure - pipelines
Timescale June 2010 – April 2011 Large topic to cover – planning is essential; Installation Methods/Subsea Infrastructure	Summer 2010 SPAR						September 2010 TLP						October 2010 Buoyancy Stabilised				November 2010 Comparison					December 2010 Application for Round 3			January 2011 Other					February 2011 onwards
Deliverables Industrial experience of subsea engineering, pipelay infrastructure and offshore installation In depth report, analysis and comparison of concept design(s) Projected benefits of proposed wind installations to meet current EU regulations against other renewable sources
Summer 2010 Allseas – Subsea and Pipelay Engineering 2000 employees 6 vessels Switzerland, Belgium, The Netherlands, Australia, Portugal, USA, UK and India Engineering Department - Delft, The Netherlands 3 month technical internship – 60 interns/summer
Allseas Internship Projects Pieter Schelte 5th Longest vessel in the world (4thKnock Nevis decommissioned)  Offshore Installation/decommission $1.7 billion Project Construction phase to begin soon in Far East, expected delivery 2013 Control Systems by Kongsberg Maritime
Summary Wind Power Political Evolving Industry Current and Topical Massive Engineering Aspects Access to industy Relevant summer placement Future Career Prospects
Any Questions?

Mais conteúdo relacionado

Mais procurados

Project Summary
Project Summary Project Summary
Project Summary
Jinliang Li
 
Wind Farm Decision Making Question
Wind Farm Decision Making QuestionWind Farm Decision Making Question
Wind Farm Decision Making Question
neilgood
 

Mais procurados (20)

Nuclear
NuclearNuclear
Nuclear
 
2010 06 Proposed Nuclear Power Development: Hinkley Point C – Nigel Knee
2010 06 Proposed Nuclear Power Development: Hinkley Point C – Nigel Knee 2010 06 Proposed Nuclear Power Development: Hinkley Point C – Nigel Knee
2010 06 Proposed Nuclear Power Development: Hinkley Point C – Nigel Knee
 
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear PowerEnergy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
Energy, Nuclear & Sustainable Power: Rhodri Owen, Horizon Nuclear Power
 
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
Energy, Nuclear & Sustainable Power: Stuart Klosinski, Furness Economic Devel...
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
 
Supporting CCS deployment – an update from the UK Department of Energy and Cl...
Supporting CCS deployment – an update from the UK Department of Energy and Cl...Supporting CCS deployment – an update from the UK Department of Energy and Cl...
Supporting CCS deployment – an update from the UK Department of Energy and Cl...
 
Air 2014 energy_efficiency_forum
Air 2014 energy_efficiency_forumAir 2014 energy_efficiency_forum
Air 2014 energy_efficiency_forum
 
Energy Storage - 9: Richard Riley, Highview
Energy Storage - 9: Richard Riley, HighviewEnergy Storage - 9: Richard Riley, Highview
Energy Storage - 9: Richard Riley, Highview
 
Project Summary
Project Summary Project Summary
Project Summary
 
CREATION OF A POSTGRADUATE COURSE FOR WIND ENERGY AT THE INTERNATIONAL HELLEN...
CREATION OF A POSTGRADUATE COURSE FOR WIND ENERGY AT THE INTERNATIONAL HELLEN...CREATION OF A POSTGRADUATE COURSE FOR WIND ENERGY AT THE INTERNATIONAL HELLEN...
CREATION OF A POSTGRADUATE COURSE FOR WIND ENERGY AT THE INTERNATIONAL HELLEN...
 
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
SaskPower CCS Project - presentation by Mike Monea, SaskPower, London, 17 Nov...
 
Climate change: our chance to give rise to the next industrial revolution — F...
Climate change: our chance to give rise to the next industrial revolution — F...Climate change: our chance to give rise to the next industrial revolution — F...
Climate change: our chance to give rise to the next industrial revolution — F...
 
2011 09 Potential New Development: Oldbury Nuclear Power Station – Chris Pearce
2011 09 Potential New Development: Oldbury Nuclear Power Station – Chris Pearce 2011 09 Potential New Development: Oldbury Nuclear Power Station – Chris Pearce
2011 09 Potential New Development: Oldbury Nuclear Power Station – Chris Pearce
 
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
 
Marine Energy
Marine EnergyMarine Energy
Marine Energy
 
Gccsi japan members'_meeting_200613_tom-connor_aust_gov
Gccsi japan members'_meeting_200613_tom-connor_aust_govGccsi japan members'_meeting_200613_tom-connor_aust_gov
Gccsi japan members'_meeting_200613_tom-connor_aust_gov
 
EDF Carbon Capture & Storage
EDF Carbon Capture & StorageEDF Carbon Capture & Storage
EDF Carbon Capture & Storage
 
Wind Farm Decision Making Question
Wind Farm Decision Making QuestionWind Farm Decision Making Question
Wind Farm Decision Making Question
 
Influences on the Design and Viability of Large Offshore Wind Farms and their...
Influences on the Design and Viability of Large Offshore Wind Farms and their...Influences on the Design and Viability of Large Offshore Wind Farms and their...
Influences on the Design and Viability of Large Offshore Wind Farms and their...
 
Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030
 

Semelhante a 4th Year Project Proposal Presentation

CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
Global CCS Institute
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Glenn Klith Andersen
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpo
Damian Connon
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
Matthew Hannon
 

Semelhante a 4th Year Project Proposal Presentation (20)

The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter KyddThe Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
The Severn Estuary - A sustainable low carbon energy resource - Peter Kydd
 
DeepOcean Presentation - Pareto Securities Conference
DeepOcean Presentation - Pareto Securities ConferenceDeepOcean Presentation - Pareto Securities Conference
DeepOcean Presentation - Pareto Securities Conference
 
Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...
Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...
Decarbonising Australia’s Electricity Supply: The role for Small Modular Reac...
 
James Beal Bwea 08 Presentation
James Beal Bwea 08 PresentationJames Beal Bwea 08 Presentation
James Beal Bwea 08 Presentation
 
"Converting Offshore Wind into Electricity" (complete book 2011)
"Converting Offshore Wind into Electricity" (complete book 2011)"Converting Offshore Wind into Electricity" (complete book 2011)
"Converting Offshore Wind into Electricity" (complete book 2011)
 
Energy from the sea Offshore RE.pptx
Energy from the sea Offshore RE.pptxEnergy from the sea Offshore RE.pptx
Energy from the sea Offshore RE.pptx
 
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
 
G.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power PresentationG.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power Presentation
 
Renewable Energy and Local Opportunities
Renewable Energy and Local OpportunitiesRenewable Energy and Local Opportunities
Renewable Energy and Local Opportunities
 
CaBA conference 2015 III
CaBA conference 2015  IIICaBA conference 2015  III
CaBA conference 2015 III
 
Green energy, the key to the future of our planet
Green energy, the key to the future of our planetGreen energy, the key to the future of our planet
Green energy, the key to the future of our planet
 
Wind energy projects integration in electricity grids portugal and med tso e...
Wind energy projects integration in electricity grids  portugal and med tso e...Wind energy projects integration in electricity grids  portugal and med tso e...
Wind energy projects integration in electricity grids portugal and med tso e...
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For Deployment
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpo
 
2013 05 bristol channel energy - johnny gowdy
2013   05 bristol channel energy - johnny gowdy2013   05 bristol channel energy - johnny gowdy
2013 05 bristol channel energy - johnny gowdy
 
Offshore Wind Foundations Brussels 8th November 2017
Offshore Wind Foundations Brussels  8th November 2017Offshore Wind Foundations Brussels  8th November 2017
Offshore Wind Foundations Brussels 8th November 2017
 
SW Cleantech pack
SW Cleantech packSW Cleantech pack
SW Cleantech pack
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
 
Geoscience in Offshore Renewables
Geoscience in Offshore RenewablesGeoscience in Offshore Renewables
Geoscience in Offshore Renewables
 

4th Year Project Proposal Presentation

  • 1. Deepwater Offshore Wind Installations 4th Year Project ProposalMonday 19th April 2010 Ewan Baird, SIMarEST, RINA
  • 2. Purpose To explain choice of Proposed 4th Year Project on Deepwater Offshore Wind Installations
  • 3. Ewan Baird - Origin 1989: Stavanger, Norway, parents with BP Exploration Father: BP Controls EngineerForties, Magnus, ULA, GYDA, Thistle Mother: BP Technical AssistantForties Alpha Cofferdam Step Father: Kongsberg MaritimeUK General Manager (Offshore)
  • 4. Wind Power Sustainable infinite Source of Energy ≈ 72 TW ≈ 54,000 Million Tons of Oil ≈ 5x world Energy use in all forms Current OperationsWorldwide capacity 160 GW≈ 340 TWhr≈ 2% worldwide Electricity Consumption => Current Operations 0.222% of total source!
  • 5. Wind Power in the UK UK demand around 40 GWeWind Resource of Offshore Only 2000 GWe – 50x demand UK Current: 2757 Turbines 4.113 GW UK Proposed: 7000+ Turbines 25+ GW Capacity [Target 35 GW by 2020] Target of 60% reduction in CO₂ Emissions by 2050Intermediate Target of 30% by 2020
  • 6. EU2020 20% of EU Energy from Renewable Sources by 2020,with unique target per EU country UK Target 15% Energy Consumption from renewable Sources by 2020 = 35%-40% of UK Electricity Consumption= 33-35 GW of Wind Capacity
  • 7. Rounds 1-3 UK proposed 3 Rounds of installation of Offshore Farms Round 1 – Completed and OperatingShallow Waters314 Turbines, 962.4 MW Capacity Round 2 – Under ConstructionIncreased water depth, still shallow2033 turbines, 7491 MW Capacity Round 3 – Future ProjectsSome Deepwater Operations32000+ MW Capacity
  • 8. Deepwater Operations Proved feasible by UMass in 1970’s Increased Efficiency – lack of topographical features =>Competitive capital costs against near-shore installations Situated >12 miles, Reduced visual pollution– debatable! No real solutions for deepwater. No proven Concepts Experience lies in Shallow Fixed
  • 9. Project Focus/Objectives With Offshore Wind Power moving into deeper water, the focus is to analyse and discuss deepwater concepts Related Subsea Infrastructure Round 3 includes deepwater regions, so a study of a suitable solution for application in this particular field of operation will be undertaken Methods of offshore installation for turbines
  • 10. Methodology Floating Platform Concepts SPAR TLP Buoyancy Stabilised Installation Methods Barge Specialised Turbine vessel Subsea Infrastructure - pipelines
  • 11. Timescale June 2010 – April 2011 Large topic to cover – planning is essential; Installation Methods/Subsea Infrastructure Summer 2010 SPAR September 2010 TLP October 2010 Buoyancy Stabilised November 2010 Comparison December 2010 Application for Round 3 January 2011 Other February 2011 onwards
  • 12. Deliverables Industrial experience of subsea engineering, pipelay infrastructure and offshore installation In depth report, analysis and comparison of concept design(s) Projected benefits of proposed wind installations to meet current EU regulations against other renewable sources
  • 13. Summer 2010 Allseas – Subsea and Pipelay Engineering 2000 employees 6 vessels Switzerland, Belgium, The Netherlands, Australia, Portugal, USA, UK and India Engineering Department - Delft, The Netherlands 3 month technical internship – 60 interns/summer
  • 14. Allseas Internship Projects Pieter Schelte 5th Longest vessel in the world (4thKnock Nevis decommissioned) Offshore Installation/decommission $1.7 billion Project Construction phase to begin soon in Far East, expected delivery 2013 Control Systems by Kongsberg Maritime
  • 15. Summary Wind Power Political Evolving Industry Current and Topical Massive Engineering Aspects Access to industy Relevant summer placement Future Career Prospects