SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
Inya Lake Hotel, Yangon 7 October 2016
Current core funders:
UK DFID
DANIDA
Norway
Switzerland
Netherlands
Ireland
Founders:
MCRB Objective
To provide an effective and legitimate platform for
the creation of knowledge, capacity and dialogue
concerning responsible business in Myanmar,
based on local needs and international
standards, that results in more responsible
business and thereby contributes to sustained,
inclusive and sustainable economic growth.
MCRB defines ‘responsible business’ as
‘business activities that work for the long-
term interests of Myanmar and all its
people’.
www.myanmar-responsiblebusiness.org
15 Shan Yeiktha Street, Sanchaung, Yangon
Tel/Fax: 01 510069
MCRB publications
and translations
www.mcrb.org.mm
myanmar.responsible.business
Sector-Wide Impact Assessments
(SWIA)
The mining SWIA is the fourth sector-wide impact assessment project
undertaken by MCRB, following the publication of previous SWIAs
Myanmar ICT
Sector Wide Impact Assessment (SWIA)
http://www.myanmar-
responsiblebusiness.org/swia/ict.
html
Fieldwork
period:
November 2014 –
February 2015
 General lack of worker-management engagement in most companies across the
ICT value chain
 A few companies provided grievance mechanisms (fibre companies had letter
boxes but few complaints addressed)
 Unskilled workers relieved to secure a job at all → afraid of raising complaints
 At fibre factories, workers unaware of basic association and collective
bargaining rights; some aware of the right but assume company does not allow
them to form union
 No women (justified as unsafe) or only as manual workers on construction sites
 Racial and religious tensions were observed in some areas, mainly where
communities identified the company or its workers as Muslim
 Several cases where workers were brought on to dig fibre cable trenches due to a
debt owed to the group leader (debt bondage)
 General lack of basic measures to prevent underage workers in fibre cable
digging in particular
 Workers travel long distance so children regularly left with someone connected to
the works in the worker camps during the 10 hour shift periods.
 Employment contracts generally not used; limited exception of direct,
permanent employees of a tower company (no wage slips provided)
 When jobs of manual labourers and construction workers secured through
relatives/connections, wages were negotiated with no contracts
 Daily wage workers typically worked every day possible to maximise income
while work available, exceeding legal working time limits (?)
 Awareness of rights to wages and benefits varied considerably; very low level
of understanding of their rights vis-à-vis employers or the Government.
 Tower construction companies: reported cases of no rest, no payment of
overtime, wages varied (direct/indirectly employed)
 Fibre line digging: cases of pressure to work till target is reached, not given set
rest if not reached, wages not covering basic needs and do not reflect level of
difficulty (type of soil), sick pay not provided
 Working conditions for fibre cable digging particularly harsh: long distances of
trenches dug manually, 12 hour work days, injured workers have to repay any
medical expenses, Language barriers, Little to no facilities or equipment were
provided to fibre cable diggers etc...
 Some fibre factory workers were provided with accommodation
 Workers of subcontractors commonly not informed
about which tower construction company or telecoms
operator the tower was being built for: health and
safety and other operational standards may not have
been transmitted to the site level?
 Workplace attention to health and safety varied greatly
amongst the tower and fibre sites visited
 Often no personal protective equipment (PPE) used
(even where workers had PPE to hand)
 Failure to ensure that emergency first aid kits available
at tower sites
 For fibre factories: PPE +some training provided
 Dealing with local non-state armed groups: access fee, delays due
to blocked access to sites, lack of consultation with local groups
(NSAG) etc; fire-arms being carried by NSAGs;
 Workers aware of landmines around infrastructure in conflict areas
 Tower company acknowledgement and action concerning their
responsibility for the safety of workers was uneven:
◦ Some assume that this is responsibility of subcontractors, - some
provided safety and skills trainings
◦ Some labour subcontractors fear reporting incidents for fear of reprisal or
lost business even with incident reporting system in place
 Choosing to operate without contracts between tower companies
and their subcontractors was a common occurrence
Workshop objective
Establish a forum for Telecoms companies and their tier 1 subcontractors to
identify lessons learned and best practices in tower construction and fibre laying
operations in Myanmar through experience sharing in the following areas:
Health and safety
• To discuss problems, challenges or concers Telecoms companies in Myanmar
have in implementing health and safety standards at workpace, fibre factories
and during fibre cable diging;
• Ways of improving future work on safety in network construction in different
locations with possible focus on location-specific safety requrements, groups at
risk, hst community safety;
Labour
• Challenges for telecoms operations: human rights risks, ways of monitoring,
ways of mitigating, positive case studies;
• Sharing of recent experiences;
• Challenges of applying international standards in Myanmar in the absence of
developed national legal frameworks;
Company/community engagement and grievance mechanisms
• Current practice and recent challenges;
• Ways to improve work with civil society on monitoring adverse impacts
Identification of follow up actions; ongoing initiatives which can support action.
Please add our RSS feed to stay up-to-date on our activities
http://www.myanmar-responsiblebusiness.org/rss.xml
www.mcrb.org.mm
myanmar.responsible.business

Mais conteúdo relacionado

Semelhante a Workshop on Safety and Labour Issues in the Myanmar Telecoms Sector

MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
mike stone
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
mike stone
 
Choose quality-with-cost-justification
Choose quality-with-cost-justificationChoose quality-with-cost-justification
Choose quality-with-cost-justification
drottmayer
 
Proef International
Proef InternationalProef International
Proef International
Nacpe
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013
ogonzalez1997
 
GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...
GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...
GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...
4th_Global_Skills_Summit
 
20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary
tespanyo2
 

Semelhante a Workshop on Safety and Labour Issues in the Myanmar Telecoms Sector (20)

communication_(2).pptx
communication_(2).pptxcommunication_(2).pptx
communication_(2).pptx
 
Telecom infrastructure-sharing-a-panacea-for-sustainability-cost-and-network-...
Telecom infrastructure-sharing-a-panacea-for-sustainability-cost-and-network-...Telecom infrastructure-sharing-a-panacea-for-sustainability-cost-and-network-...
Telecom infrastructure-sharing-a-panacea-for-sustainability-cost-and-network-...
 
Choose Quality With Cost Justification Article
Choose Quality With Cost Justification ArticleChoose Quality With Cost Justification Article
Choose Quality With Cost Justification Article
 
H012636165
H012636165H012636165
H012636165
 
Reducing Straddle Carrier accidents at the Port
Reducing Straddle Carrier accidents at the PortReducing Straddle Carrier accidents at the Port
Reducing Straddle Carrier accidents at the Port
 
H012636165
H012636165H012636165
H012636165
 
Proef Presentation
Proef Presentation Proef Presentation
Proef Presentation
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
 
MIKE_CV NEW 2016
MIKE_CV NEW 2016MIKE_CV NEW 2016
MIKE_CV NEW 2016
 
Choose quality-with-cost-justification
Choose quality-with-cost-justificationChoose quality-with-cost-justification
Choose quality-with-cost-justification
 
The challenges of co location technology in nigeria by Spencer Dafe Itive, MN...
The challenges of co location technology in nigeria by Spencer Dafe Itive, MN...The challenges of co location technology in nigeria by Spencer Dafe Itive, MN...
The challenges of co location technology in nigeria by Spencer Dafe Itive, MN...
 
RESUME
RESUMERESUME
RESUME
 
Proef International
Proef InternationalProef International
Proef International
 
Intertek - Industry Services
Intertek - Industry ServicesIntertek - Industry Services
Intertek - Industry Services
 
Mohamed salah cv
Mohamed salah cv Mohamed salah cv
Mohamed salah cv
 
Intertek - Industry Services 2013
Intertek - Industry Services 2013Intertek - Industry Services 2013
Intertek - Industry Services 2013
 
Bernard_Onyiwe Resume 2017_Modified
Bernard_Onyiwe Resume 2017_ModifiedBernard_Onyiwe Resume 2017_Modified
Bernard_Onyiwe Resume 2017_Modified
 
GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...
GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...
GSS Session II -- Mr. S K Sinha -- Engagement of Industry for Implementation ...
 
20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary
 
Brazilian offshore and marine supply chain
Brazilian offshore and marine supply chain Brazilian offshore and marine supply chain
Brazilian offshore and marine supply chain
 

Mais de Ethical Sector

Mais de Ethical Sector (20)

Verbit - The State of Inclusivity, A Global Perspective
Verbit - The State of Inclusivity, A Global PerspectiveVerbit - The State of Inclusivity, A Global Perspective
Verbit - The State of Inclusivity, A Global Perspective
 
Acoustic Protocol 2021
Acoustic Protocol 2021Acoustic Protocol 2021
Acoustic Protocol 2021
 
Skillset
SkillsetSkillset
Skillset
 
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform PlansLabour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
Labour Issues in the Telecom Sector: Myanmar Labour Laws and Reform Plans
 
Community Grievance Management Experiences
Community Grievance Management ExperiencesCommunity Grievance Management Experiences
Community Grievance Management Experiences
 
Community Outreach (SLO)
Community Outreach (SLO)Community Outreach (SLO)
Community Outreach (SLO)
 
Workplace Safety in Telecom Industry
Workplace Safety in Telecom IndustryWorkplace Safety in Telecom Industry
Workplace Safety in Telecom Industry
 
Health and Safety in Myanmar
Health and Safety in MyanmarHealth and Safety in Myanmar
Health and Safety in Myanmar
 
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive BusinessVirtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
Virtual Roundtable Discussion with CSOs on Extractives and Inclusive Business
 
AirQualityAsia
AirQualityAsiaAirQualityAsia
AirQualityAsia
 
Health and Pollution Action Planning (HPAP)
Health and Pollution Action Planning (HPAP)Health and Pollution Action Planning (HPAP)
Health and Pollution Action Planning (HPAP)
 
HPAP - Health and Pollution Action Plan
HPAP - Health and Pollution Action PlanHPAP - Health and Pollution Action Plan
HPAP - Health and Pollution Action Plan
 
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
Dr. Dewi Aryani : Raising Awareness Towards Pollution and its Impact to Human...
 
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
How are Persons with Disabilities in Myanmar Experiencing Covid-19, Including...
 
Launch of the 2020 Pwint Thit Sa Report research phase
Launch of the 2020 Pwint Thit Sa Report research phaseLaunch of the 2020 Pwint Thit Sa Report research phase
Launch of the 2020 Pwint Thit Sa Report research phase
 
2020 Pwint Thit Sa - Webinar
2020 Pwint Thit Sa - Webinar2020 Pwint Thit Sa - Webinar
2020 Pwint Thit Sa - Webinar
 
Business & Digital Rights (Myanmar Business Associations Status)
Business & Digital Rights (Myanmar Business Associations Status)Business & Digital Rights (Myanmar Business Associations Status)
Business & Digital Rights (Myanmar Business Associations Status)
 
4b steve crown mdrf 2020
4b steve crown mdrf 20204b steve crown mdrf 2020
4b steve crown mdrf 2020
 
3e myanmar consumers u nion mdrf2020
3e myanmar consumers u nion mdrf20203e myanmar consumers u nion mdrf2020
3e myanmar consumers u nion mdrf2020
 
3d mdrf 2020 jo daniels ecommerce
3d mdrf 2020 jo daniels ecommerce3d mdrf 2020 jo daniels ecommerce
3d mdrf 2020 jo daniels ecommerce
 

Último

Último (20)

↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 

Workshop on Safety and Labour Issues in the Myanmar Telecoms Sector

  • 1. Inya Lake Hotel, Yangon 7 October 2016
  • 2. Current core funders: UK DFID DANIDA Norway Switzerland Netherlands Ireland Founders: MCRB Objective To provide an effective and legitimate platform for the creation of knowledge, capacity and dialogue concerning responsible business in Myanmar, based on local needs and international standards, that results in more responsible business and thereby contributes to sustained, inclusive and sustainable economic growth. MCRB defines ‘responsible business’ as ‘business activities that work for the long- term interests of Myanmar and all its people’. www.myanmar-responsiblebusiness.org 15 Shan Yeiktha Street, Sanchaung, Yangon Tel/Fax: 01 510069
  • 4. Sector-Wide Impact Assessments (SWIA) The mining SWIA is the fourth sector-wide impact assessment project undertaken by MCRB, following the publication of previous SWIAs
  • 5. Myanmar ICT Sector Wide Impact Assessment (SWIA) http://www.myanmar- responsiblebusiness.org/swia/ict. html
  • 7.  General lack of worker-management engagement in most companies across the ICT value chain  A few companies provided grievance mechanisms (fibre companies had letter boxes but few complaints addressed)  Unskilled workers relieved to secure a job at all → afraid of raising complaints  At fibre factories, workers unaware of basic association and collective bargaining rights; some aware of the right but assume company does not allow them to form union  No women (justified as unsafe) or only as manual workers on construction sites  Racial and religious tensions were observed in some areas, mainly where communities identified the company or its workers as Muslim  Several cases where workers were brought on to dig fibre cable trenches due to a debt owed to the group leader (debt bondage)  General lack of basic measures to prevent underage workers in fibre cable digging in particular  Workers travel long distance so children regularly left with someone connected to the works in the worker camps during the 10 hour shift periods.
  • 8.  Employment contracts generally not used; limited exception of direct, permanent employees of a tower company (no wage slips provided)  When jobs of manual labourers and construction workers secured through relatives/connections, wages were negotiated with no contracts  Daily wage workers typically worked every day possible to maximise income while work available, exceeding legal working time limits (?)  Awareness of rights to wages and benefits varied considerably; very low level of understanding of their rights vis-à-vis employers or the Government.  Tower construction companies: reported cases of no rest, no payment of overtime, wages varied (direct/indirectly employed)  Fibre line digging: cases of pressure to work till target is reached, not given set rest if not reached, wages not covering basic needs and do not reflect level of difficulty (type of soil), sick pay not provided  Working conditions for fibre cable digging particularly harsh: long distances of trenches dug manually, 12 hour work days, injured workers have to repay any medical expenses, Language barriers, Little to no facilities or equipment were provided to fibre cable diggers etc...  Some fibre factory workers were provided with accommodation
  • 9.  Workers of subcontractors commonly not informed about which tower construction company or telecoms operator the tower was being built for: health and safety and other operational standards may not have been transmitted to the site level?  Workplace attention to health and safety varied greatly amongst the tower and fibre sites visited  Often no personal protective equipment (PPE) used (even where workers had PPE to hand)  Failure to ensure that emergency first aid kits available at tower sites  For fibre factories: PPE +some training provided
  • 10.  Dealing with local non-state armed groups: access fee, delays due to blocked access to sites, lack of consultation with local groups (NSAG) etc; fire-arms being carried by NSAGs;  Workers aware of landmines around infrastructure in conflict areas  Tower company acknowledgement and action concerning their responsibility for the safety of workers was uneven: ◦ Some assume that this is responsibility of subcontractors, - some provided safety and skills trainings ◦ Some labour subcontractors fear reporting incidents for fear of reprisal or lost business even with incident reporting system in place  Choosing to operate without contracts between tower companies and their subcontractors was a common occurrence
  • 11. Workshop objective Establish a forum for Telecoms companies and their tier 1 subcontractors to identify lessons learned and best practices in tower construction and fibre laying operations in Myanmar through experience sharing in the following areas: Health and safety • To discuss problems, challenges or concers Telecoms companies in Myanmar have in implementing health and safety standards at workpace, fibre factories and during fibre cable diging; • Ways of improving future work on safety in network construction in different locations with possible focus on location-specific safety requrements, groups at risk, hst community safety; Labour • Challenges for telecoms operations: human rights risks, ways of monitoring, ways of mitigating, positive case studies; • Sharing of recent experiences; • Challenges of applying international standards in Myanmar in the absence of developed national legal frameworks; Company/community engagement and grievance mechanisms • Current practice and recent challenges; • Ways to improve work with civil society on monitoring adverse impacts Identification of follow up actions; ongoing initiatives which can support action.
  • 12. Please add our RSS feed to stay up-to-date on our activities http://www.myanmar-responsiblebusiness.org/rss.xml www.mcrb.org.mm myanmar.responsible.business