SlideShare uma empresa Scribd logo
1 de 2
JURNAL INTERNET GELOMBANG III TH. 2014 PETA KERJA
KEL TGL ACC JUDUL TAHUN
I 5 Sept 2014
Analisis Kebutuhan Jumlah Pegawai Berdasarkan Analisis
Beban Kerja
2014
II 5 Sept 2014
Aseembly Line Balancing : A Case Study in Silencer
Manufacturing
2014
III 5 Sept 2014
Time Study Model of a Compact Florescent Lamp
Manufacturer in India : A Case Study
2014
IV 4 Sept 2014
Optimization of Productivity by Work Force Management
through Ergonomics and Standardization of Process Activity
Using M.O.S.T Analysisi – A Case Study
2014
V 5 Sept 2014
Analisis Kelayakan Investasi Distro Sandwich di Mall Kota
Bandung
2014
VI 5 Sept 2014
Motion-based Method for Estimating Time Required to
Aatach Self –Adhesive Insulators
2014
VII 5 Sept 2014
Analisis Perkiraan Tenaga Kerja REkamMedis di Tpprj
dengan Metode Wisn di Puskesmas Mojabalan Tahun 2013
2014
VIII 4 Sept 2014
Production Process Analysis on Manufacturing of Hydraulic
Gear Pump
2014
IX 5 Sept 2014
Productivity Improvement in Moulding by Changes in Work
Process Flow
2014
X 5 Sept 2014 Methods Improvement for Manual Packaging Process 2013
Jurnet peta kerja gelombang 3 2014

Mais conteúdo relacionado

Mais de LAB ERGONOMI-TI-USU

Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) TerbaruDimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
LAB ERGONOMI-TI-USU
 
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
LAB ERGONOMI-TI-USU
 
Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014
LAB ERGONOMI-TI-USU
 
Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014
LAB ERGONOMI-TI-USU
 

Mais de LAB ERGONOMI-TI-USU (20)

Dimensi anthropometridiametergenggaman.docx
Dimensi anthropometridiametergenggaman.docxDimensi anthropometridiametergenggaman.docx
Dimensi anthropometridiametergenggaman.docx
 
Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) TerbaruDimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
 
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
 
Jurnet Fisiologi Gelombang 4 2014
Jurnet Fisiologi Gelombang 4 2014Jurnet Fisiologi Gelombang 4 2014
Jurnet Fisiologi Gelombang 4 2014
 
Jurnet Postur Kerja Gelombang 4 2014
Jurnet Postur Kerja Gelombang 4 2014Jurnet Postur Kerja Gelombang 4 2014
Jurnet Postur Kerja Gelombang 4 2014
 
Jurnet Antropometri Gelombang 4 2014
Jurnet Antropometri Gelombang 4 2014Jurnet Antropometri Gelombang 4 2014
Jurnet Antropometri Gelombang 4 2014
 
Jurnet Fisiologi Gelombang 3 2014
Jurnet Fisiologi Gelombang 3 2014Jurnet Fisiologi Gelombang 3 2014
Jurnet Fisiologi Gelombang 3 2014
 
Jurnet Biomekanika Gelombang 3 2014
Jurnet Biomekanika Gelombang 3 2014Jurnet Biomekanika Gelombang 3 2014
Jurnet Biomekanika Gelombang 3 2014
 
Jurnet Activity Sampling Gelombang 3 2014
Jurnet Activity Sampling Gelombang 3 2014Jurnet Activity Sampling Gelombang 3 2014
Jurnet Activity Sampling Gelombang 3 2014
 
Jurnet Lingkungan Kerja Gelombang 4 2014
Jurnet Lingkungan Kerja Gelombang 4 2014Jurnet Lingkungan Kerja Gelombang 4 2014
Jurnet Lingkungan Kerja Gelombang 4 2014
 
Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014
 
Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014
 
Daftar ukm
Daftar ukmDaftar ukm
Daftar ukm
 
Personalia pengelola
Personalia pengelolaPersonalia pengelola
Personalia pengelola
 
Jadwal Praktikum Gelombang 1 dan 2 2015
Jadwal Praktikum Gelombang 1 dan 2 2015Jadwal Praktikum Gelombang 1 dan 2 2015
Jadwal Praktikum Gelombang 1 dan 2 2015
 
Jurnet Anthropometri Gelombang 2 2014
Jurnet Anthropometri Gelombang 2 2014Jurnet Anthropometri Gelombang 2 2014
Jurnet Anthropometri Gelombang 2 2014
 
Jurnet Activity Sampling Gelombang 1 2014
Jurnet Activity Sampling Gelombang 1 2014Jurnet Activity Sampling Gelombang 1 2014
Jurnet Activity Sampling Gelombang 1 2014
 
Jurnet Lingkungan Kerja Gelombang 1 2014
Jurnet Lingkungan Kerja Gelombang 1 2014Jurnet Lingkungan Kerja Gelombang 1 2014
Jurnet Lingkungan Kerja Gelombang 1 2014
 
Jurnet Lingkungan Kerja Gelombang 2 2014
Jurnet Lingkungan Kerja Gelombang 2 2014Jurnet Lingkungan Kerja Gelombang 2 2014
Jurnet Lingkungan Kerja Gelombang 2 2014
 
Jurnet Peta Kerja Gelombang 1 2014
Jurnet Peta Kerja Gelombang 1 2014Jurnet Peta Kerja Gelombang 1 2014
Jurnet Peta Kerja Gelombang 1 2014
 

Jurnet peta kerja gelombang 3 2014

  • 1. JURNAL INTERNET GELOMBANG III TH. 2014 PETA KERJA KEL TGL ACC JUDUL TAHUN I 5 Sept 2014 Analisis Kebutuhan Jumlah Pegawai Berdasarkan Analisis Beban Kerja 2014 II 5 Sept 2014 Aseembly Line Balancing : A Case Study in Silencer Manufacturing 2014 III 5 Sept 2014 Time Study Model of a Compact Florescent Lamp Manufacturer in India : A Case Study 2014 IV 4 Sept 2014 Optimization of Productivity by Work Force Management through Ergonomics and Standardization of Process Activity Using M.O.S.T Analysisi – A Case Study 2014 V 5 Sept 2014 Analisis Kelayakan Investasi Distro Sandwich di Mall Kota Bandung 2014 VI 5 Sept 2014 Motion-based Method for Estimating Time Required to Aatach Self –Adhesive Insulators 2014 VII 5 Sept 2014 Analisis Perkiraan Tenaga Kerja REkamMedis di Tpprj dengan Metode Wisn di Puskesmas Mojabalan Tahun 2013 2014 VIII 4 Sept 2014 Production Process Analysis on Manufacturing of Hydraulic Gear Pump 2014 IX 5 Sept 2014 Productivity Improvement in Moulding by Changes in Work Process Flow 2014 X 5 Sept 2014 Methods Improvement for Manual Packaging Process 2013