SlideShare uma empresa Scribd logo
1 de 18
Baixar para ler offline
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
for PROPERTY DEVELOPMENT & CONSTRUCTION PROJECTS

18 & 19 Feb 2014
Hotel Melia,
Kuala Lumpur

Comfori-RED-SOP seminar-ppt brochure,r.4+appdx-130214

1
WORKSHOP OVERVIEW

This Seminar/workshop focuses on providing a practical roadmap for real
estate, property development and construction professionals to share and be
updated on the application of industry best methodology to prepare the
company’s Standard Operating Procedure for the real estate and
construction sector. The workshop is structured around the increasing need
for Malaysian real estate developers, contractors and their professional staff
to embrace knowledge and project management processes within their
company to deliver their projects successfully in order to succeed in a highly
competitive environment. At the end of the workshop, participants will be
able to prepare and compile their Standard Operating Procedure
successfully covering project initiation to project completion.

Comfori-RED-SOP seminar-ppt brochure-091012

2
WORKSHOP-KEY POINTS;
 Why the need for SOP
 Why more real estate developers and contractors are adopting SOP instead of
ISO 9000
 Benefits of adopting SOP in project implementation
 How to prepare your company SOP for your project life-cycle
 Using SOP Templates as a DIY [Do It Yourself] Tool
 How to implement SOP successfully
 SOP as Document control for management review and internal / external audit
 How to digitize your SOP documentation to reside in your company IT intranet or
migrate to Cloud platform to enable real time online access, collaboration and
documentation retrieval
 All SOP templates are ISO 9000 ready compliant
 Workshop enables easy learning with DIY simulation exercise for each SOP
module

3
Comfori-RED-SOP seminar-ppt brochure-091012

4
The RED K-Blocks - Covers 8 Knowledge Blocks Throughout
Project Life Cycle

The

RED–SOP

to be compiled
to match the

K-KKK

9K
(Knowledge)
-Blocks

K-Block 8 & 9

5
Registration starts at 8.30am; Workshop commences at 9:00am and concludes at 5.00pm with the arrangement
of two coffee breaks at 10.30 am and 3.30pm and lunch at 12.30pm. Workshop materials, lunch and
refreshment will be provided.

DAY 1

MODULE 1: INTRODUCTION: ORGANISING AND PLANNING THE PROPERTY DEVELOPMENT /
CONSTRUCTION PROJECT
•Introduction to Project Management
•Identifying the project stakeholders
•Identifying the project objectives/ targets
•Identifying the Project Life-cycle
•Establishing an effective Organization structure
MODULE 2: IDENTIFYING THE PROPERTY DEVELOPMENT KNOWLEDGE (K) BLOCKS
•Identifying the knowledge blocks within the property and construction industry
•Converting tacit knowledge to explicit knowledge
•Compiling the knowledge blocks to a project management manual covering the project lifecycle
•Creating the Standard Operating Procedure (SOP) Framework
Comfori-RED-SOP seminar-ppt brochure-091012

6
DAY 1
MODULE 3: CREATING THE SOP FOR KBLOCK 1:
Project Initiation, Feasibility & Budget]
covering;
•Organization Chart
•Land acquisition
•Site Visit/ Technical Data Requirements
•Site Investigation Assessment
•Feasibility Study
•Cash Flow Projection
•Budget Cost Code/ Cost Plan
•Budget Summary
•Project/ Product Brief
•Project Fact Sheet
•Master development program/schedule

MODULE 4: CREATING THE SOP FOR K-BLOCK 2:
[Design Management] covering;
•Consultants Appointment
•Design Brief
•Concept / Design Review
•Value Engineering
•Best development option
•Final concept plan
•Agreed design brief
•Zoning/Master Layout plan
•Client/sponsor/management approval
•Schematic / Planning submission plans
•Planning submission to Local Authority
•Detail Building Plans for Building Submission
•Building Plans Review.
•Architectural models and Brochures
•Client/Consultant Meeting Agenda

7
DAY 1

DAY 2

MODULE 5: CREATING THE SOP FOR K-BLOCK 3:
[Statutory Approvals] covering;
•Land conversion approvals
•Sub-division / Land Amalgamation approvals
•Environmental approval
•Planning approvals / Development Order
•Building Plan approvals
•Developers’ License
•Advertisement Permit approvals
•Earthworks approvals
•Structural plans submission
•Sub-structure /Foundation / Piling approvals
•Works Inspection forms
•Authority Technical Departments’ clearances
•Certificate of Completion & Compliance

MODULE 6: CREATING THE SOP FOR KBLOCK 4:

[Marketing & Sales] covering;
•Market research
•Marketing Concept
•Marketing & Sales Strategy
•Preliminary Pricing
•Sales Kit
•Advertising & Promotion campaigns
•Final Pricing
•Soft Launch
•Official Launch
•Sales & Purchase Stage Claims

Comfori-RED-SOP seminar-ppt brochure-091012

8
DAY 2
MODULE 7: CREATING THE SOP FOR
K-BLOCK 5:
[Contract Documentation & Tender]
covering Tender Procedures for;
•Soil Investigation Tender
•Earthworks tender
•Sub-structure / Piling Tender
•Main Building Works Tender
•M & E Tender
•External Works Tender
•Nominated sub-contractors /
suppliers packages

MODULE 8: CREATING THE SOP FOR KBLOCK 6:
[Cost Planning & Control] covering;
•Project Cost Control Unit set-up
•Cost management software
•Approved baseline budget / cost plan
•Progress Claims
•Cost changes / variations
•Cost / Budget Updates
•Variation Order Procedures
•Variation Orders Update
•Final Account Procedures

9
DAY 2
MODULE 9: CREATING THE SOP FOR KBLOCK 7:
[Construction Management] covering;
•Site Organization Structure
•Site possession by contractor
•Dilapidation Survey
•Site Kick-off meeting
•Site Meeting Agenda
•Contract Particulars
•Project Team Directory
•Contractor's program/ schedule
•Contractor’s work performance
•Site Instructions
•Project Supervision and Monitoring
•Quality Control/ Site inspection
procedures
•Progress reports
•Crash program
•Contractor's Extension of Time

MODULE 10: CREATING THE SOP FOR K-BLOCK 8:
[Completion/ Handover ] covering;
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

Authority Approval and clearances checklist
Certificate of Completion & Compliance [CCC] Forms
Purchaser Handover Forms
Purchaser Keys acceptance
Handling Purchaser Requests
Purchaser Handover Process
Handover of Agreed Defects
Building Verticality Records
Building Settlement Records
Final Inspection Checklist
Testing & Commissioning Checklist
Date of Completion Adjustment
Extension of Time [EOT] Notification
Handover Checklist
Certificate of Making Good Defects
Certificate of Practical Completion [CPC]
Archives Documentation
Appointment of Property Mgmt Company
10
DAY 2
MODULE 11: CREATING THE SOP FOR K-BLOCK 9:
[Post-Completion] covering;
•
•
•
•
•
•
•
•
•
•
•
•
•

Defects Rectification during Defects Liability Period [DLP]
Handling Purchaser Defects Complaints
Defects Analysis Process
Strata Title Application Process
Strata Title checklist
Strata Title Transfer process
Memorandum of Transfer [MOT] Process
Post-Handover Management
Formation of Joint Mgmt Body [JMB]
House Rules and service charges
Sinking Funds
Formation of Mgmt Corporation [MC]
Annual General Meetings

11
The RED–SOP comes with standard Templates, flowcharts,
checklists, etc

12
RED–SOP: Cloud Enabled

13
Training comes with simulation exercise

RED–SOP: Exercise Sheet

See SOP-Master INDEX file.>>RED-SOP-Master INDEX(pg1)K-Block1-6,r.2-030313.xls

14
Training comes with simulation exercise

RED–SOP: Exercise Sheet

See SOP-Master INDEX file>>RED-SOP-Master INDEX(pg2)K-Block7-9,r.1-110212.xls

15
Training comes with simulation exercise

Simulation Exercise:
Participants preparing
SOP

Simulation Exercice:
Participants preparing
flowchart

RED-Manual-Main cover pg,r.1

©Conpex Solutions Sdn Bhd, 2011-2012
SPEAKER’S PROFILE
Eric CL Gan is an international speaker, trainer and consultant for the real estate industry. An Architect by
profession, he is the managing director of CONPEX International Group of companies that provides “onestop” solution for real estate investment and project management consultancy and training, covering
investment portfolio identification, investor matching, project management, property development,
construction management, quality management and knowledge management solutions such as RED-Monitor
and Project Site Tracker.
Eric holds a Bachelor degree in Architecture from the University of Singapore and a Quality Management
System Assessment Certificate from the University of Portsmouth, UK. He is a member of the Malaysian
Institute of Architects, a National Council member (2000-2010) of the International Real Estate Federation
Malaysian Chapter, a member of FIABCI Asia Pacific Regional Secretariat Taskforce Committee and a member
of the Malaysia Business Chamber, Vietnam. An industry veteran with over 30 years of experience, Eric had
worked as an Architect, Project Manager, Property Manager, Quality Management Systems Manager and
General Manager-Property for major corporations in Malaysia and Singapore such as PETRONAS (the National
Oil Corporation of Malaysia), the Housing and Development Board (HDB) of Singapore and Sunrise Bhd. He
specializes in real estate investment facilitation, project management, construction management, total quality
management and had undertaken numerous multi-million dollar property development projects in Singapore,
Malaysia, Vietnam and Africa.
He was appointed the Special International Investment Consultant and Advisor to the Board Chairman of a
township development company in Vietnam. Eric is also an appointed Construction Industry Development
Board Malaysia (CIDB) accredited trainer for construction project management and had conducted numerous
seminar programs in Malaysia, Vietnam and Thailand. Eric is also the ISO9000 Consultant to some key
property development companies in Malaysia.
17
For course enquiries,

Contact:
email to conpexs@gmail.com
or
join LinkedIn Group: Real Estate Development & Construction Trends

http://www.linkedin.com/groups/Real-Estate-Development-Construction-Trends-4167229?gid=4167229&trk=hb_side_g

18

Mais conteúdo relacionado

Mais procurados

Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016
Hani Ahmed
 
Mills Robert CV 2015-2
Mills Robert CV 2015-2Mills Robert CV 2015-2
Mills Robert CV 2015-2
Robert Mills
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect
wael hassan
 
Engr. ALPHINE A. ARRIOLA _RESUME
Engr. ALPHINE A. ARRIOLA _RESUMEEngr. ALPHINE A. ARRIOLA _RESUME
Engr. ALPHINE A. ARRIOLA _RESUME
ALPHINE ARRIOLA
 

Mais procurados (20)

Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016
 
Mills Robert CV 2015-2
Mills Robert CV 2015-2Mills Robert CV 2015-2
Mills Robert CV 2015-2
 
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - WorkshopPROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
 
Cv abdullatif 2016
Cv abdullatif 2016Cv abdullatif 2016
Cv abdullatif 2016
 
Fabio_CV 2014n
Fabio_CV 2014nFabio_CV 2014n
Fabio_CV 2014n
 
Early contractor involvement (eci) procurement approach spm talk 2016
Early contractor involvement (eci) procurement approach   spm talk 2016Early contractor involvement (eci) procurement approach   spm talk 2016
Early contractor involvement (eci) procurement approach spm talk 2016
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projects
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
REDmonitor> Product features,Benefits,USP
REDmonitor> Product features,Benefits,USPREDmonitor> Product features,Benefits,USP
REDmonitor> Product features,Benefits,USP
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Roman Victor Santos
Roman Victor SantosRoman Victor Santos
Roman Victor Santos
 
JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Shipyard Multi-Project Management
Shipyard Multi-Project ManagementShipyard Multi-Project Management
Shipyard Multi-Project Management
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect
 
Personal CV (Mohd) BM
Personal CV (Mohd) BMPersonal CV (Mohd) BM
Personal CV (Mohd) BM
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
Engr. ALPHINE A. ARRIOLA _RESUME
Engr. ALPHINE A. ARRIOLA _RESUMEEngr. ALPHINE A. ARRIOLA _RESUME
Engr. ALPHINE A. ARRIOLA _RESUME
 
Scheduling and deployment of an evm system integrated with risk management in...
Scheduling and deployment of an evm system integrated with risk management in...Scheduling and deployment of an evm system integrated with risk management in...
Scheduling and deployment of an evm system integrated with risk management in...
 
Resume Gp
Resume GpResume Gp
Resume Gp
 

Destaque

K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511
REDceo.net
 
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]21041200 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
REDceo.net
 
Eg cic-detail profile[1]-081011
Eg cic-detail profile[1]-081011Eg cic-detail profile[1]-081011
Eg cic-detail profile[1]-081011
REDceo.net
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
REDceo.net
 

Destaque (15)

Using the Cloud Platform to manage, monitor and track real estate development...
Using the Cloud Platform to manage, monitor and track real estate development...Using the Cloud Platform to manage, monitor and track real estate development...
Using the Cloud Platform to manage, monitor and track real estate development...
 
How to be a Certified Construction Project Manager, Malaysia
How to be a Certified Construction Project Manager, Malaysia How to be a Certified Construction Project Manager, Malaysia
How to be a Certified Construction Project Manager, Malaysia
 
Cic co.portfolio-condensed[1]-010911
Cic co.portfolio-condensed[1]-010911Cic co.portfolio-condensed[1]-010911
Cic co.portfolio-condensed[1]-010911
 
Fiabci Mentoring Programme-My career story;-From Slave Employee to Cloud Entr...
Fiabci Mentoring Programme-My career story;-From Slave Employee to Cloud Entr...Fiabci Mentoring Programme-My career story;-From Slave Employee to Cloud Entr...
Fiabci Mentoring Programme-My career story;-From Slave Employee to Cloud Entr...
 
How Real Estate Developers can leverage the Cloud Platform to manage, monitor...
How Real Estate Developers can leverage the Cloud Platform to manage, monitor...How Real Estate Developers can leverage the Cloud Platform to manage, monitor...
How Real Estate Developers can leverage the Cloud Platform to manage, monitor...
 
REDmonitor Screenshots
REDmonitor ScreenshotsREDmonitor Screenshots
REDmonitor Screenshots
 
Tak dubai news-meydan-pm visit +pics-200110
Tak  dubai news-meydan-pm visit +pics-200110Tak  dubai news-meydan-pm visit +pics-200110
Tak dubai news-meydan-pm visit +pics-200110
 
K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511
 
Malton km seminar-cloud talk-slides-eg,r.2-070413
Malton km seminar-cloud talk-slides-eg,r.2-070413Malton km seminar-cloud talk-slides-eg,r.2-070413
Malton km seminar-cloud talk-slides-eg,r.2-070413
 
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]21041200 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
00 k-dev-slides(7)land dev seminar+demo -chuan[3a]210412
 
Eg cic-detail profile[1]-081011
Eg cic-detail profile[1]-081011Eg cic-detail profile[1]-081011
Eg cic-detail profile[1]-081011
 
Metro Learning Centre-2014 Career Talk
Metro Learning Centre-2014 Career TalkMetro Learning Centre-2014 Career Talk
Metro Learning Centre-2014 Career Talk
 
Bi zsop presentn why need sop,r.1-280415
Bi zsop presentn why need sop,r.1-280415Bi zsop presentn why need sop,r.1-280415
Bi zsop presentn why need sop,r.1-280415
 
REDmonitor-the next wave in vertical market data collaboration
REDmonitor-the next wave in vertical market data collaborationREDmonitor-the next wave in vertical market data collaboration
REDmonitor-the next wave in vertical market data collaboration
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 

Semelhante a HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)

Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
Joan Willox
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
Joan Willox
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
houserdah
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Bernie Buenavent
 
OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016
Tomi Ogunjobi
 

Semelhante a HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP) (20)

K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
 
Corporate member event September 2015, BIM and Soft Landings
Corporate member event September 2015, BIM and Soft LandingsCorporate member event September 2015, BIM and Soft Landings
Corporate member event September 2015, BIM and Soft Landings
 
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi BrochureConstruction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
Construction Oil and Gas Forum Jan 2015 Abu Dhabi Brochure
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
COBIT®5 - Foundation
COBIT®5 - FoundationCOBIT®5 - Foundation
COBIT®5 - Foundation
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
 
The role of commissioning in closing the gap
The role of commissioning in closing the gap The role of commissioning in closing the gap
The role of commissioning in closing the gap
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Proposed Project Office Strategy
Proposed Project Office StrategyProposed Project Office Strategy
Proposed Project Office Strategy
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
 
Path to PMP II - Project Integration Management
Path to PMP II -  Project Integration ManagementPath to PMP II -  Project Integration Management
Path to PMP II - Project Integration Management
 
Path to PMP - Cracking Project Integration Management
Path to PMP - Cracking Project Integration Management Path to PMP - Cracking Project Integration Management
Path to PMP - Cracking Project Integration Management
 
CV SSsoderberg 2016 eng linke
CV SSsoderberg 2016 eng linkeCV SSsoderberg 2016 eng linke
CV SSsoderberg 2016 eng linke
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
Guide M - with Geoff Prudence
Guide M - with Geoff PrudenceGuide M - with Geoff Prudence
Guide M - with Geoff Prudence
 
OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016OLATOMI_OGUNJOBI_PM_CV_ 2016
OLATOMI_OGUNJOBI_PM_CV_ 2016
 
Introduction To Project Management
Introduction To Project Management Introduction To Project Management
Introduction To Project Management
 
Xelocity insights into PMO Conference June 2018
Xelocity insights into PMO Conference June 2018Xelocity insights into PMO Conference June 2018
Xelocity insights into PMO Conference June 2018
 

Último

Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
delhi24hrs1
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
asmaqueen5
 
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
asmaqueen5
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
Listing Turkey
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
ApartmentWala1
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
asmaqueen5
 
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
delhi24hrs1
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
Truhomes
 

Último (20)

Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
construction material procurement in India
construction material procurement in Indiaconstruction material procurement in India
construction material procurement in India
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
 
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
Kalpataru Exquisite Wakad Pune  E-Brochure.pdfKalpataru Exquisite Wakad Pune  E-Brochure.pdf
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
 
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
Call girls in Shakti Nagar Delhi~8447779280°/=@/ Short 1500 Night 6000}ESCORT...
 
Real Estate Finance and Investments (2019).pdf
Real Estate Finance and Investments (2019).pdfReal Estate Finance and Investments (2019).pdf
Real Estate Finance and Investments (2019).pdf
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
 
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdf
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
 

HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)

  • 1. HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP) for PROPERTY DEVELOPMENT & CONSTRUCTION PROJECTS 18 & 19 Feb 2014 Hotel Melia, Kuala Lumpur Comfori-RED-SOP seminar-ppt brochure,r.4+appdx-130214 1
  • 2. WORKSHOP OVERVIEW This Seminar/workshop focuses on providing a practical roadmap for real estate, property development and construction professionals to share and be updated on the application of industry best methodology to prepare the company’s Standard Operating Procedure for the real estate and construction sector. The workshop is structured around the increasing need for Malaysian real estate developers, contractors and their professional staff to embrace knowledge and project management processes within their company to deliver their projects successfully in order to succeed in a highly competitive environment. At the end of the workshop, participants will be able to prepare and compile their Standard Operating Procedure successfully covering project initiation to project completion. Comfori-RED-SOP seminar-ppt brochure-091012 2
  • 3. WORKSHOP-KEY POINTS;  Why the need for SOP  Why more real estate developers and contractors are adopting SOP instead of ISO 9000  Benefits of adopting SOP in project implementation  How to prepare your company SOP for your project life-cycle  Using SOP Templates as a DIY [Do It Yourself] Tool  How to implement SOP successfully  SOP as Document control for management review and internal / external audit  How to digitize your SOP documentation to reside in your company IT intranet or migrate to Cloud platform to enable real time online access, collaboration and documentation retrieval  All SOP templates are ISO 9000 ready compliant  Workshop enables easy learning with DIY simulation exercise for each SOP module 3
  • 5. The RED K-Blocks - Covers 8 Knowledge Blocks Throughout Project Life Cycle The RED–SOP to be compiled to match the K-KKK 9K (Knowledge) -Blocks K-Block 8 & 9 5
  • 6. Registration starts at 8.30am; Workshop commences at 9:00am and concludes at 5.00pm with the arrangement of two coffee breaks at 10.30 am and 3.30pm and lunch at 12.30pm. Workshop materials, lunch and refreshment will be provided. DAY 1 MODULE 1: INTRODUCTION: ORGANISING AND PLANNING THE PROPERTY DEVELOPMENT / CONSTRUCTION PROJECT •Introduction to Project Management •Identifying the project stakeholders •Identifying the project objectives/ targets •Identifying the Project Life-cycle •Establishing an effective Organization structure MODULE 2: IDENTIFYING THE PROPERTY DEVELOPMENT KNOWLEDGE (K) BLOCKS •Identifying the knowledge blocks within the property and construction industry •Converting tacit knowledge to explicit knowledge •Compiling the knowledge blocks to a project management manual covering the project lifecycle •Creating the Standard Operating Procedure (SOP) Framework Comfori-RED-SOP seminar-ppt brochure-091012 6
  • 7. DAY 1 MODULE 3: CREATING THE SOP FOR KBLOCK 1: Project Initiation, Feasibility & Budget] covering; •Organization Chart •Land acquisition •Site Visit/ Technical Data Requirements •Site Investigation Assessment •Feasibility Study •Cash Flow Projection •Budget Cost Code/ Cost Plan •Budget Summary •Project/ Product Brief •Project Fact Sheet •Master development program/schedule MODULE 4: CREATING THE SOP FOR K-BLOCK 2: [Design Management] covering; •Consultants Appointment •Design Brief •Concept / Design Review •Value Engineering •Best development option •Final concept plan •Agreed design brief •Zoning/Master Layout plan •Client/sponsor/management approval •Schematic / Planning submission plans •Planning submission to Local Authority •Detail Building Plans for Building Submission •Building Plans Review. •Architectural models and Brochures •Client/Consultant Meeting Agenda 7
  • 8. DAY 1 DAY 2 MODULE 5: CREATING THE SOP FOR K-BLOCK 3: [Statutory Approvals] covering; •Land conversion approvals •Sub-division / Land Amalgamation approvals •Environmental approval •Planning approvals / Development Order •Building Plan approvals •Developers’ License •Advertisement Permit approvals •Earthworks approvals •Structural plans submission •Sub-structure /Foundation / Piling approvals •Works Inspection forms •Authority Technical Departments’ clearances •Certificate of Completion & Compliance MODULE 6: CREATING THE SOP FOR KBLOCK 4: [Marketing & Sales] covering; •Market research •Marketing Concept •Marketing & Sales Strategy •Preliminary Pricing •Sales Kit •Advertising & Promotion campaigns •Final Pricing •Soft Launch •Official Launch •Sales & Purchase Stage Claims Comfori-RED-SOP seminar-ppt brochure-091012 8
  • 9. DAY 2 MODULE 7: CREATING THE SOP FOR K-BLOCK 5: [Contract Documentation & Tender] covering Tender Procedures for; •Soil Investigation Tender •Earthworks tender •Sub-structure / Piling Tender •Main Building Works Tender •M & E Tender •External Works Tender •Nominated sub-contractors / suppliers packages MODULE 8: CREATING THE SOP FOR KBLOCK 6: [Cost Planning & Control] covering; •Project Cost Control Unit set-up •Cost management software •Approved baseline budget / cost plan •Progress Claims •Cost changes / variations •Cost / Budget Updates •Variation Order Procedures •Variation Orders Update •Final Account Procedures 9
  • 10. DAY 2 MODULE 9: CREATING THE SOP FOR KBLOCK 7: [Construction Management] covering; •Site Organization Structure •Site possession by contractor •Dilapidation Survey •Site Kick-off meeting •Site Meeting Agenda •Contract Particulars •Project Team Directory •Contractor's program/ schedule •Contractor’s work performance •Site Instructions •Project Supervision and Monitoring •Quality Control/ Site inspection procedures •Progress reports •Crash program •Contractor's Extension of Time MODULE 10: CREATING THE SOP FOR K-BLOCK 8: [Completion/ Handover ] covering; • • • • • • • • • • • • • • • • • • Authority Approval and clearances checklist Certificate of Completion & Compliance [CCC] Forms Purchaser Handover Forms Purchaser Keys acceptance Handling Purchaser Requests Purchaser Handover Process Handover of Agreed Defects Building Verticality Records Building Settlement Records Final Inspection Checklist Testing & Commissioning Checklist Date of Completion Adjustment Extension of Time [EOT] Notification Handover Checklist Certificate of Making Good Defects Certificate of Practical Completion [CPC] Archives Documentation Appointment of Property Mgmt Company 10
  • 11. DAY 2 MODULE 11: CREATING THE SOP FOR K-BLOCK 9: [Post-Completion] covering; • • • • • • • • • • • • • Defects Rectification during Defects Liability Period [DLP] Handling Purchaser Defects Complaints Defects Analysis Process Strata Title Application Process Strata Title checklist Strata Title Transfer process Memorandum of Transfer [MOT] Process Post-Handover Management Formation of Joint Mgmt Body [JMB] House Rules and service charges Sinking Funds Formation of Mgmt Corporation [MC] Annual General Meetings 11
  • 12. The RED–SOP comes with standard Templates, flowcharts, checklists, etc 12
  • 14. Training comes with simulation exercise RED–SOP: Exercise Sheet See SOP-Master INDEX file.>>RED-SOP-Master INDEX(pg1)K-Block1-6,r.2-030313.xls 14
  • 15. Training comes with simulation exercise RED–SOP: Exercise Sheet See SOP-Master INDEX file>>RED-SOP-Master INDEX(pg2)K-Block7-9,r.1-110212.xls 15
  • 16. Training comes with simulation exercise Simulation Exercise: Participants preparing SOP Simulation Exercice: Participants preparing flowchart RED-Manual-Main cover pg,r.1 ©Conpex Solutions Sdn Bhd, 2011-2012
  • 17. SPEAKER’S PROFILE Eric CL Gan is an international speaker, trainer and consultant for the real estate industry. An Architect by profession, he is the managing director of CONPEX International Group of companies that provides “onestop” solution for real estate investment and project management consultancy and training, covering investment portfolio identification, investor matching, project management, property development, construction management, quality management and knowledge management solutions such as RED-Monitor and Project Site Tracker. Eric holds a Bachelor degree in Architecture from the University of Singapore and a Quality Management System Assessment Certificate from the University of Portsmouth, UK. He is a member of the Malaysian Institute of Architects, a National Council member (2000-2010) of the International Real Estate Federation Malaysian Chapter, a member of FIABCI Asia Pacific Regional Secretariat Taskforce Committee and a member of the Malaysia Business Chamber, Vietnam. An industry veteran with over 30 years of experience, Eric had worked as an Architect, Project Manager, Property Manager, Quality Management Systems Manager and General Manager-Property for major corporations in Malaysia and Singapore such as PETRONAS (the National Oil Corporation of Malaysia), the Housing and Development Board (HDB) of Singapore and Sunrise Bhd. He specializes in real estate investment facilitation, project management, construction management, total quality management and had undertaken numerous multi-million dollar property development projects in Singapore, Malaysia, Vietnam and Africa. He was appointed the Special International Investment Consultant and Advisor to the Board Chairman of a township development company in Vietnam. Eric is also an appointed Construction Industry Development Board Malaysia (CIDB) accredited trainer for construction project management and had conducted numerous seminar programs in Malaysia, Vietnam and Thailand. Eric is also the ISO9000 Consultant to some key property development companies in Malaysia. 17
  • 18. For course enquiries, Contact: email to conpexs@gmail.com or join LinkedIn Group: Real Estate Development & Construction Trends http://www.linkedin.com/groups/Real-Estate-Development-Construction-Trends-4167229?gid=4167229&trk=hb_side_g 18