West Mercer Place March, 2011
MERCER UNDERPASS TWO-WAY CONVERSION WEST MERCER PLACE ,[object Object],[object Object],[object Object],[object Object],[object Object],Completing the Vision For Two-Way Mercer St From I-5 to Elliott Ave W
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],WEST MERCER PLACE West Mercer Place
MERCER ST ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],MERCER ST Why consider changes  to West Mercer Place?
6 Limited pedestrian and bicycle connections No sidewalks or bike lanes on West Mercer Place Why consider changes  to West Mercer Place?
[object Object],Left-turn lanes back up into through lanes Existing Conditions Existing Slide Area ELLIOTT AVE W WEST MERCER PL Steep Driveway Kinnear Park Residential Neighborhood Grades Up to 8%  WEST MERCER PL = SDOT-owned Right-of-Way Merge Point
A A A - A 250’ Retaining Wall New Sidewalk – extend to Elliott Ave W. Alternative 1 New Sidewalk
A A New Sidewalk A - A New Bike Lane 330’ Retaining Wall Uphill Bike Lane & New Sidewalk Alternative 2
Extend the Merge Lane half-way up the hill Alternative 3 A A Extend Merge Lane to Here A - A 330’ Retaining Wall 380’ Retaining Wall New Sidewalk New Bike Lane
Reconfigure Driveway A A 330’ Retaining Wall 700’ Retaining Wall Extend the Merge Lane to the top of the hill Alternative 4 Extend Merge Lane to Here A - A New Sidewalk New Bike Lane
[object Object],[object Object],[object Object],Extend the Left-Turn Lane Storage Alternative 5 225 ft Existing Queue  Extend Queue to 350 ft
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Traffic Modeling Traffic Modeling Includes:
Alternatives Summary  Alternative 1:   Add  - 8 ft sidewalk. Alternative 2:   Add  - 8 ft sidewalk,  - 5 ft bike lane. Alternative 3:   Add - 8 ft sidewalk,  - 5 ft bike lane, - Extend merge lane  half  way up the hill. Alternative 4:   Add - 8 ft sidewalk,  - 5 ft bike lane, - Extend merge lane  all  the way up the hill. Alternative 5:   Extend left-turn lanes on Elliott Ave W  Travel Time Reduction: 0 seconds 0 seconds 0 seconds 1-5 seconds 4-52 seconds Kinnear Park  Vehicle Entrance: - - Modified Modified - Parking  (approx # of spaces): 4 11 11 23 / 4 - Wall length: 250 ft south 330 ft south 330 ft south 380 ft north 330 ft south 700 ft north - Noise: - - Traffic lanes closer to homes Traffic lanes closer to homes - Estimated Cost: $2.7 Mil $4.2 Mil $8.0 Mil $12.9 Mil $0.2 Mil
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],QR code for the web site

Mais conteúdo relacionado

Mais procurados

CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
Crosstown TO
 
Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020
Crosstown TO
 
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018
Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Crosstown TO
 
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Crosstown TO
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
Josia Tannos, EIT
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019
Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019
Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019
Crosstown TO
 

Mais procurados (20)

Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020
 
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
 
Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020Eglinton-Mount Pleasant Construction update - May 2020
Eglinton-Mount Pleasant Construction update - May 2020
 
Cedarvale & Forest Hill CLC - September 25, 2019
Cedarvale & Forest Hill CLC - September 25, 2019Cedarvale & Forest Hill CLC - September 25, 2019
Cedarvale & Forest Hill CLC - September 25, 2019
 
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
 
Avenue & Chaplin CLC - Construction Update: May 5, 2021
Avenue & Chaplin CLC - Construction Update: May 5, 2021Avenue & Chaplin CLC - Construction Update: May 5, 2021
Avenue & Chaplin CLC - Construction Update: May 5, 2021
 
Cedarvale & Forest Hill Construction Update (January 27, 2021)
Cedarvale & Forest Hill Construction Update (January 27, 2021)Cedarvale & Forest Hill Construction Update (January 27, 2021)
Cedarvale & Forest Hill Construction Update (January 27, 2021)
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - April 2018
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - February 2018
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
 
Cedarvale-Forest Hill CLC Presentation - November 27 2019
Cedarvale-Forest Hill CLC Presentation - November 27 2019Cedarvale-Forest Hill CLC Presentation - November 27 2019
Cedarvale-Forest Hill CLC Presentation - November 27 2019
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
 
Fairbank & Oakwood Construction Updates Deck - November 2020
Fairbank & Oakwood Construction Updates Deck - November 2020Fairbank & Oakwood Construction Updates Deck - November 2020
Fairbank & Oakwood Construction Updates Deck - November 2020
 
Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021
 
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
Eglinton-Mount Pleasant Construction Liaison Committee Meeting - May 2018
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
 
Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019
Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019
Eglinton & Mount Pleasant Construction Liaison Committee - Sep 2019
 
Fairbank-Oakwood Construction Update - July 2021
Fairbank-Oakwood Construction Update - July 2021Fairbank-Oakwood Construction Update - July 2021
Fairbank-Oakwood Construction Update - July 2021
 
Pinkerton tunnel rehabilitation project references
Pinkerton tunnel rehabilitation project referencesPinkerton tunnel rehabilitation project references
Pinkerton tunnel rehabilitation project references
 

Destaque

Filipino Thanksgiving - Photo Social Interaction
Filipino Thanksgiving - Photo Social InteractionFilipino Thanksgiving - Photo Social Interaction
Filipino Thanksgiving - Photo Social Interaction
rafaelmalapitan
 

Destaque (9)

Japanese-American Boy - Photo Interview
Japanese-American Boy - Photo InterviewJapanese-American Boy - Photo Interview
Japanese-American Boy - Photo Interview
 
Mercer West: Open House (June 8, 2011)
Mercer West: Open House (June 8, 2011)Mercer West: Open House (June 8, 2011)
Mercer West: Open House (June 8, 2011)
 
Mercer West Open House - April 24, 2012
Mercer West Open House - April 24, 2012Mercer West Open House - April 24, 2012
Mercer West Open House - April 24, 2012
 
Filipino Thanksgiving - Photo Social Interaction
Filipino Thanksgiving - Photo Social InteractionFilipino Thanksgiving - Photo Social Interaction
Filipino Thanksgiving - Photo Social Interaction
 
Sampuso Photo Observation #1 9/23/10
Sampuso Photo Observation #1 9/23/10Sampuso Photo Observation #1 9/23/10
Sampuso Photo Observation #1 9/23/10
 
Mercer West: Open House (Sept. 21, 2010)
Mercer West: Open House (Sept. 21, 2010)Mercer West: Open House (Sept. 21, 2010)
Mercer West: Open House (Sept. 21, 2010)
 
The 16% Rule: The Secret to Accelerating Diffusion of Innovation
The 16% Rule: The Secret to Accelerating Diffusion of InnovationThe 16% Rule: The Secret to Accelerating Diffusion of Innovation
The 16% Rule: The Secret to Accelerating Diffusion of Innovation
 
The Six Highest Performing B2B Blog Post Formats
The Six Highest Performing B2B Blog Post FormatsThe Six Highest Performing B2B Blog Post Formats
The Six Highest Performing B2B Blog Post Formats
 
The Outcome Economy
The Outcome EconomyThe Outcome Economy
The Outcome Economy
 

Semelhante a West Mercer Place Open House (March 15, 2011)

Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
NLandUSA
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
GardinerEast
 
I-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit RedesignI-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit Redesign
Sean Deken
 
Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15
Aaron Zimmerman, PTP
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020
Crosstown TO
 

Semelhante a West Mercer Place Open House (March 15, 2011) (20)

Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsBird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
 
Final recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DCFinal recommendations Thinkbike Workshop DC
Final recommendations Thinkbike Workshop DC
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and Restriping
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
July 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual WorkshopJuly 21, 2021 TARC Virtual Workshop
July 21, 2021 TARC Virtual Workshop
 
Campo January 27 Tpb
Campo January 27 TpbCampo January 27 Tpb
Campo January 27 Tpb
 
I-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit RedesignI-670, North Fourth Street Exit Redesign
I-670, North Fourth Street Exit Redesign
 
Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15Aspen Hill MMPA Transportation Section & Appendix May '15
Aspen Hill MMPA Transportation Section & Appendix May '15
 
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingHillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
 
Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014Public Meeting #2 Presentation - November 11, 2014
Public Meeting #2 Presentation - November 11, 2014
 
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...
Lee District 2018 Paving and Restriping: Public Information Meeting-March 7, ...
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
 
The 3068 Group - Presentation to East West Link Assessment Panel
The 3068 Group - Presentation to East West Link Assessment PanelThe 3068 Group - Presentation to East West Link Assessment Panel
The 3068 Group - Presentation to East West Link Assessment Panel
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
Clairemont subcommittee presentation 07.19.17
Clairemont subcommittee presentation  07.19.17Clairemont subcommittee presentation  07.19.17
Clairemont subcommittee presentation 07.19.17
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020
 
Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 

Último

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Último (20)

HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 

West Mercer Place Open House (March 15, 2011)

  • 1. West Mercer Place March, 2011
  • 2.
  • 3.
  • 4.
  • 5. 6 Limited pedestrian and bicycle connections No sidewalks or bike lanes on West Mercer Place Why consider changes to West Mercer Place?
  • 6.
  • 7. A A A - A 250’ Retaining Wall New Sidewalk – extend to Elliott Ave W. Alternative 1 New Sidewalk
  • 8. A A New Sidewalk A - A New Bike Lane 330’ Retaining Wall Uphill Bike Lane & New Sidewalk Alternative 2
  • 9. Extend the Merge Lane half-way up the hill Alternative 3 A A Extend Merge Lane to Here A - A 330’ Retaining Wall 380’ Retaining Wall New Sidewalk New Bike Lane
  • 10. Reconfigure Driveway A A 330’ Retaining Wall 700’ Retaining Wall Extend the Merge Lane to the top of the hill Alternative 4 Extend Merge Lane to Here A - A New Sidewalk New Bike Lane
  • 11.
  • 12.
  • 13. Alternatives Summary Alternative 1: Add - 8 ft sidewalk. Alternative 2: Add - 8 ft sidewalk, - 5 ft bike lane. Alternative 3: Add - 8 ft sidewalk, - 5 ft bike lane, - Extend merge lane half way up the hill. Alternative 4: Add - 8 ft sidewalk, - 5 ft bike lane, - Extend merge lane all the way up the hill. Alternative 5: Extend left-turn lanes on Elliott Ave W Travel Time Reduction: 0 seconds 0 seconds 0 seconds 1-5 seconds 4-52 seconds Kinnear Park Vehicle Entrance: - - Modified Modified - Parking (approx # of spaces): 4 11 11 23 / 4 - Wall length: 250 ft south 330 ft south 330 ft south 380 ft north 330 ft south 700 ft north - Noise: - - Traffic lanes closer to homes Traffic lanes closer to homes - Estimated Cost: $2.7 Mil $4.2 Mil $8.0 Mil $12.9 Mil $0.2 Mil
  • 14.

Notas do Editor

  1. Role of Mercer is important regardless of AWVR replacement option
  2. Waterfront construction – assumed 200 additional left turns beyond model forecast
  3. Alt 1: 4 parking spaces affected in “lot” west of houses   Alt 2: 11 spaces affected, 5 in “Lot”, three in front of second “house” and 3 in front of apartment building   Alt 3: Same as Alt 2, 11 spaces   Alt 4:  23 spaces plus 4-5 load spaces: the 11 noted above and 2 more in front of two story building, then 10 along curb and 5 loading.  These last 15 are authorized curb side parking.