SlideShare uma empresa Scribd logo
1 de 39
COOLING LOAD and DUCTING
SYSTEM
 HANDIKA SEMBIRING
 SAIFUL HABIB
 MADITSA ARIZAL
I. Luas area
II. Cooling load
III. CFM dan ducting
I. Luas area
1. Quite library room
2. Mess room
3. Day room 1
4. Day room 2
5. TV room
6. Film room
Quite library room
Mess room
Day room 1
Day room 2
TV room
Film room
II. Cooling load
quite library room
Con’t Internal heat
Mess Room
ukuran ruangan
t 7.26
p 17.82
l 12.1
outdoor temperatur indoor temperature selisih
dry bulb 95° F dry bulb 82° F dry bulb 13
humidity 58% humidity 40% humidity 18%
wet bub 82° F wet bulb 65° F wet bulb 17
kandungan uap
air 146 kandungan uap air 66 kandungan uap air 80
suhu ruangan
yang
diinginkan 23.88889 75° F
Item Area (ft2) ∆T Factor total
Wall (sisi kiri) 47.674 6.2 0.2293578 67.79330275
Wall (sisi kanan) 26.62 17 0.14792899 66.94378698
Wall (sisi depan) 39.204 0 0.23310023 0
Wall (sisi belakang) 49.368 3 0.23310023 34.52307692
langit-langit
52.9613333
3 0 0.46511628 0
lantai
52.9613333
3 0 0.62111801 0
total panas
material 134.7370897
Internal heat
item jumlah daya
People 8
light 4 30
Televisi 1 100
kulkas 1 150
Sensible
rooom sensible heat 3512.96533
safety Factror 2% 70.2593066
total sensible heat+safety
factor 3583.224636
Laten
room latent heat 1385.793076
safety factor 2% 27.71586152
total laten heat+safety factor 1413.508937
supply duct heat gain 5,7% 204.2438043
Supply duct leakage 2% 71.66449273
fan horsepower 2,3% 82.41416664
cooling load 5355.056037btu/hr
Mess Room
kostruksi dinding luar (sisi kanan)
U= 0.147928994
konstruksi dinding depan dan belakang
U= 0.233100233
konstruksi sisi kiri
U= 0.229357798
konstruksi langit-langit
U= 0.465116279
Konstruksi lantai
U= 0.621118012
Rincian
 Dindingkanan
1
mild steel + air space + mild steel 1/2" + rookwoo + plywood 1/2"
 Dindnigdepanbelakang
1
𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2 "
 Dindingkiri
1
𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2"
 Langit-langit
1
𝑔𝑦𝑝𝑠𝑢𝑚 + 𝑎𝑖𝑟 𝑠𝑝𝑎𝑐𝑒 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"
 Lantai
1
ℎ𝑎𝑟𝑑𝑤𝑜𝑜𝑑 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"
bahan faktor/inch
mild steel 1.4
plywood 1/2" 0.63
rookwool 3.03
mild steel 1/2" 0.7
air space 1
hardwood 0.91
gypsum 0.45
Mess Room
aktivitas di mess room,seated at rest
sensible 230btu/hr
latent 120btu/hr
total 350btu/hr
kalor dari orang
sensible 1840btu/hr
latent 960btu/hr
total 2800btu/hr
menghitung jumlah watt dari cahaya
lampu
light 120watt
menghitung beban panas dari lampu
light 408btu/hr
panas di sekitar
lampu 25% 102btu/hr
total panas
lampu 510btu/hr
Menghitung panas dari
televisi
Televisi 100watt
panas dari tv 340btu/hr
kulkas 150watt
panas dari
kulkas 510btu/hr
total panas
sensible 3200btu/hr
laten 960btu/hr
infiltration
volume ruangan 1565.41572
air changes rate 0.3
waktu 60second
kebutuhan cfm per orang 15
air flow 7.8270786cfm
kebutuhan cfm per orang 120
total cfm 127.8270786
sensible infiltration 143.7051631
laten infiltration 425.7930758
friction loss 2.3
diameter duct 3.25inch 8.125
luas pipa 8.2915625square inch 81.25
Day Room 1
outdoor temperatur indoor temperature selisih
dry bulb 95° F dry bulb 82° F dry bulb 13° F
humidity 58% humidity 40% humidity 18%
wet bub 82° F wet bulb 65° F wet bulb 17° F
kandungan uap air 146 kandungan uap air 66
kandungan uap
air 80
suhu ruangan yang
diinginkan 25.55556 78° F
Item Area (ft2) ∆T Factor total
Wall (sisi kiri) 49.368 6.2 0.2293578 70.20220183
Wall (sisi kanan) 49.368 17 0.14792899 124.1502959
Wall (sisi depan) 24.684 3 0.23310023 17.26153846
Wall (sisi belakang) 24.684 0 0.23310023 0
langit-langit 76.296 0 0.46511628 0
lantai 76.296 0 0.62111801 0
total panas material 211.6140362
Internal heat
item jumlah daya
People 12
light 5 30
Televisi 1 100
kulkas 1 150
hand dryer 1 50
ukuran ruangan
t 7.26
p 22.44
l 11.22
Sensible
rooom sensible heat 3512.96533
safety Factror 2% 70.2593066
total sensible heat+safety
factor 3583.224636Laten
room latent heat 1385.793076
safety factor 2% 27.71586152
total laten heat+safety factor 1413.508937supply duct heat gain 5,7% 204.2438043
Supply duct leakage 2% 71.66449273
fan horsepower 2,3% 82.41416664
cooling load 5355.056037btu/hr
Day Room 1
Rincian
 Dindingkanan
1
mild steel + air space + mild steel 1/2" + rookwool + plywood 1/2"
 Dindnigdepanbelakang
1
𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2 "
 Dindingkiri
1
𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2"
 Langit-langit
1
𝑔𝑦𝑝𝑠𝑢𝑚 + 𝑎𝑖𝑟 𝑠𝑝𝑎𝑐𝑒 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"
 Lantai
1
ℎ𝑎𝑟𝑑𝑤𝑜𝑜𝑑 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"
bahan faktor/inch
mild steel 1.4
plywood 1/2" 0.63
rookwool 3.03
mild steel 1/2" 0.7
air space 1
hardwood 0.91
gypsum 0.45
kostruksi dinding luar (sisi kanan)
U= 0.147928994
konstruksi dinding depan dan belakang
U= 0.233100233
konstruksi sisi kiri
U= 0.229357798
konstruksi langit-langit
U= 0.465116279
Konstruksi lantai
U= 0.621118012
Day Room 1
aktivitas di ruang makan 1
sensible 240btu/hr
latent 310btu/hr
total 550btu/hr
jumlah orang dengan kalor
sensible 2880btu/hr
latent 3720btu/hr
total 6600btu/hr
menghitung jumlah watt dari cahaya
lampu
light 150watt
menghitung beban panas dari
lampu
light 510btu/hr
panas di sekitar
lampu 25% 127.5btu/hr
total panas lampu 637.5btu/hr
Menghitung panas dari televisi
Televisi 100watt
panas dari tv 340btu/hr
kulkas 200watt
panas dari kulkas 680btu/hr
hand dryer 50watt
panas dari hand
dryer 170btu/hr
total panas
sensible 4707.5
laten 3720
infiltration
volume ruangan 1827.899568
air changes rate 0.3
waktu 60second
kebutuhan cfm per orang 15
air flow 9.13949784cfm
kebutuhan cfm per orang 180
total cfm 189.1394978cfm
sensible infiltration 167.8011803
laten infiltration 497.1886825
friction loss 1.7
diameter duct 4inch
luas pipa 12.56square inch
Day Room 2
outdoor temperatur indoor temperature selisih
dry bulb 95° F dry bulb 82° F dry bulb 13° F
humidity 58% humidity 40% humidity 18%
wet bub 82° F wet bulb 65° F wet bulb 17° F
kandungan uap air 146 kandungan uap air 66
kandungan uap
air 80
suhu ruangan yang
diinginkan 25.55556 78° F
Item Area (ft2) ∆T Factor total
Wall (sisi kiri) 49.368 6.2 0.2293578 70.20220183
Wall (sisi kanan) 49.368 17 0.14792899 124.1502959
Wall (sisi depan) 24.684 3 0.23310023 17.26153846
Wall (sisi belakang) 24.684 0 0.23310023 0
langit-langit 76.296 0 0.46511628 0
lantai 76.296 0 0.62111801 0
total panas material 211.6140362
Internal heat
item jumlah daya
People 12
light 5 30
Televisi 1 100
kulkas 1 150
hand dryer 1 50
ukuran ruangan
t 7.26
p 22.44
l 11.22
Sensible
rooom sensible heat 3512.96533
safety Factror 2% 70.2593066
total sensible heat+safety
factor 3583.224636Laten
room latent heat 1385.793076
safety factor 2% 27.71586152
total laten heat+safety factor 1413.508937supply duct heat gain 5,7% 204.2438043
Supply duct leakage 2% 71.66449273
fan horsepower 2,3% 82.41416664
cooling load 5355.056037btu/hr
Day Room 2
Rincian
 Dindingkanan
1
mild steel + air space + mild steel 1/2" + rookwool + plywood 1/2"
 Dindnigdepanbelakang
1
𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2 "
 Dindingkiri
1
𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2"
 Langit-langit
1
𝑔𝑦𝑝𝑠𝑢𝑚 + 𝑎𝑖𝑟 𝑠𝑝𝑎𝑐𝑒 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"
 Lantai
1
ℎ𝑎𝑟𝑑𝑤𝑜𝑜𝑑 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"
bahan faktor/inch
mild steel 1.4
plywood 1/2" 0.63
rookwool 3.03
mild steel 1/2" 0.7
air space 1
hardwood 0.91
gypsum 0.45
kostruksi dinding luar (sisi kanan)
U= 0.147928994
konstruksi dinding depan dan belakang
U= 0.233100233
konstruksi sisi kiri
U= 0.229357798
konstruksi langit-langit
U= 0.465116279
Konstruksi lantai
U= 0.621118012
Film Room
TV Room
 III. CFM dan Ducting
Perhitungan CFM dan Diameter
ducting
Ducting
EQUAL FRICTION
Kunjungan Ke DKB
 Pada kunjungan ke DKB ini kami
berangkat pukul 6 pagi dari kampus
dan sampai di tujuan sekitar pukul 8.
Kami langsung menuu kantor SDM
DKB untuk menyerahkan surat
pengantar dari DTM. Namun ternyata
Bapak General Manager dari DKB
tidak ada di tempat sehingga kami
tidak mendapatkan izin untuk
langsung ke lapangan.
Karena tidak mendapatkan izin, kami hanya mendapatkan pengarahan
dari bagian SDM tersebut. Kami berbicang-bincang mengenai
sistem tata udara kapal terakhir yang sedang dibangun (BCM 5500).
Secara umum, pengetahuan tentang sistem tata udara yang
dijelaska langsung di lapangan tidak beda jauh dengan apa yang
telah kami dapatkan di kelas.
Para petugas DKB menjelaskan pengerjaan kapalmsecara umum
sampai bisa dilucurkan. Kemudian mereka juga menjelasakan
khusus pada bagian tat udaranya. STU dari kapal akan dibuat ketika
kerangka kapal sedah jadi dan dengan perhitungan yang sangat
matang. Disini dijelaskan bahwa cooling load dihitung dari berbagai
aspek, seperti pengaruh kaca,pengaruh sinar matahari,pengaruh
jenis bahan dinding,atap dan lantai dari ruangan, volume ruangan,
banyak orang di dalam ruangan. Dan banyak lagi sesuai dengan
apa yang kami hitungh pada perhitungan tugas sistem tata udara ini.
Sayangnya, pada kunjungan ini kami tidak diperbolehkan ke kapal
BCM 5500 sehingga kami hanya bisa saling betukar pikiran dengan
para pekerja yang ada di kantor.
Foto-foto dokumentasi
 TERIMA KASIH

Mais conteúdo relacionado

Destaque

How to get your sanity back with socket.io
How to get your sanity back with socket.ioHow to get your sanity back with socket.io
How to get your sanity back with socket.ioDanielius Visockas
 
Allied presentation pd jan 2015
Allied presentation  pd jan 2015Allied presentation  pd jan 2015
Allied presentation pd jan 2015Paul W Davies
 
Kt product catalogue s s
Kt product catalogue s sKt product catalogue s s
Kt product catalogue s sSohail Ahmed
 
Faiz Aldalbhi CV English dated 17 Nov 15
Faiz Aldalbhi CV English dated 17 Nov 15Faiz Aldalbhi CV English dated 17 Nov 15
Faiz Aldalbhi CV English dated 17 Nov 15Faiz Aldalbhi
 
Isabella_Practicum_Assessment
Isabella_Practicum_AssessmentIsabella_Practicum_Assessment
Isabella_Practicum_AssessmentSarah Bunting
 
Effect of BA, IBA and cutting type on transplants production from cuttings
Effect of BA, IBA and cutting type on transplants production from cuttingsEffect of BA, IBA and cutting type on transplants production from cuttings
Effect of BA, IBA and cutting type on transplants production from cuttingsAhmedabd Eleslamboly Eleslamboly
 
fältstudie på LINKEDIN
fältstudie på LINKEDINfältstudie på LINKEDIN
fältstudie på LINKEDINEva. Lindqvist
 
Mika Sulin Nordic Venue Forum Århus 2015
Mika Sulin Nordic Venue Forum Århus 2015Mika Sulin Nordic Venue Forum Århus 2015
Mika Sulin Nordic Venue Forum Århus 2015Mika Sulin
 
Bariatric Weight Loss Surgery | Buzzle.com
Bariatric Weight Loss Surgery | Buzzle.comBariatric Weight Loss Surgery | Buzzle.com
Bariatric Weight Loss Surgery | Buzzle.comkindverdict7287
 
The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...
The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...
The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...n3marketing
 
Kymco Book_EDITED
Kymco Book_EDITEDKymco Book_EDITED
Kymco Book_EDITEDBrian Bott
 
Happy birthday facebook picture happy birthday
Happy birthday facebook picture   happy birthdayHappy birthday facebook picture   happy birthday
Happy birthday facebook picture happy birthdaykayum1
 

Destaque (17)

How to get your sanity back with socket.io
How to get your sanity back with socket.ioHow to get your sanity back with socket.io
How to get your sanity back with socket.io
 
Allied presentation pd jan 2015
Allied presentation  pd jan 2015Allied presentation  pd jan 2015
Allied presentation pd jan 2015
 
Kt product catalogue s s
Kt product catalogue s sKt product catalogue s s
Kt product catalogue s s
 
Faiz Aldalbhi CV English dated 17 Nov 15
Faiz Aldalbhi CV English dated 17 Nov 15Faiz Aldalbhi CV English dated 17 Nov 15
Faiz Aldalbhi CV English dated 17 Nov 15
 
Isabella_Practicum_Assessment
Isabella_Practicum_AssessmentIsabella_Practicum_Assessment
Isabella_Practicum_Assessment
 
Vipra today november 16
Vipra today november 16Vipra today november 16
Vipra today november 16
 
Effect of BA, IBA and cutting type on transplants production from cuttings
Effect of BA, IBA and cutting type on transplants production from cuttingsEffect of BA, IBA and cutting type on transplants production from cuttings
Effect of BA, IBA and cutting type on transplants production from cuttings
 
Comune di Savignano sul Rubicone | Linee programmatiche 2014-2019
Comune di Savignano sul Rubicone | Linee programmatiche 2014-2019Comune di Savignano sul Rubicone | Linee programmatiche 2014-2019
Comune di Savignano sul Rubicone | Linee programmatiche 2014-2019
 
Execution
ExecutionExecution
Execution
 
fältstudie på LINKEDIN
fältstudie på LINKEDINfältstudie på LINKEDIN
fältstudie på LINKEDIN
 
ResumeMarch2015.docx
ResumeMarch2015.docxResumeMarch2015.docx
ResumeMarch2015.docx
 
Crazybulkwomen.com
Crazybulkwomen.comCrazybulkwomen.com
Crazybulkwomen.com
 
Mika Sulin Nordic Venue Forum Århus 2015
Mika Sulin Nordic Venue Forum Århus 2015Mika Sulin Nordic Venue Forum Århus 2015
Mika Sulin Nordic Venue Forum Århus 2015
 
Bariatric Weight Loss Surgery | Buzzle.com
Bariatric Weight Loss Surgery | Buzzle.comBariatric Weight Loss Surgery | Buzzle.com
Bariatric Weight Loss Surgery | Buzzle.com
 
The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...
The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...
The New Science for Optimizing your Tech Sales Reach with N3, InsideSales + S...
 
Kymco Book_EDITED
Kymco Book_EDITEDKymco Book_EDITED
Kymco Book_EDITED
 
Happy birthday facebook picture happy birthday
Happy birthday facebook picture   happy birthdayHappy birthday facebook picture   happy birthday
Happy birthday facebook picture happy birthday
 

Semelhante a CFM dan ducting untuk ruangan pendinginan

Perhitungan cooling load di pt aqua wonosobo
Perhitungan cooling load di pt aqua wonosoboPerhitungan cooling load di pt aqua wonosobo
Perhitungan cooling load di pt aqua wonosoboyushatrimulya
 
Canisius College Heat Insulation Thermal Comfort Design Consultation
Canisius College Heat Insulation Thermal Comfort Design ConsultationCanisius College Heat Insulation Thermal Comfort Design Consultation
Canisius College Heat Insulation Thermal Comfort Design ConsultationAlta Integra
 
S6 Topik 2 Kawalan Termal
S6 Topik 2 Kawalan TermalS6 Topik 2 Kawalan Termal
S6 Topik 2 Kawalan Termalno suhaila
 
Teknologi pendinginan dan pembekuan by kiman siregar
Teknologi pendinginan dan pembekuan  by kiman siregarTeknologi pendinginan dan pembekuan  by kiman siregar
Teknologi pendinginan dan pembekuan by kiman siregarKiman Siregar
 
b7f04_B._ENERGI-36.pptx
b7f04_B._ENERGI-36.pptxb7f04_B._ENERGI-36.pptx
b7f04_B._ENERGI-36.pptxsamsam703239
 
Pengaruh sudut datang sinar matahari
Pengaruh sudut datang sinar matahariPengaruh sudut datang sinar matahari
Pengaruh sudut datang sinar matahariSilfia Juliana
 
Biologi 12 laporan praktikum fotosintesis
Biologi 12   laporan praktikum fotosintesisBiologi 12   laporan praktikum fotosintesis
Biologi 12 laporan praktikum fotosintesisNisa 'Icha' El
 
190356718 cara-hitung-kebutuhan-chiller-room
190356718 cara-hitung-kebutuhan-chiller-room190356718 cara-hitung-kebutuhan-chiller-room
190356718 cara-hitung-kebutuhan-chiller-roomAgus Cahyono
 
Presentasi Rancang Bangun Dinding Lilin by Maulidah Hayati S
Presentasi Rancang Bangun Dinding Lilin by Maulidah Hayati SPresentasi Rancang Bangun Dinding Lilin by Maulidah Hayati S
Presentasi Rancang Bangun Dinding Lilin by Maulidah Hayati SMaulida Al Jazari
 
Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...
Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...
Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...Hendra Dinata
 
Rancang bangun kolektor surya
 Rancang bangun kolektor surya Rancang bangun kolektor surya
Rancang bangun kolektor suryaHelmas Tanjung
 
Beban Penghuni - Dasar Tata Udara
Beban Penghuni - Dasar Tata UdaraBeban Penghuni - Dasar Tata Udara
Beban Penghuni - Dasar Tata UdaraSenia Firlania
 
dasar tata udaa cooling load 3
dasar tata udaa cooling load 3dasar tata udaa cooling load 3
dasar tata udaa cooling load 3try anugrah
 
Pengertian boiler tungku furnace
Pengertian boiler tungku furnace Pengertian boiler tungku furnace
Pengertian boiler tungku furnace distributor boiler
 

Semelhante a CFM dan ducting untuk ruangan pendinginan (17)

Perhitungan cooling load di pt aqua wonosobo
Perhitungan cooling load di pt aqua wonosoboPerhitungan cooling load di pt aqua wonosobo
Perhitungan cooling load di pt aqua wonosobo
 
Canisius College Heat Insulation Thermal Comfort Design Consultation
Canisius College Heat Insulation Thermal Comfort Design ConsultationCanisius College Heat Insulation Thermal Comfort Design Consultation
Canisius College Heat Insulation Thermal Comfort Design Consultation
 
Beban
BebanBeban
Beban
 
S6 Topik 2 Kawalan Termal
S6 Topik 2 Kawalan TermalS6 Topik 2 Kawalan Termal
S6 Topik 2 Kawalan Termal
 
Teknologi pendinginan dan pembekuan by kiman siregar
Teknologi pendinginan dan pembekuan  by kiman siregarTeknologi pendinginan dan pembekuan  by kiman siregar
Teknologi pendinginan dan pembekuan by kiman siregar
 
b7f04_B._ENERGI-36.pptx
b7f04_B._ENERGI-36.pptxb7f04_B._ENERGI-36.pptx
b7f04_B._ENERGI-36.pptx
 
Pengaruh sudut datang sinar matahari
Pengaruh sudut datang sinar matahariPengaruh sudut datang sinar matahari
Pengaruh sudut datang sinar matahari
 
Biologi 12 laporan praktikum fotosintesis
Biologi 12   laporan praktikum fotosintesisBiologi 12   laporan praktikum fotosintesis
Biologi 12 laporan praktikum fotosintesis
 
190356718 cara-hitung-kebutuhan-chiller-room
190356718 cara-hitung-kebutuhan-chiller-room190356718 cara-hitung-kebutuhan-chiller-room
190356718 cara-hitung-kebutuhan-chiller-room
 
Presentasi Rancang Bangun Dinding Lilin by Maulidah Hayati S
Presentasi Rancang Bangun Dinding Lilin by Maulidah Hayati SPresentasi Rancang Bangun Dinding Lilin by Maulidah Hayati S
Presentasi Rancang Bangun Dinding Lilin by Maulidah Hayati S
 
RUANG PERAWATAN.pptx
RUANG PERAWATAN.pptxRUANG PERAWATAN.pptx
RUANG PERAWATAN.pptx
 
Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...
Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...
Perencanaan Unit Mesin Pendingin Untuk Kebutuhan Pengkondisian Udara Pada Ged...
 
Rancang bangun kolektor surya
 Rancang bangun kolektor surya Rancang bangun kolektor surya
Rancang bangun kolektor surya
 
Beban Penghuni - Dasar Tata Udara
Beban Penghuni - Dasar Tata UdaraBeban Penghuni - Dasar Tata Udara
Beban Penghuni - Dasar Tata Udara
 
dasar tata udaa cooling load 3
dasar tata udaa cooling load 3dasar tata udaa cooling load 3
dasar tata udaa cooling load 3
 
Pengertian boiler tungku furnace
Pengertian boiler tungku furnace Pengertian boiler tungku furnace
Pengertian boiler tungku furnace
 
BDPE-02 Stasiun Perebusan.pptx
BDPE-02 Stasiun Perebusan.pptxBDPE-02 Stasiun Perebusan.pptx
BDPE-02 Stasiun Perebusan.pptx
 

Último

QCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptx
QCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptxQCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptx
QCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptxdjam11
 
Ahli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptx
Ahli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptxAhli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptx
Ahli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptxarifyudianto3
 
Analisis Struktur Statis Tak Tentu dengan Force Method.pdf
Analisis Struktur Statis Tak Tentu dengan Force Method.pdfAnalisis Struktur Statis Tak Tentu dengan Force Method.pdf
Analisis Struktur Statis Tak Tentu dengan Force Method.pdfAgusTriyono78
 
PPT PENILAIAN PERKERASAN JALAN Metode PCI.pptx
PPT PENILAIAN PERKERASAN JALAN Metode PCI.pptxPPT PENILAIAN PERKERASAN JALAN Metode PCI.pptx
PPT PENILAIAN PERKERASAN JALAN Metode PCI.pptxYehezkielAkwila3
 
MEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIK
MEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIKMEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIK
MEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIKFerdinandus9
 
Kelompok 5 PPt Penerapan Teori Fuzzy.pdf
Kelompok 5 PPt Penerapan Teori Fuzzy.pdfKelompok 5 PPt Penerapan Teori Fuzzy.pdf
Kelompok 5 PPt Penerapan Teori Fuzzy.pdfVardyFahrizal
 
PPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptx
PPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptxPPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptx
PPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptxHamidNurMukhlis
 
Sesi_02_Rangkaian_Hubungan_Seri_Paralel.pptx
Sesi_02_Rangkaian_Hubungan_Seri_Paralel.pptxSesi_02_Rangkaian_Hubungan_Seri_Paralel.pptx
Sesi_02_Rangkaian_Hubungan_Seri_Paralel.pptx185TsabitSujud
 
Normalisasi Database dan pengertian database
Normalisasi Database dan pengertian databaseNormalisasi Database dan pengertian database
Normalisasi Database dan pengertian databasethinkplusx1
 
PPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptx
PPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptxPPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptx
PPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptxdpcaskonasoki
 
Transfer Massa dan Panas Teknik Kimia Industri
Transfer Massa dan Panas Teknik Kimia IndustriTransfer Massa dan Panas Teknik Kimia Industri
Transfer Massa dan Panas Teknik Kimia Industririzwahyung
 
struktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptx
struktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptxstruktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptx
struktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptxAgusTriyono78
 
MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555
MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555
MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555zannialzur
 
Himpunan Fuzzy Academic Engineering Data
Himpunan Fuzzy Academic Engineering DataHimpunan Fuzzy Academic Engineering Data
Himpunan Fuzzy Academic Engineering DataDAVIDSTEVENSONSIMBOL
 

Último (14)

QCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptx
QCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptxQCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptx
QCC MANAJEMEN TOOL MAINTENANCE (MAINTENANCE TEAM).pptx
 
Ahli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptx
Ahli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptxAhli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptx
Ahli Muda Teknik Bangunan GEdung Jenjang 7 - Samet Kurnianto.pptx
 
Analisis Struktur Statis Tak Tentu dengan Force Method.pdf
Analisis Struktur Statis Tak Tentu dengan Force Method.pdfAnalisis Struktur Statis Tak Tentu dengan Force Method.pdf
Analisis Struktur Statis Tak Tentu dengan Force Method.pdf
 
PPT PENILAIAN PERKERASAN JALAN Metode PCI.pptx
PPT PENILAIAN PERKERASAN JALAN Metode PCI.pptxPPT PENILAIAN PERKERASAN JALAN Metode PCI.pptx
PPT PENILAIAN PERKERASAN JALAN Metode PCI.pptx
 
MEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIK
MEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIKMEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIK
MEKANIKA TEKNIK TEKNIK PERTAMBANGAN FAK. TEKNIK
 
Kelompok 5 PPt Penerapan Teori Fuzzy.pdf
Kelompok 5 PPt Penerapan Teori Fuzzy.pdfKelompok 5 PPt Penerapan Teori Fuzzy.pdf
Kelompok 5 PPt Penerapan Teori Fuzzy.pdf
 
PPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptx
PPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptxPPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptx
PPT Manajemen Konstruksi Unsur Unsur Proyek 1.pptx
 
Sesi_02_Rangkaian_Hubungan_Seri_Paralel.pptx
Sesi_02_Rangkaian_Hubungan_Seri_Paralel.pptxSesi_02_Rangkaian_Hubungan_Seri_Paralel.pptx
Sesi_02_Rangkaian_Hubungan_Seri_Paralel.pptx
 
Normalisasi Database dan pengertian database
Normalisasi Database dan pengertian databaseNormalisasi Database dan pengertian database
Normalisasi Database dan pengertian database
 
PPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptx
PPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptxPPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptx
PPT PPT Pelaksana lapangan Pekerasan Jalan Beton lvl 6.pptx
 
Transfer Massa dan Panas Teknik Kimia Industri
Transfer Massa dan Panas Teknik Kimia IndustriTransfer Massa dan Panas Teknik Kimia Industri
Transfer Massa dan Panas Teknik Kimia Industri
 
struktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptx
struktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptxstruktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptx
struktur statis tak tentu dengan persamaan-tiga-momen-apdf.pptx
 
MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555
MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555
MATERI PRESENTASI KEPALA TEKNIK TAMBANG KEPMEN 555
 
Himpunan Fuzzy Academic Engineering Data
Himpunan Fuzzy Academic Engineering DataHimpunan Fuzzy Academic Engineering Data
Himpunan Fuzzy Academic Engineering Data
 

CFM dan ducting untuk ruangan pendinginan

  • 1. COOLING LOAD and DUCTING SYSTEM  HANDIKA SEMBIRING  SAIFUL HABIB  MADITSA ARIZAL
  • 2. I. Luas area II. Cooling load III. CFM dan ducting
  • 3.
  • 4.
  • 5. I. Luas area 1. Quite library room 2. Mess room 3. Day room 1 4. Day room 2 5. TV room 6. Film room
  • 15. Mess Room ukuran ruangan t 7.26 p 17.82 l 12.1 outdoor temperatur indoor temperature selisih dry bulb 95° F dry bulb 82° F dry bulb 13 humidity 58% humidity 40% humidity 18% wet bub 82° F wet bulb 65° F wet bulb 17 kandungan uap air 146 kandungan uap air 66 kandungan uap air 80 suhu ruangan yang diinginkan 23.88889 75° F Item Area (ft2) ∆T Factor total Wall (sisi kiri) 47.674 6.2 0.2293578 67.79330275 Wall (sisi kanan) 26.62 17 0.14792899 66.94378698 Wall (sisi depan) 39.204 0 0.23310023 0 Wall (sisi belakang) 49.368 3 0.23310023 34.52307692 langit-langit 52.9613333 3 0 0.46511628 0 lantai 52.9613333 3 0 0.62111801 0 total panas material 134.7370897 Internal heat item jumlah daya People 8 light 4 30 Televisi 1 100 kulkas 1 150 Sensible rooom sensible heat 3512.96533 safety Factror 2% 70.2593066 total sensible heat+safety factor 3583.224636 Laten room latent heat 1385.793076 safety factor 2% 27.71586152 total laten heat+safety factor 1413.508937 supply duct heat gain 5,7% 204.2438043 Supply duct leakage 2% 71.66449273 fan horsepower 2,3% 82.41416664 cooling load 5355.056037btu/hr
  • 16. Mess Room kostruksi dinding luar (sisi kanan) U= 0.147928994 konstruksi dinding depan dan belakang U= 0.233100233 konstruksi sisi kiri U= 0.229357798 konstruksi langit-langit U= 0.465116279 Konstruksi lantai U= 0.621118012 Rincian  Dindingkanan 1 mild steel + air space + mild steel 1/2" + rookwoo + plywood 1/2"  Dindnigdepanbelakang 1 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2 "  Dindingkiri 1 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2"  Langit-langit 1 𝑔𝑦𝑝𝑠𝑢𝑚 + 𝑎𝑖𝑟 𝑠𝑝𝑎𝑐𝑒 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"  Lantai 1 ℎ𝑎𝑟𝑑𝑤𝑜𝑜𝑑 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" bahan faktor/inch mild steel 1.4 plywood 1/2" 0.63 rookwool 3.03 mild steel 1/2" 0.7 air space 1 hardwood 0.91 gypsum 0.45
  • 17. Mess Room aktivitas di mess room,seated at rest sensible 230btu/hr latent 120btu/hr total 350btu/hr kalor dari orang sensible 1840btu/hr latent 960btu/hr total 2800btu/hr menghitung jumlah watt dari cahaya lampu light 120watt menghitung beban panas dari lampu light 408btu/hr panas di sekitar lampu 25% 102btu/hr total panas lampu 510btu/hr Menghitung panas dari televisi Televisi 100watt panas dari tv 340btu/hr kulkas 150watt panas dari kulkas 510btu/hr total panas sensible 3200btu/hr laten 960btu/hr infiltration volume ruangan 1565.41572 air changes rate 0.3 waktu 60second kebutuhan cfm per orang 15 air flow 7.8270786cfm kebutuhan cfm per orang 120 total cfm 127.8270786 sensible infiltration 143.7051631 laten infiltration 425.7930758 friction loss 2.3 diameter duct 3.25inch 8.125 luas pipa 8.2915625square inch 81.25
  • 18. Day Room 1 outdoor temperatur indoor temperature selisih dry bulb 95° F dry bulb 82° F dry bulb 13° F humidity 58% humidity 40% humidity 18% wet bub 82° F wet bulb 65° F wet bulb 17° F kandungan uap air 146 kandungan uap air 66 kandungan uap air 80 suhu ruangan yang diinginkan 25.55556 78° F Item Area (ft2) ∆T Factor total Wall (sisi kiri) 49.368 6.2 0.2293578 70.20220183 Wall (sisi kanan) 49.368 17 0.14792899 124.1502959 Wall (sisi depan) 24.684 3 0.23310023 17.26153846 Wall (sisi belakang) 24.684 0 0.23310023 0 langit-langit 76.296 0 0.46511628 0 lantai 76.296 0 0.62111801 0 total panas material 211.6140362 Internal heat item jumlah daya People 12 light 5 30 Televisi 1 100 kulkas 1 150 hand dryer 1 50 ukuran ruangan t 7.26 p 22.44 l 11.22 Sensible rooom sensible heat 3512.96533 safety Factror 2% 70.2593066 total sensible heat+safety factor 3583.224636Laten room latent heat 1385.793076 safety factor 2% 27.71586152 total laten heat+safety factor 1413.508937supply duct heat gain 5,7% 204.2438043 Supply duct leakage 2% 71.66449273 fan horsepower 2,3% 82.41416664 cooling load 5355.056037btu/hr
  • 19. Day Room 1 Rincian  Dindingkanan 1 mild steel + air space + mild steel 1/2" + rookwool + plywood 1/2"  Dindnigdepanbelakang 1 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2 "  Dindingkiri 1 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2"  Langit-langit 1 𝑔𝑦𝑝𝑠𝑢𝑚 + 𝑎𝑖𝑟 𝑠𝑝𝑎𝑐𝑒 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"  Lantai 1 ℎ𝑎𝑟𝑑𝑤𝑜𝑜𝑑 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" bahan faktor/inch mild steel 1.4 plywood 1/2" 0.63 rookwool 3.03 mild steel 1/2" 0.7 air space 1 hardwood 0.91 gypsum 0.45 kostruksi dinding luar (sisi kanan) U= 0.147928994 konstruksi dinding depan dan belakang U= 0.233100233 konstruksi sisi kiri U= 0.229357798 konstruksi langit-langit U= 0.465116279 Konstruksi lantai U= 0.621118012
  • 20. Day Room 1 aktivitas di ruang makan 1 sensible 240btu/hr latent 310btu/hr total 550btu/hr jumlah orang dengan kalor sensible 2880btu/hr latent 3720btu/hr total 6600btu/hr menghitung jumlah watt dari cahaya lampu light 150watt menghitung beban panas dari lampu light 510btu/hr panas di sekitar lampu 25% 127.5btu/hr total panas lampu 637.5btu/hr Menghitung panas dari televisi Televisi 100watt panas dari tv 340btu/hr kulkas 200watt panas dari kulkas 680btu/hr hand dryer 50watt panas dari hand dryer 170btu/hr total panas sensible 4707.5 laten 3720 infiltration volume ruangan 1827.899568 air changes rate 0.3 waktu 60second kebutuhan cfm per orang 15 air flow 9.13949784cfm kebutuhan cfm per orang 180 total cfm 189.1394978cfm sensible infiltration 167.8011803 laten infiltration 497.1886825 friction loss 1.7 diameter duct 4inch luas pipa 12.56square inch
  • 21. Day Room 2 outdoor temperatur indoor temperature selisih dry bulb 95° F dry bulb 82° F dry bulb 13° F humidity 58% humidity 40% humidity 18% wet bub 82° F wet bulb 65° F wet bulb 17° F kandungan uap air 146 kandungan uap air 66 kandungan uap air 80 suhu ruangan yang diinginkan 25.55556 78° F Item Area (ft2) ∆T Factor total Wall (sisi kiri) 49.368 6.2 0.2293578 70.20220183 Wall (sisi kanan) 49.368 17 0.14792899 124.1502959 Wall (sisi depan) 24.684 3 0.23310023 17.26153846 Wall (sisi belakang) 24.684 0 0.23310023 0 langit-langit 76.296 0 0.46511628 0 lantai 76.296 0 0.62111801 0 total panas material 211.6140362 Internal heat item jumlah daya People 12 light 5 30 Televisi 1 100 kulkas 1 150 hand dryer 1 50 ukuran ruangan t 7.26 p 22.44 l 11.22 Sensible rooom sensible heat 3512.96533 safety Factror 2% 70.2593066 total sensible heat+safety factor 3583.224636Laten room latent heat 1385.793076 safety factor 2% 27.71586152 total laten heat+safety factor 1413.508937supply duct heat gain 5,7% 204.2438043 Supply duct leakage 2% 71.66449273 fan horsepower 2,3% 82.41416664 cooling load 5355.056037btu/hr
  • 22. Day Room 2 Rincian  Dindingkanan 1 mild steel + air space + mild steel 1/2" + rookwool + plywood 1/2"  Dindnigdepanbelakang 1 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2 "  Dindingkiri 1 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" + 𝑟𝑜𝑜𝑘𝑤𝑜𝑜𝑙 + 𝑝𝑙𝑦𝑤𝑜𝑜𝑑 1/2"  Langit-langit 1 𝑔𝑦𝑝𝑠𝑢𝑚 + 𝑎𝑖𝑟 𝑠𝑝𝑎𝑐𝑒 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2"  Lantai 1 ℎ𝑎𝑟𝑑𝑤𝑜𝑜𝑑 + 𝑚𝑖𝑙𝑑 𝑠𝑡𝑒𝑒𝑙 1/2" bahan faktor/inch mild steel 1.4 plywood 1/2" 0.63 rookwool 3.03 mild steel 1/2" 0.7 air space 1 hardwood 0.91 gypsum 0.45 kostruksi dinding luar (sisi kanan) U= 0.147928994 konstruksi dinding depan dan belakang U= 0.233100233 konstruksi sisi kiri U= 0.229357798 konstruksi langit-langit U= 0.465116279 Konstruksi lantai U= 0.621118012
  • 24.
  • 26.
  • 27.  III. CFM dan Ducting
  • 28. Perhitungan CFM dan Diameter ducting
  • 29.
  • 32. Kunjungan Ke DKB  Pada kunjungan ke DKB ini kami berangkat pukul 6 pagi dari kampus dan sampai di tujuan sekitar pukul 8. Kami langsung menuu kantor SDM DKB untuk menyerahkan surat pengantar dari DTM. Namun ternyata Bapak General Manager dari DKB tidak ada di tempat sehingga kami tidak mendapatkan izin untuk langsung ke lapangan.
  • 33. Karena tidak mendapatkan izin, kami hanya mendapatkan pengarahan dari bagian SDM tersebut. Kami berbicang-bincang mengenai sistem tata udara kapal terakhir yang sedang dibangun (BCM 5500). Secara umum, pengetahuan tentang sistem tata udara yang dijelaska langsung di lapangan tidak beda jauh dengan apa yang telah kami dapatkan di kelas. Para petugas DKB menjelaskan pengerjaan kapalmsecara umum sampai bisa dilucurkan. Kemudian mereka juga menjelasakan khusus pada bagian tat udaranya. STU dari kapal akan dibuat ketika kerangka kapal sedah jadi dan dengan perhitungan yang sangat matang. Disini dijelaskan bahwa cooling load dihitung dari berbagai aspek, seperti pengaruh kaca,pengaruh sinar matahari,pengaruh jenis bahan dinding,atap dan lantai dari ruangan, volume ruangan, banyak orang di dalam ruangan. Dan banyak lagi sesuai dengan apa yang kami hitungh pada perhitungan tugas sistem tata udara ini. Sayangnya, pada kunjungan ini kami tidak diperbolehkan ke kapal BCM 5500 sehingga kami hanya bisa saling betukar pikiran dengan para pekerja yang ada di kantor.
  • 35.
  • 36.
  • 37.
  • 38.