SlideShare uma empresa Scribd logo
1 de 14
UCC-Tutorial
Version SAP ERP 6.0




                      on Period Closing in SAP ERP 6.00 Systems in UCC Environments



                      Relevance

                      SAP ERP 6.00


                      Objective

                      With this tutorial you will learn how to perform and automate period closing in SAP ERP 6.0 in the UCC
                      system environment.

                      A detailed step-by-step guide helps you carry out all necessary tasks efficiently and precisely.

                      Due to its modular structure this tutorial is also suitable for online help and reference if you have made your
                      own experience with period closing in your SAP system.




                      Table of Contents

                      1.	 Overview

                      2.	 SAP	UCC	Specifics

                      3.	 Open	Posting	Period

                      4.	 Period	Closing

                           4. 1. Manual Procedure
                           4. 2. Automatic Scheduling

                      5.	 Post	Depreciation	Runs	

                      6.	 Settle	CO	Objects	to	Profitability	Analysis




                      © 2009 SAP-UCC                                                   UCC Tutorial on Period Closing – SAP ERP 6.0 |   1
1. Overview

In general, period closing in SAP ERP systems requires the following activities:

   • Opening current posting period (FI module)
   • Close past periods (MM module)
   • Post depreciation runs (FI-AA module)
   • Settle revenue-bearing and cost-carrying CO objects to profitability analysis (CO-PA module)




2. SAP UCC Specifics

Because SAP ERP systems are designed for productive	use, technical and business security	functions for
revision security, authorization concept, handling error protection, etc. have been incorporated.

These security mechanisms are well elaborated by SAP and carried out by several different departments
during fiscal year.

Using SAP ERP systems for educational purposes, these precautions are not necessary (particularly from
a business perspective).

However, some activities are still required in the UCC environment.

Mandatory and optional activities in the SAP UCC environment, together with its consequences, are de-
scribed below.



3. Open Posting Period

The reason for opening	posting	periods each month is to impede illicit postings to prior periods (rever-
sing). Since there is no need for such a constraint in teaching, you are able to open posting periods a priori
up to a certain date. SAP’s IDES department has already performed these actions for most company codes
until 12/2008.




© 2009 SAP-UCC                                                   UCC Tutorial on Period Closing – SAP ERP 6.0 |   2
The transaction	code for period control is	OB52. The figure below shows the status quo:




   Company codes                  Open posting periods ( from | to )




To open posting periods for future periods please proceed as follows:



Step 1 of 4:


First, select all company code/account type combinations by clicking on button „Select All (F7)“ high-
lighted in the following screenshot.




© 2009 SAP-UCC                                                         UCC Tutorial on Period Closing – SAP ERP 6.0 |   3
Step 2 of 4:


In the edit	menu, please select „Change Field Contents...“.




Step 3 of 4:


In the following window, please mark the entry „To	fiscal	year	(period	1)“ and press ENTER.




© 2009 SAP-UCC                                                UCC Tutorial on Period Closing – SAP ERP 6.0 |   4
Step 4 of 4:


Choose the desired target	year. To save time in the following years, choose a target year that is far in the
future and then click the button	“Replace“:




As a result you have opened the booking period until period 12 of your selected target year (in the screens-
hot 2015):




© 2009 SAP-UCC                                                 UCC Tutorial on Period Closing – SAP ERP 6.0 |   5
4. Period Closing

Period closing affects all logistic modules where valuated goods movements are going to take place.

Accounting valuation of material movements is effected on company code level, where the current posting
period is defined, and has to be updated at each beginning of a new period. Hence, a posting to a prior
period is usually not allowed.

However, posting to a prior period is explicitly allowed in IDES systems. You can always post goods mo-
vements to the current and previous period.

To identify the current posting period of your company codes please use transaction code OMSY.




                                                                                     Company code 0001
                                                                                    is used as a template and
                                                                                    shows the delivery	peri-
                                                                                    od of your IDES version.
                                                                                    It should	not be altered!




       Company codes                    Current posting period




© 2009 SAP-UCC                                               UCC Tutorial on Period Closing – SAP ERP 6.0 |   6
4.1. Manual Procedure

Manual period closing is realized by transaction code MMPV. The following screenshots show the proce-
dure in detail.

Note 1:
In case the actual company	code	period in your SAP system is more than one period in the past, please
move periods successively, e.g. from 07/2008 to 08/2008, then to 09/2008 and so on, until you reach the
current period.
In order to prevent multiple entry use F3 after each successful period closing to reach the previous screen.
In doing so, the fields will remain prefilled.

Note 2:
In case the actual	company	code	period in your SAP system is in a past year please proceed as described
above. The only difference is that as long as the period is in a past year you will get a yellow warning mes-
sage. Please tap ENTER.

Note 3:
If you are going to close periods in industry solutions (e.g. SAP for Retail), please repeat this step using
respective industry-specific company codes (e.g. R300).
In this example, company	code	1000 and period	11/2008 are used.




                                             If you would like to effect a range of company
                                            codes, use the „To company code“ field in addion.




© 2009 SAP-UCC                                                        UCC Tutorial on Period Closing – SAP ERP 6.0 |   7
Once you have executed transaction MMPV a log message appears:




                                                                          Note:
                                                                          You can see the result of period
                                                                          closing if you execute transaction
                                                                          OMSY again.



4.2. Automatic Scheduling

First, shift the period in your system to the current calendar month. (as explained in step 4.1).
To automate	period	closing please do the following:



Step 1 of 6 (Select Program)



                                                                             First of all, start transaction
                                                                             SE38:
                                                                             Enter RMMMPERI as pro-
                                                                             gram name, then hit button
                                                                             „variants“:




© 2009 SAP-UCC                                                  UCC Tutorial on Period Closing – SAP ERP 6.0 |   8
Step 2 of 6 (Create Variants)



                                 Enter a name of your choice (e.g. „UCCPERI“)
                                 as variant and click on „Create“.




Step 3 of 6 (Maintain Variant)



                                                    1   Enter company code
                                                        range.

          3
                                                    2   Leave these fields empty
                                                        as they are dynamically
                          1                             set once the program is
                                                        started.


                          2                         3   Finally, click on “Attri-
                                                        butes“.




© 2009 SAP-UCC                       UCC Tutorial on Period Closing – SAP ERP 6.0 |   9
Step 4 of 6 (Set Variant Attributes)




4

                                   1




                                                                   3




                               2




 1    First, enter any description for your variant in field „Meaning“.

 2    Now, scroll down to the end of the table.

 3    In column “Selection	 variable“, hit [F4] and select “D“ for dynamic date calculation. In column
      “Name	of	Variable	(Input	only	using	F4)“ select „First day of current month“..

 4    Then, click on „Copy	Screen	Asignments“.

 5    Save your modifications! A success message appears in the status bar:




© 2009 SAP-UCC                                                  UCC Tutorial on Period Closing – SAP ERP 6.0 |   10
Step 5 of 6 (Schedule the Background Job)


Go back twice to the view „ABAP Editor: Initial Screen“.

Start the program in the background as shown in the screenshot below:




                                                     2
                                                                        01.12.2008
                      1                              3

                                                                          4



 1   Click on “Schedule“.

 2   Please enter a random job name.

 3   Define target date for period closing. It will be executed automatically.

4    Finally, click on „Schedule periodically“



© 2009 SAP-UCC                                                  UCC Tutorial on Period Closing – SAP ERP 6.0 |   11
Select a monthly periodicity for your job:




After hitting the green checkmark, a success message should appear in the status bar:



Hit „Back“ multiple times until you reach SAP Easy Access Menu.




© 2009 SAP-UCC                                               UCC Tutorial on Period Closing – SAP ERP 6.0 |   12
Step 6 of 6 (Verify Job Scheduling)


Verify now your job scheduling using transaction code SM37:


                                                            Insert here the assigned job name (see page 11).




                                                            Enter name of user who scheduled this job or an
                                                            asterisk (*) as wildcard.




            Choose an appropriate period.



     Additionally, mark job status “Sched.“




Now you can find the scheduled job by accessing the job overview:




© 2009 SAP-UCC                                             UCC Tutorial on Period Closing – SAP ERP 6.0 |      13
5. Post Depreciation Runs

Typically, a monthly update	of	depreciation (FI-AA module) is rarely needed in the UCC	environment.
However, if you need to post depreciation runs on a monthly basis, please use the optional part of our fiscal
year change tutorial (you can find in the members area of the UCC website at www.sap-ucc.com).

In case of need, the mid-year	procedure is effected in the same way.



6. Settle CO Objects to Profitability Analysis

In practice, cost objects are settled to profitability analysis monthly. At the same time, values for unfinished
products are forwarded to financial accounting (where applicable).

Although important in practice this task is not necessary in SAP teaching because

•   the accurate amount of operating profit is not relevant in most curricula, or
•   the settlement of cost objects has already been carried out by the user running through the case study.

Now, all periodic activities on monthly basis have been completed. Taking into account teaching specifics,
the only procedure necessary for month-end closing is the period closing procedure itself. As shown in this
tutorial, it can be automated in your SAP ERP system.




            Hopefully our tutorial helped you conduct the period closing in your SAP system.


If you have any suggestions on this tutorial or problems which you can not solve on your own, our help is
                        available through the following communication channels:


              UCC Magdeburg: 0700 - SAPHCCMD or uccsupport@ucc.uni-magdeburg.de

                       UCC Munich: 0700 - SAPHCCTU or uccsupport@in.tum.de


                                     Thank you for your attention!
                             Your SAP UCC teams in Magdeburg and Munich




© 2009 SAP-UCC                                                   UCC Tutorial on Period Closing – SAP ERP 6.0 |   14

Mais conteúdo relacionado

Destaque

SAP SD Certification (C_TSCM62_66) Preparation Training Notes
SAP SD Certification (C_TSCM62_66) Preparation Training NotesSAP SD Certification (C_TSCM62_66) Preparation Training Notes
SAP SD Certification (C_TSCM62_66) Preparation Training Notessapdocs. info
 
SAP FI-AR TCODES & MENU PATHS
SAP FI-AR TCODES & MENU PATHSSAP FI-AR TCODES & MENU PATHS
SAP FI-AR TCODES & MENU PATHSsapdocs. info
 
SAP Configuration Guide for Functional Modules (Based on IDES)
SAP Configuration Guide for Functional Modules (Based on IDES)SAP Configuration Guide for Functional Modules (Based on IDES)
SAP Configuration Guide for Functional Modules (Based on IDES)sapdocs. info
 
SAP FICO BBP Sample Document PDF NEW!
SAP FICO BBP Sample Document PDF NEW!SAP FICO BBP Sample Document PDF NEW!
SAP FICO BBP Sample Document PDF NEW!sapdocs. info
 
Authorisation Concept In SAP | http://sapdocs.info
Authorisation Concept In SAP | http://sapdocs.infoAuthorisation Concept In SAP | http://sapdocs.info
Authorisation Concept In SAP | http://sapdocs.infosapdocs. info
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infosapdocs. info
 
SAP PP MRP Guide for Beginners
SAP PP MRP Guide for BeginnersSAP PP MRP Guide for Beginners
SAP PP MRP Guide for Beginnerssapdocs. info
 
SAP FI-AP TCODES & MENU PATHS
SAP FI-AP TCODES & MENU PATHSSAP FI-AP TCODES & MENU PATHS
SAP FI-AP TCODES & MENU PATHSsapdocs. info
 
SAP HR Time Management User Guide | www.sapdocs.info
SAP HR Time Management User Guide | www.sapdocs.infoSAP HR Time Management User Guide | www.sapdocs.info
SAP HR Time Management User Guide | www.sapdocs.infosapdocs. info
 
SAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project DocumentationSAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project Documentationsapdocs. info
 
SAP FI AP: End User Guide for Beginners
SAP FI AP: End User Guide for BeginnersSAP FI AP: End User Guide for Beginners
SAP FI AP: End User Guide for Beginnerssapdocs. info
 
SAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.infoSAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.infosapdocs. info
 
Variant Configurition in SAP: Beginners Guide | www.sapdocs.info
Variant Configurition in SAP: Beginners Guide | www.sapdocs.infoVariant Configurition in SAP: Beginners Guide | www.sapdocs.info
Variant Configurition in SAP: Beginners Guide | www.sapdocs.infosapdocs. info
 
SAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infoSAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infosapdocs. info
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infosapdocs. info
 

Destaque (15)

SAP SD Certification (C_TSCM62_66) Preparation Training Notes
SAP SD Certification (C_TSCM62_66) Preparation Training NotesSAP SD Certification (C_TSCM62_66) Preparation Training Notes
SAP SD Certification (C_TSCM62_66) Preparation Training Notes
 
SAP FI-AR TCODES & MENU PATHS
SAP FI-AR TCODES & MENU PATHSSAP FI-AR TCODES & MENU PATHS
SAP FI-AR TCODES & MENU PATHS
 
SAP Configuration Guide for Functional Modules (Based on IDES)
SAP Configuration Guide for Functional Modules (Based on IDES)SAP Configuration Guide for Functional Modules (Based on IDES)
SAP Configuration Guide for Functional Modules (Based on IDES)
 
SAP FICO BBP Sample Document PDF NEW!
SAP FICO BBP Sample Document PDF NEW!SAP FICO BBP Sample Document PDF NEW!
SAP FICO BBP Sample Document PDF NEW!
 
Authorisation Concept In SAP | http://sapdocs.info
Authorisation Concept In SAP | http://sapdocs.infoAuthorisation Concept In SAP | http://sapdocs.info
Authorisation Concept In SAP | http://sapdocs.info
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
 
SAP PP MRP Guide for Beginners
SAP PP MRP Guide for BeginnersSAP PP MRP Guide for Beginners
SAP PP MRP Guide for Beginners
 
SAP FI-AP TCODES & MENU PATHS
SAP FI-AP TCODES & MENU PATHSSAP FI-AP TCODES & MENU PATHS
SAP FI-AP TCODES & MENU PATHS
 
SAP HR Time Management User Guide | www.sapdocs.info
SAP HR Time Management User Guide | www.sapdocs.infoSAP HR Time Management User Guide | www.sapdocs.info
SAP HR Time Management User Guide | www.sapdocs.info
 
SAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project DocumentationSAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project Documentation
 
SAP FI AP: End User Guide for Beginners
SAP FI AP: End User Guide for BeginnersSAP FI AP: End User Guide for Beginners
SAP FI AP: End User Guide for Beginners
 
SAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.infoSAP PP End User Document - www.sapdocs.info
SAP PP End User Document - www.sapdocs.info
 
Variant Configurition in SAP: Beginners Guide | www.sapdocs.info
Variant Configurition in SAP: Beginners Guide | www.sapdocs.infoVariant Configurition in SAP: Beginners Guide | www.sapdocs.info
Variant Configurition in SAP: Beginners Guide | www.sapdocs.info
 
SAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infoSAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.info
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
 

Mais de sapdocs. info

SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Documentsapdocs. info
 
ABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.infoABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.infosapdocs. info
 
Exclusive SAP Basis Training Book | www.sapdocs.info
Exclusive SAP Basis Training Book | www.sapdocs.infoExclusive SAP Basis Training Book | www.sapdocs.info
Exclusive SAP Basis Training Book | www.sapdocs.infosapdocs. info
 
SAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infoSAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infosapdocs. info
 
HR ABAP Technical Overview | http://sapdocs.info/
HR ABAP Technical Overview | http://sapdocs.info/HR ABAP Technical Overview | http://sapdocs.info/
HR ABAP Technical Overview | http://sapdocs.info/sapdocs. info
 
SAP Accounts Reveivable Introduction | http://sapdocs.info
SAP Accounts Reveivable Introduction | http://sapdocs.infoSAP Accounts Reveivable Introduction | http://sapdocs.info
SAP Accounts Reveivable Introduction | http://sapdocs.infosapdocs. info
 
SAP Accounts Reveivable Functions | http://sapdocs.info
SAP Accounts Reveivable Functions | http://sapdocs.infoSAP Accounts Reveivable Functions | http://sapdocs.info
SAP Accounts Reveivable Functions | http://sapdocs.infosapdocs. info
 
SAP Accounts Reveivable Financial Transaction | http://sapdocs.info
SAP Accounts Reveivable Financial Transaction | http://sapdocs.infoSAP Accounts Reveivable Financial Transaction | http://sapdocs.info
SAP Accounts Reveivable Financial Transaction | http://sapdocs.infosapdocs. info
 
SAP Accounts Reveivable Customer Master | http://sapdocs.info
SAP Accounts Reveivable Customer Master | http://sapdocs.infoSAP Accounts Reveivable Customer Master | http://sapdocs.info
SAP Accounts Reveivable Customer Master | http://sapdocs.infosapdocs. info
 
SAP Accounts Reveivable SAP Documents | http://sapdocs.info
SAP Accounts Reveivable SAP Documents | http://sapdocs.infoSAP Accounts Reveivable SAP Documents | http://sapdocs.info
SAP Accounts Reveivable SAP Documents | http://sapdocs.infosapdocs. info
 

Mais de sapdocs. info (10)

SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Document
 
ABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.infoABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.info
 
Exclusive SAP Basis Training Book | www.sapdocs.info
Exclusive SAP Basis Training Book | www.sapdocs.infoExclusive SAP Basis Training Book | www.sapdocs.info
Exclusive SAP Basis Training Book | www.sapdocs.info
 
SAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infoSAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.info
 
HR ABAP Technical Overview | http://sapdocs.info/
HR ABAP Technical Overview | http://sapdocs.info/HR ABAP Technical Overview | http://sapdocs.info/
HR ABAP Technical Overview | http://sapdocs.info/
 
SAP Accounts Reveivable Introduction | http://sapdocs.info
SAP Accounts Reveivable Introduction | http://sapdocs.infoSAP Accounts Reveivable Introduction | http://sapdocs.info
SAP Accounts Reveivable Introduction | http://sapdocs.info
 
SAP Accounts Reveivable Functions | http://sapdocs.info
SAP Accounts Reveivable Functions | http://sapdocs.infoSAP Accounts Reveivable Functions | http://sapdocs.info
SAP Accounts Reveivable Functions | http://sapdocs.info
 
SAP Accounts Reveivable Financial Transaction | http://sapdocs.info
SAP Accounts Reveivable Financial Transaction | http://sapdocs.infoSAP Accounts Reveivable Financial Transaction | http://sapdocs.info
SAP Accounts Reveivable Financial Transaction | http://sapdocs.info
 
SAP Accounts Reveivable Customer Master | http://sapdocs.info
SAP Accounts Reveivable Customer Master | http://sapdocs.infoSAP Accounts Reveivable Customer Master | http://sapdocs.info
SAP Accounts Reveivable Customer Master | http://sapdocs.info
 
SAP Accounts Reveivable SAP Documents | http://sapdocs.info
SAP Accounts Reveivable SAP Documents | http://sapdocs.infoSAP Accounts Reveivable SAP Documents | http://sapdocs.info
SAP Accounts Reveivable SAP Documents | http://sapdocs.info
 

Último

First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCTammy Jackson
 
Chapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasuryChapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasurySarunChhetri1
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证ogawka
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxtmthompson1
 
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptxA DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptxLokeshwariOrchid1
 
Pixar Case Analysis.....................
Pixar Case Analysis.....................Pixar Case Analysis.....................
Pixar Case Analysis.....................mikelopezalv
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertaintycapivisgroup
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accountshttps://localsmmshop.com/
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacovaimostorept
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...AbhishekSharma823325
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxseemajojo02
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfHolger Mueller
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.SNSW group8
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
Mental Health Issues of Graduate Students
Mental Health Issues of Graduate StudentsMental Health Issues of Graduate Students
Mental Health Issues of Graduate Studentsvineshkumarsajnani12
 

Último (20)

First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLC
 
Chapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a TreasuryChapter 2 Organization Structure of a Treasury
Chapter 2 Organization Structure of a Treasury
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptxA DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
A DAY IN LIFE OF A NEGOTIATOR By Pondicherry University MBA Students.pptx
 
Pixar Case Analysis.....................
Pixar Case Analysis.....................Pixar Case Analysis.....................
Pixar Case Analysis.....................
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertainty
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Obat Aborsi Jakarta 0851\7696\3835 Jual Obat Cytotec Di Jakarta
Obat Aborsi Jakarta 0851\7696\3835 Jual Obat Cytotec Di JakartaObat Aborsi Jakarta 0851\7696\3835 Jual Obat Cytotec Di Jakarta
Obat Aborsi Jakarta 0851\7696\3835 Jual Obat Cytotec Di Jakarta
 
A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
Mental Health Issues of Graduate Students
Mental Health Issues of Graduate StudentsMental Health Issues of Graduate Students
Mental Health Issues of Graduate Students
 

Period Closing Steps in SAP ECC 6.0 | www.sapdocs.info

  • 1. UCC-Tutorial Version SAP ERP 6.0 on Period Closing in SAP ERP 6.00 Systems in UCC Environments Relevance SAP ERP 6.00 Objective With this tutorial you will learn how to perform and automate period closing in SAP ERP 6.0 in the UCC system environment. A detailed step-by-step guide helps you carry out all necessary tasks efficiently and precisely. Due to its modular structure this tutorial is also suitable for online help and reference if you have made your own experience with period closing in your SAP system. Table of Contents 1. Overview 2. SAP UCC Specifics 3. Open Posting Period 4. Period Closing 4. 1. Manual Procedure 4. 2. Automatic Scheduling 5. Post Depreciation Runs 6. Settle CO Objects to Profitability Analysis © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 1
  • 2. 1. Overview In general, period closing in SAP ERP systems requires the following activities: • Opening current posting period (FI module) • Close past periods (MM module) • Post depreciation runs (FI-AA module) • Settle revenue-bearing and cost-carrying CO objects to profitability analysis (CO-PA module) 2. SAP UCC Specifics Because SAP ERP systems are designed for productive use, technical and business security functions for revision security, authorization concept, handling error protection, etc. have been incorporated. These security mechanisms are well elaborated by SAP and carried out by several different departments during fiscal year. Using SAP ERP systems for educational purposes, these precautions are not necessary (particularly from a business perspective). However, some activities are still required in the UCC environment. Mandatory and optional activities in the SAP UCC environment, together with its consequences, are de- scribed below. 3. Open Posting Period The reason for opening posting periods each month is to impede illicit postings to prior periods (rever- sing). Since there is no need for such a constraint in teaching, you are able to open posting periods a priori up to a certain date. SAP’s IDES department has already performed these actions for most company codes until 12/2008. © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 2
  • 3. The transaction code for period control is OB52. The figure below shows the status quo: Company codes Open posting periods ( from | to ) To open posting periods for future periods please proceed as follows: Step 1 of 4: First, select all company code/account type combinations by clicking on button „Select All (F7)“ high- lighted in the following screenshot. © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 3
  • 4. Step 2 of 4: In the edit menu, please select „Change Field Contents...“. Step 3 of 4: In the following window, please mark the entry „To fiscal year (period 1)“ and press ENTER. © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 4
  • 5. Step 4 of 4: Choose the desired target year. To save time in the following years, choose a target year that is far in the future and then click the button “Replace“: As a result you have opened the booking period until period 12 of your selected target year (in the screens- hot 2015): © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 5
  • 6. 4. Period Closing Period closing affects all logistic modules where valuated goods movements are going to take place. Accounting valuation of material movements is effected on company code level, where the current posting period is defined, and has to be updated at each beginning of a new period. Hence, a posting to a prior period is usually not allowed. However, posting to a prior period is explicitly allowed in IDES systems. You can always post goods mo- vements to the current and previous period. To identify the current posting period of your company codes please use transaction code OMSY. Company code 0001 is used as a template and shows the delivery peri- od of your IDES version. It should not be altered! Company codes Current posting period © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 6
  • 7. 4.1. Manual Procedure Manual period closing is realized by transaction code MMPV. The following screenshots show the proce- dure in detail. Note 1: In case the actual company code period in your SAP system is more than one period in the past, please move periods successively, e.g. from 07/2008 to 08/2008, then to 09/2008 and so on, until you reach the current period. In order to prevent multiple entry use F3 after each successful period closing to reach the previous screen. In doing so, the fields will remain prefilled. Note 2: In case the actual company code period in your SAP system is in a past year please proceed as described above. The only difference is that as long as the period is in a past year you will get a yellow warning mes- sage. Please tap ENTER. Note 3: If you are going to close periods in industry solutions (e.g. SAP for Retail), please repeat this step using respective industry-specific company codes (e.g. R300). In this example, company code 1000 and period 11/2008 are used. If you would like to effect a range of company codes, use the „To company code“ field in addion. © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 7
  • 8. Once you have executed transaction MMPV a log message appears: Note: You can see the result of period closing if you execute transaction OMSY again. 4.2. Automatic Scheduling First, shift the period in your system to the current calendar month. (as explained in step 4.1). To automate period closing please do the following: Step 1 of 6 (Select Program) First of all, start transaction SE38: Enter RMMMPERI as pro- gram name, then hit button „variants“: © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 8
  • 9. Step 2 of 6 (Create Variants) Enter a name of your choice (e.g. „UCCPERI“) as variant and click on „Create“. Step 3 of 6 (Maintain Variant) 1 Enter company code range. 3 2 Leave these fields empty as they are dynamically 1 set once the program is started. 2 3 Finally, click on “Attri- butes“. © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 9
  • 10. Step 4 of 6 (Set Variant Attributes) 4 1 3 2 1 First, enter any description for your variant in field „Meaning“. 2 Now, scroll down to the end of the table. 3 In column “Selection variable“, hit [F4] and select “D“ for dynamic date calculation. In column “Name of Variable (Input only using F4)“ select „First day of current month“.. 4 Then, click on „Copy Screen Asignments“. 5 Save your modifications! A success message appears in the status bar: © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 10
  • 11. Step 5 of 6 (Schedule the Background Job) Go back twice to the view „ABAP Editor: Initial Screen“. Start the program in the background as shown in the screenshot below: 2 01.12.2008 1 3 4 1 Click on “Schedule“. 2 Please enter a random job name. 3 Define target date for period closing. It will be executed automatically. 4 Finally, click on „Schedule periodically“ © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 11
  • 12. Select a monthly periodicity for your job: After hitting the green checkmark, a success message should appear in the status bar: Hit „Back“ multiple times until you reach SAP Easy Access Menu. © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 12
  • 13. Step 6 of 6 (Verify Job Scheduling) Verify now your job scheduling using transaction code SM37: Insert here the assigned job name (see page 11). Enter name of user who scheduled this job or an asterisk (*) as wildcard. Choose an appropriate period. Additionally, mark job status “Sched.“ Now you can find the scheduled job by accessing the job overview: © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 13
  • 14. 5. Post Depreciation Runs Typically, a monthly update of depreciation (FI-AA module) is rarely needed in the UCC environment. However, if you need to post depreciation runs on a monthly basis, please use the optional part of our fiscal year change tutorial (you can find in the members area of the UCC website at www.sap-ucc.com). In case of need, the mid-year procedure is effected in the same way. 6. Settle CO Objects to Profitability Analysis In practice, cost objects are settled to profitability analysis monthly. At the same time, values for unfinished products are forwarded to financial accounting (where applicable). Although important in practice this task is not necessary in SAP teaching because • the accurate amount of operating profit is not relevant in most curricula, or • the settlement of cost objects has already been carried out by the user running through the case study. Now, all periodic activities on monthly basis have been completed. Taking into account teaching specifics, the only procedure necessary for month-end closing is the period closing procedure itself. As shown in this tutorial, it can be automated in your SAP ERP system. Hopefully our tutorial helped you conduct the period closing in your SAP system. If you have any suggestions on this tutorial or problems which you can not solve on your own, our help is available through the following communication channels: UCC Magdeburg: 0700 - SAPHCCMD or uccsupport@ucc.uni-magdeburg.de UCC Munich: 0700 - SAPHCCTU or uccsupport@in.tum.de Thank you for your attention! Your SAP UCC teams in Magdeburg and Munich © 2009 SAP-UCC UCC Tutorial on Period Closing – SAP ERP 6.0 | 14